PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

May 2013

Page 2: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

2

Forward-looking Statement

Disclaimer •The contents of this presentation are not to be reproduced or distributed to any third party, including the general public or the media, without the express written consent of Canada Lithium Corp. (“Canada Lithium” or the “Corporation”). The information contained herein, while obtained from available sources which the Corporation believes are reliable, is not guaranteed as to its accuracy or completeness. Canada Lithium is engaged in the construction of an open-pit mine and processing plant to produce lithium carbonate, among other products, on-site near Val d’Or, Quebec.

Cautionary Note Regarding Forward-Looking Information This presentation contains “forward-looking statements” and “forward-looking information” within the meaning of applicable law, which include statements herein relating to the potential to increase mineral resource and mineral reserve estimates. Generally, forward-looking statements and forward-looking information can be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, “believes”, or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. All forward-looking statements and forward-looking information are based on reasonable assumptions that have been made by the Company as at the date of such information. Forward-looking statements and forward-looking information are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking statements and forward-looking information, including but not limited to: risks relating to assumptions used in preparation of any Feasibility Studies on the Quebec Lithium Project, including government regulation, lithium prices, labor costs and capital costs, and project risks including project location, permitting requirements, project delays, ground control and dilution and water management; the general risks associated with the speculative nature of the Company’s business, commodity prices, current global financial conditions, uncertainty of additional capital, price volatility, the Quebec Lithium Project a development-stage project, limited operating history, no history of earnings, government regulation in the mining industry, environmental risks and hazards, impending climate change legislation, required approvals and permits, foreign subsidiaries, risks relating to the retention of the Quebec Lithium Project, expiration of leases and permits for the Quebec Lithium Project, title to mineral properties, obtaining and converting mineral concessions and surface rights, community relations and project support, water rights, exploration, development and operating risks, uncertainty in the estimation of mineral reserves and resources, uncertainty of inferred mineral resources, mineral exploration, reliability

Page 3: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

3

Forward-looking Statement (continued)

of historical exploration work, absence of public trading market, risks associated with having a controlling shareholder, arbitrary offering price, dilution to the common shares, dependence on key personnel, currency fluctuations, insurance and uninsured risks, competition, legal proceedings, conflicts of interest and lack of dividends as well as those factors discussed in the section entitled “Risk Factors” in the Company’s most recently filed annual information form available at www.sedar.com.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements and forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or forward-looking information. The forward-looking statements and forward-looking information contained in this presentation are included for the purpose of providing investors with information to assist them in understanding the Company’s expected financial and operational performance and may not be appropriate for other purposes. Canada Lithium does not undertake to update any forward-looking statement or forward-looking information that is included herein, except in accordance with applicable securities laws.

Cautionary Note to United States Investors Concerning Estimates of Mineral Resources •This presentation uses the terms “Measured Mineral Resources”, “Indicated Mineral Resources” and “Inferred Mineral Resources”. United States investors are advised that while such terms are recognized and required by Canadian regulations to be disclosed, the United States Securities and Exchange Commission generally does not permit disclosure of mineral resources of any kind in documents filed with the United States Securities and Exchange Commission. “Inferred Mineral Resources” have a great amount of uncertainty as to their existence, and as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of Measured Mineral Resources or Indicated Mineral Resources will ever be converted into Mineral Reserves. United States investors are also cautioned not to assume that all or any part of an Inferred Mineral Resource exists, or is economically or legally mineable.

•The contents of this presentation are for informational purposes only and do not constitute an offer to sell or a solicitation to purchase any securities referred to herein.

Page 4: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

4

CLQ … Soon to be World’s Fourth Largest Producer

FULL PRODUCTION: END 2013 4

Successful Mine Development

Mine and plant now commissioning

First spodumene produced

Annual 2014 EBITDA +/– $50 million at current prices

World-class Producer

~12% of world’s lithium carbonate supply: >20,000 tonnes/year

75% of production secured in off-takes with Tewoo and Marubeni

2015 LiOH/sodium sulphate proposed upgrade: EBITDA of $77M

Page 5: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

5

Energy Storage Revolution Under Way

Lightest metal with highest energy density

Currently included in only 30% of world’s batteries

More than 25 lithium battery chemistries commercially available

27,000 active battery patents at USPTO

95% of battery research includes lithium

Price competitive: 4¢ worth in a cellphone

Page 6: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

Three Major Markets in Growth Mode

6

Consumer Electronics

Li-ion batteries have captured nearly 100% market share

Sole battery technology in portable applications in 5-10 years

Prices dropping steadily

Applications migrating to larger devices (lawnmowers, wheelchairs)

Smart Grid Storage

Major electronics/battery firms spending $billions on new technology

30MW to 50MW facilities already in North America and Asia

AES bidding on 400MW storage facility for Long Island, N.Y.

