Thermal
Al Qaim (Iraq)
Al Shemal (Iraq)
Jorf Lasfar (Morocco)
Petkim (Turkey)
Power Generation and Distribution AUTOMATION
Hydro
Aswan High Dam (Egypt)
Kidatu (Tanzania)
Kihansi (Tanzania)
Three Gorges (China)
NEK (Bulgaria)
Ertan (China)
Karun (Iran)
Yali (Vietnam)
Manantali (Mali)
Gas/Diesel
Nouadhibou (Mauritania)
EDD Boulaos (Djibouti)
Omar (Syria)
Control Systems
INTEA d.d. - Av. V. Holjevca 27, HR-10020 Zagreb, CROATIA tel: +385 1 3436 200 fax: +385 1 7898 860 e-mail: [email protected] http://www.intea.hr
Power Generation and Distribution
Hydro Power Plants
Aswan High Dam - Egypt
About the Control System Scope
Entire power plant is controlled by ABB DCS - process controllers
and runs fully automatic. Control includes: turbines, generators,
breakers, transformers, subsystems etc.
Number of wired I/O signals: 10200.
Configuration
• Process controllers - AdvantController 450 (17 units)
• Operator stations - AdvantStation 500 OS (3 units)
• Operator stations - Windows NT based PC application (2 units)
• Information Management Station - PC based application (2 units)
• Local Viewers - PC based application (26 units)
• Event/alarm printers, hardcopy printers and report printers.
About the Plant AHD power plant generates 2100 MW. Main functional units are:
12 generating units - each consisting of
• turbine (Frances type, max. gross head 74 m)
• generator (60 pole, 100 rpm, 180 MW max, 15.75 kV)
• unit transformer (500 kV)
2 switchyards:
• 500 kV (2 exit lines)
• 132 kV (4 exit lines and 2 feeders)
2 auto-transformers:
• reducing the voltage from 500 kV to 132 kV and 6 kV
INTEA Scope • controller's cabinets design, specification and manuf. supervision
• DCS design documentation and site survey
• process controllers application design, programming and testing
• operator stations application design and customizing
• factory acceptance test with client
• wiring supervision, I/O check, synchronization, transducers
adjusting and installation, …
• unit & switchyard circuit breakers synchronization
• commissioning and start-up
• training for operation and maintenance personnel
INTEA Chronology • January 2001 – September 2001, 6 INTEA’s engineers worked in
Alstom, Denver-USA, on project design, cubicle production
supervision and factory acceptance tests.
• October 2001 – November 2003, 6 INTEA’s engineers worked on
site (in shifts) until successful handover.
• 2005-2010., DCS HW and SW deliveries: extensions,
modifications, site activities and commissioning due to Voith-
Siemens scheduled overhauls of generating units.
INTEA’s work was recognized, by ALSTOM project management
and end-user HPGC, as outstanding and highly professional.
17 Repeat
Orders
INTEA d.d. - Av. V. Holjevca 27, HR-10020 Zagreb, CROATIA tel: +385 1 3436 200 fax: +385 1 7898 860 e-mail: [email protected] http://www.intea.hr
Power Generation and Distribution
Hydro Power Plants
Kidatu - Tanzania
About the Control System The system controls and monitors:
• 4 generating units,
• Auxiliary PS,
• Auxiliary building,
• Switchyard,
• Dam,
• Overall Station functions.
Control system is based on 9 Siemens SIMATIC process
controllers (Unit1, Unit2, Unit3, Unit4, Aux PS, Aux Building,
Switchyard, Dam and Station Controller) and IGSS 32 SCADA
running on standard PCs with MS Windows.
About the Plant Kidatu Dam is Tanzania's largest Hydro Power Plant.
Total generating capacity: 200 MW
No. of units: 4 HD
INTEA Delivery Scope Engineering services
• project management
• design engineering
• application engineering
• factory acceptance tests
• onsite training
• site works
Hardware & Software Delivery
• Process controllers, operator panels, eng. workstation, Step7 and WinCC,
• Equipment for communication between process controllers and SCADA,
• Industrial time synchronization central plant clock with GPS radio clock,
• SCADA system software license,
• Commissioning spare parts.
