PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
Pre-Feasibility Report of
Savudu Quarry (Under the Guidelines of Ministry of Environment and Forest
in terms of the provisions of EIA notification 20051, 52 & 127 and specifically in circular
No J-11013/41/20051, 52 & 127 -IA.II (I) dated 30th
December, 2010)
Location of the Quarry Lease Area
S.F.No. 25/2,
Mudukkankulam Village,
Kaariyapatti Taluk, Virudhunagar District,
Extent: 2.15.0Ha (Less than 5Ha)
Category: B2 Project
Applicant
Ahamed satham,
S/o. Abubackar Siddiqu,
Door.No.39/12-338,
Kamarajar Nagar, 1st Street,
Paramakudi Taluk,
Ramanathapuram District.
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
1. EXECUTIVE SUMMARY
The Proponent Mr. Ahamed satham has been obtained permission from District collector
Virudhunagar to quarry Savudu for over an extent of 2.15.0Ha in Survey No: 25/2 at
Mudukkankulam Village, Kaariyapatti Taluk and Virudhunagar District, Tamilnadu state by
District Collector Virudhunagar, Rc. No. KV3/453/2017-Mine Dated: 07.09.2017 for a
period of One year only subjected to submission of Environmental clearance from MoEF /
DEIAA, consent for Establishment and Consent for operation from TNPCB.
SALIENT FEATURES OF THE PROJECT
S.NO PARTICULAR DETAILS
1. Name of the Proponent Ahamed satham
2. Type of Project Savudu quarry
3. Location Survey No.25/2
Mudukkankulam Village,
Kaariyapatti Taluk,
Virudhunagar District,
Tamilnadu State.
4. Mining lease area 2.15.0Ha
5. Type of land
Patta/forest/PWD
It is a Patta land – Non forest
6. Life of period One year only
7. Production capacity The proposed quantity of reserves is 32910m3
(or)
5485 Lorry Loads of Savudu up to an average depth
of 2.0m for a period of One year only.
Description Savudu in m3
Geological Resources 50220
Available Mineable reserves 32910
One Year plan period
As in the approved mining plan
32910
8. Method of Mining Open cast method of shallow mining is proposed,
Machineries like excavators are proposed for
quarrying Savudu up to an average depth of 2.0m.
No drilling or blasting is proposed for this type
of Savudu Quarrying, it is a conventional eco
friendly quarrying operation
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
9. Ultimate depth of Mining The quarry operation is proposed up depth 2.0m
during this period
10. Latitude 09°39’04.55’’N to 09°38’55.52’’N
11. Longitude 78°11’18.99’’E to 78°11’13.96’’E
12. Top sheet No. 58 – K/02
13. Topography of MSL area 77m from MSL
14. Land use classification It is a fresh quarry lease
15. Ground water level The Ground water is about 35mt depth from below
ground level.
16. Climatic condition Rainfall - 900/annum
Temperature - 40ºC - 25ºC
17. Land use pattern Description Area in percentage (%)
Habitation / Road – 15%
Lake / Pond / Stream – 15%
Agricultural land – 20%
Barren land – 30%
Trees / EB Line – 20%
18. Nearest habitation Allalaperi – 1km – W
19. Nearest Town Kaariyapatti - 10km - NW
20. Nearest Railway station Tiruchuli Railway station - 12.5km -SE
21. Nearest Airport Madurai Airport - 23km - NW
22. Nearest National Highways &
State Highways
NH45B - Madurai– Thoothukudi – 10km - W
SH184 – Virudhunagar - Tiruchuli - 9km-SW
23. Nearest Hospital Allalaperi – 1km – W
24. Aerial distance to the nearest
Eco sensitive areas, CRZ,
forest, wild life sanctuary,
Interstate boundary, critically
polluted area if the quarry site
is within 500m of these areas.
More than 500m from Eco sensitive areas, CRZ,
forest, wild life sanctuary, Interstate boundary,
critically polluted area.
25. Details of other quarries for a
radius of 500m around the
quarry site
There is no quarry within the radius of 500mt
26. Man power About 7 employees
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
27. Water requirement & source Total water requirement for 1.0KLD from water
vendors & nearby bore well.
28. Overburden/Waste There is no overburden anticipated in this area
29. Cost of the project The Project cost:
A. Fixed Asset cost = Rs. 5,20,000/-
B. Operational cost = Rs. 7,21,600/-
B. EMP cost = Rs. 41,000/-
Total project cost = Rs. 12,82,600/-
CSR Cost (2.5%) = Rs. 32,000/-
Total cost = Rs. 13,14,600/-
The Prefeasibility report preparing for following condition of Government of India Ministry of
Environment and Forests (No.L-11011/47/2011 –IA-II (M) Dated: 24th June, 2013)
� Odai present in the 50m radius of the lease applied area.