Electric Vehicles

45 hybrid models and 15 EVs now available (all lithium-powered)

Lithium batteries now used in all HEV and EV vehicles

EV sales slow due to ‘range anxiety’ and price

HEVs now 20% of vehicle sales in Japan ... China next

130 million E-bikes on Chinese roads (only 4% lithium-powered)

Page 7: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

7

Lithium Carbonate Applications

Application Lithium Carbonate*

Laptop 30 g

E-bike/scooter 500 g

Hybrid cars 6 kg

Plug-in hybrids 12 kg

40 kWh EV 24 kg

1 MW bulk storage (est.) 600 kg

•GM conversion factor: 0.6 kg of lithium carbonate per kWh for hybrids, plug-ins and EVs

12-MW Los Andes grid-storage facility in northern Chile

Page 8: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

8

Lithium Battery Cost and Battery Revenue Forecasts

0.0

10.0

20.0

30.0

40.0

50.0

60.0

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Lithium Battery Revenue ($B)*

* IHS iSuppli Rechargeable Batteries Special Report, August, 2011

Forecast shows sharp decline in lithium-ion battery costs*

Page 9: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

Forecast Lithium Consumption from 2011 to 2020*

9

0

50

100

150

200

250

300

Other industrial Greases Ceramics/glass Transportation Electronics

‘000s tonnes of lithium carbonate equivalent (LCE)

* BofA Merrill Lynch Global Research, October 2012; black arrow is Roskill Information Services forecast

2011 2012 2013 2014 2015 2016 2017 2020

Page 10: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

Lithium Carbonate Prices

10

0.0

1,000.0

2,000.0

3,000.0

4,000.0

5,000.0

6,000.0

7,000.0

2004 2005 2006 2007 2008 2009 2010 2011 2012 Term

2012 Spot

Lithium Carbonate: 2004 to 2012 (US$/t)*

•2004 to 2011- China Technical Grade - Roskill Information Services •2012 –China Pricing - Asia Minerals Magazine

June 2011 Chemetall 20% price increase

July 2011 FMC 15% – 20% price increase

December 2011 Talison 15% increase

May 2012 Chemetall $1,000/t increase

June 2012 FMC $1,000/t increase

July 2012 Talison announces another 10% increase

Page 11: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

Argentina 14%

Australia 29%

China 11%

Rest of world: 2% 11

Chile leads the brine producers; Australia leads the mineral side

* Source: Roskill Information Services Ltd., September 2011

Chile 41%

Canada Lithium

Brine Producers Hard-rock Producers Brine and Hard-rock Producers

Nevada 3%

World Production

SQM

Rockwood Talison Tianqui

FMC Lithium

Rockwood

Major Lithium Producers

Page 12: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

12

Lithium Carbonate Operating Costs*

0.0

500.0

1,000.0

1,500.0

2,000.0

2,500.0

3,000.0

3,500.0

4,000.0

4,500.0

5,000.0

SQM-brines ROC-brines CLQ-hard rock FMC-brines China-brines Australia-hard rock

China-hard rock

Lithium Carbonate Costs in $/tonne*

•Bank of America Merrill Lynch report, October 2012, except CLQ costs from Updated Feasibility Study, November 2012. • CLQ costs include credits for lithium hydroxide and sodium sulphate production

Page 13: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

13

Québec Lithium Project

* Hydro-Quebec ** Fraser Institute’s Annual Survey 2012

Operated 10 years from 1955 to 1965; only 60 km north of Val d’Or

Current effective power cost in Quebec: $0.047/kWh*

Easy access to plant chemicals and consumables

Skilled labor/supply infrastructure

Ranked 11th of 96 mining destinations**

Québec: Lithium/Green Energy focus Phostech Bathium/Bolloré Hydro Québec

Québec Lithium Project

Page 14: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

14

Mineral Resources and Reserves

Category Mt* % Li20 M&I Resources 33.2 1.19

Inferred Resources 13.8 1.21

•Rounded to nearest 100,000; total Inferred Mineral Resource is exclusive of total Measured and Indicated Mineral Resources.

•Mineral Resources announced December 6, 2011; Mineral Reserves announced June 13, 2011.