Outcome With minimal upgrade costs and plant downtime, the control system is now
based on up-to-date HW & SW, completely in accordance with recognized,
international standards. The upgrade has increased reliability and availability
of the plant and improved its operation and performance.
End user's satisfaction was confirmed by awarding further contracts related to
similar overhauls of their other powerplants. 4 Repeat
Orders
About the Project Partial upgrade/migration of existing Simatic S5
control system to S7 was selected by the end
user as optimal, cost-effective solution. It
included upgrade of processors, communication
modules and SCADA, without replacement of
the I/O modules.
INTEA d.d. - Av. V. Holjevca 27, HR-10020 Zagreb, CROATIA tel: +385 1 3436 200 fax: +385 1 7898 860 e-mail: [email protected] http://www.intea.hr
Power Generation and Distribution
Hydro Power Plants
Kihansi - Tanzania
About the Control System Control system (CS) provides integrated control and monitoring of
the overall plant operation from central control room. It is based on
ABB 800xA Extended Automation and AC800M process
controllers. CS controls and monitors:
• three generating units G1-G3 (unit controllers),
• auxiliaries and common devices (common controller),
• station control (station controller),
• 33kV and 220kV switchyard (switchyard controllers),
• Intake and dam RTU (intake RTU).
About the Plant Total generating capacity: 180 MW
No. of units: 3 (Pelton turbines)
Facility has been in operation since December 1999. Concrete
gravity dam on the Kihansi River has a height of 25m and a length
of 200m, which creates a reservoir with a storage volume of 1
million m³. The turbines use the 900m drop in the Kihansi Gorge
over a distance of about 3km, and return the water to the river
about 6km downstream.
INTEA Scope • control system hardware (ABB IndustrialIT: 8 x AC 800M controller, 2 x
800xA operator's workplace + 1 x 800xA engineering workplace; 3
servers, printers, GPS clock)
• system software & licenses
• engineering works (Project management, Application engineering,
F.A.T.)
• technical training
• site works (pre-commissioning and commissioning of process
controllers, start-up of operator and engineering workplaces, testing of
the complete DCS, site acceptance test)
Outcome With minimal upgrade costs and plant downtime, the control system is now
based on up-to-date HW & SW. The upgrade has increased reliability and
availability of the plant as well as improved its operation and performance.
At the same time, maintenance costs are significantly decreased.
Client's satisfaction was confirmed in a formal, written record.
INTEA d.d. - Av. V. Holjevca 27, HR-10020 Zagreb, CROATIA tel: +385 1 3436 200 fax: +385 1 7898 860 e-mail: [email protected] http://www.intea.hr
Hydro Power Plants
Three Gorges - China
INTEA Scope • DCS design documentation - specifications for Information
Management System
• process controllers - "Transit node" application design,
programming and testing
• training for operation and maintenance personnel
• site support - technical expertise
INTEA Chronology • 2001 - Information Management System specification
• 2002 - Design and development of "Transit node" - ABB
AdvantController 450 application to support and manage data
communication
• 2002 - Documentation and technical training for end-user's
personnel
• 2005 - Site intervention - technical support
4 Repeat
Orders
About the Plant The Three Gorges Hydropower Station is comprised of two power
plants, situated on each side of the central spillway, with a total of
26 generating units. Each generating unit has a capacity of 700
MW, the size of a baseload powerplant. The total capacity will be
18200 MW, with a planned annual power generation of 84.7 billion
kilowatt-hours. When completed, it will be the single greatest power
plant in the world.
Power Generation and Distribution
INTEA d.d. - Av. V. Holjevca 27, HR-10020 Zagreb, CROATIA tel: +385 1 3436 200 fax: +385 1 7898 860 e-mail: [email protected] http://www.intea.hr
Hydro Power Plants
NEK - Bulgaria
INTEA Scope • Distributed control system - SW design specification and other
documentation
• process controllers application design, programming and testing
• operator stations application design and customizing
• SW lead engineering and coordination
INTEA Chronology • 1998 - DCS SW - project leading
INTEA’s work was recognized, by ABB project management as
outstanding and highly professional.
About the Control System Scope
Power plants are controlled by ABB DCS - process controllers and
run fully automatic. Control includes: turbines, generators,
breakers, transformers, subsystems etc.
