42
PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR STREET, PORT SHEPSTONE, 4240 PREPARED BY: TPS DEVELOPMENT PROJECTS (PTY) LTD 5TH FLOOR, SMARTXCHANGE BUILDING, 5 WALNUT ROAD DURBAN 4001 CONTACT NO.PHONE: 031-307-1988 MOBILE: 072 486 1706 EMAIL: [email protected] OR [email protected]

PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

PREPARED FOR: RAY NKONYENI MUNICIPALITY

10 CONNOR STREET, PORT SHEPSTONE, 4240

PREPARED BY: TPS DEVELOPMENT PROJECTS (PTY) LTD

5TH FLOOR, SMARTXCHANGE BUILDING, 5 WALNUT ROAD

DURBAN 4001 CONTACT NO.PHONE: 031-307-1988 MOBILE: 072 486 1706

EMAIL: [email protected] OR [email protected]

Page 2: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

1 | P a g e

TABLE OF CONTENTS

1. CHAPTER ONE: INTRODUCING THE RAY NKONYENI MUNICIPALITY ..................................................... 3

1.1. PURPOSE of the ray nkonyeni municipality investment protocol and investment

opportunities profile ............................................................................................................................................. 4

2. CHAPTER two: quick facts about the Ray Nkonyeni Municipality ...................................................... 5

2.1. demographics ......................................................................................................................................... 5

2.2. main economic sectors ........................................................................................................................ 6

3. chapter three: investment promotion and attraction ........................................................................... 7

3.1. trade and investment kwazulu natal ................................................................................................ 7

3.2. investment promotion and attraction in rnm .................................................................................. 8

4. chapter four: development APPLICATIONS processes ........................................................................ 17

4.1. building plan application process ................................................................................................... 17

contact details ................................................................................................................................................ 17

4.2. business license application process .............................................................................................. 18

contact details ................................................................................................................................................ 18

4.3. signage application process ............................................................................................................. 19

billboards application ................................................................................................................................... 19

OTHER signage applicationS(DIRECTIONAL,PERMANENT,TEMPORARY, FOR SALE, BANNER AND

TRAILERS SIGNS) ............................................................................................................................................... 20

The process requires that a submission of proof of payment with skecth/drawing and

picture of the sign of the sign. .................................................................................................................... 20

contact details ................................................................................................................................................ 20

4.4. ENVIRONMENTAL COMPLIANCE processES ................................................................................... 21

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS DIGRAM ................................................................ 21

TIME FRAMES FOR THE EIA PROCESS .......................................................................................................... 22

BASIC ASSESSMENT PROCESS ....................................................................................................................... 22

department of water and sanitaton................................................................................................................. 23

water use licence application PROCESS ................................................................................................. 23

contact details ................................................................................................................................................ 24

4.5. town planning applications ............................................................................................................... 25

township establishment process ................................................................................................................ 25

subdivision process ......................................................................................................................................... 25

consolidation process ................................................................................................................................... 26

Page 3: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

2 | P a g e

removal of resctrictive conditions process .............................................................................................. 26

rezoning process ............................................................................................................................................. 26

consent use process ...................................................................................................................................... 26

STEPS TO THE SPLUMA APPLICATION PROCESS ....................................................................................... 26

contact details ................................................................................................................................................ 27

4.6. water connection – ugu district municipality ................................................................................ 28

contact details ................................................................................................................................................ 28

4.7. electricity connection – RNM AND eskom ..................................................................................... 29

contact details ................................................................................................................................................ 29

5. CHAPTER five: investment opporunities .................................................................................................... 30

5.1. port shepstone inter-modal facility .................................................................................................. 30

contact details ................................................................................................................................................ 30

5.2. port shepstone cbd urban renewal ...................................................................................................... 30

contact details ................................................................................................................................................ 31

5.3. justice park .................................................................................................................................................... 31

5.4. portshepstone BEACHFRONT RE- development ................................................................................. 32

5.5. industrial development opportunity (Lot 19 & 20 marburg) ........................................................... 33

contact details ................................................................................................................................................ 33

5.6. PORT SHEPSTONE technology hub ......................................................................................................... 33

5.7. margate cbd AND BEACHFRONT urban renewal ............................................................................. 34

5.8. margate airport precinct development plan .................................................................................... 35

5.9. nyandezulu route (waterfall) ................................................................................................................... 36

5.10. kwaxolo caves........................................................................................................................................... 37

5.11. Kwanzimakwe ............................................................................................................................................ 38

Investment opportunities .............................................................................................................................. 39

7. CHAPTER SEVEN: list of businessES WITHIN RNM ...................................................................................... 40

8. summary and conclusion ............................................................................................................................. 40

Page 4: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

3 | P a g e

1. CHAPTER ONE: INTRODUCING THE RAY NKONYENI

MUNICIPALITY

Ray Nkonyeni Municipality (RNM) is a Category B municipality and one of four local

Municipalities that constitute the UGU District Municipality. The entire municipal area

covers an extent of approximately 1487km². The Local Municipality is characterised

by the towns of Port Shepstone, Margate, Izingolweni, Hibberdene and Port Edward.

The municipality is fairly new, having been established in 2016 as a result of the

amalgamation of the erstwhile Hibuscus Coast Local Municipality and the Ezinqoleni

Local Municipality. The Municipality presents a range of invesment opportunities

across various sectors of the economy including Tourism, Manufacturing, Wholesale

and Retail, Finance and Business Services, Transport and Communication, and

Government Services

The Ray Nkonyeni Municipality (RNM) is uniquely characterized by the following

features:

An area of approximately 90km of coastline, comprising of 21 swimming

beaches;

It extends 30 kilometres inland covering a vast rural area under the leadership

of nine (9) traditional councils, Nzimakwe, Madlala, KwaXolo,Mavundla,

Ndwalane, Madlala, Lushaba, Nyuswa, Vukuzithathe and Cele.

RNM is the most concentrated economic hub within Ugu District Municipality

with the main economic sectors being tourism and agriculture with some

manufacturing occurring in Port Shepstone.

Port Shepstone is the major economic hub in the south coast and serves as

the administrative centre for both RNM and UGu District Municipality.

