Employment Land Audit 2016/17 Aberdeen City Council Aberdeenshire Council

Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

Employment

Land

Audit

2016/17 Aberdeen City Council Aberdeenshire Council

Page 2: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

Employment Land Audit 2016/17 A joint publication by Aberdeen City Council and Aberdeenshire Council

Executive Summary 1 1. Introduction 1.1 Purpose of Audit 5

2. Background 2.1 Scotland and North East Scotland Economic Strategies

and Policies 6 2.2 Aberdeen City and Shire Strategic Development Plan 7 2.3 Aberdeen City and Aberdeenshire Local Development Plans 8 2.4 Employment Land Monitoring Arrangements 8 3. Employment Land Audit 2016/17 3.1 Preparation of Audit 10 3.2 Employment Land Supply 10 3.3 Established Employment Land Supply 11 3.4 Constrained Employment Land Supply 12 3.5 Marketable Land Supply 13 3.6 Immediately Available Land Supply 14 3.7 Under Construction 14 3.8 Employment Land Supply Summary 15 4. Analysis of Trends 4.1 Employment Land Take-Up and Market Activity 16 4.2 Office Space – Market Activity 17 4.3 Industrial Space – Market Activity 18 4.4 Trends in Employment Land 18 Appendix 1 Glossary of Terms

Appendix 2 Employment Land Supply in Aberdeen and map of Aberdeen City Industrial Estates

Appendix 3 Employment Land Supply in Aberdeenshire Appendix 4 Aberdeenshire: Strategic Growth Areas and Regeneration Priority Areas

Appendix 5 Historical Development Rates in Aberdeen City & Aberdeenshire and detailed description of 2016/17 completions

December 2017

Page 3: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

1

Executive Summary Purpose and Background The Aberdeen City and Shire Employment Land Audit provides up-to-date and accurate information on the supply and availability of employment land in the North-East of Scotland. The audit has been produced by officials of Aberdeen City and Aberdeenshire Councils and the Strategic Development Planning Authority (SDPA). The 2016/17 Audit has a base date of 1st April 2017. You can also view the Employment Land Audit document on the councils’ websites: www.aberdeencity.gov.uk/localdevelopmentplan www.aberdeenshire.gov.uk/council-and-democracy/statistics/Economy

Established Supply Between April 2016 and April 2017 the established land supply increased in the City by 6% bringing the total to 286ha. Over the past year, 3.4ha have been completed in the established supply and currently 12ha is under construction. Aberdeenshire has seen a small net decrease of 1% to 551ha. Over the past year, 14.2ha have been built out and a further 8.5ha are under construction, although of this about 5ha remain under construction for a second year .

Constrained Supply There has been no change in the constrained supply for Aberdeen City between April 2016 and April 2017, remaining at 64ha for a second year, which equates to 22% of its established supply . In Aberdeenshire, the constrained supply has increased by 17% over the same period to 253ha, meaning that 46% of the established supply in the Shire is constrained. In general, the relatively high amount of constrained supply in both authorities can be explained by the fact that some of the larger Local Development Plan (LDP) allocations with more complex infrastructure requirements are realistically expected to come forward in the medium rather than short term.

Marketable Supply In Aberdeen City, the marketable land supply has seen a net increase of 9% between April 2016 and April 2017 to 223ha, of which 52ha are classed as immediately available. In Aberdeenshire, there was a net decrease of 13% in the marketable supply over the year to 298ha, of which 65ha are classed as immediately available. Various sites have been taken up over the year, largely in the vicinity of Aberdeen, while others have entered the marketable supply.

Page 4: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

2

The Strategic Development Plan requirements for employment land supply are as follows:

60ha of marketable land available in Aberdeen City

60ha of marketable land available in the Strategic Growth Areas of Aberdeenshire

At least 20ha of this marketable land to be suitable for high quality business use/company headquarters

The targets for the supply of marketable employment land in both Aberdeen City and Aberdeenshire continue to be significantly exceeded and the overall employment land supply provision is generous. Over 20ha of the total marketable land available is considered suitable for high quality business use and/or company headquarters. Figure 1: Employment Land Supply Aberdeen City and Shire, 2016/17

Market Activity 1 Figure 2 below shows the dramatic fall in the price oil towards the end of 2014 from over $100 per barrel to below $40 per barrel in early 2016. In the 2016/17 financial year prices have increased slightly and remained steady closer to $50 per barrel. It is hoped that ongoing price stability at above $50 per barrel, together with the vast reduction in operating costs achieved over the last two years, will result in a return to viability and a gradual recovery for North Sea oil.

1 Published Sources: Knight Frank Aberdeen Office Market Activity Report Spring 2017 ; Ryden 80th Scottish Property Review April 2017, Ryden 81st Scottish Property Review October 2017

0

100

200

300

400

500

600

700

Aberdeen City Aberdeenshire

Hecta

res

Marketable (ha) Constrained (ha)

Established 286ha

Established 551ha

Page 5: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

3

Figure 2: Europe Brent Crude Price January 2010 – September 2017

Source:eia.gov (US Energy Information Administration)

Looking back over 2016/17, there remained a steady take up of employment land in Aberdeenshire, despite the continuation of low oil prices. In contrast, there has been a significant drop in the rate of development in the City over 2016/17. In the past three years, City completions had been in excess of 15ha per annum compared to only 3.4ha in 2016/17. Currently 12ha is under construction on one site at Rowett North for the Aberdeen Exhibition Conference Centre and a hotel. Several of the previously completed sites in the City are yet to be occupied. Over the period there has continued to be a significant increase in the supply of both vacated secondary stock and excess space in new build premises that is no longer required , causing supply to outstrip demand in both the industrial and office markets. Speculative building over the past year has been very minimal because of the challenging market conditions. In the City, the new build activity has taken place on allocated business and employment sites at Prime Four, Kingswells and Altens East & Doonies. In addition large, high quality office developments have recently been completed on brownfield sites in the city centre (Liberty House and The Silver Fin office developments), and the Marischal Square development on Broad Street (high quality office, retail and leisure space) is to be completed towards the end of 2017. Aberdeenshire development has largely comprised of industrial/warehouse units fairly close to the City at Portlethen, Marywell, Westhill, Kintore and Inverurie. Development elsewhere in Aberdeenshire over the past year has been very limited.

$0

$20

$40

$60

$80

$100

$120

$140Jan-2010

May-2010

Sep-2010

Jan-2011

May-2011

Sep-2011

Jan-2012

May-2012

Sep-2012

Jan-2013

May-2013

Sep-2013

Jan-2014

May-2014

Sep-2014

Jan-2015

May-2015

Sep-2015

Jan-2016

May-2016

Sep-2016

Jan-2017

May-2017

Sep-2017

US

Do

llars

pe

r B

arre

l

Page 6: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

4

Issues for the Future While Aberdeen City and Shire continues to recognise the importance of the area as a centre of excellence for the global energy industry, it is recognised that the challenge now is to broaden the economy away from dependence on North Sea oil , particularly in view of the current downturn in the oil and gas sector. Significant investment is taking place in a variety of infrastructure, business, cultural and leisure projects with a view to strengthening the overall economy of the North East. The Aberdeen Western Peripheral Route and duelling of the Balmedie to Tipperty section of the A90 is expected to be completed in 2018. This will significantly improve road links from the south to the north and west of Aberdeen City and beyond into Aberdeenshire. There are several significant projects currently underway to enhance the appeal of Aberdeen city centre, such as the Marischal Square development, Broad Street improvements, the Art Gallery Redevelopment and the Music Hall refurbishment. Elsewhere, the Oil and Gas Technology Centre Innovation Hub was opened in Aberdeen in 2017, the new Aberdeen Exhibition and Conference Centre at Bucksburn is due to complete in 2019, and work has recently started on the Aberdeen Harbour Expansion Project which is expected to complete in 2020. The rate at which land is transformed from the marketable to the immediately available supply, and the subsequent building out of this land, will be determined larg ely by market forces. Within Aberdeen City and the nearby Aberdeenshire towns, market forces remain closely linked to the fortunes of the oil and gas industry. A prolonged downturn in the oil price will undoubtedly have an adverse effect on the rate of employment land take up. The majority of recent completions or developments under construction were likely to have been committed to prior to the downturn. It is known that the business rates liability can be one of the obstacles currently affecting both the viability of new build development taking place and the incentive to refurbish existing stock. Following the Barclay Review of non-domestic rates in Scotland, a number of measures were announced by the Scottish Government in September 2017 to boost economic growth through relief from business rates. In particular it has been announced that from 1 April 2018, business rates will not be payable on a new build commercial property until a new business tenant has been secured, and the tenant will benefit from one year without having to pay rates. In particular it removes the risk of vacant rates for speculative new build development for developers and is expected to attract occupiers for new offices or industrial properties. While this may encourage new build development in some parts of Scotland, it is considered unlikely that this measure alone will make a difference in the North East, where other factors such as low rental levels, high ground lease rents and a lack of market confidence are holding back development at present. Land ownership can also be a significant constraint to the development of employment land, particularly if the land is owned by a developer for whom office and/or industrial space is not a priority compared to housing. The two local authorities have seen delivering employment space within large new developments as a vital part of ensuring mixed and sustainable communities. However, within Aberdeenshire in particular, the employment land element of these mixed use allocations in the LDP has been slow to progress in the short to medium term. Aberdeenshire also faces the issue of limited demand and a subsequent low take up of employment land allocations in rural areas and the north compared to sites within settlements close to Aberdeen.

