Upload
trevor-mayes
View
219
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Â
Citation preview
TREVOR MAYESCOMPLETE WORKS
013 RESUME
012 ONGOING PROJECT | HERITAGE CENTER
010 PHOTOGRAPHY | OTHER INTERESTS
CO
NTEN
TS
009 ART | SKETCHES
008 INTERIOR DESIGN
007 GREEN OAK CONSTRUCTION
006 SMALL CHAPEL
005 ART MUSEUM
004 LIBRARY ANNEX
003 DORMITORY FOR 100
002 NATURE CENTER
001 URBAN PLANNING | PROGRAMMING
3RD YEAR | 1ST SEMESTER
001
P
LA
NN
ING
| P
RO
FR
AM
MIN
GTO
WN
SEN
D,
TN
RIVER ACCESS POINTS
NODES OF DEVELOPMENT
PUBLIC GREENSPACES
HIKING PATHS
EXISTING CITY LIMITS
GREATSMOKY
MOUNTAINNATIONAL
PARK
EDUCATIONALTHRESHOLD
COMMERCIAL
BICYCLE RENTAL | WELCOME CENTERS
MUNICIPAL
ARTS AND CRAFTS
PROPOSED ALTERATIONS
ARTS AND CRAFTSARTS AND CRAFTS
HERITAGE CENTER
NATURE CENTER
VISITOR CENTER
40’ 80’20’0’
US 321
LITTLE RIVER
PARKING
INDOOREXHIBITS
atr
ium
brid
ge
giftshop
cafe
observation platform
offices
restrooms
AUDITORIUM
rooftop eating space
rooftop eating space
cafe/gift shop storage
amphitheater
restrooms
boardwalk
PUBLICGATHERING
SPACE
bicycle rental
OUTDOOR HABITATS
greenway
RIV
ER
RO
AD
TR
AIL
S
OBSERVATIONDECK
BOARDWALKBOARDWALKTRAILS
RIVERACCESS
PUBLICGATHERINGGATHERING
SPACE
OUTDOORHABITATS
INDOOREXHIBITS
CLASSROOMCLASSROOM
PARKING
BICYCLEBICYCLEEXCHANGEEXCHANGE
CENTER
PREPARATION EXPERIENCENORMALITY
14
13
16
15
17
21
20
19
18
CO
NTEN
TS
3RD YEAR | 1ST SEMESTER
THE DICHOTOMY OF NATURE AND INDUSTRIAL PROGRESS IS EXPLORED AND CONTRASTED THROUGH LANDSCAPING AND DETERMINES THE FORM OF THIS 100 YEAR EXPERIMENT.
TO
WN
SEN
D,
TN
00
2
NATU
RE C
EN
TER
THIS PROJECT WAS THE CONTINUATION OF THE PLANNING|PROGRAMMING CONCEPT THAT FOCUSED ON A SINGLE ARCHITECTURE THAT COULD TRANSFORM THE CITY OF TOWNSEND.
3RD YEAR | 1ST SEMESTER
GREENSPACE IS PRESERVED AND MULTIPLIED BY CREATING AN ARRAY OF FLOATING HOUSING UNITS THAT EXTEND THE EXISTING QUAD.
PUBLIC, PRIVATE, AND SEMIPRIVATE OUTDOOR AREAS OVERLAP AND WEAVE TOGETHER TO ENCOURAGE INTERACTION AND PRESERVE PRIVACY.
VIEWS FROM EXISTING BUILDINGS ARE PRESERVED WHILE CARS DRIVE UNDER THIS PUBLIC MONUMENT LOOMING OVER THE ROAD AND REACHING OUT TO THE RIVER AND CAPITAL BEYOND.
2ND YEAR | 2ND SEMESTER
00
3
DO
RM
ITO
RY F
OR
10
0G
EO
RG
ETO
WN
UN
IVER
SIT
Y,
VA
MONUMENT LOOMING OVER MONUMENT LOOMING OVER
CAPITAL BEYOND.CAPITAL BEYOND.
2ND YEAR | 2ND SEMESTER2ND YEAR | 2ND SEMESTER
-002 -001 000
THIS THEOLOGICAL CENTER FOR GEORGETOWN UNIVERSITY IS MEANT TO BE THE “HEART” OF CAMPUS, WHICH IS METAPHORICALLY EXTRUDED FROM THE BODY (LIBRARY) FOR CLOSER EXAMINATION FOR ALL.
00
4
LIB
RA
RY A
NN
EX
GEO
RG
ETO
WN
UN
IVER
SIT
Y,
VA
2ND YEAR | 2ND SEMESTER
001LOBBY
OFFICESCONFERENCE
002CAFE /
OUTDOOR DINING
002CAFE /
OUTDOOR DINING
000PARKING/
GARDEN AREA
003READING ROOM W/
STUDY NOOKS
004STACKS
SITUATED IN THE OLD CITY DISTRICT OF KNOXVILLE, TN, THIS PRINTING PRESS ART MUSEUM SYMBOLIZES THE RESURECTION OF OLD METHODS OF MASS PRODUCTION AS NEW FORMS OF ART
2ND YEAR | 1ST SEMESTER
00
5
AR
T M
US
EU
MK
NO
XVIL
LE,
TN
2ND YEAR | 1ST SEMESTER
LIGHT AND SHADOW ARE USED AS THE PRIMARY MEANS OF STRUCTURE, CREATING THRESHOLDS THAT SEPARATE THE SACRED FROM THE PROFANE.
