PROGAMA MINERO

Embed Size (px)

Citation preview

  • 8/13/2019 PROGAMA MINERO

    1/30

    microLYNX 98

    Lynx Mining Systems

    Cairns, Australia

  • 8/13/2019 PROGAMA MINERO

    2/30

    Behind the scenes ..

    Written for Windows 95/98 & NT4 in

    VB5, which produces fast nativemachine language programs using the

    C++ compiler.

    At the core is the fast and up to dateAccess database engine, compatible

    with latest MS Office products.

    Extensive use of our own ActiveXcomponents gives sound modularity to

    the system.

  • 8/13/2019 PROGAMA MINERO

    3/30

    Familiar Windows user interfaceStandard Windows menus, buttons, dialogs and context

    sensitive help provide a short learning curve.

  • 8/13/2019 PROGAMA MINERO

    4/30

    Familiar Windows user interface

    Clear dialogs with easy selection of data objects, display

    colours, line types, string types, even tool-tip help

  • 8/13/2019 PROGAMA MINERO

    5/30

    microLYNX

    system features

    Online

    reference

    manual in

    standard

    PDF format,clearly

    illustrated,

    with hyper-

    links torelevant

    sections

  • 8/13/2019 PROGAMA MINERO

    6/30

    A host of transfer functions to and from many other systems -

    including DXF, Surpac, Datamine, Micromine, ascii text files.

    microLYNX system features

  • 8/13/2019 PROGAMA MINERO

    7/30

    Simple to use and effective plot system provides interfaces

    to HPGL plotting or printing via any Windows printer

    microLYNX system features

  • 8/13/2019 PROGAMA MINERO

    8/30

    microLYNX system featuresVisualization subsystem embedded in main programs for

    instant access and easy scene construction

  • 8/13/2019 PROGAMA MINERO

    9/30

    Full OpenGL rendering of all native system data objects

    combines the power of Access with the power of OpenGL

    microLYNX system features

  • 8/13/2019 PROGAMA MINERO

    10/30

    Geologically oriented database setup with aliasing of

    table/field names so that databases can co-exist with

    external systems

    Sample Manager with powerful MS Access engine

  • 8/13/2019 PROGAMA MINERO

    11/30

    Easy data selection and manipulation of data objects

    Sample Manager with powerful MS Access engine

    User friendly

    query builder

  • 8/13/2019 PROGAMA MINERO

    12/30

    Many types of display/plot format with overlays and high

    quality final output to virtually any device that can plot

    Sample Manager with powerful MS Access engine

  • 8/13/2019 PROGAMA MINERO

    13/30

    Data is presented as geologically oriented, ie as holes,

    costeans, samples, views, but can also be accessed as

    low level database entities - tables, queries, fields

    Sample Manager with powerful MS Access engine

  • 8/13/2019 PROGAMA MINERO

    14/30

    Generates polygonal model directly from sample data

    with depth from sample flitch width or sample length

    Geology Manager models spatial objects

  • 8/13/2019 PROGAMA MINERO

    15/30

    Easy wireframe construction with 2/3D linking between

    sections and assistance from the visualizer subsystem

    Geology Manager models spatial objects

  • 8/13/2019 PROGAMA MINERO

    16/30

    Sub-divisible model cells and variation of cell sizes

    provide for good spatial resolution

    Resource Manager combines spatial and grade data

  • 8/13/2019 PROGAMA MINERO

    17/30

    Grade estimation techniques include Kriging and ISD with

    optional unfolding to a surface.

    Resource Manager combines spatial and grade data

  • 8/13/2019 PROGAMA MINERO

    18/30

    Selection, display and plotting of model elements

    provided by a combination of best industry components

    Resource Manager combines spatial and grade data

  • 8/13/2019 PROGAMA MINERO

    19/30

    Highly visual planning functions with flexible mineable

    reserves reporting

    Mine Plannerprovides interactive design/schedule

  • 8/13/2019 PROGAMA MINERO

    20/30

    Visual built-in Lerchs-Grossmann pit optimization with

    supplementary interfaces to Whittle 3D & 4D programs

    Mine Plannerprovides interactive design/schedule

  • 8/13/2019 PROGAMA MINERO

    21/30

    Visual string definition and editing functions include curve

    generation, bench generation, offsets, moving to files ..

    Survey Manager integrates all in 3D space

  • 8/13/2019 PROGAMA MINERO

    22/30

    Surface modelling functions (triangulation, gridding and

    contouring) handle virtually unlimited number of points

    Survey Manager integrates all in 3D space

  • 8/13/2019 PROGAMA MINERO

    23/30

    Volumes between surfaces computed by end area or

    directly from triangulated surfaces

    Survey Manager integrates all in 3D space

  • 8/13/2019 PROGAMA MINERO

    24/30

    Has the ability to interact with both current and design

    surfaces for better blast hole placement

    Blast Designer assists open cut drill & blasting

  • 8/13/2019 PROGAMA MINERO

    25/30

    With pre-split and/or trim blast generation and clear

    drilling pattern plots

    Blast Designer assists open cut drill & blasting

  • 8/13/2019 PROGAMA MINERO

    26/30

    Merges sampled blast hole data with digitized perimeters

    providing grade control plots and as mined information

    Grade Controlprovides a handle on mined areas

  • 8/13/2019 PROGAMA MINERO

    27/30

    KCGM - have ALL mining software - reserve model built in

    Datamine & Vulcan - but mine planning is by microLYNX

    microLYNX at work - Kalgoorlie

  • 8/13/2019 PROGAMA MINERO

    28/30

    Monitoring changes to ensure that water outflow cyanide

    remains below allowed concentrations

    Tailings dam cyanide study - Kalimantan

  • 8/13/2019 PROGAMA MINERO

    29/30

    Complete resource modelling and mine design project

    within medium/large sized open cut gold mine

    Getting it all together - Mindanao

    Complexgeology

    modelled

    using

    systemhierarchy

    Gold

    grades

    estimated

    by ISD &

    Kriging

    Optimum pit

    by Lerchs-

    Grossmann

    optimization

    function

    Practical

    pit design

    from LG

    theoretical

    template

    i i ll h i d

  • 8/13/2019 PROGAMA MINERO

    30/30

    Complete resource modelling and mine design project

    within medium/large sized open cut gold mine

    Getting it all together - Mindanao