Page 7: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

5

1. Introduction

1.1 Purpose of Audit

1.1.1 The Aberdeen City and Shire Employment Land Audit has been prepared to bring together into one source an up-to-date document with accurate information on the supply and availability of employment land in the North East of Scotland.

1.1.2 The audit is used to monitor the policies and proposals relating to employment land in

the Strategic Development Plan (SDP) and the Aberdeen City and Aberdeenshire Councils’ Local Development Plans (LDP). In addition, the information provided in the audit assists in the preparation of economic strategy and policy making and in the implementation of action plans, and may highlight areas where further research and analysis is required. The audit is also of interest to companies, developers and other organisations with a requirement for, or interest in, employment land in the North East of Scotland

1.1.3 Officials of Aberdeen City and Aberdeenshire Council together with the Strategic

Development Planning Authority have prepared the audit. Reference is also made to relevant information and research from the private sector. This has helped ensure the provision of a robust and comprehensive source document for employment land supply to assist in delivering the future prosperity of the North East of Scotland.

Page 8: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

6

2. Background

2.1 Scotland and North East Scotland Economic Strategies and Policies

2.1.1 The Scottish Government Economic Strategy, published in 2015, sets out the broad agenda for the Government’s focus on Scotland’s economy . The aim is for a more cohesive and resilient economy that improves the opportunities, life chances and wellbeing of every citizen. It identifies four strategic priorities:

Investment in people, infrastructure and assets

Promote inclusive growth

Foster a culture of innovation

Enable Scotland to take advantage of international opportunities

2.1.2 The Scottish Government adopted the National Planning Framework 3 (NPF3) in June 2014. The NPF3 sets out the Government’s development priorities over the next 20 to 30 years. The NPF3 has significant implications for the development of employment land in Aberdeen City and Shire. The Aberdeen Harbour expansion and improvements to Aberdeen Airport are included as National Developments. NPF3 also reinforces the importance of infrastructure provision, particularly improvement to transport links, such as the Aberdeen Western Peripheral Route, and major energy-related projects.

2.1.3 NPF3 highlights the potential for both Aberdeen and Aberdeenshire to apply their energy sector and offshore strengths to the development of renewable and clean energy technologies. Aberdeen is focusing on strengthening its role as Scotland's northern gateway and broadening its economic base.

2.1.4 In early 2016 the Aberdeen City Region Deal was awarded funding by the UK and Scottish Governments of £250 million over the next 10 years to improve infrastructure in the region and attract employment opportunities. 2 Aberdeen City and Aberdeenshire Councils will work in partnership with the private sector led economic development agency, Opportunity North East (ONE), which has replaced ACSEF (Aberdeen City and Shire Economic Future). ONE will focus on diversifying oil and gas, tourism, food and drink, and life sciences to create a sustainable economic future for the area. A provisional Regional Economic Strategy was published in December 2015 to support the City Region Deal and establishment of ONE. It aims to ensure a long term commitment to maintain and grow the economy across the North East of Scotland through four key strands: investment in infrastructure, innovation, inclusive economic growth and internationalisation.

2.1.5 Aberdeenshire Council Economic Objectives 2017-2021 sets the key priorities of investment in infrastructure, innovation, inclusive economic growth and internationalisation. The report plans how Aberdeenshire Council will promote an “Open for Business” message and work to support delivery of the Regional Economic Strategy. In addition, a New Regeneration Strategy for Aberdeenshire was approved in March 2016 called “From Strategy to Action: Developing Excellence in our North Coast Communities” - this sets out revised proposals for the regeneration of the north coast towns of Fraserburgh, Banff, Macduff and Peterhead.

2 An additional £254 million was committed by the Scottish Government in parallel with the City Region Deal.

Page 9: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

7

2.1.6 The Energetica project aims to highlight attractive development propositions on residential and commercial sites along the A90 corridor from Bridge of Don and the airport in Aberdeen City, through Ellon, to Peterhead in Aberdeenshire.

2.1.7 The Scottish Government’s planning policy for economic development is set out in Scottish

Planning Policy (SPP) published in June 2014. The SPP requires Councils to allocate sites that meet the diverse needs of different sectors and sizes of business and to take a flexible approach, allowing changing circumstances to be accommodated and new opportunities to be realised.

2.1.8 Planning authorities should ensure that there is a range and choice of marketable sites and

locations for businesses allocated in development plans, including opportunities for mixed use development, to meet anticipated requirements and a variety of size and quality requirements. Marketable land should meet business requirements, be serviced or serviceable within 5 years, be accessible by walking, cycling and public transport, and have a secure planning status. The SPP states that business land audits should be undertaken regularly to monitor sites within the existing business land supply and to inform reviews of development plans. This audit provides a useful tool to measure performance against some of the requirements of Scottish Planning Policy and the Strategic Development Plan (see paragraph 2.2.1 below).

2.2 Aberdeen City and Shire Strategic Development Plan

2.2.1 The Aberdeen City and Shire Strategic Development Plan was approved by Scottish Ministers in March 2014. The plan, which sets out a strategic framework for the management of land in the North East up to 2035, requires the Aberdeen and Aberdeenshire Local Development Plans to identify land for business and industrial uses throughout the plan periods.

2.2.2 Specific employment land allowances are stated for the four identified strategic growth areas:

Aberdeen City

Aberdeen to Peterhead

Aberdeen to Huntly

Aberdeen to Laurencekirk There is also flexibility for Aberdeenshire Council to determine an appropriate mechanism for 'local growth and diversification' areas. Business and industrial development rates are to be monitored to ensure continuity of employment land supply. In this respect the audit contributes to the monitoring requirements of the Strategic Development Plan.

2.2.3 The targets under the Economic Growth Objective of the Strategic Development Plan include:

To make sure there is at least 60ha of marketable land available to businesses at all times in a range of places within Aberdeen City

To make sure there is at least 60ha of marketable land available to businesses at all times within the strategic growth areas in Aberdeenshire

For at least 20ha of the above land available to businesses in the strategic growth areas to be of a standard which will attract high-quality businesses or be suitable for company headquarters

Page 10: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

8

2.3 Aberdeen City and Aberdeenshire Local Development Plans

2.3.1 The Aberdeen City and Shire Strategic Development Plan 2014 seeks to provide opportunities

which encourage economic development and create new employment in a range of areas that are both appropriate for and attractive to the needs of different industries. In turn, Local Development Plans for Aberdeen City and Aberdeenshire are required to identify employment land allocations and identify strategic reserve land to meet this objective.

2.3.2 The new Aberdeen Local Development Plan was adopted in January 2017 and aims to maintain

a generous supply of employment land to ensure Aberdeen retains its position as a competitive and sustainable business location. In order to meet the diverse needs of different types of businesses, a range of allocations have been identified of varying sizes and locations. This will also ensure the Planning Authority is well equipped to manage future proposals efficiently and effectively during the Plan period.

2.3.3 The new Aberdeenshire Local Development Plan was adopted in April 2017. The plan

promotes an ‘open for business’ approach and considers the development of business as being very important to the economic health of the region. It supports the development of business and sustainable economic growth in all areas by taking account of the economic benefits of a proposed development when making decisions in development management.

2.3.4 The new and existing employment land sites allocated in the Aberdeen City and

Aberdeenshire Local Development Plans 2017 are included in the Employment Land Supply tables that can be found in Appendices 2 and 3. In addition, several previously allocated employment sites have now been removed from the 2017 plans and no longer appear in the audit. The audit supports the monitoring requirements of the two Local Development Plans.

2.3.5 Aberdeen City Council approved the City Centre Masterplan and Delivery Programme in June

2015, which focuses on improving the quality of the environment in the city centre and developing cultural and recreational facilities to create a more vibrant social scene. There is also scope for attracting more tourists to the city and expanding the service sector, including financial services. The city's role as a regional media centre is promoted by the Masterplan. This will provide a base from which to build a larger creative sector which supports jobs and businesses, and improves the perceptions of Aberdeen.

