FOUNDATION CALCULATION SHEET
One-Stop Solution for Foundation
TITLE DESCRIPTION
PROJECT/JOB NO. [POCR] Foundation Calculation-140903
PROJECT/JOB NAME .
CLIENT NAME .
SITE NAME .
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME A100-E-006
LOAD COMBINATION GROUP NAME
REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D
Copyright (c) GS E&C. All Rights Reserved
Page 1
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
FOUNDATION LISTS
Group Name No. Description No. Description
A100-E-006 1 A100-E-006
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
Page 2
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
CONTENTS
1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION
2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH
3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION
4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
4.2 CHECK OF OVERTURNING MOMENT
4.3 CHECK OF CONTACT PRESSURE
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
Page 3
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
1. GENERAL
1.1 CODE & STANDARD
Items Description
Design Code British Standard (BS-8110)
Horizontal Force for Wind BRITISH STANDARD (BS 6399 PART 2)
Horizontal Force for Seismic BY FACTORED VALUE
Unit System Input : SI, Output : SI, Calculation Unit : SI
1.2 MATERIALS & UNIT WEIGHT
Items Value
Concrete (fck : compressive strength)
Lean Concrete (Lfck : compressive strength)
Rs (Soil unit weight)
Rc (Concrete unit weight)
Es (Steel Modulus of Elasticity)
Ec (Concrete Modulus of Elasticity)
- Soil Capacity
Items Value
Soil Name Unit-01
Footing List A100-E-006
Qa (Soil Bearing Capacity)
Buoyancy Consider
WL (Water Label from the EL = 0) -4000 mm
FD (Frost Depth from the EL = 0) -2600 mm
Internal Friction Angle
Passive Soil Pressure Not Consider
Cu (Undrained cohesion)
1.3 SUBSOIL CONDITION & SAFETY FACTORS
Items Description
Allowable Increase of Soil (Wind) 33.33 %
Allowable Increase of Soil (Seismic) 33.33 %
Allowable Increase of Soil (Test) 20 %
Safety factor against overturning for OVM1(FO1) 1.5
Safety factor against overturning for OVM2(FO2) 1.8
Safety factor against sliding for the SL1(FS1) 1.5
0.45
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
Reinforcement (f5 ~ f18 , yield strength)
Reinforcement (f19 ~ , yield strength)
18.500 N/mm2
6.000 N/mm2
390.000 N/mm2
390.000 N/mm2
18.000 kN/m3
25.000 kN/m3
200.000 kN/mm2
32.000 kN/mm2
Clay , 0 kN/m2
200 kN/m2
0
Friction factor (m)
Page 4
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
1.4 LOAD COMBINATION
Index Load Case Name Load Case Description
1 SW SELF WEIGHT
2 EO Equipment/piping operating Load
3 EE Equipment/piping Erection Load
4 ET Equipment/piping Test Load
5 SL Snow Load
6 LL Imposed Load
7 TL Ambient Thermal load