� There is no forest within the radius of 10km.
� There is no CRZ within the radius of 10km.
� There is no Western Ghats within the radius of 10km.
� The project area does not fall in ‘HACA’ region.
� There is no Interstate boundary within the radius of 10km.
� There are no Bird sanctuaries, wild life sanctuaries and National park as Act 1972, within
the radius of 10kms.
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
The following information provided by the applicant
I have applied to DEIAA, Tamilnadu for getting Environmental clearance for the Savudu
quarry in S.F.No:25/2 for over an extent of 2.15.0Ha, Patta land in Mudukkankulam Village,
Kaariyapatti Taluk and Virudhunagar District.
� I swear to state and confirm that within 5km / 10km area of the quarry site, I have applied
for environmental clearance; none of the following is situated.
� Protected areas notified under the wild life (protection) Act, 1972.
� Critically polluted areas as notified by the central pollution control board constituted under
water (Prevention and Control of pollution) Act 1974. Eco – Sensitive areas as notified.
� Interstate boundaries and international boundaries within 5km radius from the boundary of
the proposed site.
� No quarries located within 500m radius from the periphery of my quarry.
� There will not be hindrance or disturbance to the people living no enroute / nearby our
quarry site while transporting the mineral our material and due to quarrying activities.
� There is no habitation within 300m radius from the periphery of my quarry.
� I swear that afforestation will be carried out during the course of quarrying operation and
maintained.
� The required insurance will be taken in the name of the labourers working in my quarry site.
� Approach road belongs to local panchayat only and no other private patta roads encountered.
� I will not engage any child labour in our quarry site and I aware that engaging child labour is
punishable under the law.
� All types of safety / protective equipment will be provided to all the labourers working in
my quarry.
� No permanent structures, temples etc., are located within 500m radius from the periphery of
my quarry.
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
2.0 INTRODUCTION OF THE PROJECT OR BACKGROUND INFORMATION
(i) Identification of project and project proponent: In case of mining project, a copy of mining
lease/letter of intent should be given
Identification of Project
Project Proponent Name with Address
Ahamed satham,
S/o. Abubackar Siddiqu,
Door.No.39/12-338,
Kamarajar Nagar, 1st Street,
Paramakudi Taluk,
Ramanathapuram District.
Mobile No. 88708 33405
Email: [email protected]
In case of mining project, a copy of mining lease/letter of intent should be given
� The precise area communication letter was issued by the District collector Virudhunagar
vide Rc. No. KV3/453/2017-Mine Dated: 07.09.2017.
� The Mining plan was approved by the Deputy Director, Department of Geology and Mining
Virudhunagar vide Rc. No. KV3/453/2017 Dated: 11.10.2017.
Name of the Project Mudukkankulam Savudu quarry
Lease area 2.15.0Ha (Patta land) - Non forest
Location Survey No. 25/2
Mudukkankulam Village, Kaariyapatti Taluk,
Virudhunagar District and Tamilnadu State.
Topo sheet No. 58 – K/02
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
(ii) Brief description of nature of the project
Mining:
The Lease applied area is plain terrain, The Savudu quarrying by opencast method of shallow
mining is proposed. Machineries like excavator are proposed for quarrying of Savudu. No drilling
and blasting is proposed. There is no formation of bench; the quarrying is a restricted to a depth of
2.0m in the entire area.
Savudu is composed of unconsolidated rock fragments that have a general particle
size range and include size classes from granule- to cobble-sized fragments. Savudu is sub-
categorized by the Udden-Wentworth scale into granular Savudu (>2 to 4 mm or 0.079 to 0.16 in)
and pebble (>4 to 64 mm or 0.2 to 2.5 in). One cubic yard of Savudu typically weighs about 3000
pounds (or a cubic meter is about 1,800 kilograms). The applicant intends to use this Savudu
especially for filling and leveling of low lying areas for Road projects and other infrastructure
development work in and around the District.
The proposed quantity of Savudu:
There is no top soil. The waste material is not anticipated during the quarry operation, the
entire Savudu is excavated and utilized. There is no top soil. It is proposed to exploit Savudu of
about 32910m3
for a period of One year only.