2.4 Employment Land Monitoring Arrangements 2.4.1 The audit is a record of the employment land supply in Aberdeen City and Shire at a

given date. It shows the supply of marketable land as required by SPP. Significant non-allocated brownfield development sites which have been granted consent for use classes 4, 5 or 6 have also been considered. It does not provide information on the range and size of individual plots within new employment areas, nor does it provide detailed information on vacant land within existing, completed sites . Aberdeen City Council additionally publishes a Development Activity Report, which monitors the development of new Class 4 (business) uses in the City.

Page 11: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

9

2.4.2 Further information on properties and sites in Aberdeen City and Aberdeenshire is available from the following sources:

1. The 2016-2017 Aberdeen Industrial Areas Guide:

http://www.aberdeencity.gov.uk/tourism_visitor_attractions/tourists_visitors/statistics/stt_Home.asp

2. The Aberdeenshire Business and Industrial Areas Guide 2014 http://www.aberdeenshire.gov.uk/council-and-democracy/statistics/Economy/ 3. The 2016 Scottish Annual Vacant and Derelict Land Survey (published April 2017): http://www.gov.scot/Publications/2017/04/3409

4. The Aberdeen Vacant and Derelict Land Survey 2016 Report http://www.aberdeencity.gov.uk/nmsruntime/saveasdialog.asp?lID=75978&sID=18949 5. Scottish Assessors Grampian Valuation Roll: http://www.saa.gov.uk/grampian/gvjbvalroll.html 6. Aberdeen Development Activity Report

http://www.aberdeencity.gov.uk/nmsruntime/saveasdialog.asp?lID=74210&sID=18949

Page 12: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

10

3. Employment Land Audit 2016/17

3.1 Preparation of Audit

3.1.1 The audit is prepared from information gathered by officials from both Councils, through their monitoring of planning approvals and individual site inspections. The information is kept up-to-date throughout the year and the status of s ites checked and reviewed prior to publication. A meeting of the Employment Land Working Group was held on 9 November 2017 to agree the figures contained in the audit and to discuss issues relating to the delivery of employment land in the region. The base date for the published data is 1 April 2017, and the period monitored is 1 April 2016 to 31 March 2017. (Up until 2009, the base date for the audit had been 1 January each year and the period monitored covered a calendar year.)

3.2 Employment Land Supply

3.2.1 Several categories of land supply are identified in the audit. Appendix 1 provides a list of definitions used for these categories. Information on established, constrained, marketable and immediately available employment land supply is given in full in Appendices 2 and 3. The information has been divided by area (Aberdeen City and Aberdeenshire. Aberdeenshire is further divided by Administrative Area and settlement - see Figure 1). It includes details of site area and location, developer, constraints and servicing status. Appendix 4 presents the information for Aberdeenshire by strategic growth areas and regeneration priority areas. Appendix 5 contains information on historical employment land take-up rates in Aberdeen City and Aberdeenshire, together with an additional table which provides a description of the type and size o f development that has taken place in the past year. Figure 2 - Aberdeen City and Aberdeenshire Map

Cruden Bay

BUCHAN

Strichen

Maud Mintlaw

Peterhead

KINCARDINE AND MEARNS

Stonehaven

Inverbervie

Johnshaven

St Cyrus

Fettercairn

Laurencekirk

Portlethen

Newtonhill

FORMARTINE

Newburgh

Ellon

Turriff

Fyvie

Oldmeldrum

MARR

Huntly

Rhynie

Alford

Banchory

Torphins

Aboyne Ballater

Braemar

BANFF AND BUCHAN

Gardenstown

Rosehearty Fraserburgh

Macduff Banff Portsoy

Whitehills

Aberchirder

GARIOCH

Newmachar

Inverurie Kemnay

Kintore

Westhill

Insch

Aberdeen City

Based on Ordnance Survey mapping. © Crown copyright reserved. Aberdeenshire Council 0100020767 2009.

Aberdeenshire part of Cairngorms National Park

Page 13: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

11

3.3 Established Employment Land Supply

3.3.1 The established employment land supply for Aberdeen City and Aberdeenshire is shown in Figure 3.

Figure 3 - Established Employment Land Supply April 2016 and April 2017

Employment Area 2016 2017 Change

Aberdeen City 269 286 6%

Aberdeenshire 558 551 -1%

TOTAL 827 837 1%

3.3.2 In Aberdeen City the level of established land supply has seen a net increase of 6%

between April 2016 and April 2017 to 286ha. Over the past year 3.4ha have been completed and 12ha are currently under construction for the new Aberdeen Exhibition and Conference Centre and an associated hotel . The Marischal Square development in the city centre is also yet to be completed. There have been no new identifications of employment land, and no additions have been made to the existing areas.

3.3.3 In Aberdeenshire there has been a small net decrease of 1% in the established land

supply between 2016 and 2017 to 551ha. Completions in the past year covered 14.2 hectares and a further 8.5 hectares were under construction as at April 2017, although of this about 5ha remain under construction for a second year . The majority of take up has been on sites close to the City at Westhill, Portlethen, Kintore and Marywell, although limited development has also taken place slightly further afield in Inverurie and Ellon.

3.3.4 Take up of quality land for new build development for the energy industry in Aberdeen

has continued in Aberdeenshire through 2016 and early 2017 at a rate close to the 10 year average despite the continuation of low oil prices, concentrated on sites in or around Aberdeen. However, the level of sites currently under construction appears low, suggesting that completions will fall next year. There has been a significant drop in completions in Aberdeen City from 15.3ha in 2015/16 to 3.4ha in 2016/17 due to the present over supply of office developments, many of which have not been fully occupied. There is only one site under construction but this is expected to change over the next few years as certain mixed use sites which include Class 4 uses are expected to come forward.

Page 14: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

12

3.4 Constrained Employment Land Supply

3.4.1 Land that is subject to constraints in Aberdeen City and Aberdeenshire is shown in Figure 4.

Figure 4 - Constrained Employment Land Supply April 2016 and April 2017

Employment Area 2016 2017 Change

Aberdeen City 64 64 0%

Aberdeenshire 217 253 17%

TOTAL 281 317 13%

3.4.2 There has been no change in the constrained land supply for Aberdeen City between

April 2016 and April 2017, remaining at 64ha for a second year, which equates to 22% of its established supply. The constrained supply takes into account allocations within the Aberdeen LDP which do not currently have a Development Framework or Masterplan or are unlikely to see significant progression in the near future. The figure also takes into account employment land allocations within larger mixed use land release sites such as Grandhome and Loirston. The employment land within such allocations will likely be delivered at a later stage of the overall development and is therefore designated as constrained within this audit.

3.4.3 The amount of constrained land in Aberdeenshire increased by 17% to 253ha, and now

makes up 46% of its established supply. A number of LDP sites are regarded as constrained, either because they do not yet have agreed masterplans or because the planned phasing means the employment land element is not expected come forward within five years of the base date of the audit , and so they are not classed as currently marketable. Other sites have significant infrastructure issues to overcome.

Page 15: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

13

3.5 Marketable Land Supply 3.5.1 The marketable land supply in 2017 is shown in Figure 5. These figures count land

which is both immediately available and land which is not immediately available but does not face any major constraints to development and could come forward within 5 years

Figure 5 - Marketable Land Supply April 2016 and April 2017

Employment Area 2016 2017 Change

Aberdeen City 205 223 9%

Aberdeenshire 341 298 -13%

TOTAL 546 521 -5%

3.5.2 The marketable land supply in Aberdeen City has increased from April 2016 to April 2017 by a net amount of 9% to 223ha. This is largely due to sites around Aberdeen Airport which have now entered the marketable supply. In Aberdeenshire there has been a net decrease of 13% in the supply of marketable land, as some sites have been taken up and further information on the phasing of several sites indicates that development of the employment land is unlikely to start in the next 5 years.

3.5.3 The supply of marketable land in Aberdeen City and key Aberdeenshire settlements remains generous with a wide choice of sites currently available. Aberdeen City and Aberdeenshire continue to have an adequate choice and supply of marketable land, following both Councils having adopted their new Local Development Plans in 2017, and exceed the requirement for the supply of marketable employment land in the Strategic Development Plan.

3.5.4 The requirement in the Strategic Development Plan for at least 20ha of the total

marketable supply in the strategic growth areas to be of a standard that will attract high quality businesses or be suitable for company headquarters has also been met. In Aberdeen City there are over 16ha at Prime Four, Kingswells available for high quality business use. In Aberdeenshire sites have been allocated specifically for high quality business use/company headquarters at both Inverurie and Chapelton. In addition, other sites in and around Aberdeen have attracted high quality business development, such as City South, Portlethen and the business parks in the vicinity of Aberdeen Airport.

3.5.5 Demand for land in Aberdeenshire tends to be in those settlements concentrated around

Aberdeen City such as Westhill, Marywell, Kintore and Portlethen. As a result, employment land in these areas tends to be taken up more quickly while large allocations of land in the north of Aberdeenshire are taken up at a much slower rate.