It serves as an external regional commercial centre for most of the areas

around the northern Eastern Cape area.

Figure 1: Ray Nkonyeni Locality Map Regional Locality Map

Page 5: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

4 | P a g e

1.1. PURPOSE OF THE RAY NKONYENI MUNICIPALITY INVESTMENT

PROTOCOL AND INVESTMENT OPPORTUNITIES PROFILE

The Ray Nkonyeni Municilaity Investment Protocol serves as a guide to the business

and investors pertaining to investment environment and processes involved in

investing in the Municipality, with a focus on the ease and cost of doing business with

both local and foreign investors. Areas covered include but are not restricted to: (i)

the regulatory environment, (ii) the processes involved in complying with the

regulations, (iii) the cost of doing business and (iv) time scale it takes to complete the

compliance processes.

These processes typically include:

Town planning processes (rezoning, special consents, subdivision, general

land use management, etc.) of land development and investment for the

local municipality.

Building Plans approval process

Business Licensing

Environmental compliance

Signage Applications

Water and electricity connection processes

The Investment Protocol also contains up-to-date facts and figures and has been

tailor made to make navigating the business and investment environment easier to

understand in Ray Nkonyeni Municipality.

It should be noted that while the information contained in this guidebook at the time of

compilation in June 2017, be it relating to legislation, policy and guidelines is believed to be

correct and the most up-to-date. Information by its nature is dynamic and subject to change

from time to time. Reference should therefore be made to the relevant offices to verify the

information as being the most current.

Page 6: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

5 | P a g e

2. CHAPTER TWO: QUICK FACTS ABOUT THE RAY NKONYENI MUNICIPALITY

2.1. DEMOGRAPHICS

(Source: www.localgovernment.gov.za)

Population 348 533

AGE STRUCTURE

Population under 15 34.4%

Population 15 to 64 61.0%

Population over 65 4.7%

DEPENDENCY RATIO

Per 100 (15-64) 64.0

SEX RATIO

Male per 100 Females 91.2

POPULATION GROWTH

Per annum 2.76%

LABOUR MARKET

Unemployment rate 69.6%

Youth Unemployment rate 89.2%

EDUCATION (AGED 20+)

No schooling 5.1%

Matric 35.7%

Higher Education 9.9%

HOUSEHOLD DYNAMICS

Households 90 409

Average Household Size 3.9

Female Headed Households 48.3%

Formal Dwellings 65.7%

Houses Owned 70.3%

HOUSEHOLD SERVICES

Flush toilet connected to sewage 28.7%

Weekly refuse removal 26.6%

Piped water inside dwelling 29.9%

Electricity for Lighting 88.6%

Page 7: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

6 | P a g e

0.00% 5.00% 10.00% 15.00% 20.00% 25.00%

Finance and Business Services

Wholesale and Retail

General Government Services

Manufacturing

Agricluture and Forestry

Transport and Communication

Finance andBusiness Services

Wholesale andRetail

GeneralGovernment

ServicesManufacturing

Agricluture andForestry

Transport andCommunication

Series1 21.50% 18.70% 13.30% 12.30% 8.90% 8.90%

Main Economic Sectors

2.2. MAIN ECONOMIC SECTORS

Source: www.localgovernment.gov.za

Page 8: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

7 | P a g e

3. CHAPTER THREE: INVESTMENT PROMOTION AND ATTRACTION

3.1. TRADE AND INVESTMENT KWAZULU NATAL

Trade & Investment KwaZulu-Natal (TIKZN) is a provincial trade and investment

promotion agency, developed to promote the province as an investment destination

and promote trade by assisting KZN based companies to identify markets and export

their products.

TIKZN is the custodian of Investment promotion and attraction in KwaZulu Natal. The

agency was established to promote the Province as an investment destination and

promote trade by assisting KZN based companies to identify markets and export their

products whilst promoting investment opportunities available in KZN to internal and

external investors.

Services that TIKZN offers investors:

The facilitation of joint ventures and business linkages between small and big

business.

The provision of relevant, reliable information to investors and traders.

Assistance with applications for investment incentives and export marketing

incentives.

Assistance to foreign investors with applications for business permits.

Negotiation of local government incentives on behalf of investors.

Provision of project support and aftercare services.

Assistance to merging international traders and with international trade

enquiries.

Assisting investors to locate suitable premises and to secure project and

operational financing.

The TIKZN is responsible for the Investment Protocol at a provincial level. Investment

protocols for both District and Local Municipalities are important in order to guide

businesses and investors on development procedures and provide the relevant

economic facilitation functions to businesses and investors at a local level.

This booklet therefore covers everything from the national and provincial policy

frameworks to the basics of setting up and obtaining development rights, licensing,

infrastructure connections, accessing services in Ray Nkonyeni Municipality.

Page 9: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

8 | P a g e

3.2. INVESTMENT PROMOTION AND ATTRACTION IN RNM

INVESTMENT CLIMATE

An investment climate refers to the economic and financial conditions in a region

that affect whether individuals and businesses are willing to lend money and acquire

a stake in the businesses operating there. Investment climate is affected by many

factors, including: poverty, crime, infrastructure, workforce, security, political

instability, regime uncertainty, taxes, rule of law, property rights, government

regulations and transparency and government accountability.

For the most part, there exists a relatively stable investment climate in the RNM. The

following are reasons why RNM is one of the best places for long-term investment:

Resilient and diverse economy;

Young and skilled workforce availability;

Good infrastructure such as roads, rail, telecommunications and electricity;

Geographically located to enable easy access to Africa’s busiest harbour

(Durban); and

Premier domestic and international tourist destination with a number of Blue

Flag beaches.

Economic hub of the Ugu District Municipality which contributes 60% to the

economy of the district municipality;

Availability of the Margate Airport, which is a regional airport.

The main economic sectors in RNM which are transport and communication,

agriculture and forestry, manufacturing, general government services, tourism,

wholesale and retail, finance and business services.

