23
PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

Embed Size (px)

Citation preview

Page 1: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18th 2013

Daryl Fullerton, PIDX International

© PIDX, Inc. 2012

Page 2: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

Table of Contents

© PIDX, Inc. 2011

1. Overview

2. Project Recent Wins – (Nov Dec 2013)

3. KPI Dictionary Update

4. Status Update on Timeline

5. 12 Point Plan ( 2014 - Next 6 Mths)

6. Marketing the Supplier KPI Project

7. Challenges

8. AOB

Page 3: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

© PIDX, Inc. 2012

Supplier KPI Project Overview

Overview The PIDX Supplier KPI Projects main focus is to develop a Supplier KPI Data Dictionary (Phase 1) followed by the development and automation of Supplier KPI data transfer between Suppliers and Oil & Gas Operators (Phase 2) beginning in late 2014.

Phase 1 project objectives are to compile an Industry Data Dictionary for Standardization of KPI terminology and definitions, e.g. NPT, TRIR etc

Focus: Upstream / Downstream Commenced: 2011 Participants : c80 Contact: Daryl Fullerton [email protected] Mike Washington [email protected]

Wins when Implemented• Standardization on KPI Terminology• Industry Recognized and endorsed Supplier KPI Data Dictionary.• Significantly better QPR’s• Cost savings for Service Companies• More Accurate Data for Operators •Standard for Supplier KPI Data Transfer

Key Drivers – Why we Need• Industry Wide KPI Definition Chaos between different Operator KPI Definitions and the Supply Chain Supplier Base• Scorecard Overload• Cost Savings Time = Money• Better Data Accuracy• Improved Data QA/QC• Scorecard impact on working conditions.

Page 4: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

Industry – Current State of SPM• Many Operators have SPM Initiatives in operation or

underway.• Often Contract Awards for a new Supplier based on WOM or

past performance but KPI Terminology / Definitions may differ. – Big Problem Area

• Many KPI initiatives are Regionally Focused or Category Line Focused with no Global Company Wide KPI role up.

• Very few provide Visibility on KPIs on Real Time to Suppliers• Often no way of telling whether A team or B team until things

go wrong – Likeness to Political Campaigns / Elections• No way of facilitating regional Specific KPIs that Matter.• Huge Drive to Standardise KPI terminology. Apples with

Apples and Like with Like. • Automated of KPI data gathering extremely low.

Confidential © 2013 PIDX 4

Page 5: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

Project Recent Wins

Page 6: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

Recent Wins for the Project (Nov Dec 2013)

© PIDX, Inc. 2011

1. BP on Board Project

2. IACCM interested in Joining Project

3. BP Submitted KPIs

4. Shell - Participation forms Submitted

5. Talks held with 8over8 about joining ( Contract Specific KPIs for Major Projects)

6. Chevron now have Nominated a dedicated representative

7. In talks with Glencore Xtrata about joining (they are one of the Worlds largest Mining & Exploration Cos)

8. In talks with Aramco about joining.

9. Interest from Genel Energy (Tony Hayward is CEO), Conversations had, Follow up Jan 2014

Page 7: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

Project Plan

Page 8: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

Project Timeline 2013- 2014

Q1 2013

KPI Dictionary

(alfa version)

Q1 2014

KPI Selection(Critical few)

KPI DefinitionsStandardized

KPI Dictionary(Beta version

Segmentation)

KPI DictionaryStandardized

Version 1

Page 9: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

•9

Performance Areas (Level 1) Framework Agreed

•21/04/23 Classification: Internal

• QUALITYS

UP

PLI

ER

• DELIVERY

• COST

• BEHAVIOUR

• HSE

Level 1

Page 10: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

Supplier KPI Data Dictionary Update (Dec 2013)

© PIDX, Inc. 2011

1. Template for Data Collection Agreed.

2. 5 Performance Areas Defined and Agreed.

3. Over 440 KPI’s recieved and in progress of being added to Master Data Dictionary

4. KPI’s Submitted by 15 Companies

5. Planning for Conversion of KPI Dictionary Spreadsheet to from Excel to Data Base underway.

Accomplishments to Date

Page 11: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

KPIs to StandardizeKPI Name KPI Definition

Total Recordable Incident Rate (TRIR) = Recordable Cases * 200,000 / Hours Worked

OSHA Severity Rate OSHA SR = (Lost Workdays + Restricted Workdays) * 200,000 / Hours Worked

Lost Workday Case Incidence Rate LWIR = Lost Workday Cases * 200,000 / Hours Worked

OSHA Incidence Rate(OSHA IR) = (Lost Workday Cases + Restricted Workday Cases) * 200,000 / Hours

Worked

Actual Costs Vs Planned Cost Days(Actual Cost of Services/Actual Operating Time (days))/(Planned Cost of Services/Planned

Operating Time (days) )

NPC % OF ACTUAL COST (Total non productive Cost NPC/Actual Cost of Services)*100.0

Days per 10k (Total number of drilling days / Total feet drilled)*10,000

NPT in % of operating time (Product Line Related Total Non-Productive Time NPT (days)/Actual Operating Time (days))*100.0

Operating Efficiency % Operating Efficiency = (Operating Time-Agreed NPT)/Operating Time x 100

Days Away from Work Injury Freq. (Days Away From Work Injuries/Total Manhours)*200000.0

Stop Cards Issue Rate Number of Stop Cards recorded for the supplier per 200,000 man hours

Recordable Injuries and Illnesses Frequency (No. of Recordable Injury and Illnesses*200000.0)/No.of Man-hours worked