Page 16: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

14

3.6 Immediately Available Land Supply 3.6.1 The immediately available land supply for 2017 is shown in Figure 6. This is marketable

land that currently has planning permission or a secure planning status, is serviced and has no major constraints to immediate development.

Figure 6 - Immediately Available Land Supply April 2016 and April 2017

3.6.2 The supply of immediately available land in Aberdeen City has increased by 13% to 52ha in April 2017 as a result of existing land which has been serviced and is awaiting development at Prime Four Business Park, as per the approved masterplans.

3.6.3 In Aberdeenshire there has been a net decrease of 7% in the supply of immediately

available land to 65ha as sites have been taken up. Much of the immediately available land is concentrated relatively close to Aberdeen at Westhill, Portleth en, Ellon, Banchory and Oldmeldrum, but there are also a number of sites in other areas of Aberdeenshire, such as Macduff, Peterhead and Fraserburgh.

3.6.4 Overall some 44% of all immediately available land is currently located within Aberdeen

City and 56% within Aberdeenshire. 18% of the established supply of land in Aberdeen City is immediately available compared with 12% in Aberdeenshire, reflecting the stronger demand in the City. Over two thirds (47ha) of the immediately available land in Aberdeenshire is situated within an 18 mile radius of Aberdeen.

3.7 Under Construction

3.7.1 Land under construction is not included in the above categories, as it is neither available nor considered as developed. On completion it will, however, be reflected in the historical development rates for next year’s audit . Land under construction is identified in Appendices 2 and 3 of the Audit. At April 2017 there were 12ha of employment land under construction in Aberdeen City and 8.5ha of land under construction in Aberdeenshire, about 5ha of which remains under construction for a second year .

Employment Area 2016 2017 Change

Aberdeen City 46 52 13%

Aberdeenshire 70 65 -7%

TOTAL 116 117 0%

Page 17: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

15

3.8 Employment Land Supply Summary 3.8.1 Figure 7 gives a summary of the amount of land in Aberdeen City and Aberdeenshire

which falls into each of the supply categories. NB: The Established Land Supply column represents the total supply of land in the corresponding area. The marketable supply includes land which is both immediately available and that which is not considered to be immediately available, but does not face any constraints to it coming forward within the next five years. Therefore the immediately available column reflects the proportion of marketable land which is serviced and awaiting development.

Figure 7 - Employment Land Supply Summary April 2017

0

100

200

300

400

500

600

Aberdeen City Aberdeenshire

Hecta

res

Established

Constrained

Marketable

Immediately Available

Under Construction

Page 18: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

16

4. Analysis of Trends3

4.1 Employment Land Take-Up and Market Activity 4.1.1 In 2016/17, 14.2ha of employment land was developed in Aberdeenshire, broadly in line with an

average development rate of 14.8ha per year for the previous 10 years. A further 8.5ha are currently under construction (April 2017), although of this about 5ha remain under construction for a second year. In Aberdeen City, 3.4ha of land has been completed over the past year, below an average development rate of around 8ha per annum for the previous 10 years, and significantly below the average over the past 3 years which has been around 15ha per annum. In addition, only one large site is reported to be under construction in the City as at April 2017.

4.1.2 Over the period April 2016 to March 2017 the price of Brent Crude fluctuated between $42 and

$55 per barrel and has remained close to $50 in more recent months. This is a steadier picture than the previous financial year (2015/16) when there was greater fluctuation between $30 and $64. However, there remains a huge contrast with the period from 2011 to late 2014 when price levels were consistently over $100 per barrel (See Figure 12). Over the past two years the oil and gas industry has sought to vastly reduce operating costs, which has resulted in significant job losses and a reduced demand for accommodation. However, it is hoped that the recent signs of more stability in the industry will lead to a gradual recovery.

4.1.3 Despite the continued low oil price, a steady level of employment land take up has continued for new build developments in Aberdeenshire on sites relatively close to the City. Oil and gas industry occupiers will often prefer good quality, purpose built new space, and take advantage of current favourable lease terms and incentives for the tenant.

4.1.4 Within Aberdeenshire the majority of the new build development has taken place or is under construction on LDP employment land sites at Westhill, Portlethen, Marywell, and Kintore. At Westhill there has been continued expansion of the Kingshill Commercial Park and Silvertrees Business Parks at Arnhall, but at a slower pace than previous years. At Portlethen there has been further expansion at Badentoy North, where the construction of an access road has opened up land to the north of the Badentoy Industrial Estate. At Marywell there has been some expansion to the Gateway Business Park in the north and the commencement of the Cairnrobin Business Park close to the A90. Development of the first phase of Midmill Business Park at Kintore is complete, and a large office/workshop premises is close to completion on the adjacent Kintore East site. In contrast, there has been only a very small amount of employment land take up in the regeneration areas of Fraserburgh, Peterhead, Macduff and Banff in the north of Aberdeenshire.

4.1.5 In Aberdeen, limited new build development has taken place on the LDP employment land sites towards the edges of the city at Altens East /Doonies and Prime Four. However, there are also a number of high quality office developments on brownfield sites in the city centre that have been recently completed or are currently under construction. These sites had not been previously counted in the marketable supply:

3 Published Sources: Knight Frank Aberdeen Office Market Activity Report Spring 2017 ; Ryden 80th Scottish Property Review April 2017; Ryden 81st Scottish Property Review October 2017

Page 19: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

17

Figure 8: Brownfield Sites Aberdeen City

Address Development Site Size Status

Liberty House, Palmerston Place (North Dee Business District)

Offices 2,900 sq m

0.12 hectares Completed 2016/17

Marischal Square, Broad Street

Mixed use including 16,264sq.m offices

0.9 hectares Under construction

The Silver Fin, 445-461 Union Street

Offices 12,300 sq m

0.23 hectares Completed 2016/17

4.2 Office Space – Market Activity

4.2.1 Reports from local agents show that the office market in Aberdeen and the North East region continues to be affected by the relationship between oil price and economic activity. The recent stability of the oil price in the region of $50 per barrel together with the reductions achieved in operating costs has seen a return to viability for the industry and some signs of this improvement are slowly filtering through to the property sector. However, total office supply in Aberdeen has again increased over the past six months and was estimated at just under 269,400 sq.m in April 2017, an increase of 7% - Grade A stock accounts for a high proportion of 41% of this total. The view of local agents is that there will be a considerable time lag before there will be any impact on the supply figure.

In Aberdeen City, major office development The Silver Fin, has completed this year and the Marischal Square development is due to be completed towards the end of 2017. Prime rents on developments of this type are reported not to have fallen but tenants are being offered very generous lease incentives in order for transactions to complete. A trend has been noted whereby some firms are downsizing from traditional office properties to new, efficient city centre accommodation with the attraction of incentives and flexible leases, further increasing the oversupply in the secondary market. This continued situation where the supply of office space in and around Aberdeen significantly exceeds demand contrasts with the situation before the fall in oil prices in 2014, when there was soaring demand from occupiers and a lack of stock. The oversupply of Grade A office space in particular can also be attributed to new developments committed to prior to the downturn in the oil and gas industry being delivered into a much weaker occupier market. However, the construction of new accommodation is still seen as important to Aberdeen maintaining its leading position as an energy hub in the future. Figure 9 below shows both the increase in supply of office space and the fall in take up over the past three years as a result of the downturn in the oil industry. With such significant levels of good quality new and second hand office stock available in prime locations, there is likely to be an impact on the building of new office developments over the next few years and a slowdown in the take up of employment land for office use in and around Aberdeen.

Page 20: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

18

Figure 9: Aberdeen Office Supply and Take Up

Source: Ryden, 80th Property Review, pg9, April 2017

4.3 Industrial Space – Market Activity 4.3.1 Local agents reports indicate that the industrial market in and around Aberdeen continues to

experience difficult and challenging times, despite the improved oil price. However, the market outlook for industrial space is considered slightly more positive than that of office space at present. Supply has significantly increased by 95% over the past year, from 85,560 sq.m in April 2016 to 167,282 sq.m in April 2017 (Ryden) and still far outstrips demand. Rental levels have remained stable for new build and good quality stock, but have reduced for second hand stock with occupiers seeking a better deal and landlords wishing to avoid becoming liable for vacant business rates. Some developers have continued with limited speculative industrial development projects in Aberdeen and the near vicinity and a number of occupiers have moved to these new build properties because they provide good quality industrial accommodation that better suit their requirements. For example, some recently built units at Gateway Business Park, Aberdeen and Kingshill Commercial Park, Westhill have been successfully let and the developers here have proceeded with some further speculative build in 2016/17. However, this is not expected to continue until those presently available have been taken up, and greater market confidence returns.

