MINING PLAN FOR GRANT OF SAVUDU EARTH QUARRY LEASE
OVER AN EXTENT OF 1.34.0 ha. IN R.S. No. 707 Pt IN THIRUMULLAIVASAL VILLAGE, SIRKAZHI TALUK, NAGAPATTINAM DISTRICT,
TAMIL NADU
EXECUTIVE SUMMARY 1. Thiru.T.Balachandar, S/o.Thiyagarajan residing at Pillaiyar Koil Street Mela
Nedumbur Kattumannarkoil Taluk Cuddalore District, Tamil Nadu has applied to
Savudu Earth Quarry lease located in R.S.No. 707 Pt Lease owned land by the
Applicant T.Balachandar, Mela Nedumbur from Dept. of Geology and Mining,
Nagapattinam.
2. Precise area for communication letter from the District Collector, Nagapattinam
R.C No. 319/G&M/2016 dated 31.01.2017 has been granted to the applicant
Thiru.T.Balachandar for a period of two years and also directed to submit the
Mining Plan, Environmental Clearance from the State level Environment Impact
Assessment Authority for the above area.
3. Accordingly, Mining Plan is prepared under Rule 19(1) of Tamil Nadu Minor
Minerals Concession Rules, 1959 and amended provisions of Minor Mineral
Conservation and Development Rules, 2010 for Grant of savudu Earth Quarry
lease with due consideration of Environmental parameters so as to obtain
Environmental clearance EC from State EIA Authority SEIAA, Chennai region as
per the Memorandum dated 18-05-2012 from MoEF.
4. Geological reserve is estimated 26235 m3 and Recoverable reserves is estimated
at 18600 m3 after leaving safety distance of 7.5 metres adjacent patta lands ,
10m for cart track.
5. Environmental measures to be adopted shall be.
i) Dust control at source while loading and transport haul roads.
ii) Avoid over loading and deepening the land beyond the
permitted depth.
iii) Land degradation by undulation should be avoided. As
practically as possible, the savudu Earth should be removed in and
uniform layer.
iv) Emission test of vehicles should be in tack to maintain
minimum emission level of fuel gases.
v) Noise level should not exceed 80db and the vehicles should use
only permitted air horn while on road near residential areas.
vi) And such other conditions as stipulated by the
concerned authorities.
INTRODUCTION : The EIA (Environmental Impact Assessment) notification, 2006, requires Mining
projects, including new projects, modernization or renewal of mine leases, with
lease area of 5 hectares shall also obtain Environmental clearance from the state
level EIA Authorities.
Lease owned land R.S.No.707 Pt Thirumullaivasal Village by the applicant intended
to Mine Savudu Earth for earth filling , basement and road making material by eco-
friendly conventional method without any impact on Environmental hazard. The
Mined savudu Earth is transported to the customers at various locations by their
own.
Under MoEF notification EIA – 2006 and Additional details EIA notification – 2009
this project falls under category “B” and SI. No. in the schedule I (a).
In addition to Geological reserve estimation and conception plan (Ref Plates) with
reference to Minor Mineral conservation and development Rules, 2010 and other
circulars this Mining plan is prepared accordingly.
1. GENERAL INFORMATION
1.1
a) Name of the applicant Thiru. V.Balachandar,
b) Address of the applicant S/o. Thiyagarajan,
Pillaiyar Koil Street,
Mela Nedumbur,
Kattumannarkoil Taluk ,
Cuddalore – 608 302
Mobile: 9686887755
E-mail : Nil
c) Status of the applicant (Individual / Company / Firm)
Individual
1.2 a) Mineral which the applicant intends to mine.
Savudu Earth Quarry
b) Precise area Communication letter details received from the competent authority of the Government.
Nagapattinam District Collector’s
R.C. No.319 /G&M/ 2016 dated
31.01.2017.
(Ref. Annexure - I)
a) Period of permission / lease to be granted
2 (two) years
b) Name and address of the RQP/Authorized person preparing the Mining Plan
C. KEERAN, M.Sc.,
57, Murugan Koil Street,
Koothapakkam,
CUDDALORE – 607 002.
Tel: 04142-236850/9443292470
E.mail: [email protected]
Regn.No. RQP/MAS/228/2011/A
2. LOCATION
a)Details of the area (with location map)
i. District, Taluk and Village Nagapattinam District,
Sirkazhi Taluk,
Thirumullaivasal Village.
ii. Survey Number R.S.No.707 Pt
iii. Extent (in hectares) 1.34.0 ha.