8 ML Maintenance Load
9 BF Bundle Pulling Force
10 WLo(+x) Wind Load (Oper)
11 WLo(-x) Wind Load (Oper)
12 WLo(+z) Wind Load (Oper)
13 WLo(-z) Wind Load (Oper)
14 WLe(+x) Wind Load (Empty)
15 WLe(-x) Wind Load (Empty)
16 WLe(+z) Wind Load (Empty)
17 WLe(-z) Wind Load (Empty)
18 WLt(+x) Wind Load (Test)
19 WLt(-x) Wind Load (Test)
20 WLt(+z) Wind Load (Test)
21 WLt(-z) Wind Load (Test)
Comb . ID Load Combination for stability
101 .9 SW + 1.0 EO + 1.14 TL
102 .9 SW + 1.0 EE + 1.26 WLe(+x)
103 .9 SW + 1.0 EE + 1.26 WLe(-x)
104 .9 SW + 1.0 EE + 1.26 WLe(+z)
105 .9 SW + 1.0 EE + 1.26 WLe(-z)
106 .9 SW + 1.0 EE + 1.4 WLe(+x)
107 .9 SW + 1.0 EE + 1.4 WLe(-x)
108 .9 SW + 1.0 EE + 1.4 WLe(+z)
109 .9 SW + 1.0 EE + 1.4 WLe(-z)
110 .9 SW + 1.0 EO + 1.14 TL + 1.26 WLo(+x)
111 .9 SW + 1.0 EO + 1.14 TL + 1.26 WLo(-x)
112 .9 SW + 1.0 EO + 1.14 TL + 1.26 WLo(+z)
113 .9 SW + 1.0 EO + 1.14 TL + 1.26 WLo(-z)
114 .9 SW + 1.0 ET + 1.26 WLt(+x)
115 .9 SW + 1.0 ET + 1.26 WLt(-x)
116 .9 SW + 1.0 ET + 1.26 WLt(+z)
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
Page 5
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
117 .9 SW + 1.0 ET + 1.26 WLt(-z)
118 .9 SW + 1.0 EO + 1.0 BF
Comb . ID Load Combination for Reinforcement
201 1.4 SW + 1.4 EO + 1.2 TL
202 1.4 SW + 1.4 EE + 1.4 WLe(+x)
203 1.4 SW + 1.4 EE + 1.4 WLe(-x)
204 1.4 SW + 1.4 EE + 1.4 WLo(+z)
205 1.4 SW + 1.4 EE + 1.4 WLo(-z)
206 1.4 SW + 1.4 EO + 1.2 SL + 1.6 LL + 1.2 TL
207 1.4 SW + 1.4 EO + 1.4 SL + 1.4 LL + 1.2 TL
208 1.4 SW + 1.4 EO + 1.2 TL + 1.4 WLo(+x)
209 1.4 SW + 1.4 EO + 1.2 TL + 1.4 WLo(-x)
210 1.4 SW + 1.4 EO + 1.2 TL + 1.4 WLo(+z)
211 1.4 SW + 1.4 EO + .2 TL + 1.4 WLo(-z)
212 1.2 SW + 1.2 EO + 1.2 SL + 1.2 LL + 1.2 TL + 1.2 WLo(+x)
213 1.2 SW + 1.2 EO + 1.2 SL + 1.2 LL + 1.2 TL + 1.2 WLo(-x)
214 1.2 SW + 1.2 EO + 1.2 SL + 1.2 LL + 1.2 TL + 1.2 WLo(+z)
215 1.2 SW + 1.2 EO + 1.2 SL + 1.2 LL + 1.2 TL + 1.2 WLo(-x)
216 1.4 SW + 1.4 ET + 1.2 TL
217 1.4 SW + 1.4 ET + .7 WLt(+x)
218 1.4 SW + 1.4 ET + .7 WLt(-x)
219 1.4 SW + 1.4 ET + .7 WLt(+z)
220 1.4 SW + 1.4 ET + .7 WLt(-z)
221 1.2 SW + 1.2 ET + .6 WLt(+x)
222 1.2 SW + 1.2 ET + .6 WLt(-x)
223 1.2 SW + 1.2 ET + .6 WLt(+z)
224 1.2 SW + 1.2 ET + .6 WLt(-z)
225 1.2 SW + 1.2 EE + 1.2 SL + 1.2 LL + 1.2 WLe(+x)
226 1.2 SW + 1.2 EE + 1.2 SL + 1.2 LL + 1.2 WLe(-x)
227 1.2 SW + 1.2 EE + 1.2 SL + 1.2 LL + 1.2 WLe(+z)
228 1.2 SW + 1.2 EE + 1.2 SL + 1.2 LL + 1.2 WLe(-z)
229 1.4 SW + 1.4 EO + 1.4 BF
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
2. DRAWING REFERENCE DWGSNO. DWG NO. DWG TITLE
N O T E S
* OUTPUT UNIT : mm
. PROJECT
FOUNDATION LOCATION PLAN
A100-E-006
SQ
UA
D C
HE
CK
PROCESS PIPING VESSELS STRUCT. ELEC. INST.
SCALE
AS SHOWN
JOB NO.
[POCR] Foundation Calculation-140903
MICROFILM NO.