INVESTMENT INCENTIVES

The main use for incentives is to meet the objective of attracting and retaining mobile

capital, create employment, and enhance exports. RNM adopted an incentives

policy in order to achieve the following objectives:

Enhancing RNM as an attractive investment destination for foreign and

domestic investors as well as retaining existing businesses within the

municipality

Build the business base of RNM and to assist local business grow and trade

with the rest of the country and the world

Improve the business environment through competitive transaction and

regulatory costs, streamlined business licensing process, well developed local

infrastructure and sound investment value proposition

Attract investments and create employment in new and existing industries.

Page 10: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

9 | P a g e

Through the policy, the Municipality has committed itself to the following non-financial

incentives:

Category Commitment

Infrastructure Ongoing infrastructure development and maintenance

through more than average budget allocations to

improve reliability of services and minimize business

downtime costs

Rezoning Maximum of 90 days or less on applications for Rezoning

Unlocking of Municipal own

land

Maximum of 3 months or less on unlocking of municipal-

owned land

Buildings Plans Maximum of 60 days or less on applications for building

plans

Business Licensing Maximum of 21 days or less on business licensing

applications in line with the Business Act 71 of 1991.

Electricity and water tariffs Fast tracking electricity and water connections

applications within 2 months or less of receiving

applications

Development rights Pre-approved development rights for designated

developments

Serviced land Long term (serviced) land availability for

Industrial Development

Middle and Low Cost Income Development

Commercial Hubs Development

Infrastructure Expedite the provision of bulk infrastructure to boost

development

Business enquiries Maximum of 1 week to respond to formal business queries.

Market and Economic

Information

To ensure the availability of recent market and economic

data

Source: Ray Nkonyeni Municipality Incentives Policy

Page 11: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

10 | P a g e

In addition to the above, the Municipality has further committed itself to the following financial

incentives:

Activity Commitment

Rates Rebates 20% rebate for a period not exceeding five years for an

investments above R10 Million

Electricity subsidy 30% for new and expanding investments above R10Million in

areas where the municipality is the service authority.

Building Plans Once-off 20% rebates on building plan submission fees for

investments of R15 Million and above

Rates Holidays Once-off rates holidays for a period not exceeding 3 months

per 3 years cycle for business which have been in the

municipality for over 5 years and employing more than 50

people on a fulltime basis.

Discount Discounts of up to 1 percent on utility services for business of

all sizes paying services 3 months in advance ( only where

Hibiscus Coast is a Service authority)

Development Levy 25% discount on development levy for the development of

above R15 Million

Discounts to approve investors on the lease or sale of Council

owned land. Sales discount not to exceed 20% of the cost of

the land and the economic value of the capital. Expenditure

of the investment must be at least five times the size of the

discount of the land.

Refuse Removal Discounts of 20% on refuse removal for factories for five years

Source: Ray Nkonyeni Municipality Incentive Policy

Page 12: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

11 | P a g e

The National and KZN Provincial Government also offer incentives to in order to promote

investment and facilitate economic growth, below is the list of some of the incentives offered at

National and Provincial Level, which the Ray Nkonyeni Municipality can play an active role in

facilitating:

BUSINESS PROCESS SERVICES:

Description The South African government implemented a

Business Process Outsourcing & Off-shoring

(BPO&0) incentive programme as from July

2007.

As part of a process of improving South Africas

position as an investment destination.

Benefits A base incentive as a tax exempt grant paid

over three years for each offshore job created

and maintained.

A graduated bonus incentive paid as

follows:

20% bonus for more than 4000 but less

than

8000 offshore jobs paid once off in a

year in

which the bonus is reached;

30% bonus for more than 800 offshore

jobs paid once off in the year in the

year in which the bonus level is

reached.

Eligible Enterprises The following will determine the elebility of the

enterprise:

must be performing BPS activities;

may be involved in starting a new

operation or expanding an existing

operation in order to perform BPS

activities, which may be operated from

more than one physical location in

South Africa;

must, by the end of three years from

the start of operation of the new

project or the expansion, have created

at least 50 new off-shore jobs in South

Africa;

must commence its commercial

operations no later than six months

from the date on which the BPS

incentive grant was approved; and

Source: Department of Trade and Industry

Page 13: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

12 | P a g e

CLOTHING AND TEXTILE COMPETITIVENESS IMPROVEMENT PROGRAMME (CTCIP):

Description The Clothing and Textile Competitiveness

Improvement Programme (CTCIP) aims to build

capacity among manufacturers and in other

areas of the apparel value chain in South

Africa.

Objectives The CTCIP aims to assist companies to attain:

increased (maintained) market

share/penetration, increased labour or

capital productivity, and increased skills

levels of employees

improved product/service quality,

uniformity and reliability, Improved

product design, packaging design,

etc., and improved reliability and

response times to client orders and

order changes.

introduction or adoption of new

technologies

or techniques that result in the

diversification or

extension of the cluster’s range of

sellable products or services.

Source: Source: Department of Trade and Industry

CRITICAL INFRASTRUCTURE PROGRAMME (CIP)

Description The Critical Infrastructure Programme (CIP) is a

cost sharing grant for projects designed to

improve critical infrastructure in South Africa.

The grant covers qualifying development costs

from a minimum of 10% to a maximum of 30%

towards the total development costs of

qualifying infrastructure. It is made available to

approved eligible enterprise upon the

completion of the infrastructure project

concerned.

Benefits A cash grant to a maximum of 30% capped at

R30 million of the development cost of

qualifying infrastructure.

Eligible Enterprises Public sector entities such as

municipalities;

Private investors / companies. INVESTMENT PROTOCOL 97

Source: Source: Department of Trade and Industry

Page 14: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

13 | P a g e

THE PRODUCTION INCENTIVE (PI)

Description The Production Incentive (PI) forms part of the

overall Clothing and Textile Competitiveness

Programme (CTCP) and flows from the

implementation, by the Department of Trade

and Industry (the dti), of customised sector

programmes (CSPs) for the clothing, textiles,

footwear, leather and leather goods industries.

The incentive consists of two components,

namely (i) an upgrade grant facility, which is

meant to focus on competitiveness

improvement, and (ii) an interest subsidy for

working capital facility, whose aim is to support

working capital requirements resulting from

past and future upgrading interventions.