% Objectives Met (number of objectives met / number of objectives defined) * 100

On Time Delivery Rate On Time Delivery in Full to Specification / Total Deliveries Received

Right First Time Invoicing Rate Invoices received Right First Time / Total Invoices Received *100

Days Sales Outstanding Ratio DSO ratio = accounts receivable / (annual sales / 365 days)

Days Payment Outstanding Ratio DPO ratio = accounts payable / (annual sales / 365 days)

Page 12: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

Submitted V Standardised

Goal = Feb 2014 Publish the 21 or so KPIs for

Industry Feedback

Page 13: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

Participation Update

Page 14: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

© PIDX, Inc. 2012

2011 - 2013Workgroup Meeting Participation / Expressions of Interest

ApacheBPCairn Energy*ChevronConocoPhillipsEP EnergyGenelKinder MorganMurphy Oil MarathonNoble EnergyNexenPenn West Exploration RWESasolShell StatoilTalismanTullow Oil Wintershal

Aker SolutionsAmecBaker HughesCBICameronGE Oil & GasGenelHalliburton OceaneeringPacific Drilling *SchlumbergerSiemensTetra TechnologiesTransoceanWeatherford

Total Participants / Interested Parties = c80Last Updated Date: November 2013

Operators Service Companies / Suppliers

Page 15: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

© PIDX, Inc. 2012

KPI Data Dictionary Contributing Companies & Organisations & Desired State

Already Submitted KPI’sAfrenBPConoco PhilipsHalliburtonNexenOSHA ActianPICSWintershallHackett GroupSasolStatoilWintershall

Update as at Sept December

ApacheAker SolutionsAnadarkoAmecBaker HughesChevronCameronGE Oil & GasEP EnergyHessMarathonOceaneeringPacific Drilling SchlumbergerTransoceanWeatherfordWintershall

And as many more contributors as we can get.

Total Participants / Interested Parties = circa 80Last Updated Date: December 2013

KPIs Submitted to Date Followups

Page 16: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

Future Meetings / Deliverables Schedule(Next 6 Mths)

© PIDX, Inc. 2011

Meetings

2013

Q4 - Houston Meeting – Sept 13th 2013

Location Schlumberger, Houston

Q4- London Meeting – Oct 17th 2013

Q3 / Q4 Continue to Map New KPI’s as and when recieved from participant Companies.

2014

Continue to Map New KPI’s as and when recieved from participant Companies.

Q1 / Q2 Meeting Locations to be decided

Supplier Performance Dictionary releases

2013

Q2 / Q3- Populate Supplier KPI Dictionary Alpha Version 1.08 to 1.12

Q4 October - Draft Supplier Performance KPI Dictionary BETA V1

Q4 December – Ver 1- Supplier KPI Dictionary

2014

Q2 2014 – Ver 2- Supplier KPI Dictionary

Page 17: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

Success – PIDX Standard for AutomatedTransmission of KPI Data between Suppliers and

Operators

SPM

140 Data Inputs

SPM

26 Data Inputs

KPI Data Inputs

Operator 1

Service Co 1

Service Co 2

Service Co 3

Operator 2

Service Co 1

Service Co 2

Service Co 3

Clients

70 KPI Data Inputs

Service Co 3 CRM

Internal DB’s

Clients

Operator 1

Operator 4

Operator 3

Page 18: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

12 Point Plan

Page 19: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

12 Point Plan ( Q1-Q2 2014)

© PIDX, Inc. 2011

1. Project Update to All Participants Jan 16th 2014

1. Update, KPIs for Standardisation

2. Project Plan

2. Marketing for Supplier KPI Feb Meeting Jan 20th 2014

3. Apoint VC Europe Jan 21st 2014

4. Announce VC Europe Jan 28th 2014

5. PSCM Conference (Ams) Jan 30th 2014

6. Supplier KPI eBrochure Feb 2nd 2014

7. Standardise KPIs (Feb 2014 to June 2014)

8. Houston Meeting Feb 20th 2014

9. Colate feedback from Houston Meeting Feb 23rd 2014

10. Publish Houston Meeting Minutes Feb 30th 2014

11. Marketing for Remaining 2014 Meetings Mar 3rd 2014

12. Publish Standardised KPIs V1 (to date) May 2014

Page 20: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

Marketing

Page 21: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

Marketing Plan for Supplier KPI

© PIDX, Inc. 2011

1. PIDX Conferences• Houston April 2014, London May 2014,

2. Adhoc Meetings• Houston February 2014• London March 2014

3. Direct Calls & meetings with Interested Parties

4. Oil & Gas Supply Chain Conferences

5. PIDX Website

6. Linkedin

7. Other Publications (Digital Energy, Oil IT)

8. Educate PIDX Country Reps

9. PIDX Supplier KPI - Ebrochure (2 Pager)

10. Presentation on Slideshare

Page 22: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

Assistance Required

Page 23: PIDX Supplier KPI Project Update PIDX Executive Update – Dec 18 th 2013 Daryl Fullerton, PIDX International © PIDX, Inc. 2012

Challenges / Assistance Required

© PIDX, Inc. 2011

1. Registered Participation from more Suppliers possibly we could leverage some contacts in (OFS-Members)

2. Meeting Sponsorship• Houston Feb 2014• London May 2014

3. KPI Documentation / Repository

4. Financial / Travel Costs / Project Exposure• Third Party Conferences 3 Per Year @ $2000 each

example : http://pscm.insideintelligence.com/ 5. Costs - Consultants (Hackett ) ?

6. IACCM Membership (36000 Members 20% Oil & Gas

Help Market the Project through IACCM Surveys, Webinars etc Cost –Membership $3500 PA