(iii) Need for the project and its importance to the country and or region
The Savudu quarrying project falls in the area of Virudhunagar District, Tamilnadu where
scanty agricultural activities are been carried out and the new industries are springing up in the
district. Savudu is an important commercial product, with a number of applications. The applicant
intends to use for filling and leveling of low lying areas.
This project will give employment opportunities to 7 members directly. Mineral Industries
of the state of Tamilnadu provides employment opportunities for the people of the state as well as in
the specific project area. Mining and Quarrying is one among the major core sector industries which
plays a vital process of country’s economic development.
(iv) Demand and supply gap
There is a huge demand of Savudu in Virudhunagar District for this a huge quantity of
Savudu is required for filling and leveling of low lying areas of road construction projects and other
infrastructure development work. Besides there is also huge demand of Savudu for public and
private sector projects also.
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
(v) Imports vs indigenous production
There is no import of Savudu at present in India. India especially the peninsular India
(southern India) has good resource of Savudu.
(vi)Export Possibility
There is no possibility for export of this Savudu.
(vii) Domestic/Export Markets
The Savudu is specifically use for filling and leveling of low lying areas for Road projects
and other infrastructure development work in and around the District for during this lease period.
(viii) Employment Generation (Direct and Indirect) due to the project
About 7 employees labors directly and engaged in this proposed quarry project and the
tentative man power required for the proposed Savudu quarry shall be as follows.
Designation No’s
Skilled
Mines foreman 1
Supervisor 1
Semi skilled
Excavators Operators 1
Co operator 1
Un-Skilled
Watchman 1
Unskilled helper 2
Total 7
The above man power is adequate to meet out the production schedule and the machinery
strength envisaged in the mining plan and also to comply with the stationary provisions of mine
safety regulation.
It is been ensured that the labors will not be deployed less than 18 years, No Child labors
will engaged or entertained for any kind of quarrying operations. All the labors engaged for
quarrying operations will be insured till the end of life of quarry.
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
3.0 PROJECT DESCRIPTION
(i) Type of project including interlinked and interdependent projects, if any
The Mudukkankulam Savudu quarry, it is an opencast method of shallow mining is
proposed. There is no interlinked & Interdependent Project.
(ii) Location (map showing general location, specific location, and project boundary & project
site layout) with coordinates
� The area is located in S.F.No.25/2, Mudukkankulam Village, Kaariyapatti Taluk and
Virudhunagar District.
� It’s a Patta land; the Lease applied area is plain terrain.
� The altitude of the area is 77m (Maximum) from MSL
� The area is falls in GSI Topo sheet No. 58 – K/02
� The Latitude between of 09°39’04.55’’N to 09°38’55.52’’N
� The Longitude between of 78°11’18.99’’E to 78°11’13.96’’E on WGS 1984 datum.
GOOGLE IMAGE SHOWING THE LEASE BOUNDARY AREA
Lease area
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
LOCATION MAP OF THE PROJECT AREA WITH CO ORDINATES
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
DRAWING SHOW THE SURFACE PLAN WITH CO-ORDINATES
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
DRAWING SHOW THE ENVIRONMENTAL PLAN
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
(iii) Details of alternate sites considered and the basis of selecting the proposed site,
particularly the environmental considerations gone into should be highlighted
The quarrying operation is proposed in the Patta land and there is no any alternative site for
this project is not considered, the project is site specific.
(iv) Size or magnitude of operation
The total area of the project is about 2.15.0Ha. It is proposed to exploit Savudu about
32910m3 by open cast method of shallow mining is proposed for quarry by deploying excavate
directly for a period of One year only.
(v) Project description with process details (a schematic diagram/flow chart showing the
project layout, components of the project etc. should be given)
General Geology
Savudu is composed of unconsolidated rock fragments that have a general particle size range
and include size classes from granule- to cobble-sized fragments. Savudu is sub-categorized by
the Udden-Wentworth scale into granular Savudu (>2 to 4 mm or 0.079 to 0.16 in) and pebble (>4
to 64 mm or 0.2 to 2.5 in). One cubic yard of Savudu typically weighs about 3000 pounds (or a
cubic meter is about 1,800 kilograms).
Savudu is an important commercial product, with a number of applications. The applicant
intends to use this Savudu especially filling and leveling of low lying areas for Road projects and
other infrastructure development work in and around the District.
OPEN CAST WORKING
Open cast method of shallow mining is proposed, Machineries like excavators are proposed
for quarrying Savudu 2.0m depth. No drilling or blasting is proposed for this type of Savudu
quarrying, it is a conventional eco friendly quarrying operation.
The Savudu will be loaded directly to the trucks / Lorries for transportation to the needy
customers.