4.4 Trends in Employment Land

4.4.1 Figure 10 shows that Aberdeenshire had dominated the take-up of employment land up

to 2012/13. However, this changed over the next 3 years with substantial rates of take up in Aberdeen City where rapid development has taken place on many of the large employment sites allocated in the LDP. Most recently, take up of employment land can be seen to have dropped back significantly in the City during 2016/17 and it is likely to fall further as there is only one site reported as currently under construction. However, this is expected to change over the next few years as mixed sites with employment uses come forward. Overall, take up in Aberdeenshire has remained relatively steady which might be expected to continue despite the low oil prices, particularly on sites in close

Page 21: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

19

proximity to Aberdeen. NB: The monitored period for the Employment Land Audit changed from a calendar year to April-March in 2009.

Figure 10: Employment Land Development Rates 2006-2016/17

4.4.2 Figure 11 shows that both Aberdeenshire and Aberdeen City had a steady amount of

marketable land supply up until the Structure Plan of 2009 and the release of land through the subsequent adoption of the two LDPs in 2012, when the supply of marketable land increased significantly. The totals are expected to remain fairly steady at this higher level in the near future, as some sites allocated by the LDPs are developed and subsequently replaced by the progression of other sites into the marketable supply. However, a reduction in new build construction as a result of the prolonged downturn in the oil and gas industry over the past two years, particularly in the City, will result in fewer marketable sites coming forward and existing sites being taken up at a slower rate. The increase in marketable supply from 2016 to 2017 highlighted in Aberdeen City is due to 17.15ha that has now been added to the supply in the Aberdeen Airport area. Aberdeenshire shows a slight fall in the marketable supply since 2012 as sites have been taken up and some LDP allocations have moved into the constrained supply as they are not now expected to come forward in the short to medium term.

Figure 11: Trends in Marketable Employment Land in Aberdeen City and Shire 2006-2017

0

5

10

15

20

25

2006 2007 2008 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17

He

cta

res

YearAberdeen City Aberdeenshire

0

100

200

300

400

500

600

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

Hecta

res

Years

Aberdeen City Aberdeenshire Aberdeen City & Aberdeenshire

Page 22: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

20

4.4.3 Figure 12 below shows the dramatic fall in the price of Brent Crude during late 2014 from over $100 per barrel to a level in the region of $50 over 2016/17 where it has remained relatively stable. In response, the rate of take up of employment land in Aberdeen City has reduced over the past year, now that sites which had commenced before the downturn in oil prices have been largely built out. However, the take up in Aberdeenshire for industrial uses on sites close to the City has been relatively steady and in line with the 10 year average.

Figure 12: Europe Brent Crude Price January 2010 – September 2017

Source:eia.gov (US Energy Information Administration )

$0

$20

$40

$60

$80

$100

$120

$140

Jan-2010

May-2010

Sep-2010

Jan-2011

May-2011

Sep-2011

Jan-2012

May-2012

Sep-2012

Jan-2013

May-2013

Sep-2013

Jan-2014

May-2014

Sep-2014

Jan-2015

May-2015

Sep-2015

Jan-2016

May-2016

Sep-2016

Jan-2017

May-2017

Sep-2017

US

Do

llars

pe

r B

arre

l

Page 23: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

21

Appendix 1: Glossary

Brownfield Sites Land which has been built on or used in the past for some development purpose. Brownfield land does not include private or public gardens, sports pitches, woodlands or open spaces used for leisure and recreation purposes. The grounds of institutions (such as schools and hospitals) that are no lo nger used are not considered as brownfield sites. Brownfield sites have only been included in the audit where planning permission has been granted for employment land use on sites above 0.1 hectares in size. Constrained Employment Land Supply (Const) This includes land for example, that has planning difficulties, land subject to ownership difficulties (e .g. multiple ownership/unwilling sellers), land subject of local plan objections, land with insufficient infrastructure provision, etc. This category therefore includes much of the land in the Established Employment Land Supply that is not Marketable (see below). Development Rates These refer to the sum of the net area of employment land that has been developed in a particular year. A site is considered to be developed once the first building has been constructed, even though further building may take place within the same site at a later date. Employment Land This includes land for general industrial and business/office use, storage and distribution uses, business parks and specialist technology parks including research and development uses. This comprises Classes 4 (Business), 5 (General Industrial) and 6 (Storage or Distribution) of the 1997 Town and Country Planning (Use Classes) (Scotland) Order, but is not exclusive to these uses. Established Employment Land Supply (Estab) This includes all undeveloped land that is allocated for industrial/business/employment use in finalised or adopted Local Plans or has a valid planning approval for these uses. Greenfield Sites

Sites which have never been previously developed, or are fully restored derelict land. Immediately Available Land Supply (Imm/Avail) This is marketable land that currently has planning permission or has a secure planning status, is serviced and has no other major constraints to immediate development. This definition is useful in the assessment of whether demand for land is being adequately met. Marketable Land Supply (Market) This is land that as well as meeting business requirements, has a secure planning status, can be serviced within 5 years, is accessible by walking, cycling and public transport as defined by SPP. It is incumbent on the two planning authorities to ensure that a supply of marketable land is available throughout their areas at any one time, as set down in the Str ategic Development Plan. Land that is restricted to Class 4 (Business) use only is cons idered marketable. Land that is held as 'option land' for existing companies' own expansion cannot be considered to be marketable. Net/Gross Figures In general net figures are used where it is known how the site is to be developed or where development of the site is in progress, which in some cases can be spread over a number of years . The net area is generally expressed as 80% of the gross site area to account for roads, landscaping etc. Net areas are also used for completions and sites under construction. LDP allocations that have yet to come forward

Page 24: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

22

have not been adjusted to a net area – this is done once further detail about the how the site is to be developed becomes available.

Serviced (Ser) The area of undeveloped land for which servicing has been provided either on the site itself or the wider site. Under Construction (UC) The area of land under construction but not yet complete. This land is not included within the land supply totals. Development Rates Development rates are shown in Appendix 5. Since the 2009 audit, the base date used has altered from a calendar year to April-March. Annual development rates shown in Appendix 5 since 2009 reflect the period 1 April of the year indicated to 31 March of the following year.

Page 25: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

APPENDIX 2: Employment Land Supply in Aberdeen City (all figures in hectares)

Location Developer Constraints Serviced Established Constrained Marketable (of which)

immediately available

Under Construction

Lochside/Newlands (Balmoral Business Pk)

Balmoral Group None Yes 2.2 0 2.2 2.2 0

Aberdeen Gateway Halladale Muir None Yes 2.4 0 2.4 2.4 0

Peterseat Forbes Development Ltd None Yes 8.6 0 8.6 8.6 0

Altens East & Doonies Aberdeen City Council / Esson Properties

None Part 8.2 0 8.2 8.2 0

Aberdeen Science & Energy Park

Scottish Enterprise Class 4 Only Yes 1.5 0 1.5 0 0

Aberdeen Innovation Park

Scottish Enterprise Class 4 Only Yes 3 0 3 0 0

Findlay Farm Aberdeen Science Parks LP Class 4 Only No 16.4 0 16.4 0 0

The Core Berryhill/Cloverhill

Private

No 68.4 0 68.4 0 0

Airport Dyce Drive Miller, Abstract, ABZ Development Ltd

Ownership & Infrastructure

Part 77.35 30.1 47.25 21.5 0

Dyce Drive 9 Dyce Avenue

Morley

Yes 1.1 0 1.1 1.1 0

Raiths, Dyce (Kirkton Drive)

Private

Yes 1.5 0 1.5 1.5 0

Wellheads West Private Noise & Height

Restrictions Yes 0.9 0 0.9 0.9 0

OP9 Grandhome Grandhome Trust

No 5 5 0 0 0

OP18 Craibstone North & Walton Farm

Private

No 1.5 1.5 0 0 0

OP19 Rowett North Private

No 34.5 0 34.5 0 12

Prime Four Drum

Part 16.5 0 16.5 5.9 0

OP33 Greenferns ACC

No 10

10 0 0 0

OP34 East Arnhall Private

No 1

1 0 0 0

OP38 Countesswells Countesswells Consortium

No 10

0 10 0 0

O48 Oldfold CALA

No 5

5 0 0 0

OP59 Loirston Private

No 11

11 0 0 0

Report Total 286.05 63.6 222.45 52.3 12

Page 26: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

Aberdeen City Industrial and Business Areas 2015-16 From Aberdeen City Council Industrial Areas Guide

Page 27: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

APPENDIX 3: Employment Land Supply in Aberdeenshire (all figures in hectares)

Site Ref No Location Settlement LDP 2017 Code

LDP 2012 Code

Main Developer Constraints Serviced Established Constrained Marketable

Total Imm

Available Under Const

Banff & Buchan

B/AB/E/001 Cornhill Road Aberchirder BUS BUS1 Part 1 0 1 0 0

B/FR/E/002 West Shore Fraserburgh BUS1 BUS1 Aberdeenshire Council Yes 0.27 0 0.27 0.27 0