Number of wired I/O signals: 5500.
Configuration
• Process controllers - AdvantController 450 (12 units)
• Operator stations - AdvantStation 500 OS (6 units)
• Information Management Stations - AS500 IMS (3 units)
• Control network MasterBus 300 and Plant network TCP/IP
• Event/alarm printers, hardcopy printers and report printers.
About the Plants NEK system project covers 3 hydro power plants:
• Belmeken (375MW),
• Momina Klisura (120MW) and
• Sestrimo (240MW).
Power Generation and Distribution
INTEA d.d. - Av. V. Holjevca 27, HR-10020 Zagreb, CROATIA tel: +385 1 3436 200 fax: +385 1 7898 860 e-mail: [email protected] http://www.intea.hr
Hydro Power Plants
Ertan - China
9 Repeat
Orders
About the Plant The plant is located near Panzhihua on the Yalong river (a tributary
of the Yangtze) in Sichuan province. Total installed plant capacity is
3300MW (6x550MW). Construction began in 1991. Ertan power
plant produced 3.9 billion kilowatt hours of power in the first year of
operation since August 1998, when its first generating unit went
into operation. Completed at the end of 1999, it has set a new
record for speed of installation of a hydroelectric project.
About the Control System Scope
Power plants are controlled by ABB DCS - process controllers and
run fully automatic. Control includes: turbines, generators,
breakers, transformers, subsystems etc.
Configuration
• Process controllers - AdvantController 450 (12 units)
• Process controllers - AdvantController 110 (2 units)
• Process controllers - AdvantController 410 (3 units)
• Operator stations - AdvantStation 500 OS (5 units)
• Information Management Stations - AS500 IMS (3 units)
• Control network MasterBus 300 and Plant network TCP/IP
• Event/alarm printers, hardcopy printers and report printers.
INTEA Chronology • 1997. F.A.T. with the client
• 1999. Application development
• 2000. Intervention, communication problems analysis
• 2000. Control system upgrade
• 2004. Control system upgrade
• 2006. Site interventions and technical support
• 2007. System extensions, interventions and technical support
INTEA Scope INTEA took part in:
• process controllers application design, programming and testing
• operator stations application design and customizing
• communication troubleshooting intervention
• control system upgrade, extension and modifications
Power Generation and Distribution
INTEA d.d. - Av. V. Holjevca 27, HR-10020 Zagreb, CROATIA tel: +385 1 3436 200 fax: +385 1 7898 860 e-mail: [email protected] http://www.intea.hr
Hydro Power Plants
Karun I - Iran
2 Repeat
Orders
About the Control System Scope
Power plant is controlled by ABB DCS - process controllers and
runs fully automatic. Control includes: turbines, generators,
breakers, transformers, subsystems etc.
Number of wired I/O signals: 4500.
Configuration
• Process controllers - AdvantController 450 (9 units)
• Process controllers - AdvantController 110 (7 units)
• Operator stations - UNIX based PC (5 units)
• Control network MasterBus 300 and Plant network TCP/IP
• Event/alarm printers, hardcopy printers and report printers.
INTEA Chronology • 1999. Application development
• 2001. F.A.T., technical training for the client, commissioning
INTEA Scope INTEA took part in:
• process controllers application design, programming and testing
• F.A.T. with the client
• technical training for client's operation and maintenance
personnel
About the Plant Location: Karun river, Iran
Operator: Khuzestan Regional Electric Power
Configuration: 8 X 250 MW Francis
Operation: since 1976.
Power Generation and Distribution
INTEA d.d. - Av. V. Holjevca 27, HR-10020 Zagreb, CROATIA tel: +385 1 3436 200 fax: +385 1 7898 860 e-mail: [email protected] http://www.intea.hr
Hydro Power Plants
Yali - Vietnam
3 Repeat
Orders
INTEA Scope • DCS site survey
• process controllers application design, programming and testing
• operator stations application design and customizing
• factory acceptance test with client
• DCS commissioning
• training for operation and maintenance personnel
INTEA Chronology • 1999. - technical trainig for clients personnel
• 2001. - site survey
• 2002-3. - DCS commissioning
About the Control System Scope
Entire power plant is controlled by ABB DCS - process controllers
and runs fully automatic. Supervision and control includes turbines,
generators, breakers, transformers, subsystems, e.g.:
• 4 units
• high-voltage switchyard
• water intake gates
• spillway structure
• auxiliaries and station service
Number of wired I/O signals: 4000.