Benefits Clothing manufacturers; Textile manufacturers;

Cut, Make and Trim (CMT) operators;

Footwear manufacturers; Leather goods

manufacturers and Leather processors

(Specifically for Leather Goods and Footwear

industries).

Design Houses (Provided the design house

partners with one or more CMT’s)

NB: The PIP specifically excludes goods

manufactured for the automotive sector which

qualifies for any incentive programme offered

for that sector.

Eligible Enterprises Registered legal entities in South Africa in terms

of the Companies Act, 1973 (as amended) or

the Close Corporations Act, 1984 (as

amended). Section 21 companies or ‘not-for-

profit-or-gain’ organisations are specifically

excluded from applying.

Must be classifiable as manufacturing (SIC

code 3) in terms of the Standard Industrial

Classification of all Economic Activities.

Must be a taxpayer in good standing and

must,

Valid tax clearance certificate.

Source: Source: Department of Trade and Industry

Page 15: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

14 | P a g e

SECTOR SPECIFIC ASSISTANCE SCHEME (SSAS)

Description The Sector Specific Assistance Scheme (SSAS)

is a reimbursable 80:20 cost-sharing grant

offering financial support to export councils,

joint action groups and industry associations.

The scheme comprises two subprogrammes,

namely (i) Generic Funding and (ii) Project

Funding for Emerging Exporters (PFEE).

Benefits Travel and accommodation, transport

of samples and marketing materials,

exhibition costs.

Maximum allocation per project is R1.5

million.

Eligible Enterprises Non-profit business organisations in sectors and

subsectors of the industry prioritised by the dti,

in respect of (i) generic funding and (ii) project

funding

Source: Source: Department of Trade and Industry

SEDA TECHNOLOGY PROGRAMME (STP)

Description STP seeks to stimulate economic growth and

development through facilitating

technological innovation increasing the

accessibility to, and utilisation of technology

and technical support for small enterprises,

whilst at the same time improving the

sustainability and international competitiveness

of small enterprises supported through the

programme. stp, as a programme of the

Department of Trade and Industry (the dti), is

therefore responsiblefor the provision of both

financial and non-financial technology

transfer, business incubation and quality

support services for small enterprise.

Benefits The following are some of the categories that

are eligible to qualify for Technology Transfer

Fund (TTF), provided they are related to the

product and/or process technology is being

transferred:

Design, formulation, materials and

methods transfer, including design

improvement and optimisation;

Source: An Investment Protocol for the Province of KZN: 2014

Page 16: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

15 | P a g e

Know-how, knowledge, skills and

expertise transfer, including training

and mentoring;

Designs, equipment, systems,

machinery and tooling directly related

to the product and process

technology being transferred;

The know-how, knowledge, skills and

expertise required to operate and

maintain the equipment, systems and

machinery, including training and

mentoring;

Expert labour costs regarding the

technology, where such costs do not

exceed 20% of the total approved TTF

funding provided by stp;

Intellectual Property payments (e.g.

Licensing

Agreements) and expertise transfer

payments to enable the TTF

transaction.

Travelling and subsistence claims;

Legal and expert resource expenses

regarding the negotiations, agreement

and transfer of thetechnology;

Business training, development and

mentoring; and

General business services, e.g.

equipment, machines, facilities or

processes that areutilised to provide

repairs, examinations, overhauls,

support or assistance in some form or

other, as well as specialised equipment,

machines or processes are utilised to

provide support for manufacturing,

mining, agro-processing or service

enterprises

Eligible Enterprises South African enterprises in the 2nd economy

Source: Source: Department of Trade and Industry

Page 17: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

16 | P a g e

SUPPORT PROGRAMME FOR INDUSTRIAL INNOVATION (SPII)

Description The Support Programme for Industrial

Innovation (SPII) is designed to promote

technology development in South Africa’s

industry, through the provision of financial

assistance for the development of innovative

products and/ or processes.

Benefits The SPII offers three schemes namely, the:

SPII Product Process Development

(PPD) Scheme;

SPII Matching Scheme; and

SPII Partnership Scheme.

Source: Source: Department of Trade and Industry

It is imperative to note that even though the RNM is not the custodian of the investment

incentives offered by province, prospective investors will be able to be connected directly to

the relevant officials in the provincial and national departments.

Page 18: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

17 | P a g e

Figure 1: Building Plan Application Process

4. CHAPTER FOUR: DEVELOPMENT APPLICATIONS PROCESSES

4.1. BUILDING PLAN APPLICATION PROCESS

Ray Nkonyeni Municipality is responsible for the administration of the National Building

Regulations, and control the on-site activities on construction projects. All proposed buidling

related projects must submitt building plans and the plans must be approved by the Municipality

in terms of the National Building Regulations and & Building Standards Act 103 of 1977. The

Municipality is committed to a swift turn around time in the plans approval process. Below is a

digram of the building plan process:

Source: Ray Nkonyeni Municipality, Building Control Section

CONTACT DETAILS

Contact Person: Mr Ravi Naidoo (Senior Manager: Building Control) Tel: 039 315 9250,

Email: [email protected]

Admin. Assistant : Buysiwa Qwabe

Email: [email protected]

Step 1: Submission of

Plans

Step 2: Pre-plan

Scrutiny

Step 3: Payment of

Application Fee

Step 4: Application

forms and

supporting

documents

Step 5: Issuance of

plan number

Step 6: Departments

scrutinize plans,

make comments

and send plans

back to admin assist

Step 7: Final

Approval

Page 19: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

18 | P a g e

4.2. BUSINESS LICENSE APPLICATION PROCESS

Why do you need to Apply?