B/FR/E/003b Chapelhill Rosehearty/ Watermill

Fraserburgh BUS3 BUS2 Private Infrastructure Part 10.13 10.13 0 0 0

B/FR/E/007 Fairney Business Park Fraserburgh BUS1 BUS1 Aberdeenshire Council Yes 1.18 0 1.18 1.18 0

B/FR/E/008 Phingask Fraserburgh OP3 E1 Private Physical, Marketability

No 16.5 16.5 0 0 0

B/FR/E/009 Kirkton Development Fraserburgh OP1 M1 Private Other No 4 4 0 0 0

B/IB/E/002 Inverboyndie- Phase 1 Inverboyndie BUS BUS1 Private Yes 1.4 0 1.4 1.4 0

B/IB/E/003 Inverboyndie- Phase 2 Inverboyndie BUS BUS1 Private No 1.4 0 1.4 0 0

B/MC/E/001 Buchan Road - East Macduff BUS BUS1 Aberdeenshire Council 0.9 0 0.9 0.9 0

B/MC/E/003 Tarlair Business Park Macduff BUS BUS2 Aberdeenshire Council Yes 5.3 0 5.3 5.3 0

B/MC/E/004 Buchan Road- West Macduff BUS BUS2 Private Ownership No 4.01 4.01 0 0 0

B/MC/E/005 Green Hills Macduff BUS E1 Private No 12 0 12 0 0

B/RH/E/001 South of Ritchie Road Rosehearty OP1 M1 Private Infrastructure No 2 2 0 0 0

Banff & Buchan Total: 60.09 36.64 23.45 9.05 0

Buchan

U/AD/E/001 Land at Nether Backhill Ardallie OP1 M1 Private Physical No 0.3 0.3 0 0 0

U/AG/E/001 South of A948 Auchnagatt OP1 M1 Private No 0.5 0 0.5 0 0

U/CR/E/001 Land at Aulton Road Cruden Bay OP1 M1 Claymore Homes No 2 0 2 0 0

U/HT/E/001 East of A90 Hatton OP4 E1 A Wyness & Sons No 0.8 0 0.8 0 0

U/LG/E/001 Inverquhomery Road Longside BUS BUS1 Private No 1.2 0 1.2 0 0

U/LG/E/002 Land at Skinner Road Longside OP1 M1 Unknown Infrastructure, Other

No 1.7 1.7 0 0 0

U/ML/E/003 Newlands Road Mintlaw BUS1 BUS1 Claymore Homes Part 0.62 0 0.62 0.62 0.29

U/ML/E/005 Land at Nether Aden Mintlaw OP1 M1 Bancon Homes Other No 5 5 0 0 0

Page 28: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

U/PH/E/002 Balmoor Industrial Estate Peterhead BUS2 BUS2 Aberdeenshire Council Yes 0.81 0 0.81 0.81 0.93

U/PH/E/003 Dales Industrial Estate West

Peterhead BUS3 BUS3/BUS4 Aberdeenshire Council Part 8.75 1.91 6.84 2.06 0

U/PH/E/004a Dales Industrial Estate East

Peterhead BUS3 BUS4 Private Part 1.71 0 1.71 1.71 0

U/PH/E/005a Damhead/Upperton Industrial Estate North

Peterhead BUS3 BUS4/BUS6 Private Part 2.76 0 2.76 0 0

U/PH/E/006 Energetica Industry Park (Upperton Ind Est)

Peterhead BUS3 BUS6/BUS7 Scottish Enterprise No 16.6 0 16.6 0 0

U/PH/E/007 Wellbank (North) Peterhead BUS3 BUS5 Score Group Ltd Other Part 26.9 9.9 17 0 0

U/PH/E/008 Burnside Business Park Peterhead Private Part 0.37 0 0.37 0.37 0

U/PH/E/009 Waterside (Inverugie Meadows)

Peterhead OP1 M1 Private Other No 4 4 0 0 0

U/PH/E/010 Land at Wellbank (South) Peterhead OP6 E1 Score Group Ltd Part 7.75 0 7.75 0 0

Buchan Total: 81.77 22.81 58.96 5.57 1.22

Formartine

F/BA/E/001 Land at Balmedie South Balmeddie OP1 M1 Aberdeenshire Council Other No 5 2.5 2.5 2.5 0

F/BD/E/001 Land at Blackdog Blackdog OP1 M1 Private Infrastructure, Other

No 4 4 0 0 0

F/CT/E/001 Cuminestown Industrial Estate

Cuminestown BUS BUS1 Aberdeenshire Council Marketability, Other

No 0.54 0.54 0 0 0

F/EL/E/005 Balmacassie South Ellon BUS BUS1 Yes 4.23 0 4.23 4.23 0.11

F/EL/E/006 Balmacassie Ellon OP4 E1 Private No 9 0 9 0 0

F/EL/E/007 Cromleybank Ellon OP1 M1 Scotia Homes Other No 2 2 0 0 0

F/FV/E/001 South of Westfield Farm Foveran OP1 M1 Harper & Cochrane Ltd No 2 0 2 0 0

F/FV/E/002 South of Turin Way Foveran OP3 E1 Private No 1.5 0 1.5 0 0

F/NB/E/002 Loanhead Phase 2 Newburgh BUS BUS1 Private No 1.96 0 1.96 0 0

F/NB/E/007 West of Airyhall Newburgh OP1 M1 Private No 0.8 0 0.8 0 0

F/OM/E/003b Oldmeldrum Business Park/ Meadows Industrial Estate

Oldmeldrum BUS BUS1 Private Part 3.2 0 3.2 3.2 0

F/OM/E/005 West of Coutens Park Oldmeldrum OP2 M2 Private Other No 4.2 4.2 0 0 0

F/PM/E/001 Milldale East Pitmedden BUS2 BUS2 Private Ownership, Infrastructure

No 1.58 1.58 0 0 0

F/RO/E/002 Rothienorman West Of B9001

Rothienorman BUS BUS1 Private Marketability No 1.22 1.22 0 0 0

F/RR/E/001 West of Rashiereive Cottages

Rashiereive OP1 E1 Private No 2 0 2 0 0

Page 29: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

F/TF/E/001 Markethill North Turriff BUS1 BUS1 Aberdeenshire Council Yes 0.2 0 0.2 0.2 0

F/TF/E/004 East Of Markethill Industrial Estate

Turriff BUS1 BUS1 Private No 2.02 0 2.02 0 0

F/TF/E/005 South Of Markethill Road Turriff BUS1 BUS1 Ownership Yes 0.67 0.67 0 0 0

F/TF/E/007 North east of Markethill Industrial Estate

Turriff OP3 E1 Private No 1 0 1 0 0

F/TF/E/008 East of Markethill Industrial Estate

Turriff OP4 E2 Private No 1.7 0 1.7 0 0

F/TF/E/009 Broomhill Road/Markethill Industrial Estate

Turriff OP5 E3 Private No 4.5 0 4.5 0 0

F/TF/E/010 Adjacent to Wood of Delgaty

Turriff OP1 M1 Private Other No 10 10 0 0 0

F/TV/E/003 The Grange Tarves OP1 M1 Private Other No 3 3 0 0 0

F/US/E/001 Woodlea East Udny Station OP1 M1 Private Ownership No 1 0 1 0 0

F/WP/E/001 West Pitmillan West Pitmillan OP1 E1 Private No 3.1 0 3.1 0 0

Formartine Total: 70.42 29.71 40.71 10.13 0.11

Garioch

G/BB/E/004 Blackburn Business Park Blackburn BUS BUS Private Part 0.61 0 0.61 0.61 0.3

G/IS/E/005 Insch Business Park, Muiryheadless

Insch BUS BUS Aberdeenshire Council Yes 2.13 0 2.13 2.13 0.24

G/IS/E/006 South Of Insch Business Park

Insch BUS BUS Private Ownership No 2.2 2.2 0 0 0

G/IS/E/007 North of Insch Business Park

Insch OP4 E1 Private No 5 0 5 0 0

G/IV/E/005c Port Elphistone North Inverurie BUS10 BUS6 Private Contamination No 2.5 2.5 0 0 0

G/IV/E/008 Highclere Business Park Inverurie BUS3 BUS3 Private Yes 0.6 0 0.6 0.6 0

G/IV/E/012 Inverurie Town Centre Inverurie OP2 M2 Private/Aberdeenshire Council

Other No 0.5 0.5 0 0 0

G/IV/E/013 Crichie Inverurie OP11 E1 Crichie Dev Ltd/Dandara Infrastructure No 19 19 0 0 0

G/IV/E/014 Adj to Axis Business Centre

Inverurie OP12 E2 ANM Group Ltd No 1.5 0 1.5 0 0

G/IV/E/015 Thainstone Inverurie OP13 E3 ANM Group Ltd No 10 0 10 0 0

G/IV/E/016 Port Elphinstone Central Inverurie BUS6 BUS7 Kilbride Resources Ltd No 2.5 0 2.5 0 0

