Load shedding in PakistanReasons & Remedies

February 9, 2009

By

Muhammad Ziauddin

Page 2: Presentation to IEE

7/30/2019 Presentation to IEE

http://slidepdf.com/reader/full/presentation-to-iee 2/17

Organization

Historical Background

Load duration curve

Capacity, capability & availability

ShortageReasonsRemedies / Suggestions

Page 3: Presentation to IEE

7/30/2019 Presentation to IEE

http://slidepdf.com/reader/full/presentation-to-iee 3/17

Historical Background

Pre 1994 eraSever load shedding

Post 1994 era

Surplus power in the system2002 Power Policy

Lengthy procedure– Approval of feasibility

– Tariff negotiation & approval

– Security packages

High load growth

Page 4: Presentation to IEE

7/30/2019 Presentation to IEE

http://slidepdf.com/reader/full/presentation-to-iee 4/17

Current Situation

Supply / Demand Balance

Load duration curve

Capacity, Capability and Availability

Demand

Supply

Page 5: Presentation to IEE

7/30/2019 Presentation to IEE

http://slidepdf.com/reader/full/presentation-to-iee 5/17

Power Supply/DemandBalance

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

55,000

60,000

65,000

70,000

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Year

D e m a n

d / S u p p

l y ( M W )

Demand

Supply

Page 6: Presentation to IEE

7/30/2019 Presentation to IEE

http://slidepdf.com/reader/full/presentation-to-iee 6/17

Load Duration Curve18th August 2007

9,000

10,000

11,000

12,000

13,000

14,000

15,000

16,000

17,000

010002000300040005000600070008000900100011001200130014001500160017001800190020002100220023002400

Time in hrs

L o a d

i n M

Com p ut ed Sys te m De m and Act ual L oad Supplie d Act ual Availab ilit y

Page 7: Presentation to IEE

7/30/2019 Presentation to IEE

http://slidepdf.com/reader/full/presentation-to-iee 7/17

Load Duration Curve21st August 2008

9,000

10,000

11,000

12,000

13,000

14,000

15,000

16,000

17,000

18,000

0100 0200 0300 0400 0500 0600 0700 0800 0900 1000 1100 12001300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400

Time in hrs

L o a d i n M

Computed System Demand Actual Load supplied Acutal Availability

Page 8: Presentation to IEE

7/30/2019 Presentation to IEE

http://slidepdf.com/reader/full/presentation-to-iee 8/17

Load Duration Curve10th January 2007

5,000

6,000

7,000

8,000

9,000

10,000

11,000

12,000

13,000

010002000300040005000600070008000900100011001200130014001500160017001800190020002100220023002400

Time in hrs

L o a d

i n M

Computed System Demand Actual Load Supplied Actual Availability

Page 9: Presentation to IEE

7/30/2019 Presentation to IEE

http://slidepdf.com/reader/full/presentation-to-iee 9/17

Load Duration Curve23rd January 2008

5,000

6,000

7,000

8,000

9,000

10,000

11,000

12,000

13,000

010002000300040005000600070008000900100011001200130014001500160017001800190020002100220023002400

Time in hrs

L o a d

i n M

Com put ed Sys te m De m and Actual L oad s upp lie d Acut al Availabilit y

Page 10: Presentation to IEE

7/30/2019 Presentation to IEE

http://slidepdf.com/reader/full/presentation-to-iee 10/17

Reasons

Late finalization of 2002 power policy

Late initiation of new projects

Long processing time

Not soliciting new power plants

Reliance of unsolicited proposal

WAPDA was not allowed to install thermal

power plantsPrivate sector started taking advantages

Availability of machines in the internationalmarket

Page 11: Presentation to IEE

7/30/2019 Presentation to IEE

http://slidepdf.com/reader/full/presentation-to-iee 11/17

Reasons(contd)

No serious efforts on effeciency improvementand energy conservation

Time of day metering system is not up to its

strengthHydropower not comming up

Small hydro power plants are not being takenup by WAPDA

Closure of some IPP & WAPDA‘s power plants

Not payment of fuel bills to fuel suppliers

Page 12: Presentation to IEE

7/30/2019 Presentation to IEE

http://slidepdf.com/reader/full/presentation-to-iee 12/17

Reasons(contd)

International investors are not comming withenthusiasm

International recession

Governace issueNo serious efforts to exploit alternative energyresources

Huge reserve of coal is not being used

Page 13: Presentation to IEE

7/30/2019 Presentation to IEE

http://slidepdf.com/reader/full/presentation-to-iee 13/17

Issues

Most of the new thermal power plants arebased on fuel oil

Cost of electricity generations

Fuel imports – major implecations on forxreseve

Volatility of crude oil prices

Fuel transporation and import infrastructure

Road / railway network

Port facilities

Page 14: Presentation to IEE

7/30/2019 Presentation to IEE

http://slidepdf.com/reader/full/presentation-to-iee 14/17

Issues(contd)

Gas is not available for new power plants

Un efficient energy useage

No incentive from the government to develop

alternative energy resourcesRental power plant is sucidal

Page 15: Presentation to IEE

7/30/2019 Presentation to IEE

http://slidepdf.com/reader/full/presentation-to-iee 15/17

Remedies / Suggestions

Development of alternative energy

The Regulator should be linient in tariff for wind andsolar power plants

Manufacturing facility for wind and solar power plantsbe encouraged by the government

Coal should be used for power generation includingimported Coal

Thermal power plants should be installed by WAPDA inparllel to IPPs

More emphasis should be on energy conservation andefficiency improvement

Page 16: Presentation to IEE

7/30/2019 Presentation to IEE

http://slidepdf.com/reader/full/presentation-to-iee 16/17

Remedies / Suggestions(contd)

Time of day tariff should be implemented in allcatagories of consumers

A digonostic study should be conducted for oil

transporatation infrastructure and portfacilities

Captive power plant should brougt on bar

Industrial sector should be encouraged toinstall their own power plants and surplusshould be purchased by WAPDA at acompetitive price