PLANET AGILE 17E BPUG SEMINAR
www.bpug.nl
Bouwen zonder Bestek
Frank van de Kolk
2
www.bpug.nl 3
Others:
Saudi Arabia: 730 / China: 390 / South Africa: 340 / Switzerland: 290 / Singapore: 240 / India:
200 / Austria: 200 / Norway: 180 / Portugal: 160 / Poland: 130
Korea: 1,370
Australia: 3,600
UK: 8,200
Belgium: 950
Germany: 4,500
Spain: 2,100
Italy: 2,600
Netherlands: 2,000
USA: 2,200
Canada: 1,200
Brazil and rest of
Latin America: 660
France: 34,300
www.bpug.nl 4
Thales Hengelo • Land: 40 ha.
• Buildings: 90.000 m2
• Construction 1947-1985
• 5000 employees 1990
• 1600 employees current
www.bpug.nl 5
Plattegrond Thales
AFVALDEPOT
B5 B6 B7 B8 B9 B11 B12 B14 B15 B17 B18 W
V
E
Kantine Z
W
F
Repro
A3 A4 A5 A6 A7 A8 A9 A11 A12 A14 A15 A16 A17 A18 G
A0 A1 A2
hal expeditie
Overige ruimtes
Magazijn NORMA - Saffierstraat
- Automobielclub Signaal
Expeditie EPMZA
FA bovendeks T&I
Lege ruimte ILS
H17,5 Opslag"Witte hut"
N3
ZA : Vanaf 1 januari 2009 in beheer bij FA bovendeks tbv overhaul activiteiten
10-02-09: veel lege kisten en 1 hele grote (zitten kleinere kisten in), aantal binnenkort weer weg
komt geen ruimte vrij voor expeditie, alle ruimte benodigd voor overhaul
2 witte APA-bokken binnen en 1 groene buiten80% kantoor
overige ruimtes max 80m2, maar bezet
2,5 x 5,0
6,00 x 6,00
3,75 x 3,00
2 x 2
2,6 x 2,0
3,2 x 2 3,5 x 2,6
1,88 x 2,12 (+0,37)
1,84 x 2,10
7,00 x 7,00
2 x 2
2 x 2
2 x 2
2 x 2
3,57 x 3,907,7 x 9,0
3,5 x 2,62 x 2
1.125 m2h = 5,0m 1.125 m2 1.125 m2 1.750 m2
h = 5,0m
300 m2h = 3,5m
2.200 m2h = 5,0m
225 m2h = 7,7m
250 m2 + 100 m2 in
nissen
h = 5,0m
225 m2
600 m2h = 5,0m
1.350 m2
1.050 m2h = 2,2 m
Totaal hal Z: 4.400 m2
Totaal Hal WNoord: 2.250 m2Zuid: 2.390 m2
15m
75m
40m
7,00 x 7,00
1.100 m2h =
600 m2h = 5,0m
525 m2h = 5,0m
1.125 m2h = 5,0m
600 m2h = 5,0m
600 m2h = 5,0m
600 m2h = 7,7m
375 m2h = 5,0m
1.125 m2h = 5,0m
600 m2h = 5,0m
600 m2h = 5,0m
600 m2h = 5,0m
Totaal: 1.400 m2h = 9,5m
600 m2h = 2,2 m
600 m2h = m
7,7 x 9,0
5,0 x 4,0 5,0 x 4,0
3,56 x 4,0 3,56 x 4,0 5,0 x 4,15
3,25 x 5,0
3,25 x 5,0
7,0 x 6,89 3,25 x 4,88 3,25 x 4,883,25 x 4,88
3,25 x 5,0
2,400 m2h =
AKS: 150 m2
Saffierstraat hal 1: 1.000 m2
Balk: 400 m2(Museum)
Gieterij Oldenzaal: 1.150 m2
Externe opslag
15 m
15 m
2xSmart-L
41,25 m
600 m2h =
900 m2
150 m2h =
containers
Ponystal
Kantoor: 350 m2
Kantoor: 50 m2
Kantoor: 250 m2
Saffierstraat hal 2: 1.000 m2
• Logistic analyses/ design (Ergo design)
Facility figures: • Gas: Eur. 1 mln. / year
• Electricity Eur. 1.2 mln. / year
• Facility costs: Eur. 8 mln. / year
• Taxes , insurance, security…….
The inefficient history
www.bpug.nl 6
Objectives: • Focus on core high technologies and activities.