A100-E-006
1
A01
01
Z X
Y
11/12/2015 Page 6
Copyright (c) GS E&C. All Rights Reserved
OUTPUT UNIT : mm
11/12/2015 Page 7
Copyright (c) GS E&C. All Rights Reserved
REFERENCE DWGSNO. DWG NO. DWG TITLE
N O T E S
* OUTPUT UNIT : mm
. PROJECT
FOUNDATION DETAIL FOR
A100-E-006
SQ
UA
D C
HE
CK
PROCESS PIPING VESSELS STRUCT. ELEC. INST.
SCALE
AS SHOWN
JOB NO.
[POCR] Foundation Calculation-140903
MICROFILM NO.
REV. DATE DESCRIPTION DRWNCHKDAPPD APPD APPD
4300
F25@200
F25
@20
0
F25@200
F25
@20
0
75 TY
P.
LC FOOTING
TOP BOTTOM
FOUNDATION PLAN FOOTING REINF. PLAN
CRUSHED STONE 150 THK
LEAN CONC. 100 THK
260029
00
TOC EL. + 300
7550
75F
16
@30
015
0
F25
SECTION
F16
72-F25
4300
ANCHOR & REBAR
11/12/2015 Page 8
Copyright (c) GS E&C. All Rights Reserved
Page 9
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
f4300
4300
The Origin coordinate
The Center of gravity (0,0) mm
29
00
30
0
( mm ) Ft. Name A100-E-006
Ft. Type
Area
Ft. Thickness 2900.00 mm
Ft. Volume
Ft. Weight 1110.525 kN
Soil Height -300.00 mm
Soil Volume
Soil Weight 0.000 kN
Buoyancy 0.000 kN
Self Weight (except Pr.SW) 1110.525 kN
Section Data
( mm ) Ft.Name Direction Ft. Volume Soil Volume Pier Wt
A100-E-006 All Direct
Sec.Name Section Area Ft. Weight Soil Weight Total Weight
S1
3.2 PIER DATA
Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
Unit( Length : mm , Weight : kN , Area : m2 )
Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y
A100-E-006 1 Octagonal 4300.000 4300.000 0.000 0.000 0.000 0.000
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
OCT
15.318 m2
44.421 m3
0.000 m3
15.318 m2
44.421 m3
1110.525 kN
0.000 m3
0.000 kN
0.000 kN
1110.525 kN
15.318
Page 10
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
3.3 LOAD CASE
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are
based on the right hand rule.
Fx
FyFz
Mx
My
Mz
Index Load Case Name Load Case Description
1 SW SELF WEIGHT
2 EO Equipment/piping operating Load
3 EE Equipment/piping Erection Load
4 ET Equipment/piping Test Load
5 SL Snow Load
6 LL Imposed Load
7 TL Ambient Thermal load
8 ML Maintenance Load
9 BF Bundle Pulling Force
10 WLo(+x) Wind Load (Oper)
11 WLo(-x) Wind Load (Oper)
12 WLo(+z) Wind Load (Oper)
13 WLo(-z) Wind Load (Oper)
14 WLe(+x) Wind Load (Empty)
15 WLe(-x) Wind Load (Empty)
16 WLe(+z) Wind Load (Empty)
17 WLe(-z) Wind Load (Empty)
18 WLt(+x) Wind Load (Test)
19 WLt(-x) Wind Load (Test)
20 WLt(+z) Wind Load (Test)
21 WLt(-z) Wind Load (Test)
Unit( kN , kN-m )
Ft.Name Pr.Name Load Case Fx Fy Fz Mx My
A100-E-006 1
1 0 0 0 0 0
2 0 0 -1141 0 0
3 0 0 -495 0 0
4 0 0 -1642 0 0
5 0 0 0 0 0
6 0 0 0 0 0
7 0 0 0 0 0
8 0 0 0 0 0
9 0 0 0 0 0
10 57.74 0 0 0 586.84
11 -22.54 0 0 0 -136.78
12 0 22.54 0 -136.78 0
13 0 -22.54 0 136.78 0
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
Page 11
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
14 22.54 0 0 0 136.78
15 -22.54 0 0 0 -136.78
16 0 22.54 0 -136.78 0
17 0 -22.54 0 136.78 0
18 11.27 0 0 0 87.82
19 -11.27 0 0 0 -87.82
20 0 11.27 0 -87.82 0
21 0 -11.27 0 87.82 0
Footing SW 0.000 0.000 -1110.525 0.000 0.000
3.4 LOAD COMBINATION
In Pier Top
without Self Weight
In Footing Bottom
with Pier Self Weight,
But without Footing Self Weight,
In Footing Bottom Center
with Pier & Footing Self Weight & Soil Weight,
Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing
3.4.1 Load Combination in Pier Top (Without SW)Unit( kN , kN-m )
Ft.Name Pr.Name L.Comb.
