PEÑA BOULEVARD IMPROVEMENTSPROJECT DELIVERY
MICHELLE MARTIN, P.E.LANDSIDE ENGINEERING SUPERVISORSEPTEMBER 22, 2016
• Review project needs
• Level of Service (LOS)
• Capacity, condition and operation at the Y-split
• Current project delivery
• Project timing
• Questions & Answers
AGENDA
2
• DEN has experienced a 10% increase in O&D traffic which has negatively
impacted the Level of Service (LOS) of Peña Blvd.
• LOS from I-70 to Green Valley Ranch are D & E
• LOS from Green Valley Ranch to E-470 are C & D
• LOS from E-470 to the terminal are C & D
• Per the DEN Roadway Master Plan (Section 4.1.1) “The City and County of
Denver Department of Aviation set the target level of service for the airport
roadways at LOS C” or higher.
PLAN FOR PEÑA BOULEVARD - CAPACITY
3
LEVEL OF SERVICE (LOS)- PEÑA BLVD LEVEL
OF SERVICE
FLOW CONDITIONS
OPERATING SPEED(MPH)
TECHNICAL DESCRIPTIONS SAFETY OPERATIONAL
A 65+Highest level of service. Traffic flows freely with little or no restrictions on maneuverability. No delays
Highest level of safety
Highest level of mobility and speed.
B 65Traffic flows freely, but drivers have slightly less freedom to maneuver. No delays
High level of safety
High level of mobility and speed with few restrictions.
C <65Density becomes noticeable with ability to maneuver limited by other vehicles. Minimal delays
Acceptablelevel of safety
Acceptable level of mobility and speed with some restricted maneuverability.
D 62Speed and ability to maneuver is severely restricted by increasing density of vehicles.Infrequent delays
Acceptablelevel of safety
Low level of mobility and restricted maneuverability. Congestion levels impact speed.
E 60Unstable traffic flow. Speeds vary greatly and are unpredictable.Intermittent delays
Low level of safety
Mobility and maneuverability restricted by road congestion. Congestion levels impact speed.
F <60Traffic flow is unstable, with brief periods of movement followed by forced stops.Significant delays
Impaired level of safety
Mobility and maneuverability mostly restricted. Congestion levels create “traffic jams.”
*Level of Service (LOS) is a qualitative measure used to relate the quality of traffic service based on performance measures, e.g. speed, density, congestion, etc., with LOS A being the best and LOS F being the worst. LOS C is the target LOS for Peña Blvd.
4
PEÑA BLVD CURRENT LEVEL OF SERVICE
5
• Traffic counts
completed in May,
2015 show that
areas to the west
are rivaling traffic
volumes
predicted for 2035
(based on a study
done in 2011).
PEÑA BLVD – PROJECTED TRAFFIC COUNTS
6
NEW Pavement to East Terminal
NEW Pavement West Terminal Exit
Existing Pavement to Remain
Existing Pavement to be removed
Current terminal roadway segment traffic volumes have exceeded those associated with the Phase I (50 MAP) Airport development LOS C.
CURRENT Y-SPLIT CONFIGURATION
NEW Pavement to East Terminal
NEW Pavement West Terminal Exit
Existing Pavement to Remain
Existing Pavement to be removed
Proposed terminal roadway design and alignment will provide LOS C or better for full Airport build out (110 MAP).
FUTURE Y-SPLIT CONFIGURATION
NEW Pavement to East Terminal
NEW Pavement West Terminal Exit
Existing Pavement to Remain
Existing Pavement to be removed
COMPREHENSIVE CONSTRUCTION PLAN
10
IB / OB Peña from Jackson Gap to the Terminal
• Design – Build
• RFQ Late December
• 1 month for proposals
• Short list to 3 teams
• RFP and ATC process will follow
• DEN to provide information regarding needs of parking, ground transportation
and DEN Real Estate by the RFP process
Phase 1
11
IB / OB Peña from I-70 to 64th Avenue
• Design – Bid – Build
• Design RFP will be advertised by the Peña PMT
• Design will be completed in 2017 – 2018
• Project will be constructed pending FAA agreement and securing additional
funding
• Tentative build dates 2021 – 2022
Phase 2
12
IB / OB Peña from Picadilly Bridge to Jackson Gap
• Design – Bid – Build
• Design RFP will be advertised by the Peña PMT
• Tentative build dates 2023 – 2024
Phase 3
13
IB / OB Peña from 64th Avenue to Picadilly Bridge
• Design – Bid – Build
• Design RFP will be advertised by the Peña PMT
• Tentative build dates 2025 – 2026
Phase 4
14