If you open a business that requires a license, you may not, unless otherwise

indicated, begin trading before a license has been issued. Trading without a valid

license is a punishable offense. Licensing is governed by the Business Act No. 71 of

1991, which is national law. Schedule 1 of the Business Act No 71 of 1991 lists the

businesses, which need a license. Below is a standard application process:

CONTACT DETAILS

Contact Person: Mr. Philani Khambule – Manager: Local Economic Development

Department

Telephone: 039 688 2275

Email: [email protected] / [email protected]

Admin Assistant: Msa Maphumulo

Email: [email protected]

Step 1: Completion of

Application Forms and

Supporting

Documents

Step 2: Application

fee to be paid to

council

Step 3: The Business

License application is

then submitted

Step 4: Circulation for

Comments

Step 5: Approval and

Issuance of Busiiness

License

Page 20: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

19 | P a g e

4.3. SIGNAGE APPLICATION PROCESS

Signage applications are necessary for the control of outdoor advertising in an effort

to promote and maintain a pleasant visual environment and ensure the health and

safety of all in the Municipality All on-site commercial advertising, remote advertising

signs (billboards and wall signs), temporary banners and flags, temporary posters

along street lamp standards, advertising trailers need Municipal approval before

usage.

The RNM differentiates between types of signage, all of which have separate

application processes: These are the following:

Billboards Application

Directional Sign Application

Permanent Sign Application

Temporary Sign Application

For Sale Sign Application

Banner Application

Trailer Sign Application

BILLBOARDS APPLICATION

There are billboards on council property1 and billboards on private property2.

1 Billboard erected on a council property is treated differently in terms of payment of annual fees and agreement that both parties have

to enter into. 2 The applicant first approach the owner of the land whom gives in writing a consent indicating his/her position in as far as the billboard is

concerned. There are also fees attached to this one payable at the municipality once approved.

Submission of motivation, sketch drawing and picture of the sign

Payment of application fee

Approval Process

Page 21: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

20 | P a g e

Applications go to portfolio committee which then recommends to the full council for

approval. You are also required to contact KZN Department of Transport (KZN DOT)

for their consent and advice if the sign is located along a provincial road.

The proposal must be accompanied by the following documents

Engineer’s appointment form

A Drawing or design

Title deed of the area (if any – esp. private property)

Complete the prescribed application forms obtainable from the municipality

Submit drawings to building control for approval (this you do once application

for billboard has been approved by council)

Submit comments from the DOT & the ward councillor.

You will be provided with application forms and payment details (tariffs)

OTHER SIGNAGE APPLICATIONS(DIRECTIONAL,PERMANENT,TEMPORARY, FOR

SALE, BANNER AND TRAILERS SIGNS)

The process requires that a submission of proof of payment with

skecth/drawing and picture of the sign of the sign .

The application normally takes five working days provided that all the

necessary or required documents are submitted by the applicant timeously.

CONTACT DETAILS

Contact Person: Ms. Feziwe Mhlongo – Manager: Environment Control

Tel: 039 688 2254

Email: [email protected]

Admin. Assistant: Nomusa Sithole

Email: [email protected]

Page 22: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

21 | P a g e

Step 1:

Screening

Phase

Step 2:

Scoping

Phase

Step 3:

Specialist

Study

Phase

Step 4:

Integration

and

Assessmen

t Phase

Step 5:

Authority

Review and

Decision-

Making

Step 6:

Approval of

the EIA

4.4. ENVIRONMENTAL COMPLIANCE PROCESSES

Applications for environmental authorisation are either subject to a basic assessment

process or scoping and environmental impact report, and this is determined by the

Listing Notice under which an activity is published. The applicant may not proceed

with a listed activity before obtaining an environmental authorisation from the

competent authority.

BASIC ASSESSMENT

The BA process should be undertaken for project activities that are considered minor

but that may have an impact on the environment. Impacts of these activities are

more generally known and can often be mitigated or easily managed. The BA

process is generally shorter and less onerous than EIA process. The BA process must

follow the procedure as prescribed in regulations found in the National Environment

Act (NEMA).

ENVIRONMENTAL IMPACT ASSESSMENT

One of the outputs from an EIA is a set of enhancement or mitigation measures that

will require funding. It makes sense, therefore, that the best time for an EIA in any

project is during the pre-feasibility and feasibility stages of its life-cycle, when various

planning and design options are investigated. The enhancement and mitigation

measures can then be incorporated into these designs, and their funding and

scheduling included into the business plan for the project.

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS DIGRAM

Page 23: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

22 | P a g e

Submission of

application and Basic

Assessment Report

Competent Authority

assesses application

to confirm prescribed

info. submitted

Competent Authority

considers the merits

of the application

Application is

approved and

decision Record oif

Decision (ROD) is

issued with the

stipulated

responsibilities to be

performed by the

applicant

Step 1: Screening Phase:

Step 2: Scoping Phase and Public Participation:

Step 3: Specialist Study Phase:

Step 4: Integration and Assessment Phase:

Step 5: Authority Review and Decision-Making:

Step 6: Approval of the EIA

Source: Department of Economic Development and Environmental Affairs

TIME FRAMES FOR THE EIA PROCESS

If a Basic Assessment or Scoping & EIR is well-managed, the timeframe – which

includes those that are prescribed - is as follows:

Basic Assessment process should on average take 8 – 10 months, including 2

months for comments by government departments and the public on the

draft and final Basic Assessment Reports.

The Scoping & Environmental Impact Assessment process should on average

consist of a 13 – 14 month process, including 4 months for comments by

government departments and the public on the draft and final Scoping and

EIA Reports. Obviously there are certain projects that might require more time

than the above, due to the complexity of issues that the associated factors

will have to be considered.

BASIC ASSESSMENT PROCESS

The Basic Assessment Report must provide the Competent Authority with sufficient

information to consider the Application and to reach a decision. If the Competent

Authority is however unable to decide the Application based on the Basic

Assessment report alone, the Competent Authority may request an

Applicant/Developer to subject the Application to the more thorough Scoping and

EIA process

The Basic Assessment process outlined below is divided into 4 phases. Each of the

phases contains a number of steps.

