Placing and Finishing Concrete

Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Embed Size (px)

Citation preview

Page 1: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Page 2: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Basic Requirements for Placing Concrete (1)

Preserve concrete quality Water-cement ratio Slump Air-content Homogeneity

Avoid separation of aggregate and mortar

Page 3: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Basic Requirements for Placing Concrete (2)

Avoid excessive horizontal movement

Consolidate adequately Maintain sufficient placement

capacity Choose the right equipment for

the concrete

Page 4: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Preparation Before Placing Includes:

Trimming the subgrade

Page 5: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Preparation Before Placing Includes:

Moistening the subgrade

Page 6: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Preparation Before Placing Includes:

Compacting the subgrade

Page 7: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Depositing Concrete

DO NOT —(a) disturb saturated subgrades so bearing capacity is maintained(b) deposit on frozen subgrade

Deposit continuously and as near as possible to its final position

Rate of placement should be such that previously placed concrete has not set when the next layer is placed upon it

Page 8: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Depositing Concrete

Start placing along perimeter at one end with each batch discharged against previously placed concrete

Do not — (a) dump in separate piles & then level and work together(b) deposit in large piles & then move horizontally into position

These practices result in segregation

(mortar flows ahead of coarser material)

Slab Construction

Page 9: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Depositing Concrete

Discharging into previously placed concrete

Effective use of wheelbarrows

Page 10: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Incorrect Placement with Conveyor Belt

Baffle

Mortar

Rock Mortar

Mortar

Rock

Shallow hopper

Page 11: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Placement with Conveyor Belt

Belt Scraper

No Separation

Provide at least 0.6 m (24 in.) headroom for downpipe, elephant trunk or equivalent

Page 12: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Depositing Concrete

Pavement Slab

Concrete deposited in front of slip form paver by dump trucks

Concrete spread evenly across the subgrade by the paver before consolidation and finishing

Page 13: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Curb/Curb and Gutter

Depositing Concrete

Concrete deposited into hopper of slip form curb and gutter machine which then extrudes the concrete into the desired shape

Page 14: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Depositing Concrete

Deposit in horizontal layers of uniform thickness Reinforced — 150 mm to 500 mm Mass — 375 mm to 500 mm

Consolidate each layer before next is placed

Timely placement & consolidation prevents flow lines and cold joints

Walls

Page 15: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Horizontal Construction Joint

Page 16: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Horizontal Construction Joints

Page 17: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Underwater Placement Methods

Tremie Pump Bottom dump buckets Grouted preplaced

aggregate (specialized) Toggle bags Bagwork Diving bell

Page 18: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Placing Concrete Under Water

Water velocity 3 m (10 ft) / min. Water temperature 5°C

(if below — test for strength gain) w/c 0.45 Cementing materials content

390 kg/m3 (600 lb/yd3) Slump range 150 to 225 mm (6 to

10 in.)

Basic Recommendations

Page 19: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Placing Concrete Underwater Used: Tremie

Advantages: Can be used to funnel concrete down through the water into the structure.

Watch for: Discharge end always has to be buried in fresh concrete to ensure seal between water and concrete mass.

Page 20: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Consolidating Concrete Internal Vibration

External Vibration

Page 21: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Internal Vibration

d

R

1½ R

Vibrator

Radius of Action

Page 22: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Internal Vibrators

Diameter

of head,

mm (in.)

Recommended frequency,

vibrations per minute

Approximate radius of

action, mm (in.)

Rate of placement,

m3/h (yd3/h) Application

20-40(3/4-1½)

9000-15,00080-150(3-6)

0.8-4(1-5)

Plastic and flowing concrete in thin

members. Also used for lab test specimens.

30-60(1¼-2½)

8500-12,500130-250(5-10)

2.3-8(3-10)

Plastic concrete in thin walls, columns,

beams, precast piles, thin slabs, and along construction joints.

50-90

(2-3½)8000-12,000

180-360

(7-14)

4.6-15

(6-20)

Stiff plastic concrete (less than 80-mm [3-in.] slump) in general

construction .

Adapted from ACI 309

Page 23: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Systematic Vibration of Each New Lift

CORRECTCORRECTVertical penetration a few inches into previous lift (which should not yet be rigid) of systematic regular intervals will give adequate consolidationINCORRECTINCORRECTHaphazard random penetration of the vibrator at all angles and spacings without sufficient depth will not assure intimate combination of the two layers

Page 24: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Placing Concrete in a Sloping Lift

CORRECTCORRECTStart placing at bottom of slope so that compaction is increased by weight of newly added concrete. Vibration consolidates the concrete.INCORRECTINCORRECTWhen placing is begun at top of slope the upper concrete tends to pull apart especially when vibrated below as this starts flow and removes from concrete above.

