Project Reporting, Control, Evaluation and Risk Mgt

Embed Size (px)

Citation preview

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    1/22

    PROJECTREPORTING, EVALUATION

    ANRISKMANAGEMENT

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    2/22

    HOWPROJECTREPORTSSHOULDBE?

    Concise

    Accurate

    Match report to type of stakeholder it was intended

    to Use exception reporting

    Work within established thresholds

    Good reporting format; use graphs and other

    visuals if necessary Statement of purpose and action to be taken

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    3/22

    PROJECTMANAGEMENTPROVERB

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    4/22

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    5/22

    SCHEDULEBASELINEPLAN

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    6/22

    SUMMARY SCHEDULESTATUSREPORT

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    7/22

    SAMPLECOSTREPORT

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    8/22

    TYPESOFREPORTING

    Exception report

    Shows only major deviations rather than all deviations

    Percent complete

    Amount of work completed on a activity is expressed as

    a percent the total work required

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    9/22

    FREQUENT CHANGES COULD MEAN

    Frequent scope changes inadequate planning

    Weak management in the organization

    Trying to handle more work than resources

    available External events

    Change in external regulations

    New technologies

    New products or competitors

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    10/22

    CHANGECONTROL

    Formal process to manage proposed changes to

    the project plan

    Also called configuration management

    Necessary to manage potential effects on theproject budget, schedule and scope

    Protects the project from scope creep

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    11/22

    CONFIGURATIONMANAGEMENT

    Establish sops for submitting, evaluating, approvingand communicating changes

    Review change request with the project team

    Study alternative actions

    Approve or reject change or provide alternative

    solutions

    Communicate approved changes to all concern

    Document and track all changes and its effects on

    the project

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    12/22

    CHANGEREQUESTAPPROVALFORM

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    13/22

    CHANGECONTROLLOG Keep track of changes

    Determine why changes are made

    Justify changes to management

    Capture lessons learned for future projects

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    14/22

    Checkpoints to ensure project is on course

    Motivate team members, clients and customers

    Provide feedback

    WHATISPROJECTEVALUATION

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    15/22

    On going reviews Done by project team members

    Ensure that standards included in the scope statement is applied to

    the work

    Make sure that finances are being handled according to guidelines

    Periodic inspections

    Done by team leaders, supervisors and quality inspectors

    Ensure that project objectives are being met

    Predetermine what to inspect an at what frequency

    Milestone evaluations Done by the project manager

    Certify that all works required to be done for a particular phase are

    completed according to specifications

    WHENTOPERFORM

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    16/22

    Final audit Conducted at the conclusion of the project

    Verifies completeness and agreement of client or customer for

    the final product

    Provide information for project closure Gather an documents lessons learned for future projects

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    17/22

    Quality of work if according to specifications

    If quality of work has been maintained or compromised

    Team performance

    Conducted by pm, team members or independent auditors

    Determines if the team is performing as well as they can

    Basis of comparison

    Past performance

    Benchmarking

    CONSIDERATIONSINPROJECTEVALUATION

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    18/22

    Project status

    Compares planned with actual results variance

    analysis

    Special consideration must be given to the critical path

    and activities with high risk

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    19/22

    MANAGINGRISK

    Risks are uncertain events or conditions that could

    have positive or negative effect on the project

    objectives

    Risk identification

    Consider possible sources

    Determine likely risks

    Continuing risk identification

    Risk assessment

    Determine probability of occurrence

    Prioritize potential risks

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    20/22

    MAJORCATEGORIESOFRISK

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    21/22

    PRIORITIZINGPOTENTIALRISK

  • 7/27/2019 Project Reporting, Control, Evaluation and Risk Mgt

    22/22

    Possible responses to risk

    Avoiding eliminate the cause and prevent the riskfrom happening

    Transferring to a third party entering into a contract or

    getting an insurance coverage

    Mitigating steps taken to lower the probability of the

    risk happening

    Accepting