Page 24: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

23 | P a g e

Step 1: Pre-position

and Validation

Step 2: Initial

Assessment and

Grouping

Step 3: Regional

Assessment

Step 4: Evaluation by

the National Office

Step 5: Decision by

the Chief Director:

Water Use

Step 6:

Implementation

N.B.: If unable to decide on the Basic Assessment Report alone, Compentent

Authority must request that Environmental Assessment Practitioner to:

Submit additional information; or

Submit a report on any specialist study or

Request the Applicant to consider and comment on feasible and reasonable

alternatives; or

Subject the Application to Scoping

DEPARTMENT OF WATER AND SANITATON

WATER USE LICENCE APPLICATION PROCESS

Page 25: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

24 | P a g e

Source: Department of Water and Sanitation

Step 1: Pre-position and Validation

Step 2: Initial Assessment and Grouping

Step 3: Regional Assessment

Step 4: Evaluation by the National Office

Step 5: Decision by the Chief Director: Water Use

Step 6: Implementation

CONTACT DETAILS

There are provincial and national competencies. RNM Environmental Control will

facilitate the process.

Contact Person: Sabelo Ngcobo – Ugu District Manager

Email: [email protected]

Contact Person: Ms. Feziwe Mhlongo (Manager: Environmental

Management)

TEL: 039 688 2271

EMAIL: [email protected]

From the Department of Water and Sanitation:

Contact Person: Ashley Starkey

Tel: 031 336 2700

Email: [email protected]

Page 26: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

25 | P a g e

SPLUMA

REZONING

APPLICATION

SPECIAL

CONSENT

APPLICATION

REMOVAL OF

RESTRICTIVE

CONDITIONS

TOWNSHIP

ESTABLISHMENT

CONSOLIDATION

SUBDIVISION

4.5. TOWN PLANNING APPLICATIONS

In terms of the Spatial Planning and Land Use Management Act No. 16 of 2013

(SPLUMA), the application processes for all development planning applications is the

same. This is done in order to streamline the application proceess and improve turn

around times. Below is a diagram indicating all the development planning

application processes:

TOWNSHIP ESTABLISHMENT PROCESS

The establishment of townships is the process where land is subdivided into individual

sites for various land uses including roads and public spaces. Usually, it would involve

the creation of twenty or more subdivisions, which would eventually be shown on a

general plan, which has been approved by the Surveyor General, and many

sometimes agree to a general plan being prepared for as few as ten sites.

SUBDIVISION PROCESS

Subdivision on the other hand normally refers to the subdivision of a parent erf into a

limited number of portions of the original erf and each portion is so designated.

Usually there is no road created, but this is not necessarily a rule. In this case, each

Page 27: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

26 | P a g e

Figure 2: SPLUMA Application Process

portion of land would have its own survey diagram approved by the Surveyor

General.

CONSOLIDATION PROCESS

Consolidation occurs/ensues when a number of erven are consolidated into one

newly designated erf with a new number.

REMOVAL OF RESCTRICTIVE CONDITIONS PROCESS

Contained in every title deed are conditions restrctive conditions for the

development of that particular property. These conditions are used as preservation

and protective measures to uphold the character and integrity of an area. These

conditions are however subject to removal or cancellationn based on adequate

motivation.

REZONING PROCESS

Zoning provides the land use rights to use on a property (commercial, residential,

industrial, etc.). The purpose of zoning is to mitigate conflicting land uses and to

preserve the character and integrity of areas. Therefore, rezoning is the change of

the land use rights to accommodate a different land use. The proposed zone and

attendant land use however, must be congruent with the zones and land uses

surronding it.

CONSENT USE PROCESS

This process deals primary with the seeking of council approval for certain land uses

to be conducted on a property. The council, based on their discretion, can approve

the land uses should it be adequately motivated.

STEPS TO THE SPLUMA APPLICATION PROCESS

Page 28: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

27 | P a g e

Source: KZN Department of Cooperative Governance and Traditional Affairs

Step 1: Pre-scrutiny

Step 2: Submission of application

Step 3: Confirmation of completeness of application

Step 4: Advertisement

Step 5: Response to Objections

Step 6: Approval Municipal Planning Tribunal

Step 7: Issuance of Decision Notice

CONTACT DETAILS

Contact Person: Sinenhlanhla Dlamini (Manager: Town Planning)

TEL: 039 688 2254

EMAIL: [email protected]

Admin. Assistant: Vuyelwa Makhasi

Email: [email protected]

Page 29: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

28 | P a g e

Step 1:

Submission to

Development

Control Offices

Step 2: Capital

Contribution to

be Paid

Step 3: Ugu DM

confirms

availability of

water

pressure.

Step 4: Ugu

confirms water

pipeline to

accommdate

requires for fire

hydrant

Step 5:

Application for

water metre

can then be

undertaken

4.6. WATER CONNECTION – UGU DISTRICT MUNICIPALITY

The Ugu District Municipality houses a water services department, which is responsible

for the provision of core services, which are water, sanitation and environment

services under water services. The department also includes the following:

Mechanical Workshops

Laboratory Services

Operation and maintenance of water sewage treatment plants

Sewer and water reticulation systems

Leakage divisions

Meter section

Pipe extensions

Therefore, water connection applications are submitted to Ugu District Water Services

Department will facilitate and approve the application.

CONTACT DETAILS

Contact Person: Queenie Ogle

Tel: 039 688 3374

Email: [email protected]

Page 30: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

29 | P a g e

Step 1:

Submission to

Development

Control Offices.

Step 2: Capital

Contribution to

be Paid.

Step 3: Ugu DM

confirms

availability of

electricity.

Step 4:

Application for

electrIcity

connection can

be made.

4.7. ELECTRICITY CONNECTION – RNM AND ESKOM

Residents and businesses are required to follow the same process when applying for

electricity connection. In your application, the category of the application must be

specified. As a resident, you can either apply for the lifeline or domestic tariff. As a

business, you can apply for different tariffs based on your expected monthly energy

requirements.

CONTACT DETAILS

Contact Person: Nandi Sihlali

Tel: 039 688 2089/88

Email: [email protected]

Admin. Assistant: Vaneshree Moodley

Email: [email protected]

Contact: Thandi Mbanjwa - Key Customer Relations Officer

Department: Distribution Key Customer Department (KZN) Eskom Group Customer

Services

Tel: 033-395 3970

Cel : 082 423 3545

Page 31: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

30 | P a g e

Fax to email: 086 6634195

Email: [email protected]

5. CHAPTER FIVE: INVESTMENT OPPORUNITIES

Below is a summary of invesment opportunities, both in the public and private sector within Ray

Nkonyeni Municipality. The Municipality invites investors to take an advatange of these

investment opportunities and take part in the growith of our economy.