(Ref. Annexure – II)
b) Classification of the area
Patta , Punchai , Non-Forest (Ref. Annexure – III)
c)Ownership / occupancy of the applied area (surface right)
The Power of Attorney holder has given consent to the applicant . (Ref.Annexure – III)
d)Toposheet No. with latitude and longitude.
Toposheet No.C44B16 Latitude : 110 15’ 28.10’’ N to 110 15’ 33.20”N Longitude: 790 49’ 39.20’’ E to 790 49’ 42.00’’ E (Ref. PLATE - I)
e)Existence of Public road / Railway line, if any nearby and approximate distance.
The proposed site reached from
Thirumullaivasal to Vettankudi
1.5 metal road and 800 mts cart
track to Thoduvai reaches the
proposed site. Nearest Railway
Station at sirkazhi at a distance
of 15 kms West.
PART – A
3. GEOLOGY AND MINERAL RESERVES
3.1
Brief Description of the Topography and general Geology of the area (with plans)
Topography: The lease applied area Thirumullaivasal is with an elevation of 10 m above MSL. It is represented in the survey of India Toposheet C44B16 and lies at Latitude : 110 15’ 28.10’’ N to 110 15’ 33.20”N Longitude: 790 49’ 39.20’’ E to 790 49’ 42.00’’ E . The lease applied area is containing accumulated alluvial Earth deposit of below 2m from the ground level. The area receives 1200mm rainfall mostly
northeast monsoon period of October to
December. The ground water level is 6m.
There is no reserve forest wildlife sanctuary,
National monument etc., nearby area.
Karaikal U.T. boundary lies 35 kms away . Ref.
PLATE 1
General Geology:
The main geological formation occupying in
the coastal area upper Gondwana sand silt and
earthy clay undulation by disintegration of pre
existing crystalline archean rocks. Quaternary
formations comprising mainly sands , silt and
earthy clays are confined to major drainage
courses in the district . The thickness of the
alluvium varies from place to place in the
district.
3.2
Details of Exploration already carried out if any
The area was personally examined by the Geologist who prepared the mining plan . The savudu Earth is a recent alluvial deposit.
4.MINING
4.1
Method of Mining (opencast / Underground)
Opencast semi mechanized shallow
Mining of 2m below ground level .
4.2
Mode of Working (mechanized, semi mechanized, manual)
Opencast method of mining by Semi mechanized system of Quarrying out loose sediment using hydraulic excavators and tippers combination of both will do adopted. The sedimentary earth directly loaded in to the tipper and transported to consumers directly.
3.3 Estimation of reserves
a) Geological reserves with geological sections on a scale of 1 : 1000
The geological and mineral reserves of Earth has been computed by taking standard method of cross sectional influence for determining the volume of earth occurrence in this area below to a level of 10 m AMSL. The estimated reserves of the by maintaing 450 slope horizontal .
b) Recoverable reserve After leaving safety distance of 7.5 m for adjacent patta lands, 10 m for cart Track, the recoverable reserves is consumed at mineral fetches to Pit 1: 62mX150m X2m = 18600 m3
4.3 Proposed bench height & width It is an a shallow mining of 2 meters below ground level and No bench system proposed in this mining activity.
4.4 Indicate the overburden / mineral production expected pit wise as detailed below.
The following and the production and developmental work to be carried out for a period of 2 years as given by Dept. of Geology & Mining Nagapattinam as under and no top soil encounter in this proposal. No mine waste, rejection of mineral in this proposal.
Year Pit. Nos.
Over Burden
ROM Ore/ Min
Saleable Ore/Min
Sub grade
Ore/Min
Mineral Rejects
Ore to Over Burden
ratio
1
2
1
1
Nil
Nil
9300 9300
9300
9300
Nil
Nil
Nil
Nil
Nil
Nil
4.5 Machineries used
a) Mining The sedimentary savudu Earth
deposit of sedimentary terrain area
being excavated with low intensity
hydraulic excavator like Tata Ex200
and there will not be stocking of
savudu Earth in the stockyard it will
be loaded directly with tippers. No
drilling (or) blasting required in the
Mining activity.
b) Loading equipment The same hydraulic excavator like
Tata Ex200 can be used for loading.
There is no separate lifter is
required for this mining activity.
c) Transportation The entire overburden deposit of
savudu earth is loaded directly in to
the tippers from the mine area to
the consumer site.