Details of Exploration
No exploration is carried out. The Savudu is found clearly right from the surface in the lease
applied area.
Proposed Study to be carried out
As the quarrying operation is proposed to be carried out for a period of One year only to a
depth of 2.0m further exploration or proposed study is redundant.
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
Method of Estimation of Reserves
The Geological plans demarcating the commercially viable Savudu body have been prepared in
1:1000 scales (Plate No.III).
Total Three sections have been drawn, One Section along the Length wise as (X-Y) another
Two sections drawn the Width wise as (A-B) & (C-D) to choose the maximum area cover under the
lease in the Horizontal 1:1000 and Vertical 1: 100 (please refer Plate No- III).
The cross sectional area for the proved depth persistence of 2.0m below the ground level has
been worked out for the section. The cross sectional area multiplied by its length of influence on the
longer axis gives the volume (insitu) in the cross sectional area.
The sum total of the insitu reserves available within the individual cross sectional area gives the
geological Resources of the lease applied area.
As the Recoverable of Savudu in the terms of cubic meter. The Geological Resources,
Mineable Reserves are given only in terms of Cubic meter. The Details of estimation of Geological
Resources and Mineable Reserves with reference to Topography, Geological Plan and Section shown
in (Plate No. III).
Mineable reserves
MINEABLE RESERVES
Section Bench Length in
(m)
Width in
(m)
Depth in
(m)
Savudu
Formation
in m3
XY-AB
I 80 115 1 9200
II 77 112 1 8624
TOTAL 17824
XY-CD I 71 110 1 7810
II 68 107 1 7276
TOTAL 15086
GRAND TOTAL 32910
Total Mineable Reserves are calculated up to a maximum depth of 2.0m below the ground
level = 32910m3 for a period of One year.
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
Process details:
Overburden:
No overburden in the area, Savudu Clearly visible right from the surface.
(vi) Raw material required along with estimated quantity, likely source, marketing area of
final products, Mode of transport of raw Material and Finished Products
This is a quarrying project for excavating Savudu hence there is no requirement for raw
material.
Uses:
The Excavated Savudu especially for filling and leveling of low lying areas for Road
projects and other infrastructure development work in and around the District.
(vii) Resource optimization/recycling and reuse envisaged in the project, if any, should be
briefly outlined
No optimization/ Recycling and Reuse envisaged in the proposed Savudu quarry project.
(viii) Availability of water its source, Energy/power requirement and source should be given
This Savudu quarry project does not require huge water for the project. The total water
requirement in the quarry will be around 1KLD.
Purpose Quantity Sources
Drinking &
Domestic purpose
0.3 KLD Water Purchase from Approved water vendors
available in Allalaperi (1km – Western side of the
area)
Dust suppression 0.3 KLD From Existing Borehole on nearby the quarry area.
Green belt 0.4 KLD From Existing Borehole on nearby the quarry area.
Total 1.0KLD
Excavating the Savudu by excavators
Loading the Savudu into tippers by excavator to the
needy Road construction sites
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
Energy
No electricity is required for quarry operation; the quarry working is restricted on day time
only (between 9Am to 5Pm). Diesel (HSD) will be used for quarrying machineries around 8768
liters of HSD will be used for the entire projects. Diesel will be brought from nearby diesel pumps.
No power is required for the project. Lightings on the Night will be taken from nearby electric poles
after obtaining permission from concerned authorities.
Per hour Excavator will consume = 16 liters / hour
Per hour Excavator will excavate = 60m3
Per 32910m3 = 32910m
3/60m
3
= 548 hours
Diesel consume 548 working hours = 548 hours x 16 liters
= 8768 liters of HSD for entire project life
(ix) Quantity of wastes to be generated (liquid and solid) and scheme for their
management/disposal
There is no wastage is encountered during the quarrying operation the entire Savudu is
utilized for public and private sector projects for filling and leveling the low lying areas.
There is no toxic effluent expected to generate in the form of solid liquid and gases and the
no requirement of treatment of waste. There is no top soil available in the lease applied area.
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
(x) Schematic representations of the feasibility drawing which give information of EIA
purpose
4.0 SITE ANALYSIS
(i) Connectivity
S.
No.
Particulars Location Direction Approximate
Distance in
km
1. Nearest Post office Allalaperi W 1km
2. Nearest Town Kaariyapatti NW 10km
3. Nearest Police station Kaariyapatti NW 10km
4. Nearest Govt. Hospital Allalaperi W 1km
5. Nearest Dispensary Kaariyapatti NW 10km
6. Nearest school Kaariyapatti NW 10km
7. Nearest DSP office Virudhunagar SW 27km
8. Nearest Railway station Tiruchuli SE 12.5km
9. Nearest Airport Madurai NW 23km
(ii) Land Form, Land use and Land ownership
Land form:
The lease applied area is plain terrain. Lease area is dry land. The area does not fall in forest
land.