G/IV/E/017 Crichiebank Business Centre

Inverurie BUS5 BUS5 Private Part 0.6 0 0.6 0 0

G/IV/E/018 Kirkwood Commercial Park, Thainstone

Inverurie OP16 Kirkwood Investments Ltd

Yes 1.7 0 1.7 1.7 0

G/KM/E/002 Quithie Road Kemnay BUS1 BUS1 Private Ownership No 4.3 4.3 0 0 0

Page 30: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

G/KM/E/004 Fyfe Park Kemnay BUS2 BUS2 Private Part 2.8 0 2.8 0 0

G/KS/E/001x Kingseat Kingseat BUS1 Private Land Use Part 1 1 0 0 0

G/KT/E/002 Kintore - Midmill North Kintore BUS3 BUS3 Private Yes 0.9 0 0.9 0.9 0

G/KT/E/002b Kintore North/Bridgend Kintore BUS2 BUS2 Private Physical No 5 2.5 2.5 0 0

G/KT/E/003b Kintore Business Park Kintore BUS1 BUS1 Private Yes 0.6 0 0.6 0 0

G/KT/E/004 Kintore East Kintore OP1 M1 Malcolm Allan Yes 0 0 0 0 4.9

G/KT/E/005 Kintore South Kintore OP5 Other No 6 6 0 0 0

G/MB/E/003 Land at Millbank Crossroads

Millbank OP1 M1 Cluny Estates Infrastructure No 1.3 1.3 0 0 0

G/NM/E/003 Land at Redwood Cottage Newmachar OP3 E1 Kirkwood Homes No 5 0 5 0 0

G/WH/E/007 Arnhall/Silvertrees Business Parks

Westhill BUS BUS Chap Construction Yes 0.95 0 0.95 0.95 0

G/WH/E/008 Arnhall Gateway Westhill OP2 E1 Westhill Dev Co Ltd Yes 5.65 0 5.65 5.65 0

G/WH/E/009 Former Blockworks Site, Straik Road

Westhill Private Yes 0.86 0 0.86 0.86 0

Garioch Total: 83.2 39.3 43.9 13.4 5.44

Kincardine & Mearns

K/AU/E/001 East of Glenfarquhar Rd Auchenblae OP1 M1 Kincardineshire Investment Co

Other No 1 1 0 0 0

K/CH/E/001 Chapelton - New Settlement

Chapelton OP1 M1 Elsick Dev Co Ltd No 11.5 0 11.5 0 0

K/DL/E/001 Adj Bowling Green Drumlithie OP1 M1 Peterkin Homes Ltd Land Use No 0.5 0.5 0 0 0

K/EW/E/001 Newesk Edzell Woods OP1 M1 Carnegie Base Services Marketability, Infrastructure

No 68.7 67 1.7 1.7 1.7

K/GD/E/001 Linton Business Park Gourdon BUS BUS Aberdeenshire Council Yes 1.29 0 1.29 1.29 0

K/GD/E/002 East of Linton Business Park

Gourdon OP1 E1 Private No 3 0 3 0 0

K/LK/E/004 Mart Site West, Market St Laurencekirk Aberdeenshire Council Yes 0.11 0 0.11 0.11 0

K/LK/E/005 North Laurencekirk Laurencekirk OP1 M1 Kirkwood Homes Infrastructure No 11 11 0 0 0

K/LM/E/001 The Chapel Luthermir OP1 M1 Private Other No 0.25 0.25 0 0 0

K/LM/E/002 Land at Aberluthnott Church

Luthermuir OP2 M2 Private Other No 0.25 0.25 0 0 0

K/MK/E/001 West of Marykirk Marykirk OP1 M1 Private No 0.5 0 0.5 0 0

K/MW/E/006 Cairnrobin Marywell BUS BUS Private Other Part 56.7 37 19.7 0 0

Page 31: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

K/NH/E/001 West Monduff Farm Newtonhill BUS BUS A&D Developments (Scotland) Ltd

No 6.65 0 6.65 0 0

K/NH/E/002 Land to West of A90 Newtonhill OP2 E1 Private No 12.1 0 12.1 0 0

K/PL/E/004 Badentoy Industrial Estate Portlethen BUS1 BUS1 Badentoy Developments Ltd

Yes 6.9 0 6.9 0.4 0

K/PL/E/005 City South Business Park Portlethen BUS2 BUS2 Dandara Part 10.6 0 10.6 10.6 0

K/PL/E/008 Land to NW of Badentoy Portlethen OP1 E1 Private No 6.5 0 6.5 0 0

K/PL/E/009 Fairview Portlethen OP2 E2 Private No 7 0 7 7 0

K/SC/E/001 Roadside Adjacent A92 St Cyrus OP1 M1 Private No 2 0 2 0 0

K/ST/E/003 East Newtonleys Stonehaven BUS2 BUS2 Bancon Developments No 11.31 0 11.31 0 0

K/ST/E/004 East Newtonleys Stonehaven OP5 E2 Bancon Developments No 7 0 7 0 0

K/ST/E/005 Redcloak Stonehaven BUS3 E1 Private No 1 0 1 0 0

Kincardine & Mearns Total: 225.86 117 108.86 21.1 1.7

Marr

M/AB/E/004 Land to the west of Tarland Road

Aboyne OP1 M1 Private Land Use No 1 1 0 0 0

M/AF/E/002b Land at Wellheads Alford OP2 M2 Kirkwood Homes No 1 0 1 0 0

M/AF/E/003 School Campus Site Alford OP1 M1 Aberdeenshire Council Ownership Yes 1.2 1.2 0 0 0

M/BN/E/002 Hill Of Banchory Banchory BUS1 BUS1 Bancon Developments Yes 5.9 0 5.9 4.3 0

M/BN/E/003 Burn O'Bennie Banchory BUS2 BUS2 Bancon Developments No 2.21 0 2.21 0 0

M/BN/E/004 Lochside of Leys Banchory OP2 M2 Private Other No 2 2 0 0 0

M/HT/E/002 Steven Road Huntly BUS2 BUS2 RB Farquhar Yes 0.88 0 0.88 0.88 0

M/HT/E/004a Deveron Road Huntly BUS1 BUS1 Private No 1.75 0 1.75 0 0

M/HT/E/005 Mart Huntly BUS3 BUS3 Private No 3.28 0 3.28 0 0

M/HT/E/006 Adj Linnorie Huntly OP6 E1 Private No 4.5 0 4.5 0 0

M/KM/E/001 Opposite School Kennethmont OP3 E1 Private No 0.6 0 0.6 0 0

M/KN/E/001 Land at Haugh Farm Kincardine O'Neil

OP1 M1 Private Other No 0.4 0.4 0 0 0

M/KN/E/002 Willowbank Kincardine O'Neil

OP4 E1 Ownership No 0.8 0.8 0 0 0

M/LD/E/002 Lumsden Lumsden BUS BUS Private No 0.3 0 0.3 0 0

Page 32: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

M/MF/E/001 Muir Of Fowlis Muir of Fowlis BUS BUS Private No 0.3 0 0.3 0 0

M/RN/E/001 Rhynie Richmond Avenue East

Rhynie BUS BUS Aberdeenshire Council Yes 0.18 0 0.18 0.18 0

M/RN/E/002 Land north of Richmond Avenue

Rhynie OP1 M1 Private Other No 0.6 0.6 0 0 0

M/TL/E/002 Glendeskry Tarland OP1 M1 Private Other No 1 1 0 0 0

M/TP/E/001 Station Garage Torphins OP1 BUS Private No 1.22 0 1.22 0 0

Marr Total: 29.12 7 22.12 5.36 0

Report Total: 550.46 252.46 298 64.61 8.47

Page 33: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

APPENDIX 4: Strategic Growth Areas and Regeneration Priority Areas (all figures in hecatres) Strategic Growth Area Established Constrained

Marketable Total

Immediately Available

Under Construction

Ellon-Blackdog 32.83 8.5 24.33 6.73 0.11

Peterhead-Hatton 70.45 15.81 54.64 4.95 0.93

Total 103.28 24.31 78.97 11.68 1.04

Huntly-Pitcaple 19.74 2.2 17.54 3.01 0.24

Inverurie-Blackburn 52.01 30.5 21.51 3.81 5.2

Total 71.75 32.7 39.05 6.82 5.44

Portlethen-Stonehaven 137.26 37 100.26 18 0

Sth of Drunmlithie-Laurencekirk 11.11 11 0.11 0.11 0

Total 148.37 48 100.37 18.11 0

Aberdeen HMA Local Growth 37.6 15.38 22.22 10.66 0

Rural HMA Local Growth 189.46 132.07 57.39 17.34 1.99

Total 227.06 147.45 79.61 28 1.99

Report Total 550.46 252.46 298 64.61 8.47

Regeneration Priority Area Established Constrained

Marketable Total

Immediately Available

Under Construction

Regeneration Priority Area 127.84 52.45 75.39 13.1 0.93

Outwith Regeneration Priority Area

422.62 200.01 222.61 51.51 7.54

Report Total 550.46 252.46 298 64.61 8.47

Page 34: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

Appendix 5: Development Rates in Aberdeen City 2005 - 2016/17 NB: The monitored period for the Employment Land Audit changed from a calendar year to April-March in 2009