4.6 Disposal of overburden / waste The term overburden/waste is one
and the same in this mining activity
which will be used for Earth filling
material to the consumers. There
is no waste involved in this mining
activity.
4.7 Brief note on conceptual mining plan for the entire lease period based on the geological, mining and environmental considerations.
The ultimate pit size is designed based on certain practical parameters such as economical depth of Quarrying & Permissible are etc., The ultimate pit dimensions fetches to Pit 1: 62mX150m X2m = 18600 m3 It is scientific Eco-friendly Quarrying operation.
5.BLASTING
5.1 Blasting pattern The accumulated sedimentary
Savudu Earth deposit is being
removed without blasting and
drilling.
6. MINE DRAINAGE
6.1 Depth of water table The depth of water table in this area
is 6 meters. The removal of savudu
Earth deposit in this area is below 2
m from the ground level.
6.2 Arrangements and places where the mine water is finally proposed to be discharged.
We cannot expect even a drop of
water encountered during the entire
portion of excavation. The
excavation is done 2 meters below
ground level.
7. OTHER PERMANENT STRUCTURES (also shown in the map)
7.1 Habitations / Village natham NE -Koolaiyar – 1km -200 houses
800 population
NW – Vazhuthalaikudi – 800m - 100
– houses 400 population
SE –Thirumullaivasal – 1.5km – 400
houses – 1200 population
SW –Talantondi – 800m - 50 houses
200 population
7.2 Power lines (HT/LT) No HT/LT power line is existing in
the proposed quarry site .
7.3 Water bodies No water bodies is existing nearby.
7.4 Archaeological / Historical Monuments
No archaeological (or) Historical
Monuments found nearby.
7.5 Road ( NH, SH others) NH 45A – 10 km West.
Ref. Plate No 1 .
7.6 Places of worship Sirkazhi at a distance of 12 kms.
7.7 Reserved forest / Forest / Social forest / wild life sanctuary/ Interstate Borders etc.,
There is no forest (or) wild life
sanctuary (or) any other place of
interest around 500m radius. No
wild life sanctuary around 10kms
radius. No interstate borders within
15 kms radius.
7.8 Any other structures Bay of Bengal at a distance of 1.4
kms East.
Ref. Plate No 1.
8. EMPLOYMENT POTENTIAL & WELFARE MEASURES
8.1 Employment Potential The following manpower structure is
proposed for savudu earth quarry to
carry out day today quarry activity
aimed at the proposed mine plan with
the statutory provisions of the
Government norms.
i) Mines foreman ii) Supervisor iii) Clerk iv) Skilled
Operators v) Semi – skilled
T.Driver Mechanic
1 No 1 No 1 No 2No 2 Nos 1No
vi) Un- Skilled Waterman Cleaners
2 2
12 Nos.
8.2 Welfare Measures The above man power structure is
adequate to meet out the production
schedule as per the conceptual plan
with statutory provision of the mines
safety regulations.
a) Drinking Water The requirement of water will be of
drinking water for the labours, which
will be around 100 litres/day. This
quantity can be met through R.O
.vendors available nearby area.
b) Sanitary Facilities Temporary surface portable latrines
and urinals shall be maintained at
convenient places for use of labours
as per the provisions of Rule (33) of
the Mines Rules,1960 separately for
males and females.
c) First Aid facility First Aid station will be provided for
being small mine under Rule (44) of
mines Rules 1960, PHC is working at
Thirumullaivasal at a distance of 1.5
km. Qualified first aid personal
should be appointed (or) conducted
to attend emergency treatment.
d) Labour Health Periodic medical examination will be
provided to the labor engaged in
Mining activity as per the Rule 45(A),
MR, 1960.
e) Precautionary safety measures to the laborers
Safety provisions like helmet, goggles,
safety shoes etc., here to be provided
as per the circulars and amendments
made for mine labour under the
guidance of DGMS.
PART – B
9. ENVIRONMENT MANAGEMENT PLAN
9.1 Existing Land use Pattern The existing proposed lease land of
Savudu Earth Quarry is undulated
terrain below ground level of 2 metres.
The proposed site is surrounded by Dry
plants like Bengal grams is planted
around 1 km radius. The proposed
quarry site is accumulated with allviual
soil . No loss of trees is proposed in this
mining activity.
9.2 Water Regime Ground water level in this area is 6
metres. No water bodies found nearby.