To Submit DEIAA
As the project is categorized in category-“B2”
The project area is (>5Ha)
Final Presentation of this project
DEAC-Grant of Environmental Clearance
Form – 1
Along with Mining Plan
&
Pre-feasibility Report
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
Land use:
There are no water courses flowing through the applied lease area. There is no
vegetation/plantation in this area. Some thorny bushes and shrubs are observed. The land is
specifically used for collecting the water during the rainy season.
Land Ownership:
It is a Patta land register in the name of Karuppaiah. Vide Patta No.679. Applicant has
obtain consent from the Pattadhar. Refer the Annexure No – IV.
(iii) Topography (along with map)
The area is Plain Terrain covered with Savudu which does not sustain any type of vegetation.
The altitude of the area is 77m (Maximum) from MSL; the slope of the area is towards Western side.
Google map view of the Quarry lease applied area
Lease area
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
GOOGLE IMAGE SHOWING THE LEASE BOUNDARY AREA
For Mudukkankulam Savudu Quarry
Lease Area:
Village: Mudukkankulam
Taluk: Kaariyapatti
District: Virudhunagar
Topo sheet No: 58 – K/02
Latitude : 09°39’04.55’’N to 09°38’55.52’’N
Longitude: 78°11’18.99’’E to 78°11’13.96’’E
Lease area
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
(iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including
area under CRZ)), shortest distances from the periphery of the project to periphery of the
forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the
HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette notification
should be given.
� Odai present in the 50m radius of the lease applied area.
� There is no forest within the radius of 10km.
� There is no Western Ghats within the radius of 10km.
� There is no CRZ within the radius of 10km.
� The project area does not fall in ‘HACA’ region.
� There is no interstate boundary within the radius of 10km.
� There are no Bird sanctuaries, wild life sanctuaries and National park as Act 1972, within
the radius of 10kms.
� There is no quarry within the radius of 500m.
(v) Existing Infrastructure
There is no existing infrastructure in the proposed quarry lease applied area.
(vi) Soil Classification
The area is mostly covered with Savudu formation.
(vii) Climatic data form secondary sources
Both the North East and South West monsoon occurs here and the summer are hot and
winter is cool. During April and May the temperature may shoot up to 40°C and during winter the
temperature does not fall below 25°C. The average annual rainfall is around 900mm.
(viii) Social infrastructure available
There is no social infrastructures like Government Buildings, worship in the 1Km vicinity of
the quarry lease applied area.
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
5.0 PLANNING BRIEF
(i) Planning Concept (type of industries, facilities, transportation etc.) Town and Country
Planning/Development authority Classification.
The total area of the Project is about 2.15.0Ha. The Proposed production of Savudu is about
32910m3
for a period of One year only up to a depth of 2.0m depth below the ground level. This
quarrying project is to excavate Savudu by conventional Open cast method of shallow mining is
proposed. Hydraulic excavator is proposed for quarrying Savudu. Transportation of Savudu shall be
done by tippers on roads.
The Project land is devoid of Vegetation and lies in the backward town of Virudhunagar
District. There are no specific industries or factories in and around the project areas.
Transportation
Hired Tippers of 10/20Ts capacity will be utilized for Transportation of Savudu from the
quarry to needy sites by Tarpaulin cover to prevent spillage. During the transportation the material
along the village roads and populated areas the vehicle should not exceed the 20Km speed limit.
Population project
There are few villages located in 5km radius from the lease applied area the details are given
below.
(iii) Land use planning (breakup along with green belt etc.,)
The Savudu quarrying operation is proposed for a period of One year only up to depth of
2.0m. The project area extent is 2.15.0Ha. The entire area is proposed to be quarried. The land is
specifically used for collecting the water during the rainy season.
S.
No Name of the Village
Approximate distance
& Direction from lease
applied area
Approximate
population
1. Mudukkankulam 2.0Km -NE 400
2. Manaviyendal 1.0Km -SE 100
3. Allalaperi 1.0Km -W 500
4. Srirampoor 2.5Km -NW 300
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
(iv) Assessment of Infrastructure Demand (Physical & Social)
The existing road facilities are already available which shall be used and maintained.