1
101 0.000 0.000 -1141.000 0.000 0.000
102 28.398 0.000 -495.000 0.000 172.339
103 -28.398 0.000 -495.000 0.000 -172.339
104 0.000 28.398 -495.000 -172.339 0.000
105 0.000 -28.398 -495.000 172.339 0.000
106 31.553 0.000 -495.000 0.000 191.488
107 -31.553 0.000 -495.000 0.000 -191.488
108 0.000 31.553 -495.000 -191.488 0.000
109 0.000 -31.553 -495.000 191.488 0.000
110 72.752 0.000 -1141.000 0.000 739.418
111 -28.398 0.000 -1141.000 0.000 -172.339
112 0.000 28.398 -1141.000 -172.339 0.000
113 0.000 -28.398 -1141.000 172.339 0.000
114 14.199 0.000 -1642.000 0.000 110.648
115 -14.199 0.000 -1642.000 0.000 -110.648
116 0.000 14.199 -1642.000 -110.648 0.000
117 0.000 -14.199 -1642.000 110.648 0.000
118 0.000 0.000 -1141.000 0.000 0.000
201 0.000 0.000 -1597.400 0.000 0.000
202 31.553 0.000 -693.000 0.000 191.488
203 -31.553 0.000 -693.000 0.000 -191.488
204 0.000 31.553 -693.000 -191.488 0.000
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
S Fx S Fy S Fz S Mx S My
A100-E-006
Page 12
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
205 0.000 -31.553 -693.000 191.488 0.000
206 0.000 0.000 -1597.400 0.000 0.000
207 0.000 0.000 -1597.400 0.000 0.000
208 80.836 0.000 -1597.400 0.000 821.576
209 -31.553 0.000 -1597.400 0.000 -191.488
210 0.000 31.553 -1597.400 -191.488 0.000
211 0.000 -31.553 -1597.400 191.488 0.000
212 69.288 0.000 -1369.200 0.000 704.208
213 -27.046 0.000 -1369.200 0.000 -164.132
214 0.000 27.046 -1369.200 -164.132 0.000
215 -27.046 0.000 -1369.200 0.000 -164.132
216 0.000 0.000 -2298.800 0.000 0.000
217 7.888 0.000 -2298.800 0.000 61.471
218 -7.888 0.000 -2298.800 0.000 -61.471
219 0.000 7.888 -2298.800 -61.471 0.000
220 0.000 -7.888 -2298.800 61.471 0.000
221 6.761 0.000 -1970.400 0.000 52.690
222 -6.761 0.000 -1970.400 0.000 -52.690
223 0.000 6.761 -1970.400 -52.690 0.000
224 0.000 -6.761 -1970.400 52.690 0.000
225 27.046 0.000 -594.000 0.000 164.132
226 -27.046 0.000 -594.000 0.000 -164.132
227 0.000 27.046 -594.000 -164.132 0.000
228 0.000 -27.046 -594.000 164.132 0.000
229 0.000 0.000 -1597.400 0.000 0.000
3.4.2 Load Combination in Footing Bottom (With Pier SW)Unit( kN , kN-m )
Ft.Name Pr.Name L.Comb.