No need of realignment impoundment,
damming, culverting etc., there will not
be any changes in the ground water
level due to this project and there will
not be any changes affecting drainage
run-off. No solid waste, effluent
involved in this activity.
9.3 Flora and Fauna The only flora observed in this area is
paddy and palm trees . Among faunas
we observe dogs, foxes No other
creatures encountered / traced. No loss
of genetic species (or) genetic diversity
due to this project.
9.4 Climatic conditions Both North East and South west
monsoon prevailing in this but mainly
we get North East monsoon during
October to December . Average rainfalls
in 1200mm. Temperature during
summer 430C. and during winter 250C.
Tropic to Sub tropic Climate. Cyclone
threat will be during North East
monsoon period.
9.5 Human Settlement
There is few villages around this area
are given below:
Sl. No
Name of the Village
Approx. distance &
direction from Lease
area
Approx. Population
1 2 3 4
Koolaiyur
Vazhuthalaikudi
Thirumullaivasal
Talantondi
1 km NE
800 m NW
1.5 Km SE
800 m SW
800 400
1200
200
9.6 Plan for air, dust suppression
In this proposed project Excavators and
Tippers are engaged for mining and
transport. There will not be any blasting
or drilling involved R.T.O. certified
vehicles are to be engaged in the
mining. For dust suppression water
spray will be sprinkled in the haulage
roads.
9.7 Plan for noise level control The workman are provided with ear-
plugs. Good maintained excavators and
tippers are engaged and periodical
maintenance will be carried out. Safety
Eye glasses and mufflers will be
provided to the workers.
9.8 Environmental Impact Assessment Statement describing impact of mining on the next five years.
The period granted for mining this
savudu deposit for 2 years. The depth
of mining is 2 meters. The machineries
used for mining is excavators and
tippers that too R.T.O certified valid
vehicles is engaged for excavation. So,
due to this mining activity there will not
be any adverse impact on Environment.
9.9 Proposal of Waste management
There are no wastes or gangues
encountered in Quarrying operation.
The entire mining material is removed
and transported directly to the clients
and there is no room for waste
management.
9.10 Proposal for Reclamation of Land affected during mining activities and the end of mining
The objective of this mine activity is to
remove the savudu Earth deposit of 2 m
below ground level. So, there is no
question of refilling or fencing necessary
for this project.
9.11 Program of Afforestation (indicate extend, number, name of species to be afforested)
Converting dry land by removal of
accumulated savudu Earth deposit and
their by make it fertile land .The
applicant proposed to plant 25 Nos.
Neem tress for per year.
9.12 Proposed financial estimate / budget for (EMP) Environment Management
a) Project cost/investment
i) Land Cost (Lease Owned land)
Rs. 2,00,000/-
ii) Machinery to be used
JCB Excavator Hired
Rs. 10,00,000
iii) Refilling / Fencing Rs. Nil
iv) Labourers Shed Rs. 1,00,000
v) Sanitary facility Rs. 1,00,000
vi) Others Rs. 1,00,000
Total Rs.15,00,000
b) Expenditure
i) Drinking water facility for the labour
Rs. 1,00,000
ii) Sanitary arrangement Rs. 1,00,000
iii) Safety kids Rs. 1,00,000
iv) Water sprinkling
(if necessary)
Rs. 1,00,000
v) Green belt etc., Rs. 1,00,000
Total Rs. 5,00,000
10. MINE CLOSURE PLAN
10.1 Steps proposed for phased restoration, reclamation of already mined out areas.
This project is only removal of savudu
Earth below 2 m from the ground level .
After removal of this earth will be
leveled so as to the ground level with
the adjoining lands and is used for
future agricultural purpose by planting
seasonal crops and make it useful for
vegetation. No deep excavation and
therefore no need for reclamation of
excavation area.
10.2 Measures to be under taken on in closure as per Act & rules
The excavated area shall be leveled
properly for proper agricultural field
land in future.
10.3 Mitigation measures to be undertaken for safety and restoration / reclamation of the already mined out area
Not applicable being a fresh lease.
11. ANY OTHER DETAILS INTEND TO FURNISH BY THE APPLICANT Adequate steps shall be taken to protect the ecological system and environment and
the entire area of excavation shall be leveled as per the Rules and the Guidance of AD
Mines and we are using low emission vehicles and RTO Certified Tippers for transporting
and loading of 9 tons of weight which will not impact any damage to panchayat roads up
to the Customer site with the allotted removal of Savudu Earth.