Medical facilities is available for the project sites, Government and private hospitals and other basic
infrastructure facilities like communication center, school supermarket, bus stand are also available
in Kaariyapatti which is at a distance of 10km on Northwestern side of the area. This quarry project
will provide employment for about 7 persons directly.
(v) Amenities/Facilities
The simple methods adopted and the limited scale of activities involved in Savudu quarrying
does not require High Tension Electric Power supply or huge worship facilities. The quarrying
work is restricted to one general shift during day time only. Major Machinery repair works are
attended at Virudhunagar. Packaged drinking water will be brought from approved water vendors.
All the facilities are available in Virudhunagar district which is at a distance about 27km on the
Southwestern side of the area.
6.0PROPOSED INFRASTRUCTURE
(i) Industrial Area (Processing area)
There is no processing area proposed within the lease applied area.
(ii) Residential area (Non processing area)
There is no habitations located within 300mts of the lease applied area.
(iii) Green Belt
After the completion of the quarrying operation, the land will be used for the agriculture and
infrastructure purpose. The applicant ensures to plant native species like pungam, neem, causirina
on the periphery of the 7.5m Safety Distance of the lease applied Area. It is proposed to plant
around 25 trees. The estimated budget for plantation and maintenance of Green belt development
would be around Rs. 10,000/-
(iv) Social infrastructure
This proposed Savudu quarry will fetch employment for about 7 people directly and 5
persons indirectly.
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
(v) Connectivity (traffic and transportation road/ Rail/ Metro/ Water ways etc.)
Mode Description
Road connectivity 1. The Road is available on the Southern side of the area which
Roads Connecting on the Allalaperi Village Road at a
distance of 10m.
2. The Nearest National Highway (NH45B) - Madurai–
Thoothukudi – 10km – Western side of the area.
3. The Nearest State Highway (SH184) – Virudhunagar -
Tiruchuli – 9km –Southwestern side of the area.
Railway station &
Railway line
1. The Nearest Railway station is Tiruchuli – 12.5km – South
eastern side.
2. The Nearest Railway line is Virudhunagar - Karaikudi line –
12km –South eastern side of the area.
Air port 1. The Nearest Airport is Madurai – 23km- Northwestern side.
(vi) Drinking Water management (Source& Supply of water)
This proposed Savudu quarry project does not require huge water either for beneficiation or
processing. Drinking water for this will be brought from approved water vendors in Allalaperi
which is about 1km on the Western side of the area.
(vii) Sewerage System
Toilets will be constructed on semi-permanent structure and sewage will be discharged
once in One year. The sewage waste will be collected in soak pit and discharged as manure.
(viii) Industrial Waste Management
No industrial waste will be generated from the project.
(ix) Solid Waste Management
The Savudu quarrying does not produce any waste. The entire Savudu is excavated and
utilized. This waste may not produce any toxic effluent in the form of solid liquid or gas.
(x) Power Requirement & Supply / source
The proposed Savudu quarrying does not required any power supply the quarrying operation
which is proposed to operate in day time only for 7 Am to 5Pm with 1 Hour lunch interval between
1Pm to 2Pm.
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
7.0 REHABILITATION AND RESETTLEMENT (R & R PLAN)
(i) Policy to be adopted (Central/State) in respect of the project affected persons including
home oustees, land oustees and landless laborers (a brief outline to be given)
The project area lies in Patta land, Mudukkankulam Village, Kaariyapatti Taluk,
Virudhunagar district. There is no residential area within the radius of 300m; hence there is no
rehabilitation and resettlement involved in this Savudu quarrying project.
8.0 PROJECT SCHEDULE & COST ESTIMATES
(i) Likely date of start of construction and likely date of completion (Time schedule for the
project to be given)
The Savudu quarrying project is likely to get commenced after the execution of quarrying
lease. The total quantity of reserves is 32910m3 of Savudu. The life of the quarry project is One
year only.
