Pima County Regional
Optimization Master Plan
Pima County Regional
Optimization Master Plan
Arizona County Engineers Association
Wickenburg, Arizona
January 10, 2008
Arizona County Engineers Association
Wickenburg, Arizona
January 10, 2008
Michael Gritzuk, P.E., Director,Pima County Regional Wastewater
Reclamation Department
Michael Gritzuk, P.E., Director,Pima County Regional Wastewater
Reclamation DepartmentNORTHAeration Basins
Clarifiers
Administration Building
Central Lab Building
San
ta Cru
z River
Disinfection
Preliminary Treatment
Existing Roger Road WWTP
Approximately 48 acres
Water ReclamationCampus
Approximately 41 acres
Proposed extent of screen
enclosure
Existing and Expanded Ina Road WPCF
Approximately 160 acres
Sports Park
2
Roger Road WWTP
Ina Road WPCF
Green Valley WWTF
Pima County Fairgrounds WWTF
Avra Valley WWTF
Corona de Tucson WWTF
Arivaca Junction WWTF
Marana WWTF
Mt. Lemmon WWTF
Rillito Vista WWTF
Randolph Park WRF
PCRWRDTreatmentFacilities
PCRWRDTreatmentFacilities
1
22
33
44
55
66
77
88
99
1010
1111
3
Ina Road WPCF
Roger Road WWTP
Ina Road WPCFSewer Basin =
198 square miles
Roger Road WWTP
Sewer Basin =275 square
miles
TheMetropolitan
SewerageSystem
4
Regional Optimization Master Plan Goals
Regional Optimization Master Plan Goals
• Current and future regulatory compliance
• Meet capacity needs to 2030
• Upgrade / rehabilitate aging infrastructure
• State-of-the-art technology
• Staff-friendly
• Automation
• Community acceptance
• Current and future regulatory compliance
• Meet capacity needs to 2030
• Upgrade / rehabilitate aging infrastructure
• State-of-the-art technology
• Staff-friendly
• Automation
• Community acceptance
N2 N2 O2O2
Clarifier
Waste SludgeRecycle Sludge
Ferment-ation
FirstAnoxic
Nitrification SecondAnoxic
Re-aeration
1 2 3 4 5
5-stage Bardenpho process (Source: EIMCO Water Technologies)
5
Regional Optimization Master Plan Scope of Work
Regional Optimization Master Plan Scope of Work
Develop the optimal treatment process and plan to comply with regulatory requirements to reduce total nitrogen concentrations in discharged effluent
Master plan foreseeable future regulatory requirements
Determine the long-term capacity needs of the County metropolitan facilities, conveyance system and outlying growth areas
Develop the optimal treatment process and plan to comply with regulatory requirements to reduce total nitrogen concentrations in discharged effluent
Master plan foreseeable future regulatory requirements
Determine the long-term capacity needs of the County metropolitan facilities, conveyance system and outlying growth areas
Ina Road WPCF HeadworksIna Road WPCF Headworks
6
Regional Optimization Master Plan Scope of Services
Regional Optimization Master Plan Scope of Services
Develop long-term plan for the treatment, handling and reuse of system bio-solids and bio-gas
Develop a detailed implementation schedule to meet regulatory implementation deadlines and the optimization master plan
Develop a financial plan to support the system’s regulatory and other needs for the next fifteen years
Develop long-term plan for the treatment, handling and reuse of system bio-solids and bio-gas
Develop a detailed implementation schedule to meet regulatory implementation deadlines and the optimization master plan
Develop a financial plan to support the system’s regulatory and other needs for the next fifteen years
7
Regulatory Implementation Requirements to Reduce Total
Nitrogen Concentrations
Regulatory Implementation Requirements to Reduce Total
Nitrogen ConcentrationsIna Road WPCF Roger Road WWTP
Complete initial engineering study
Recommendation for upgrading treatment plants
Submit recommended
plan letter to ADEQ
February 1, 2007 January 30, 2007
Award contract for construction
December 31, 2010 January 30, 2011
Treatment of effluent to non-toxic nitrogen levels
January 30, 2014 January 30, 2015
8
ROMP PlanROMP Plan
Expand Ina Road WPCF to 50 mgd
Construct new 32 mgd Water Reclamation Campus (in vicinity of existing Roger Road WWTP)
Plant Interconnect – 28 mgd average, 72 mgd peak flow
Decommission existing 41 mgd Roger Road WWTP
Ina Road WPCFIna Road WPCF Roger Road WWTPRoger Road WWTP
9
ROMP Cost Estimate (2006 dollars)ROMP Cost Estimate (2006 dollars)
Ina Road WPCF Upgrade/Expansion $243,900,000
Electrical Upgrades $35,000,000
Plant Interconnect $22,300,000
Water Reclamation Campus $211,000,000
Roger Road WWTP Demolition $23,800,000
Total Estimated Cost $536,000,000
Cost estimate includes design costs, UV disinfection and 5% contingency.Cost estimate includes design costs, UV disinfection and 5% contingency.