Category Mt* % Li20 Proven Reserves 6.6 0.92

Probable Reserves 10.5 0.95

Total 17.1 0.94

Page 15: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

15

Québec Lithium Surface View

14.9-Year Pit Outline

Dyke extensions

Lithium-bearing pegmatite outcrop

Page 16: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

Project Upside Potential

16

Mined ore 0.94% Li2O >1.3 million tonnes

Spodumene 5.7%-6.5% Li2O 165,000 tonnes

Spodumene sales

Lithium carbonate >99.5% >20,000 tonnes

Base Case:

Increased resource = longer mine life

Upside Potential:

Lithium metal production*

Lithium metal

Lithium carbonate

Metal

Lithium hydroxide ∼2,000 tonnes

Sodium sulphate ~30,000 tonnes

Lithium alloys

* CLQ to receive $6.5 million grant from federal government technology program

Page 17: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

Spodumene to Lithium Carbonate

17

Post-kiln product

Sulphation

Water leaching

Leach solution purification

Ion exchange

Battery-grade lithium carbonate

Lithium carbonate precipitation

Soda Ash

Kiln

Lithium hydroxide

Sodium sulphate

Page 18: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

18

Project Economics: Updated Feasibility October 2012

US$/C$ exchange rate 1:1.1

Key Indicators Updated

Feasibility (2012)

NPV (pre-tax; 8%) at flat $5,875 per tonne lithium carbonate revenue $318M

NPV (pre-tax; 8%) lithium carbonate price based on Roskill market study $456M

Lithium hydroxide and sodium sulphate capital cost $20M Average operating costs ($ per tonne lithium carbonate inclusive of lithium hydroxide/sodium sulphate operating costs) $3,194

Average operating costs ($ per tonne lithium carbonate net of lithium hydroxide/sodium sulphate credits) $2,328

Average annual EBITDA with co-products $77M IRR @ $5,875/t lithium carbonate revenue vs. 2012 Roskill market study @ ∼$6,600 32% vs. 37%

Simple Payback (years) <4

Page 19: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

19

Project Economics Operating Costs

US$/C$ exchange rate 1:1

Operating Costs $/t (milled) $/t (Li2CO3) Mining 16.73 1,024

Crush/Grind/Float 8.52 521

Lithium hydroxide/sodium sulphate sorting 3.11 191

Hydrometallurgical 21.85 1,338

Administration 1.96 120

Total 52.17 3,194

Page 20: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

Aerial View of the Project August 2011

20

A green-field site

Page 21: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

21

Site Construction

Process plant

Winter 2013 August 2012

Page 22: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

22

Open-pit blast

Open Pit January 2013

Page 23: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

23

Open Pit January 2013

Excavators and mine trucks in open pit

Page 24: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

24

Site Construction December 2012

Crushing circuit

Page 25: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

25

Site Construction December 2012

Ball and rod mills

Page 26: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

26

Site Construction December 2012

Flotation cells

Page 27: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

27

Site Construction November 2012

Rotary kiln

Page 28: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

Site Construction December 2012

28

Precipitation tanks

Page 29: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

Site Construction December 2012

29

Carbonate Polishing

Page 30: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

Site Construction December 2012

30

Filter circuit

Page 31: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

Site Construction December 2012

31

Lithium Carbonate Bag Plant

Page 32: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

32

Site Construction December 2012

Tailings facility

Page 33: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

33

Quality and the Environment

Lithium carbonate

Battery-Grade Credentials: 99.5% to 99.9% Li2CO3

Fe: <0.0002% Mg: 0.0081% Cl: 0.0048% S: <0.01% Na: 0.016%

Environmental footprint

Utilizes green/renewable hydro power No cyanide use No acid mine drainage Tailings >99% silica (beach sand)

Page 34: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

Next Stages .... Production Schedule

34

2013 2014 2015 Q1 - 3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

Spodumene commissioning Li2CO3 commissioning First carbonate sales Li2CO3 production Na2SO4 design/construct LiOH design/construct Lithium metal testwork Lithium metal feasibility/pilot Lithium metal construction Lithium metal commissioning

Québec Lithium inc.

Page 35: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

Experienced Senior Management and Technical Team

35

Kerry Knoll Chairman Co-founder of Wheaton River, Glencairn Gold, Thompson Creek Metals

Peter Secker Deputy Chairman, CEO

Developed three mines in Australia and two in China

Over 30 years project management, operations and CEO experience

Charles Taschereau President and COO

20 years operating experience

Developed $450 million Essakane open-pit project for IAMGOLD

Yves Desrosiers GM, Operations

15 years operating experience

Metallurgist with graphite, iron ore, gold experience in Quebec

Halina McGregor

VP, Finance Former VP, Finance, and CFO of Goldcorp and, prior to that, Senior VP, Finance, and CFO of Sherritt International Corp

Germaine Coombs CFO

More than 15 years in financial management

Former Controller of FNX Mining

Shaun McCurdy VP, Marketing

20+ years global experience with ENRC, Katanga and Sherritt International

Extensive work negotiating/administering off-take agreements

Page 36: PowerPoint Presentation · FULL PRODUCTION: END 2013 . 4 . Successful Mine Development . Mine and plant now commissioning First spodumene produced Annual 2014 EBITDA +/ – $50 million

36

Capital Structure & Market Shares O/S 361 million

Shares F/D 442 million

Debt Facility: $75 million

Debt Drawdown complete

Date: May 2013