Page 25: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

External Vibration

Form vibrators Vibrating tables Surface vibrators

Vibratory screeds Plate vibrators Vibratory roller screeds Vibratory hand floats or

trowels

Page 26: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Consolidating Concrete

Inadequate consolidation can result in: Honeycomb Excessive amount of entrapped

air voids (bugholes) Sand streaks Cold joints Placement lines Subsidence cracking

Page 27: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Nuclear Gauges to Determine Subbase Compaction

Page 28: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Screeding (Strikeoff)The process of cutting off excess concrete to bring the top surface of a slab to proper grade

Page 29: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Vibratory Screeds

Page 30: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Bullfloating

Page 31: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Darbying

Page 32: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Edging

Required along all edge forms,isolation and construction jointsin floors and exterior slabs

Cut concrete away from formsto a depth of 25 mm with apointed mason or margin trowel

Edging may be required aftereach subsequent finishing operation for interior slabs

Edging densifies and compacts concrete next to forms where floating is less effective

Page 33: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Highway Straightedges

Page 34: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Floating (Power or Hand)

To embed aggregate particles just beneath the surface

To remove slight imperfections, humps, and voids

To compact the mortar at the surface in preparation for additional finishing operations.

Page 35: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Troweling Creates smooth,

hard,dense surface Exterior concrete should

not be troweled because: it can lead to a loss of

entrained air caused by overworking the surface

troweled surfaces can be slippery when wet.

Page 36: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Brooming

Page 37: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Tining

Page 38: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Curing and Protection

Cure for 7 days

Page 39: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Placing on Hardened Concrete

Preparing Hardened ConcretePreparing Hardened Concrete

Page 40: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Bonding New to Previously Hardened Concrete

Cement-sand grout

Latex Epoxy

Page 41: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Isolation Joints

Page 42: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Contraction Joints

Page 43: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Spacing of Contraction Joints in Meters

Slab thickness,

mm

Maximum-size aggregate

less than 19 mm

Maximum-size aggregate

19 mm and larger

100 2.4 3.0

125 3.0 3.75

150 3.75 4.5

175 4.25 5.25

200 5.0 6.0

225 5.5 6.75

250 6.0 7.5

MetricMetric

Page 44: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Spacing of Contraction Joints in Feet

Slab thickness, in.

Maximum-size aggregate less than ¾ in.

Maximum-size aggregate

¾ in. and larger

4 8 10

5 10 13

6 12 15

7 14 18

8 16 20

9 18 23

10 20 25

Inch-PoundInch-Pound

Page 45: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Making Contraction Joints

Dry-cut sawing concrete

Grooving tool on bull-float

Page 46: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Construction Joints

Page 47: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Joint Layout for Slabs

Panels created by contraction joints should be approximately square

Panel aspect ratio max. 1½ to 1 Contraction (control) joints should

only terminate at a free edge or at an isolation joint

When joint spacing exceeds 4.5 m (15 ft), load transfer by aggregate interlock decreases significantly

Basic Factors to Remember

Page 48: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Typical Joint Layout

Page 49: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Finishing Operations

Consolidation Strike-off Edging Darbying or Bull Floating Lapse of Time Edging Grooving (if desired) Floating (power or hand) Troweling (power or hand) Lapse of Time Second Troweling (power or hand) Final Troweling (hand) Curing

Single Course Floors

Page 50: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Finishing Operations - Exterior Slabs

Consolidation Strike-off Depress aggregate with metal/wood strip

at joint location if hand tooled Darbying or Bull floating Lapse of time Edging Jointing (optional if hand tooled) Floating Lapse of time Texturing (brooming/swirl float finish) Curing

Sidewalks, Driveways etc.

Page 51: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Patching

Page 52: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Curing Patches

Page 53: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Cleaning Concrete Surfaces

Cleaning methods:

Water

Chemical

Mechanical

Page 54: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Finishing Formed Surfaces

Rough-form finishes

Smooth off-the-form finish

Smooth, rubbed finish

Sand-floated finish

Grout cleandown

(sack-rubbed finish)

Page 55: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Special Surface Finishes

Pattern and Textures

Exposed Aggregate Concrete

Colored Finishes

Stains, Paints and Clear

Coatings

Page 56: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Page 57: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Working Safely with Concrete

Protect:

Your Eyes

Your Back

Your Skin

Page 58: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Precautions

http://www.cement.org/pdf_files/ms271.pdfhttp://www.cement.org/pdf_files/ms271.pdf

WARNING: Contact with wet (unhardened) concrete, mortar, cement, or cement mixtures can cause SKIN IRRITATION, SEVERE CHEMICAL BURNS (THIRD-DEGREE), or SERIOUS EYE DAMAGE. Frequent exposure may be associated with irritant and/or allergic contact dermatitis. Wear water-proof gloves, a long-sleeved shirt, full-length trousers, and proper eye protection when working with these materials. If you have to stand in wet concrete, use waterproof boots that are high enough to keep concrete from flowing into them. Wash wet concrete, mortar, cement, or cement mixtures from your skin immediately. Flush eyes with clean water immediately after contact. In-direct contact through clothing can be as serious as direct contact, so promptly rinse out wet concrete, mortar, cement, or cement mixtures from clothing. Seek immediate medical attention if you have persistent or severe discomfort.

Page 59: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Videos 1/4

Placing and Consolidating Vibration

Page 60: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Videos 2/4

Finishing I Finishing II

Page 61: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Videos 3/4

Contraction Joints Jointing

Page 62: Placing and Finishing Concrete. Basic Requirements for Placing Concrete (1) n Preserve concrete quality u Water-cement ratio u Slump u Air-content u Homogeneity

Placing and Finishing Concrete

Videos 4/4

Improper Finishing