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
(ii) Estimated project cost along with analysis in terms of economic viability of the project
A. Fixed asset cost
Land cost = Rs. 4, 30,000/-
Temporary rest shelter = Rs. 20,000/-
Sanitary facilities = Rs. 50,000/-
First aid & accessories = Rs. 20,000/-
Total Fixed asset Cost = Rs. 5, 20,000/-
B. Operational cost
For Excavation = Rs. 6, 57,600/-
Drinking Water = Rs. 12,000/-
Sanitary Maintenance = Rs. 12,000/-
Safety kits = Rs. 20,000/-
Leveling after quarrying = Rs. 20,000/-
Total Operational Cost = Rs. 7, 21,600/-
C. EMP cost
Water Sprinkling = Rs. 36,000/-
Afforestation cost = Rs. 5,000/-
Total EMP cost = Rs. 41,000/-
The project cost:
A. Fixed asset cost = Rs. 5,20,000/-
B. Operational Cost = Rs. 7,21,600/-
C. EMP cost = Rs. 41,000/-
Total Project cost (A+B+C) = Rs. 12, 82,600/-
CSR Cost (2.5%) = Rs. 32,000/-
Total Cost = Rs. 13, 14,600/-
• The total Project cost (A+B) and including CSR cost is about Rs. 13,14,600/- (Rupees
Thirteen lakhs fourteen thousand and six hundred only)
• The total EMP cost is around Rs. 41,000/- (Rupees Forty one thousand only)
Population Benefit
The applicant ensures to take social responsibilities like providing School Note books,
Uniforms to the Students below poverty level beside if the villages require any borehole for public
use the applicant ensure to do so. The applicant will also take part and contribute the native cultural
activities in the nearby villages. During summer seasons packaged drinking water will be kept in the
village for public and for tress passers. The applicant will involve and contribute all the socio
cultural allocation in and around the area.
Government Revenue
The state Government will get revenue as Royalty, sale tax, surface rent, dead rent/ VAT/
income tax etc.
PRE FEASIBILITY REPORT FOR MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Under EIA Notification 2006
9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)
(i) Financial and social benefits with special emphasis on the benefit to the local people
including tribal population, if any, in the area
The Excavated Savudu is utilized for filling and leveling of low lying areas for Road
projects and other infrastructure development work in and around the District, Besides the Savudu
also used for domestic housing and infrastructure projects of the district. Due to this project many
of the infrastructure development will be carried out in and around the district on time, nearly 7
employees directly and 5 employees indirectly get employment opportunity through this project.
The detail furnished in this mining plan is based on information provided by the state Government
and lessee. By considering the merit of the project the permission may be granted.
Place: Virudhunagar
Date: 13.10.2017
1. Signature of the Applicant
Ahamed satham
2. Signature of the Qualified Person
Dr. P. Thangaraju, M.Sc., Ph.D.,
BASE LINE STUDIES OF MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Base Line Studies is Prepared for
Mudukkankulam Savudu Quarry
BASE LINE STUDIES OF MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
BASE LINE STUDIES The base line study is prepared for Mudukkankulam Savudu Quarry project. Base line
studies provide a base data for regular Environmental Monitoring and Environmental Impact
Assessment (EIA). The baseline study is provides bench mark for carrying out environmental
Impact assessment due to the course of quarrying and mining activities. The purpose of these
studies is to evaluate the benefited and adverse effect of developing activities on the
neighborhood environment and the area where the quarrying is proposed to carry out.
Mr. Ahamed satham applied for Savudu Quarry project lease for over an extent of
2.15.0Ha in S.F.No: 25/2 at Mudukkankulam Village, Kaariyapatti Taluk, Virudhunagar District
and Tamilnadu.
General approach to Environment
The Environmental besides data comprise of the features present of the site area its
includes environmental features such as forest area, conservation area, water bodies, industries,
wild life and fauna place of historic and importance etc.,
The data collected to cover the following.
1. Air Environment
2. Noise Environment
3. Water Environment
Air Environment
Ambient Air quality has been assessed through a net – Work of 3 ambient air quality
stations. Standard monitoring and analysis procedures were adopted for adopted for determining
the Air quality parameters. The PM10, PM2.5, SO2, NO2 are monitored as per prescribed
guidelines/methods. The AAQ monitored data for all locations for above parameters are shown
in Table No: 1
S.No Test Parameters Unit Protocol Results CPCB
Standards
1 Particulate matter less
than 10 micron size
(PM10)
µg/m3
IS 5182 Part 23-2006 41.3 100
2 Particulate matter less
than 2.5 micro size
(PM2.5)
µg/m3 IS 5182 part 4-1999
(Reaff 2010)
21.2 80
3 Sulphur dioxide SO2 µg/m3
IS 5182 part 2-2001
(Reaff 2006)
4.1 80
4 Nitrogen Dioxide
NO2
µg/m3 IS 5182 Part 6-2006 5.4 80
BASE LINE STUDIES OF MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Noise Environment:
Sound can be defined as atmospheric or air vibration perceptible to ear. Noise is usually
unwanted or undesired sound. Consequently, particular sound can be noise to one person and not
to others or noise at one time and not at other time. Hence sound loud enough to be harmful is
called noise without regard to its characteristics. Noise is a form of pollution because it can cause
hearing impairment and psychological stresses.
