Item Wet Weight,tonne
Dry Weight Note
Drill module 480 480 0Static Hook Load 340 0 340Mud cleaning Package 60 60 0
Mud pumps 0Pipe storage racks 40 40 0
Stored Pipe 100 100 0
BOP and well control equipment 50 50 0
BOP Handling system 25 25 0Power generation 90 90 0
Emergency Power Gen 25 25 0HPU and PCR 75 75 0Tensioned conductors 300 300 0Mud Storage 658 220 438.207401Brine Storage 286 100 186.1771309Drill water Storage 300 0 300Fuel Storage 300 100 200
Mud mixers and charge pumps 40 40 0
Fluid transfer pumps 20 20 0Sack Storage 200 200 0Dry bulk solids storage 300 100 200
Service Equipment 500 500 0
Production Module 1250 1250 0
Firewater Pumps 2 2 0 1
Cooling water lift pumps 1.5 1.5 0 1
Risers for: export flowline;tieback to future field; PFW dumpline; future subsea storage tankumbilical.
1 1 0 1
Risers for; dry mud and cementtransfers from supply boats,includes air compressor systemfor providing pneumaticconveying air
1 1 0 1
Workshop, Tools store andwarehouse.
0.2 0.2 0 1
Accommodation (100 manminimum)
910 910 0 1
Helideck 110 110 0 1Life boats / life rafts / safetyequipment
32.1 32.1 0
Platform cranes (minimum 2 off) 7 7 0 1
Potable water tanks and water
maker
0.5 0.5 0 1
Instrument Air System 0.5 0.5 0 1
8/11/2019 Preliminary Weight Takeoff For
2/4
COMMS systems 0.25 0.25 0 1
Main Control Room 0.25 0.25 0 1
FRC/ Davits 8 8 0 1Davits 0 1Contingency 325.6842266 242.465 83.2192266 1
Total 6839.368759 5091.765 1747.603759Notes1). Brian Chang etal to estimate this weight2). Normal Jacking : 1000 Kips/per pinion = 446 ton/pinion3). Static Holding : 1450 Kips/per pinion = 647 ton/pinion
8/11/2019 Preliminary Weight Takeoff For
3/4
8/11/2019 Preliminary Weight Takeoff For
4/4
Expect this would be located on/within accomodationmodule, and antennae on central jacking leg
Previously located in JU units Accomodation blockoverlooking drill module.
to be deleted