SITE LOCATION 2005 2006 2007 2008 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17

1. Altens - - - 3.0 - - - - - 0.9 - -

2. Altens East - - 0.6 2.4 2.3 - 0.8 - - - - 2.7

3. East Tullos/Redmoss - - - - - - - - - - - -

4. Lochside/Newlands - - - - - - - - 1.9 - 1.9 -

5. Peterseat - - 2.4 2.4 - - - - - - - -

6. Wellington Road 0.7 - - - - - - - - - - -

7. West Tullos - - - - - - - - - - - -

8. Aberdeen Gateway

1.9 1.9 - - 7.8 2.1 - -

Sub Total 0.7 - 3.0 7.8 4.2 1.9 0.8 - 9.6 3.0 1.9 2.7

9. Links Road - - - - - - - - - - - -

10. Mastrick - - - - - - - - - - - -

11. Northfield - - - - - - - - - - - -

12. St Machar - - - - - - - - - - - -

13. Kingswells (Prime Four) - - - - - - - - 6.8 6.8 6.6 0.7

Sub Total - - - - - - - - - - - 0.7

14. Bridge of Don - - - - - - - - - - - -

15. Denmore - - - - - - - - - - - -

16. Newton of Murcar - - - - - - - - - - - -

17. Aberdeen Energy Park - 0.2 - 1.4 1.8 - 0.7 - - - - -

18. Aberdeen Innovation Park - - - - 1.3 - - - - - - -

Sub Total - 0.2 - 1.4 3.1 - 0.7 - 6.8 6.8 6.6 -

19. Dyce Drive (Morley) - - - 3.8 - - - - - - - -

20. Airport South West (Dyce Drive) - - - - - - - 0.8 0.6 6.1 6.8 -

21. Farburn/Stoneywood - - - - - - - - - - - -

22. Kirkhill - - - 0.9 - - - - - - - -

23. Mugiemoss Road - - - - - - - - - - - -

24. Pitmedden Road - - - - - - - - - - - -

25. Pitmedden Road East - - - 0.8 - - - - - - - -

26. Raiths - - - - - - 0.6 - - - - -

27. Wellheads - - - - - 0.9 - - - - - -

28. Wellheads West - - - - - - - - - - - -

Sub Total - - - 5.5 - 0.9 0.6 0.8 0.6 6.1 6.8 -

TOTALS 0.7 0.2 3.0 14.7 7.3 2.7 2.1 0.8 17.0 15.9 15.3 3.4

Page 35: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

Appendix 5: Development Rates in Aberdeenshire 2005 - 2016/17 (all figures in hectares)

NB: The monitored period for the Employment Land Audit changed from a calendar year to April-March in 2009

Site Location 2005 2006 2007 2008 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17

Balmedie 0 0.54 0 0 0 0 1.22 0 0 0 0 0

Banchory 0 0 0 0 0.63 3.26 0.93 0 0 0.1 0 0.1

Blackburn 0 0 0 0 0 0 0 0.76 2.13 0.35 0 0

Boyndie 0 0 0 0 0.78 0 1.94 3.29 0 3 0 0

Ellon 0.43 0 5.63 0 0 1.79 1.38 1.86 2.18 0 1.1 1.07

Fraserburgh 0 0 0 0 0 0 0 0 2.96 0.85 1.32 0

Gourdon 0 0 0 0.44 0 0 0 0 0 0 0 0.24

Huntly 0 5.5 0 0 0 0 0 0.61 0 0 0 0.68

Insch 0 0 0.66 0 0 0 0.47 0.67 0 0.23 0 0

Inverurie 1.43 1.15 1.33 0 0 0 0 0.9 0 0 0 1.95

Kintore 0.24 0 1.12 0 2.7 0 7.79 2.06 2.99 1.48 0.95 1.16

Laurencekirk 0 0.08 0 0 0.4 0 0 0 0 0 0.15 0

Macduff 0.2 0 0 0 0 0 0.21 0 0 0 0.43 0

Marywell 0 0 3.2 1.27 0 2.36 0.28 0.28 0 0 0.62 4.23

Mintlaw 0 0 0 0 0 0 0 0.31 0 0 0 0

Newburgh 0 0 0.78 0.46 0.15 0 0.24 0 0 0 0 0

Oldmeldrum 1.46 0.36 0 0 0 0 0.31 2.81 1.9 0 0.4 0

Peterhead 4.99 0 0.2 0.65 0.1 0 1.44 1.09 0 2.81 0 0.28

Portlethen 0.8 10.6 1.2 0 0.7 0 0 0 0.39 4.32 3 3.1

Turriff 0.17 0 0 1.53 0 0 0 0 0 0 0 0

Westhill 0.91 4.1 0.6 14.71 3.12 0.32 2.5 2.71 1.53 2.96 1.05 1.4

Report Total: 10.63 22.33 14.72 19.06 8.58 7.73 18.71 17.35 14.08 16.1 9.02 14.21

Page 36: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

Details of Aberdeen City and Aberdeenshire Completions 2016/17

Site Ref Site Name Settlement Plot

Size (h) Planning Permission Description

Building size (sq m)

U/PH/E/001 Blackhouse Industrial Estate Peterhead 0.28 2008/4002 6 industrial units 705

G/IV/E/008 Highclere Business Park Inverurie 0.65 2014/3979 Warehouse and office building 3049

G/IV/E/018 Kirkwood Commercial Park, Thainstone (Plot 16) Inverurie 1.3 2014/1994 Warehouse and office building 3458

G/KT/E/004 Kintore East (Site N) Kintore 1.16 2015/3773 Office/workshop/warehouse/yard 697

G/WH/E/007 Arnhall/Silvertrees Business Parks (Site 7) Westhill 0.6 2015/3777 Office and industrial building 1962

G/WH/E/008 Arnhall Gateway (Unit 1) Westhill 0.4 2016/1875 Office/warehouse buildings 1727

G/WH/E/008 Arnhall Gateway (Unit 2) Westhill 0.4 2014/1065 Office/warehouse buildings 1440

K/GD/E/001 Linton Business Park Gourdon 0.24 2015/3496 Office building 250

K/MW/E/006 Cairnrobin (Cairnrobin Business Park Plot 6) Marywell 2.8 2015/2192 Workshop/office/yard 1279

K/MW/E/007 Gateway Business Park (Site E8) Marywell 0.73 2015/0715 Industrial/office building 1348

K/MW/E/007 Gateway Business Park (Site E7) Marywell 0.7 2015/0714 Industrial/office building 1348

K/PL/E/004 Badentoy Industrial Estate (North) Portlethen 0.7 2015/0507 Recycling centre 21

K/PL/E/004 Badentoy Industrial Estate (North) Portlethen 1.6 2015/1755 Warehouse/office/wash bay/yard 3979

K/PL/E/004 Badentoy Industrial Estate (North) Portlethen 0.8 2016/0943 Warehouse/office/yard 864

M/BN/E/002 Hill of Banchory Banchory 0.1 2014/1537 Self Service Car Wash 116

M/HT/E/002 Steven Road Huntly 0.68 2014/4383 Workshop and Office 1106

F/EL/E/005 Balmacassie South Ellon 1.07 2015/0144 HWRC (Temporary office) 23

Liberty House, Palmerston Place (North Dee Business District) Aberdeen City 0.12 131844 Class 4 office space 2931

The Silver Fin, Union Street Aberdeen City 0.23 131135 Class 4 office space 12319

Lloyds Register, Prime Four Aberdeen City 0.7 150113 Class 4 office space 10792

ACC - Waste Management Centre Aberdeen City 2.7 150432 Recycling Facility, Refuse Fuel plant, Office, 10260

Page 37: Publications - Employment Land Audit 2016/17publications.aberdeenshire.gov.uk/dataset/85402573-8685... · 2017. 12. 5. · Marketable Supply In Aberdeen City, the marketable land

Aberdeen City and Shire

Strategic Development

Planning Authority (SDPA)

Woodhill House

Westburn Road

Aberdeen

AB16 5GB

Aberdeen City Council

Enterprise, Strategic

Planning and Infrastructure

Marischal College Broad

Street

Aberdeen

AB10 1AB

Aberdeenshire Council

Planning and Building

Standards

Woodhill House

Westburn Road

Aberdeen

AB16 5GB