**
**
10
Ina Road WPCF Ina Road WPCF
• Expand treatment capacity to 50 mgd
Convert existing process to Bardenpho process
Additional 12.5 mgd expansion
Most cost-effective utilization of existing headworks capacity of 50 mgd
• Centralized biosolids processing and handling
Reduces overall cost
Provides for co-generation bio-gas utilization at one location
Provides one point of distribution of final product
• Expand treatment capacity to 50 mgd
Convert existing process to Bardenpho process
Additional 12.5 mgd expansion
Most cost-effective utilization of existing headworks capacity of 50 mgd
• Centralized biosolids processing and handling
Reduces overall cost
Provides for co-generation bio-gas utilization at one location
Provides one point of distribution of final product
11
50 MGD Ina Road RWRFOverall Plant Aerial View with Screen Enclosure
50 MGD Ina Road RWRFOverall Plant Aerial View with Screen Enclosure
Proposed extent of screen
enclosure
Existing and Expanded
Ina Road RWRF Approximately 160 acres
Bardenpho Treatment Units
EXISTING
Primary Clarifier
Secondary Clarifiers
Digesters
Thickener Tanks
Enhanced Chlorination
PROPOSED:
SportsPark
12
50 MGD Ina Road WPCF Screen Enclosure Concept, Interior View
50 MGD Ina Road WPCF Screen Enclosure Concept, Interior View
Wire mesh screen
South facing solar panels w/perimeter lighting
Cor-ten steel frame
Natural stone gabion base
13
NORTHAeration Basins
Clarifiers
Administration Building
Central Lab Building
San
ta Cru
z River
32 MGD Water Reclamation CampusOverall Aerial View
32 MGD Water Reclamation CampusOverall Aerial View
Disinfection
Preliminary Treatment
Existing Roger Road WWTP
Approximately 48 acres
Water Reclamation Campus
Approximately 41 acres
14
•Recycled content aluminum shell with natural finish
•West façade perforated for sun control with view maintained
•Solar collection capacity over roof surface
Administration Building
Central Lab Building
Parking
32 MGD Water Reclamation Campus Admin. and Central Lab Building Concept Aerial
View
32 MGD Water Reclamation Campus Admin. and Central Lab Building Concept Aerial
View
15
Aeration Tanks
Clarifiers Support Building
Support Buildings
Santa Cruz River
32 MGD Water Reclamation Campus Support Building and Aeration Tank Concepts
32 MGD Water Reclamation Campus Support Building and Aeration Tank Concepts
16
32 MGD Water Reclamation CampusAdmin. and Central Lab Building
32 MGD Water Reclamation CampusAdmin. and Central Lab Building
Portico at east face of buildingsfacing athletic fields
17
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
INA Road W PCF 50 mgd
Power Plant (Ina Road W PCF)
Water Reclamation Cam pus 32 mgd
Dem olish existing plant
Central Laboratory (Water Reclamation Campus)
Thermophilic Digestion(Mesophilic Digestion)
Design / Approval Construction Acceptance / Startup Testing
?