1
101 0.000 0.000 -1141.000 0.000 0.000
102 28.398 0.000 -495.000 0.000 254.693
103 -28.398 0.000 -495.000 0.000 -254.693
104 0.000 28.398 -495.000 -254.693 0.000
105 0.000 -28.398 -495.000 254.693 0.000
106 31.553 0.000 -495.000 0.000 282.992
107 -31.553 0.000 -495.000 0.000 -282.992
108 0.000 31.553 -495.000 -282.992 0.000
109 0.000 -31.553 -495.000 282.992 0.000
110 72.752 0.000 -1141.000 0.000 950.400
111 -28.398 0.000 -1141.000 0.000 -254.693
112 0.000 28.398 -1141.000 -254.693 0.000
113 0.000 -28.398 -1141.000 254.693 0.000
114 14.199 0.000 -1642.000 0.000 151.825
115 -14.199 0.000 -1642.000 0.000 -151.825
116 0.000 14.199 -1642.000 -151.825 0.000
117 0.000 -14.199 -1642.000 151.825 0.000
118 0.000 0.000 -1141.000 0.000 0.000
201 0.000 0.000 -1597.400 0.000 0.000
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
S Fx S Fy S Fz S Mx S My
A100-E-006
Page 13
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
202 31.553 0.000 -693.000 0.000 282.992
203 -31.553 0.000 -693.000 0.000 -282.992
204 0.000 31.553 -693.000 -282.992 0.000
205 0.000 -31.553 -693.000 282.992 0.000
206 0.000 0.000 -1597.400 0.000 0.000
207 0.000 0.000 -1597.400 0.000 0.000
208 80.836 0.000 -1597.400 0.000 1056.000
209 -31.553 0.000 -1597.400 0.000 -282.992
210 0.000 31.553 -1597.400 -282.992 0.000
211 0.000 -31.553 -1597.400 282.992 0.000
212 69.288 0.000 -1369.200 0.000 905.143
213 -27.046 0.000 -1369.200 0.000 -242.565
214 0.000 27.046 -1369.200 -242.565 0.000
215 -27.046 0.000 -1369.200 0.000 -242.565
216 0.000 0.000 -2298.800 0.000 0.000
217 7.888 0.000 -2298.800 0.000 84.347
218 -7.888 0.000 -2298.800 0.000 -84.347
219 0.000 7.888 -2298.800 -84.347 0.000
220 0.000 -7.888 -2298.800 84.347 0.000
221 6.761 0.000 -1970.400 0.000 72.298
222 -6.761 0.000 -1970.400 0.000 -72.298
223 0.000 6.761 -1970.400 -72.298 0.000
224 0.000 -6.761 -1970.400 72.298 0.000
225 27.046 0.000 -594.000 0.000 242.565
226 -27.046 0.000 -594.000 0.000 -242.565
227 0.000 27.046 -594.000 -242.565 0.000
228 0.000 -27.046 -594.000 242.565 0.000
229 0.000 0.000 -1597.400 0.000 0.000
3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name L.Comb. C.G. of Loads
101 0.000 0.000 -2140.472 0.000 0.000 2150.0 , 2150.0
102 28.398 0.000 -1494.472 0.000 254.693 2150.0 , 2150.0
103 -28.398 0.000 -1494.472 0.000 -254.693 2150.0 , 2150.0
104 0.000 28.398 -1494.472 -254.693 0.000 2150.0 , 2150.0
105 0.000 -28.398 -1494.472 254.693 0.000 2150.0 , 2150.0
106 31.553 0.000 -1494.472 0.000 282.992 2150.0 , 2150.0
107 -31.553 0.000 -1494.472 0.000 -282.992 2150.0 , 2150.0
108 0.000 31.553 -1494.472 -282.992 0.000 2150.0 , 2150.0
109 0.000 -31.553 -1494.472 282.992 0.000 2150.0 , 2150.0
110 72.752 0.000 -2140.472 0.000 950.400 2150.0 , 2150.0
111 -28.398 0.000 -2140.472 0.000 -254.693 2150.0 , 2150.0
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
S Fx S Fy S Fz S Mx S My
A100-E-006
Page 14
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
