Marriott Residence Inn at Johns Hopkins Medical Campus Baltimore, MD Project Schedule Narrative Project Activities: Site Improvements & Underground Utilities: Base course installation of valet parking lot Back of House/Lobby: Overhead Rough – In in progress Permanent back of house lighting installation underway Lobby Ceiling hard lid ceilings in progress Back of House Kitchen Tile installation in progress Fire Pump and Controller assembly in progress Retail: Construction of elevators 4 and 5 in progress Tower: Overhead Rough-In in progress In-Wall Rough-In in progress on upper levels 3 Bank Elevator construction in progress - Construction Elevator Cab in operation Exterior Metal Panel installation in progress along North fin Tape and Finish of dry wall in progress through Level 5 Guestroom Millwork on lower levels delivered and installation in progress Prime Coat for wall coverings on lower guestrooms. Upcoming Activities: Site Improvement & Underground Utilities: Installation of topping slab at Porte Cochere Installation and relocation of Street Lights Site Pavers and Hardscape scheduled for mid April Asphalt along Madison Exterior EIFS installation on West Elevation Installation of Exterior Storefront Doors Tower: Exterior Ornamental Handrail on Balcony Installation of Nanawall Interior: Guestroom Tile and Flooring installation Guestroom Carpet installation Installation of Mincey Marble shower basins

Project Schedule Narrative - Chesapeake Regional Center · • Installation of Mincey Marble shower basins . Created Date: 4/12/2017 9:35:49 AM

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Schedule Narrative - Chesapeake Regional Center · • Installation of Mincey Marble shower basins . Created Date: 4/12/2017 9:35:49 AM

Marriott Residence Inn at Johns Hopkins Medical Campus

Baltimore, MD

Project Schedule Narrative

Project Activities:

Site Improvements & Underground Utilities:

• Base course installation of valet parking lot

Back of House/Lobby:

• Overhead Rough – In in progress

• Permanent back of house lighting installation underway

• Lobby Ceiling hard lid ceilings in progress

• Back of House Kitchen Tile installation in progress

• Fire Pump and Controller assembly in progress

Retail:

• Construction of elevators 4 and 5 in progress

Tower:

• Overhead Rough-In in progress

• In-Wall Rough-In in progress on upper levels

• 3 Bank Elevator construction in progress - Construction Elevator Cab in operation

• Exterior Metal Panel installation in progress along North fin

• Tape and Finish of dry wall in progress through Level 5

• Guestroom Millwork on lower levels delivered and installation in progress

• Prime Coat for wall coverings on lower guestrooms.

Upcoming Activities:

Site Improvement & Underground Utilities:

• Installation of topping slab at Porte Cochere

• Installation and relocation of Street Lights

• Site Pavers and Hardscape scheduled for mid April

• Asphalt along Madison

Exterior

• EIFS installation on West Elevation

• Installation of Exterior Storefront Doors

Tower:

• Exterior Ornamental Handrail on Balcony

• Installation of Nanawall

Interior:

• Guestroom Tile and Flooring installation

• Guestroom Carpet installation

• Installation of Mincey Marble shower basins