Configuration
• Process controllers - AdvantController 450 (6 units)
• Process controllers - AdvantController 110 (5 units)
• Operator stations - AdvantStation 500 OS (2 units)
• Control network MasterBus 300, Plant Network TCP/IP
• Event/alarm printers, hardcopy printers and report printers.
About the Plant Yali Falls Dam was the first of the proposed dams in the Se San
River basin to be constructed. Construction of the dam commenced
in 1993, and was completed in December 2001. The 69 meter-high
dam was sealed in 1996. The 64.5 km2 reservoir was filled by
1998. Yali HPP is composed of 4 units totaling 720 MW and high-
voltage 500kV switchyard (6 lines).
Power Generation and Distribution
INTEA d.d. - Av. V. Holjevca 27, HR-10020 Zagreb, CROATIA tel: +385 1 3436 200 fax: +385 1 7898 860 e-mail: [email protected] http://www.intea.hr
Hydro Power Plants
MANANTALI - Mali
About the Control System Scope
Entire power plant is controlled by ABB DCS - process controllers
and runs fully automatic. Supervision and control includes turbines,
generators, breakers, transformers, subsystems, e.g.:
• 5 unit groups
• 2 high-voltage switchyards
• water intake gates
• auxiliaries
Number of wired I/O signals: 3700.
Configuration
• Process controllers - AdvantController 410 (8 units)
• Process controllers - AdvantController 70 (5 units)
• Operator stations - AdvantStation 500 OS (3 units)
• Control network MasterBus 300, Plant Network TCP/IP
• Event/alarm printers, hardcopy printers and report printers.
About the Plant Manantali consists of the Manantali dam on the Bafing river, a
power station and a network of transmission lines. The dam is
1460m long and 65m high. It created a reservoir with a storage
capacity 11,3 million m3 and a surface of 477km2.
200MW hydro power plant consists of:
• 5 units - 40MW each and
• 2 switchyards - 225kV and 90kV.
Three 225kV lines run to Bamako (Mali capital, 322km), Dakar
(Senegal, 820km) and Nouakchott (Mauritania capital) (226km).
One 90kV line connects Manantali HPP and a town of Kaedi (Mali,
87km).
INTEA Scope • process controllers application design, programming and testing
• operator stations application design and customizing
• factory acceptance test with client
INTEA Chronology • May 2000 – August 2000, process controller and operator station
- application design, programming and FAT with the client.
Power Generation and Distribution
INTEA d.d. - Av. V. Holjevca 27, HR-10020 Zagreb, CROATIA tel: +385 1 3436 200 fax: +385 1 7898 860 e-mail: [email protected] http://www.intea.hr
Power Generation - Circulating Water System
Thermal Power Plants
Al Qaim - Iraq
INTEA Chronology INTEA is present on Al Qaim SCP plant since 2003. Even before
the project start, INTEA was engaged in site survey and finding
optimal solutions for steam turbines control system modernization.
About the Plant Chemical complex "State Company for Phosphate" - Al Qaim, Iraq -
consists of integrated and interrelated plants to produce different
kinds of phosphate fertilizers as a final product.
Local power plant 2x14 MW is based on two steam turbine
generating units TG1 and TG2.
About the Control System Main parts of Al Qaim SCP steam turbines control system are:
• Process controllers - ABB AdvantController 160 (4 units),
• Operator stations - ABB IndustrialIT 800xA (2 units),
• Engineering station - ABB 800xA Engineering Workplace (1 unit),
• Communication networks, printers and uninterruptible power
supplying units.
INTEA Scope INTEA has delivered complete control system, including:
• design engineering,
• application engineering,
• HW manufacturing and assembling,
• factory acceptance test with the client,
• site works and commissioning,
• end user technical training.