2ND YEAR
1ST SEMESTER
00
6
CH
AP
EL O
F A
NN
UN
CIA
TIO
NK
NO
XVIL
LE,
TN
ORIGINAL DESIGN BY:
SHERIF SUJIAMA
GROUP DRAWINGS AND DESIGN BY:
ANGIE CLAEYSBRICE HOLMESEMILY THREADGILLTREVOR MAYES
THE OBJECTIVE HERE WAS TO TAKE AN EXISTING CABIN DESIGN USING GREEN OAK CONSTRUCTION, MODIFY IT FOR ADDITIONAL PROGRAM, AND CREATE DRAWINGS AT FINER DETAIL.
WE DEVELOPED A HYBRID GREEN OAK AND DRIED TIMBER CONSTRUCTION TO REDUCE THE WARPING OF THE GREEN OAK DURING THE FIRST 8 YEARS AFTER CONSTRUCTION.
00
7
GR
EEN
OA
K C
AB
INLO
NE O
AK
FA
RM
S,
TN
3RD YEAR | 2ND SEMESTER
SCALE : 1” = 16’0”
SCALE : 1” = 16’0” SCALE : 1” = 16’0”
*It is critical that designs do not confl ict with the current fi re code. It is important that proposal does not incroach in egress areas such as cooridors.
Project Space
3RD YEAR | 2ND SEMESTER
THIS SCHOOL WIDE COPMETITION ASKED STUDENTS TO DESIGN AN AMENITIES HUB FOR THE UT ARCHITECTURE BUILDING. THE WINNING PROJECTS WILL BE BUILT NEXT YEAR.
COMPLETED IN GROUPS OF 4, OUR TEAM RECEIVED HONORABLE MENTION.
GROUP MEMBERS:
TREVOR MAYESJORDAN RUNDERDYLAN BUCBLAKE KOTTI
00
8
IN
TER
IOR
DES
IGN
UN
IVER
SIT
Y O
F T
EN
NES
SEE,
TN
00
9 A
RT |
SK
ETC
HES
00
9 P
HO
TO
GR
AP
HY|A
RT
ACRYLIC WATERCOLORPHOTOGRAPH|TOWNSEND,TN
PHOTOGRAPH|TOWNSEND,TN
ACRYLIC|CHARCOAL|GESSOINK
CHARCOAL
ACRYLIC
010
P
HO
TO
GR
AP
HY
MA
NC
HES
TER
, K
Y011
ON
GO
ING
|HER
ITA
GE C
EN
TER
3RD YEAR | 2ND SEMESTER - ONGOING
0012
R
ES
UM
E
COMMUNICATION
EDUCATIONTHE UNIVERSITY OF TENNESSEE SCHOOL OF ARCHITECTURE AND DESIGNI’m currently pursuing a Bachelors of Architecture and have become proficient in studio, staying near the top of my class with a 3.8 design GPA and consistently receiving exemplary feedback on my reviews. I’ve been on the Dean’s list for 3 semesters.
Over the course of the past 5 semesters in the school of architecture, I’ve developed and refined my communication and presentation skills, as presentation and collaboration are the primary means of expression in this field of study.
SO
FTW
AR
E SketchUp (4yrs)
Photoshop (7yrs)
InDesign (2 yrs)
AutoCAD (2yrs)
Illustrator (1 yr)
AutoCAD Architecture
Rhinocerous
Kerkythea
Revit
3ds Max
ABILITIESI have years of sales experience, extensive tech troubleshooting experience, great communication skills, and excel in my architecture design studio. I’m comfortable working with everything from computers and cash registers to soldering irons and groups of people, large or small.
EX
PER
IEN
CE PRINT TECHNICIAN THE UNIVERSITY OF TENNESSEE, KNOXVILLE
September 2013 – current (part time)I help students and faculty process large format prints and troubleshoot other tech issues in the UTK Digital Print Center. We deal with Acrobat, Photoshop, Illustrator, Indesign, and AutoCAD problems, specifically in regards to file integrity, flattening images, and other exporting issues that arrise.
FLOOR MANAGER|PHOTOGRAPHER|TECHNICIAN INCREDIBLE PHOTOS, GATLINBURG
May 2008 – current (weekends/seasonal part time)My responsibilities here involve running a cash register, managing employees, troubleshooting and taking photos. Photoshop is also an integral program that we use here.
TECHNICIAN JMAYES ENGINEERING, GATLINBURG
May 2010 – January 2014 (seasonal full time)I’m responsible for repairing/refurbishing industrial grade AV equipment. Concentration and atten-tion to detail are essential. I gained much experience here with Excell doing invetory work.
COOK ARAMARK, UT KNOXVILLE
September 2011 – May 2012 (part-time)Here I worked in an on-campus cafeteria for one year before it closed. I moved up from the dish room to the main grill in that time.
REFER
EN
CES MATT HALL
865.789.4065 [email protected]
Studio Professor|Auburn College of Architecture
Founder/Designer|Obstructures.org
SCOTT WALL 865.974.3235 [email protected]
Director of College of Architecture|University of Tennessee COaD
JEFF WILKINSON 865.974.3261 [email protected]
IT Team Leader|University of Tennessee COaD (current employer)
ROBERT FRENCH
865.974.3259 [email protected]
Studio Professor|University of Tennessee COaD
TREVOR MAYES
865.567.3321
https://www.facebook.com/trevor.mayes.90