112 0.000 28.398 -2140.472 -254.693 0.000 2150.0 , 2150.0
113 0.000 -28.398 -2140.472 254.693 0.000 2150.0 , 2150.0
114 14.199 0.000 -2641.472 0.000 151.825 2150.0 , 2150.0
115 -14.199 0.000 -2641.472 0.000 -151.825 2150.0 , 2150.0
116 0.000 14.199 -2641.472 -151.825 0.000 2150.0 , 2150.0
117 0.000 -14.199 -2641.472 151.825 0.000 2150.0 , 2150.0
118 0.000 0.000 -2140.472 0.000 0.000 2150.0 , 2150.0
Load Combination of Ultimate Condition
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name Sec.Na L.Comb. C.G. of Loads
S1
201 0.000 0.000 -1597.400 0.000 0.000 2150.0 , 2150.0
202 31.553 0.000 -693.000 0.000 282.992 2150.0 , 2150.0
203 -31.553 0.000 -693.000 0.000 -282.992 2150.0 , 2150.0
204 0.000 31.553 -693.000 -282.992 0.000 2150.0 , 2150.0
205 0.000 -31.553 -693.000 282.992 0.000 2150.0 , 2150.0
206 0.000 0.000 -1597.400 0.000 0.000 2150.0 , 2150.0
207 0.000 0.000 -1597.400 0.000 0.000 2150.0 , 2150.0
208 80.836 0.000 -1597.400 0.000 1056.000 2150.0 , 2150.0
209 -31.553 0.000 -1597.400 0.000 -282.992 2150.0 , 2150.0
210 0.000 31.553 -1597.400 -282.992 0.000 2150.0 , 2150.0
211 0.000 -31.553 -1597.400 282.992 0.000 2150.0 , 2150.0
212 69.288 0.000 -1369.200 0.000 905.143 2150.0 , 2150.0
213 -27.046 0.000 -1369.200 0.000 -242.565 2150.0 , 2150.0
214 0.000 27.046 -1369.200 -242.565 0.000 2150.0 , 2150.0
215 -27.046 0.000 -1369.200 0.000 -242.565 2150.0 , 2150.0
216 0.000 0.000 -2298.800 0.000 0.000 2150.0 , 2150.0
217 7.888 0.000 -2298.800 0.000 84.347 2150.0 , 2150.0
218 -7.888 0.000 -2298.800 0.000 -84.347 2150.0 , 2150.0
219 0.000 7.888 -2298.800 -84.347 0.000 2150.0 , 2150.0
220 0.000 -7.888 -2298.800 84.347 0.000 2150.0 , 2150.0
221 6.761 0.000 -1970.400 0.000 72.298 2150.0 , 2150.0
222 -6.761 0.000 -1970.400 0.000 -72.298 2150.0 , 2150.0
223 0.000 6.761 -1970.400 -72.298 0.000 2150.0 , 2150.0
224 0.000 -6.761 -1970.400 72.298 0.000 2150.0 , 2150.0
225 27.046 0.000 -594.000 0.000 242.565 2150.0 , 2150.0
226 -27.046 0.000 -594.000 0.000 -242.565 2150.0 , 2150.0
227 0.000 27.046 -594.000 -242.565 0.000 2150.0 , 2150.0
228 0.000 -27.046 -594.000 242.565 0.000 2150.0 , 2150.0
229 0.000 0.000 -1597.400 0.000 0.000 2150.0 , 2150.0
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
S Fx S Fy S Fz S Mx S My
A100-E-006
Page 15
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
Formula : mSFz + P.F
SFx2 + SFy
2
> Fs -> OK (Bi-Axial)
P.F = Passive Force (apply only in case checked passive force, mark by P) Unit ( kN )
Ft.Name Dir. L.Comb. Fs(i) Result
A100-E-006 Bi-Axial 110 1.5
4.2 CHECK OF OVERTURNING MOMENT
Formula : (SMry / SMoy or SMrx / SMox) > OVM(i) -> OK Unit ( kN-m )
Ft.Name Dir. L.Comb. OVM(i) Result
A100-E-006X 110 1.8 OK
Y 110 1.8 OK
4.3 CHECK OF CONTACT PRESSURE
4.3.1 Contact Pressure Formula
'Handbook CONCRETE ENGINEERING' Second Edition edited by Mark Fintel
q1,q2 = SFz
Af
SMy X(i)
Iy
SMx Y(i)
Ix
if q1 or q2 < 0 , than q1 and q2 will be recalculated