INTEA d.d. - Av. V. Holjevca 27, HR-10020 Zagreb, CROATIA tel: +385 1 3436 200 fax: +385 1 7898 860 e-mail: [email protected] http://www.intea.hr
Power Generation - Circulating Water System
Thermal Power Plants
Al Shemal - Iraq
2 Repeat
Orders INTEA Chronology • 2002. Control system design, final design project documentation
• 2004. Distributed process control and supervision system,
integration, programming, testing and equipment delivery.
INTEA Scope • design documentation
• process controllers - application design and development
• operator stations - application design and development
• control cubicles and other equipment delivery
• system integration
• F.A.T. - testing with the client
• training for operation and maintenance personnel
• "As manufactured" - documetation delivery
About the Plant Al Shemal TPS is a new 1400 MW thermal power plant consisting
of 4 units (4x350MW).
Circulating water system (CWS)
Primary task of the CWS is to provide cooling water from Tigris
river for main condenser and closed cycle cooling water heat
exchangers. The circulating water intake structure also provides
river water for screen wash system, service water system, fire
fighting system and raw water treatment plant. The circulating
water intake structure and pump station are sized for four 350 MW
units with possibility of extension with two similar units.
Main CWS parts
• water intake accessories
• circulating water pumps
• lubrication water pumps
• swing check valves
About the Control System Scope
Main CWS parts listed above are supervised and controlled by
process control software applications running in 8 ABB process
controllers AdvantController 800M and auxilliary electrical
equipment mounted in 8 control cubicles.
Number of wired I/O signals: 1600.
DCS Configuration
• Process controllers - AdvantController 800M (8 units)
• Operator interface - Process Panel 245 (2 units)
• Control network and Plant Network TCP/IP.
INTEA d.d. - Av. V. Holjevca 27, HR-10020 Zagreb, CROATIA tel: +385 1 3436 200 fax: +385 1 7898 860 e-mail: [email protected] http://www.intea.hr
Power Generation - Process Utilities
Thermal Power Plants
Jorf Lasfar - Morocco
3 Repeat
Orders INTEA Chronology • 1999. application design, programming and commissioning
• 2001. “coal handling” – intervention, program modifications,
system maintenance
• 2005. program modifications & commissioning
INTEA Scope Process utilities - control and supervision system:
• process controllers application design, programming and testing
• operator stations application design and customizing
• commissioning
About the Plant Jorf Lasfar power plant consists of 4x330 MW coal-fired/steam-
based turbo-generators. With total production capacity of 1320MW
this is the largest independent power plant in Africa.
About the Control System ABB DCS Configuration
• Process controllers - AdvantController 450
• Process controllers - AdvantController 160
• Operator stations - AdvantStation 500 OS
• Control network MasterBus 300, Plant Network TCP/IP.
INTEA d.d. - Av. V. Holjevca 27, HR-10020 Zagreb, CROATIA tel: +385 1 3436 200 fax: +385 1 7898 860 e-mail: [email protected] http://www.intea.hr
Gas and/or Diesel Power Plants
Nouadhibou - Mauritania
5 Repeat
Orders INTEA Chronology • 2009. Control System Upgrade
• 2010. Delivery of additional HW
• 2011. Control System Extension
• 2012. Delivery of additional HW
• 2013. Delivery of additional HW
About the Plant Diesel power plant Nouadhibou configuration:
• 4 x 5,5 MW; 12PC2.5V400D engines, 500 rpm,
• 2 x 11 MW, 600 rpm; Voltage: 15 kV/50 Hz
About the Control System Scope
DCS controls and monitors:
• two new diesel generators G5 & G6,
• 15kV switchyard - protection relays,
• common systems and equipment.
DCS Configuration
Main ABB equipment comprises:
• Process controller - AC800M with remote I/O & local panel,
• Operator/Engineering stations 800xA (5 servers + 3 clients),
• Control network - ModuleBus,
• TCP/IP plant network,
• Separate network segments for G5&G6 and 15kV switchyard,
• MODBUS communication with panel instruments,
• GPS clock, UPS, printers, large display;
Power Generation and Distribution
INTEA Scope INTEA scope of supply for the project was:
• ABB 800xA distributed control system (DCS) equipment,
• ABB DCS system software,
• DCS application software,
• DCS engineering and site works,
• end user DCS technical training.