5.1. PORT SHEPSTONE INTER-MODAL FACILITY

The Municipality has put forward an initiative for development of the Intermodal Public Transport

Facility with high order commercial mix. The facility in essence will be bus and taxi rank and a

mall to be in Port Shepstone current bus and taxi rank. The informal economy will also be

promoted within this development to promote integration between the formal and the informal

economy.

CONTACT DETAILS

Contact Person: Siyabonga Zama – HOD Department of Development Planning

Email: [email protected]

Contact Person Philani Khambule – Manager: Local Economic Development

Email: [email protected]

5.2. PORT SHEPSTONE CBD URBAN RENEWAL

Figure 3: Source - Hibiscus Coast Municipality SDF 2016/17

Page 32: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

31 | P a g e

Port Shepstone is the economic and administrative hub of UGU Ditrict Municipal area. The town

presents a range of opportunities for the private sector to take part in the economy through

investing in the various esectors of the economy. The Municipality and other spheres of

governement are upgrading the CBD infrastructure and investing in large scale infrasctructure

projects such a the Justice Park, New Library, New Museum, New Government Complex and

other upgrades of governmnet services to modern standards. These developments pave way for

the private sector to also take an opportunity in investing in a town under major rejuvanation

and having been identified as one of the secondary cities that the provincial governement has

earmarked as a priority. The municipality has developed the Port Shepstone Urban Renewal

Framework for the purpose of guiding development in this regard.

CONTACT DETAILS

Contact Person: Siyabonga Zama – HOD Department of Development Planning

Email: [email protected]

Contact Person Philani Khambule – Manager: Local Economic Development

Email: [email protected]

5.3. JUSTICE PARK

The project entails the construction of a Magistrate’s court on a new site with main access

control via Andreasen Street. The complex consists of 19 offices and 16 courts. It has three

components: Admin Section, Main Court Complex and Prisoner’s Quarters.

Access to site would be via Andreasen Street, Marburg, Port Shepstone. The Justice Park is a

flagship Justcice government services complex in the Port-Shepstone with a project value of

approximatesly R 360,000,000, it includes a high court, magisrate courts, government legal

sevices and office for supporting legal proffessionals and other opportunities to promote

Page 33: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

32 | P a g e

investment. With a development of the magnitude comes opportunities for private investors to

provide various supporting services to the development including new residential

accomodation, offices, recreation and other services. The Municipality also ownes land within

close proximity to the Justice Park.

5.4. PORTSHEPSTONE BEACHFRONT RE- DEVELOPMENT

Port Shepstone beachfront presents an ideal opportunity for investment, it is well located, with

an accredited swimming beach, sea views, and ample opportunity for re-development. The

Municipality has formulated a plan with proposals on various invetment opportunities available

(Port-Shepstione Urban renewal Framework). Investors are invited to peruse the report for

investment oportunities in the beachfront and contact Development Planning Services

Department for more details.

Figure 4: Source - South Coast Herald

Page 34: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

33 | P a g e

5.5. INDUSTRIAL DEVELOPMENT OPPORTUNITY (LOT 19 & 20 MARBURG)

Lot 19&20 Marburg are two properties owned by the Ray Nkonyeni Municipality in an

established industrial area of Marburg, which is known as the backbone of the

economy of Ray Nkonyeni Municipality in terms of industrial development. The land

has been zoned for light industrial usage and the Municipality hereby invites

prospective investors to take this opportunity to lease the land from the Municipality

or come with alternative tangible proposal for the usage of the strateic piece of land.

CONTACT DETAILS

Contact Person: Siyabonga Zama – HOD Department of Development

Planning

Email: [email protected]

Contact Person Philani Khambule – Manager: Local Economic

Development

Email: [email protected]

5.6. PORT SHEPSTONE TECHNOLOGY HUB

The Port Shepstone Technology hub is a science and technology park based in

Marrbug and is on of only four which have been development in key regions across

the province to promote the knowledge economy, drive socio-economic

development and increase competitiveness.

The Technology Hub is situated close to major road networks and the local Margate

airport, the hub promises to boost economic development on the KZN South Coast

by offering a range of incentives, rebates and assistance for investors.

High-tech entrepreneurs, researchers, property developers, business owners and

academics will be able to benefit from local government concessions and support

around income tax, research and development, rates and electricity tariffs and

marketing.

Technology Hub is being developed in Izotsha. This initiative is funded by the Premiers

office. The main attributes of the Technology hub include:

Specialised business park with tenants focused on technology and scientific

research.

Closed alignment to tertiary institutes and their academic staff.

Partly linked to a wider research system.

Figure 5: Source - Google Images

Page 35: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

34 | P a g e

5.7. MARGATE CBD AND BEACHFRONT URBAN RENEWAL

Margate is the tourism hub of Ray Nkonyeni Municipality and UGU Ditrict Municipal area. The

town presents a range of opportunities for the private sector to take part in the economy

through investing in the various tourism related opportunities presented by the town. The

Municipality and other spheres of governement are upgrading the CBD infrastructuren to create

a conducive environment for investment. These infrastructure improvements pave way for the

private sector to also take an opportunity in investing in a town under major rejuvanation and

having been identified as one of the secondary cities that the provincial governement has

earmarked as a priority. The urban renewal plan showcases some of the private sector projects

which beautify the area and provide opportunities for investors to invest.

Figure 6: KZN Technology Hub Website

Page 36: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

35 | P a g e

5.8. MARGATE AIRPORT PRECINCT DEVELOPMENT PLAN

The Margate Airport is considered a regional airport in KZN with great potential to attract related

investment opoprtunities. The Airport also has spaces to lease to related businesses such as

logistics and transport companies. The Airport currently has one major arirline (Cem-Air), which

has wekely flights to Johannesburg (OR Tambo Airport) and provider service to range of private

aviation companies and individuals.