The noise level measurement in the core zone and nearby buffer zone area was carried
out to evaluate the future impact on noise environment due to the proposed mining operation.
Noise measurements were carried out using Lutron SL 4001 sound level meter. The result of
hourly background noise levels for all locations are given in Table No: 2
S.No Location Results
dB (A)
CPCB Standard
Limit
1 Project site – Centre area 41.2 70*
2 Project Site SW corner 39.3 70*
3 Project site SE Corner 42.2 70*
4 Project site NE Corner 43.3 70*
Water environment
Assessment of baseline data on water environment includes identification of water
resources, collection of water samples, Analyzing water samples collected for Physico –
Chemical parameters as per standards. 1 bore well and 2 well water samples were collected and
the water quality results are given Table No: 3
Test Protocol Results Limits as per IS 10500 : 2012
Acceptable
Limit
Permissible limit in the
absence of alternate
source
Colour IS : 3025 part : 4-1983
(Reaff : 2006)
9.1Hazen 6 15
Odour IS : 3025 part : 5-1983
(Reaff : 2006)
Agreeable Agreeable Agreeable
pH at 250C IS : 3025 part : 11-
1983 (Reaff : 2006)
6.2 7.5 – 8.5 No relaxation
Total Dissolved
solids
IS : 3025 part : 16-
1984 (Reaff : 2006)
1415mg/l 600 mg/l 2000mg/l
Aluminiumas Al IS : 3025 part 2:2004
(Reaff : 2009)
BDL (DL:0.005
mg/l)
0.04 mg/l
0.2 mg/l
Barium as Ba IS : 3025 Part 2:2004
(Reaff : 2009)
0.21 mg/l 0.7mg /l No relaxation
Boran as B IS : 3025 Part 2:2004
(Reaff : 2009)
BDL (DL: 0.1
mg/l)
0.5mg /l 1.0mg/l
Calcium as Ca IS: 3025 Part 2: 2004
(Reaff : 2009)
149.7mg/l 75mg/l 200mg/l
Chloride as Cl IS : 3025 Part 32-1988
(Reaff . 2009)
471mg/l 245mg/l 1000mg/l
Copper as Cu IS: 3025 part 2: 2004
(Reaff : 2009)
BDL (DL:0.01
mg/l)
0.05mg/l 1.5mg/l
Fluoride as F IS : 3025 Part 60: 2008 0.71mg/l 1.0mg/l 1.5mg/l
BASE LINE STUDIES OF MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Flora and fauna in and around the area
A detail study related to flora and fauna was carefully observed physically by
environmental engineers, Botanist and zoologist. The following table shows the flora and Fauna
available at the region.
S.No Common Name Botanical name Pictures
1. Neem Azadirachata indica
2. Korai Cyperus Pangorei
3. Oomathai Datura metel
4. Sappathikalli Opuntia dillenii
5. Pirandi Cissusqua drangularis
6. Karuvelam Tree Acsia nilotica
7. Palm tree Borassus falabellifer
8. Velikathan Prosopis juliflora
9. chotthukatali Aloe Vera
10. Mookuthichedi Tridax procumbens
List of Faunas
S.No Common Name Scientific name 1. Frog Rana aurora
2. Dog Canius familairis
3. Goat Capra hircus
4. Crow Corvus splenders
5. Squirrel Rodentia scrurus,
6. Ant Hymenopterous formicida,
7. Cat Felsis catus
BASE LINE STUDIES OF MUDUKKANKULAM SAVUDU QUARRY AHAMED SATHAM
Conclusion
The base line studies relents no hazardous levels of dust and noise and prevailing at the
project area. A well implemented environmental Management plan as discussed in the mining
plan will help in mitigation the adverse effects due to quarrying activities.
The movement of vehicles is very minimal. The entire vehicle used will be periodically
maintained by well experienced mechanic and kept under TNPCB standards, emission testing
will be carried out periodically and water will be sprinkled periodically to prevent dust into air.
The small quantity of non-humus rich surface soil will be removed and preserved in the
boundary barrier to facilitate the Afforestation.
Environmental care and attitude of preventing environment is inducted to the proponent
and advice to carry out and mitigate the minor impacts due to quarrying. Appropriate persons are
advice to get employed to protect the Environment and Ecology of the area.
Date : 13.10.2017
Place : Virudhunagar
1. Signature of the applicant
Ahamed satham
2. Signature of the Qualified Person
Dr. P. Thangaraju, M.Sc., Ph.D.,