INTEA d.d. - Av. V. Holjevca 27, HR-10020 Zagreb, CROATIA tel: +385 1 3436 200 fax: +385 1 7898 860 e-mail: [email protected] http://www.intea.hr
Gas and/or Diesel Power Plants
Centrale de Boulaos - Djibouti
16 Repeat
Orders
INTEA Scope INTEA scope of supply related to the ABB DCS since 1999 was:
• design engineering,
• ABB 800xA and other equipment delivery,
• system software delivery,
• application software,
• engineering and site works,
• end user technical training.
INTEA Chronology Most significant DPP Boulaos projects:
• 1999. Commissioning and system optimizing
• 2005. DCS visualization system upgrade
• 2007. Integration of G22 in the DCS
• 2011. 800xA extension and training
• 2013. DCS extension - G24 alarms
• 2016. Upgrade of 4 x ABB AC110 to 4 x ABB AC160
About the Plant BOULAOS power plant operates in Djibouti grid with 100 MW of
total power. Main parts of the system are:
• 13 generators (6 more in Marabout),
• 63 and 20kV overhead lines (246 km),
• 279 transformer locations
About the Control System Power generation is controlled by process controllers. Control
includes: turbines, generators, transformers, subsystems etc.
DCS Configuration
Presently, automation subsystems originate from various
manufacturers, mostly ABB and Siemens. Main ABB equipment
comprizes:
• Process controllers - AdvantController 110 (4 units),
• Process controllers - AdvantController 160 (4 units),
• Process controllers - AC800M (2 units)
• Operator stations 800xA (8 servers + 5 clients),
• Control network - Advant Fieldbus 100,
• TCP/IP plant network.
Power Generation and Distribution
INTEA d.d. - Av. V. Holjevca 27, HR-10020 Zagreb, CROATIA tel: +385 1 3436 200 fax: +385 1 7898 860 e-mail: [email protected] http://www.intea.hr
Gas and/or Diesel Power Plants
OMAR - Syria
About the Control System Scope
Entire power system is controlled by ABB DCS - process
controllers and runs fully automatic. Control includes: turbines,
generators, breakers, transformers, subsystems etc.
Number of wired I/O signals: 8200.
Power Management System is a special group of dedicated
programs in ABB DCS controller. Main functions are:
• monitoring interconnection status of the power system
• coordination of generators, frequency/voltage regulation
• calculation of consumption per load, island, area and site
• monitoring spare capacity of running generator sets
• load-shedding (disconnecting) preselected loads within 100ms
• disabling start of large loads if exceeding spare capacity
• monitoring and recording power consumption peaks
• warning and suggesting messages for the operator
• reports: production, consumption, running hours, peaks, ...
DCS Configuration
• Process controllers - AdvantController 450 (9 units)
• Operator stations - AdvantStation 500 OS (10 units)
• Information Management Station - AS500 IMS (2 units)
• X terminals - (2 units)
• Control network MasterBus 300, Plant Network TCP/IP,
MODBUS serial links etc.
About the Plant OMAR power system network operates in island mode, covering
area of some 100km2, with 200MW of total power. Main parts are:
• 18 distributed generators with dual fuel turbines (gas/diesel),
• double 66kV overhead lines to 4 major remote sites,
• 400 major devices (transformers, breakers, motors, etc)
INTEA Scope • Power Management System - application development
• Process utilities (fuel gas, water treatment, instrument air, diesel
fuel, etc.) - application design and development
• process controllers application design, programming and testing
• operator stations application design and customizing
• factory acceptance test with client
• wiring supervision, I/O check
• commissioning and start-up
• training for operation and maintenance personnel
INTEA Chronology • 1996. Application development, programming and
commissioning, technical training
• 1998. Onsite – “baby sitting” and extensive customer technical
training
• 1999. “Y2000” – compliance survey and corrections
• 2000. “Maleh extension” – adding AC450 controller in a new
location
• 2000. System extensions to support new G4 generator
• 2002. “Tanak” extensions – system modifications to support new
equipment in Tanak location.
• 2003. System extensions to support new G5 generator
7 Repeat
Orders
Power Generation and Distribution