    Item Wet Weight,tonne

    Dry Weight Note

    Drill module 480 480 0Static Hook Load 340 0 340Mud cleaning Package 60 60 0

    Mud pumps 0Pipe storage racks 40 40 0

    Stored Pipe 100 100 0

    BOP and well control equipment 50 50 0

    BOP Handling system 25 25 0Power generation 90 90 0

    Emergency Power Gen 25 25 0HPU and PCR 75 75 0Tensioned conductors 300 300 0Mud Storage 658 220 438.207401Brine Storage 286 100 186.1771309Drill water Storage 300 0 300Fuel Storage 300 100 200

    Mud mixers and charge pumps 40 40 0

    Fluid transfer pumps 20 20 0Sack Storage 200 200 0Dry bulk solids storage 300 100 200

    Service Equipment 500 500 0

    Production Module 1250 1250 0

    Firewater Pumps 2 2 0 1

    Cooling water lift pumps 1.5 1.5 0 1

    Risers for: export flowline;tieback to future field; PFW dumpline; future subsea storage tankumbilical.

    1 1 0 1

    Risers for; dry mud and cementtransfers from supply boats,includes air compressor systemfor providing pneumaticconveying air

    1 1 0 1

    Workshop, Tools store andwarehouse.

    0.2 0.2 0 1

    Accommodation (100 manminimum)

    910 910 0 1

    Helideck 110 110 0 1Life boats / life rafts / safetyequipment

    32.1 32.1 0

    Platform cranes (minimum 2 off) 7 7 0 1

    Potable water tanks and water

    maker

    0.5 0.5 0 1

    Instrument Air System 0.5 0.5 0 1

  • 8/11/2019 Preliminary Weight Takeoff For

    2/4

    COMMS systems 0.25 0.25 0 1

    Main Control Room 0.25 0.25 0 1

    FRC/ Davits 8 8 0 1Davits 0 1Contingency 325.6842266 242.465 83.2192266 1

    Total 6839.368759 5091.765 1747.603759Notes1). Brian Chang etal to estimate this weight2). Normal Jacking : 1000 Kips/per pinion = 446 ton/pinion3). Static Holding : 1450 Kips/per pinion = 647 ton/pinion

  • 8/11/2019 Preliminary Weight Takeoff For

    3/4

  • 8/11/2019 Preliminary Weight Takeoff For

    4/4

    Expect this would be located on/within accomodationmodule, and antennae on central jacking leg

    Previously located in JU units Accomodation blockoverlooking drill module.

    to be deleted