?
?
?
Implementation ScheduleImplementation Schedule
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
INA Road W PCF 50 mgdINA Road W PCF 50 mgd
Power Plant (Ina Road W PCF)
Power Plant (Ina Road W PCF)
Water Reclamation Campus 32 mgd
Water Reclamation Campus 32 mgd
Demolish existing plantDemolish existing plant
Central Laboratory (Water Reclamation Campus)
Central Laboratory (Water Reclamation Campus)
Thermophilic Digestion(Mesophilic Digestion)
Design / Approval Construction Acceptance / Startup Testing
?
?
?
?
18
ROMP Implementation CostsROMP Implementation Costs
Current Estimated Cost (2006 dollars): $536 million
Cost Inflation (assuming an inflation rate of 5% over 15 years): $719 million
Bonding / Debt Service $1+ billion
Current Estimated Cost (2006 dollars): $536 million
Cost Inflation (assuming an inflation rate of 5% over 15 years): $719 million
Bonding / Debt Service $1+ billion
19
Possible Community EnhancementsPossible Community Enhancements
Park enhancements
Regional / International Sports Complex
Economic development
Environmental enhancement
Water Reclamation Campus
Study underway
Park enhancements
Regional / International Sports Complex
Economic development
Environmental enhancement
Water Reclamation Campus
Study underway
Existing WWTPExisting WWTP
SoftballDiamondsSoftballDiamonds
BaseballDiamondsBaseballDiamonds
SoccerFieldsSoccerFields
CommercialDevelopmentCommercialDevelopment
WetlandsWetlands
20
ROMP Procurement
Schedule
ROMP Procurement
ScheduleNORTHAeration Basins
Clarifiers
Administration Building
Central Lab Building
San
ta Cru
z River
Disinfection
Preliminary Treatment
Existing Roger Road WWTP
Approximately 48 acres
Water ReclamationCampus
Approximately 41 acres
Proposed extent of screen
enclosure
Existing and Expanded Ina Road WPCF
Approximately 160 acres
Sports Park
22
Plant Interconnect – Roger Road WWTP to Ina Road WPCF
Plant Interconnect – Roger Road WWTP to Ina Road WPCF
Design Consultant – Brown & Caldwell
Contract : June 2007
Contruction Manager at Risk: Contractor selected,under negotiations
Project Management: PCRWRD staff
Full-time Inspection: To be determined
Design Consultant – Brown & Caldwell
Contract : June 2007
Contruction Manager at Risk: Contractor selected,under negotiations
Project Management: PCRWRD staff
Full-time Inspection: To be determined
23
Design Consultant
RFQ advertised: October 2007
Selection process: Underway
Consultant selected: February 2008
Complete negotiations & NTP: April 2008
Construction Manager at Risk
RFQ advertised: December 2007
Anticipate contract: March 2008
Project Management: To be determined
Full-time Inspection: To be determined
Design Consultant
RFQ advertised: October 2007
Selection process: Underway
Consultant selected: February 2008
Complete negotiations & NTP: April 2008
Construction Manager at Risk
RFQ advertised: December 2007
Anticipate contract: March 2008
Project Management: To be determined
Full-time Inspection: To be determined
Ina Road Upgrade/Expansion DesignIna Road Upgrade/Expansion Design
24
Water Reclamation CampusWater Reclamation Campus
Procurement Method Decided: Summer 2008Examples of methods to be evaluated:
Design Build (DB)
Design Build Operate (DBO)
Design Build Finance Operate (DBFO)
Others?
RFQ Advertisement: Fall 2008
Project Management: To be determined
Full-time Inspection: To be determined
Procurement Method Decided: Summer 2008Examples of methods to be evaluated:
Design Build (DB)
Design Build Operate (DBO)
Design Build Finance Operate (DBFO)
Others?
RFQ Advertisement: Fall 2008
Project Management: To be determined
Full-time Inspection: To be determined