Figure 8: Source: Google Images

Figure 7: Source: Google Images

Page 37: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

36 | P a g e

5.9. NYANDEZULU ROUTE (WATERFALL)

With a partnership between the local community’s various stakeholders such as the

tour guides, guesthouse owners, taxi association and policing forum, the route has

recently been resuscitated. Guided tours are offered to tourists coming from as far as

France, Sweden and Norway.

While several strides have been taken to ensure that this route offers an unforgettable

experience for visitors, it is not without its shortcomings and as such, further investment

is required to make this an unforgettable experience for nature loving tourists looking

for an authentic experience.

The five-hour tour covers the following areas of interest

1. Betannia Mission

2. Shembe Church

3. Mdlungwana Mountain

4. KwaSaka Beach

5. Ntantana Mountains

6. Sangoma

Whether seeking to experience the authentic thrill of a sangoma at work, hiking up

the Ntantana Mountains for a breath-taking view of the Nyandezulu Waterfall, this

route offers tourists a diverse experience. However, tourism infrastructure is still a

challenge in the area. Furthermore, the municipality is working with Ugu District

Municipality Tourism to address the challenge. Otherwise, there are a range of

opportunities available for potential investors in the private sector.

- The revitalisation of the existing buildings near the wetland at the Bettania

Mission for economic purposes provides an opportunity.

- A picnic site near the Shembe Mission

- Facilities at KwaSaka Beach

- Coffee shops or refreshment stations at the peak of the Ntantana Mountain or

backpackers lodge.

Figure 9: Source: Google Images

Page 38: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

37 | P a g e

5.10. KWAXOLO CAVES

The KwaXolo Caves are located ±20 km from Margate, close to Port Edward which is

2.5 hour travel to Durban. The land is owned by Ingonyama Trust under the

custodianship of Inkosi Xolo. The area is in close proximity to well known Golf Courses.

One of the advantages of the area is the potential to link coast with rural tourism with

packages to be enjoyed by all.

The KwaXolo caves contain ancient San rock, which form a significant part of the

province’s heritage. The project has been earmarked to expand tourism offering

beyond the coast towards the hinterland. The focus is to ensure that local

communities get opportunities to participate in the District’s thriving tourism sector.

Included in the development is tourism infrastructure linked with the caves in the form

of:

Accommodation facilities;

Hiking Routes;

Interpretive Centre;

Information Office;

Curio Shop;

Some of the opportunities involved are:

Partnership between Private Investor, KwaXolo Community Development Trust

and KwaXolo Rock Art Co-operative, with the investor taking the lead role in

business activities.

Private Investor leases the facility from the two partners and independently

run the facility, inclusive of new business development, marketing, further

investment etc.

NB: All project documents, inclusive of Master Plan and financial records to date, can

be made available upon request.

Page 39: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

38 | P a g e

5.11. KWANZIMAKWE

The KwaNzimakwe is located on the along the R69 Road between Mpenjati Nature

Reserve and Izingolweni, above the KwaNzimakwe Village. The loca tribal leaders

and friendly willagers will welcome you warmly. The experience includes the crafters

of the area and you can learn to weave, drum and do traditional dances.

The experience also includes visits to the homesteads with cattle kraal, an organic

garden and a sangoma. Then there is the walk across the holy mountain, past a

traditional Shembe church to a high view site above the sea. There, enjoy the shaded

lunch or, in the evening, enjoy a meal and listen to stories and music while you watch

the village settle in for the night and see the sunset splash colour across the vast

expanse of the sea and sky.

Figure 10: Google Images

Page 40: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

39 | P a g e

6. CHAPTER SIX: INVESTMENT OPPORTUNITIES PROVIDED BY UGU SOUTH

COAST DEVELOPMENT AGENCY (USCDA)

INVESTMENT OPPORTUNITIES

Property Development

Beachfront development – Scottburgh, Turton, Port Shepstone and Margate

Government office complex

Retail and residential development

Blue Economy

Small craft harbour, fish farming, boat manufacturing and maritime academy

ICT and Broadband

Fibre-optic network rollout to ensure coverage for the entire Ugu area

Tourism

medium sized convention centre (3000 seater)

cultural tourism and nation building exercises

adventure tourism (product development in traditional areas / settlements

occupied by indigenous communities)

Creative industries and ideal location for filming and advertising

Light manufacturing

Tenants for our industrial estates – Shelley Beach, Marburg and Ifafa (still at

planning stages)

Furniture manufacturing taking advantage of the plantations

Infrastructure

Page 41: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

40 | P a g e

Public-Private Partnerships for Margate airport upgrade

Green Economy

Renewable energy and recycling

Manufacture and repair of solar panels

Agriculture

Expansion of sugar cane and banana cultivation to traditional areas

Conversion of fallow fields by cultivating high yield cash crops – macadamia

and vegetables

Vertical agriculture / hydroponics

Fish farming / aquaculture

Agro-processing and logistics

For further details visit our website www.uscda.org.za or email [email protected]

Tel: 039 682 3881

7. CHAPTER SEVEN: LIST OF BUSINESSES WITHIN RNM

8. SUMMARY AND CONCLUSION

This report has provided background and substantial information for the

development of the Ray Nkonyeni Municipality Investment Protocol and Investment

Opportunities Profile. The report set forth the various investment opportunities extant

within the RNM and the incentives (national, provincial, local) provided by the

different spheres of government.

The investment protocol also gave substantial background and information on the

processes and procedures relating to the development of land, statutory applications

(rezoning, consent use, consolidation, subdivision and township establishment) and

the applications for, inter alia, building plans, business licensing and signage.

The document then named the investments opportunities for the prospective

investors in areas in and around the local municipalty. The investment protocol for the

RNM is envisaged to enhance local economic development, which will in turn

generate employment opportunities. Prospective investors are thus urged to contact

Page 42: PREPARED FOR: RAY NKONYENI MUNICIPALITY 10 CONNOR …rnm.gov.za/Departments/Economic_Development_Tourism_planning/… · durban 4001 contact no.phone: 031-307-1988 mobile: 072 486

41 | P a g e

the relevant departments to liaise with the relevant officials to ascetain more clarity for individual

projects.