• Develop teamwork and exchange between skills in a work environment closer to external style of life.
• Return on invest by business efficiency and reduction of site running costs.
• Reduction of CO2
The Huygens Project • International project.
• Eur. 50 mln.
• Duration of 2 years. Mid. 2014 complete.
2011 2012 2013 2014
Time frame
Move & Close down
Tender & Contract
Specification & Design
Engineering & Construction
Gate
1
Gate
2
Gate
3
www.bpug.nl
Did you know:
that one of the biggest challenge for the Dutch High tech industry is to attract technical qualified personnel.
that China has the fastest grow in mobile communication.
that China can build a 17.000 m2 energy efficient building in less then a month.
7
www.bpug.nl 8
Scope
Park SFC Office BB&S Warehouse
Re-development
www.bpug.nl 9
www.bpug.nl 10
Investigated sustainable opportunities:
1. Solar Panels
1. Very low ROI 20+ years, not implemented
2. Heat/Cold Storage
1. Structure of the Soil is poor, not implemented
3. Led lighting
1. Glare factor for office environment is poor
2. Will be used in meeting environment
4. Rain water
1. Re-use for toilets very high ROI < 1 year implemented
5. Heat/Cold distribution between buildings
1. Profitable option, will be implemented with warmth pumps
6. Bio diversity
1. Campus park, restoring local biodiversity, win/win low maintenance
www.bpug.nl 11
New Buildings
Eur. 30 mln.
Thales Engineering & build contract
(including design responsibility & coordination)
Roads & Infra
Eur. 5 mln.
RAW bestek
Industrial refurbishment
Eur. 4 mln.
Thales building team contract
Kitchen
equipment Security
Facility
Management
Furniture
Landscape
www.bpug.nl 12
Realise Smart Working @ Thales (SW@T) Hengelo
and align within TNL
Smart Working:
“A commitment to modernize working practices, by moving away from the ‘command and control’ assumptions of traditional styles of
working about where, when and how work should be done. It’s about doing more with
less, working wherever, whenever and however is most appropriate to get the work done”
www.bpug.nl 13
Bricks**
Bits**
Behaviour (Branding) I-Change**
SW@T* Project
Which technologies are required?
* … **: peer-to-peer relation
What drives people? What is the cultural identity? Image?
Which places are required?
SW@T (Smart working @ Thales)
Thales Board Management
www.bpug.nl
SW@T – Transformation phase
www.bpug.nl
M
A
M
J
J
A
S
O
N
D
J
F
M
A
M
2014
2013
Kick-off Behaviour
workshop TNL-MT
Finalize interior
Pannen
bier
Official
opening
Eerste
steen
Eerste
paal
slaan
Sneak Preview
Behaviour workshop
SW@T-agents & HR
Mock-up & demo
room available
Road-shows
1: Reducing the environmental footprint of our working practices
2: Increasing the efficiency and effectiveness of our activities
3: Being a flexible and attractive company and employer
Archiving & digitizing
sweeping floor by floor
Kick-off Behaviour
workshop
Management Brief
Roll-out first
400 IT users
Start
Physical
move
Start refurbish
existing buildings
Perform work-sessions &
Define zone allocation and prepare
physical move
Roll-out all
IT users
www.bpug.nl 16
• Back from 400.000 m2 land to globally 250.000 m2
(150.000 m2 ready for re-development)
• Reduction of 25.000 m2 industry
• From 20 different industrial locations > 5 main buildings
• Logistic saving : from 23.500 meter/day > 15.500 meter/day
• Reduction of 13.000 m2 office
• Total saving of Eur. 9 mln. / year
• Total project investment of Eur. 50 mln.
• Failure cost: 0%
• Unforeseen interface costs: 0.9 %
Project results
www.bpug.nl
Know that our environment is changing
Clear vision and strategy
Manage on results
Full commitment and support from Steering comity (board) Building & IT are enablers to support
Cooperation/Collaboration
Innovative & Creative
Flexibility
Cost efficient, effective and an organisation that takes responsibility
Transparency
Avoid waste Agile and innovative
Short & direct communication
Continuous improvements and open feedback
People are center staged Sh
are
kn
ow
led
ge
Commitment
Trust Lean management
Change management
Self-management,
Self-discipline.
Accountable and committed to excellence
Focus on human factor
One team, one goal
Fast decisions
Risk & opportunity management
Fun