by following formula
Px = L
0 q(x) width (x) X dx
L
0 q(x) width (x) dx
P = L
0 q(x) width (x) dx
4.3.2 Input Data
Ft.Name
A100-E-006
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
( mS Fz + P.F ) / S Fx2
+ S Fy2
0.45 2140.47 / 72.75 = 13.24 OK
S Mry / S Moy = OVM or S Mrx / S Mox = OVM
4602.02 / 950.4 = 4.84
SMo = 0 , Then N/A
Af (m2
) Fl (m ) Fw (m ) Ix (m4
) Iy (m4
)
15.318 4.300 4.300 18.7146 18.7146
Page 16
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
4.3.3 Pressure Check
- Qa = Soil bearing capacity
- Uc = Uplift Allowable capacity
- XY-Direction (Bi-Axial) Unit( kN , kN-m , kN/m2 )
Ft.Name L.Comb. q1 q2 ci cj Qmax Qa Cont.A.R Result
A100-E- 110
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
30.554 248.925 0.000 4.300 248.925 100 / 80 % OK266.660(gross)
Page 17
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
SQ = SFz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name, Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction, L.Comb. : Load Combination Index, Fl or Fw : Footing Length or Footing Width, Sl or Sw : Strip X or Y width
5.1.1 DataUnit( mm , kN , kN-m )
Ft.Name Sec.Na Dir. L.Comb. Fl or Fw Sl or Sw
A100-E-
006
S1 X
201 4300.00 4300.00 1597.400 0.00 1597.400
202 4300.00 4300.00 693.000 282.99 693.000
203 4300.00 4300.00 693.000 -282.99 693.000
204 4300.00 4300.00 693.000 0.00 693.000
205 4300.00 4300.00 693.000 0.00 693.000
206 4300.00 4300.00 1597.400 0.00 1597.400
207 4300.00 4300.00 1597.400 0.00 1597.400
208 4300.00 4300.00 1597.400 1056.00 1597.400
209 4300.00 4300.00 1597.400 -282.99 1597.400
210 4300.00 4300.00 1597.400 0.00 1597.400
211 4300.00 4300.00 1597.400 0.00 1597.400
212 4300.00 4300.00 1369.200 905.14 1369.200
213 4300.00 4300.00 1369.200 -242.56 1369.200
214 4300.00 4300.00 1369.200 0.00 1369.200
215 4300.00 4300.00 1369.200 -242.56 1369.200
216 4300.00 4300.00 2298.800 0.00 2298.800
217 4300.00 4300.00 2298.800 84.35 2298.800
218 4300.00 4300.00 2298.800 -84.35 2298.800
219 4300.00 4300.00 2298.800 0.00 2298.800
220 4300.00 4300.00 2298.800 0.00 2298.800
221 4300.00 4300.00 1970.400 72.30 1970.400
222 4300.00 4300.00 1970.400 -72.30 1970.400
223 4300.00 4300.00 1970.400 0.00 1970.400
224 4300.00 4300.00 1970.400 0.00 1970.400
225 4300.00 4300.00 594.000 242.56 594.000
226 4300.00 4300.00 594.000 -242.56 594.000
227 4300.00 4300.00 594.000 0.00 594.000
228 4300.00 4300.00 594.000 0.00 594.000
229 4300.00 4300.00 1597.400 0.00 1597.400
S1 Y201 4300.00 4300.00 1597.400 0.000 1597.400
202 4300.00 4300.00 693.000 0.000 693.000
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
S Fz S M S Q
Page 18
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
203 4300.00 4300.00 693.000 0.000 693.000
204 4300.00 4300.00 693.000 -282.992 693.000
205 4300.00 4300.00 693.000 282.992 693.000
206 4300.00 4300.00 1597.400 0.000 1597.400
207 4300.00 4300.00 1597.400 0.000 1597.400
208 4300.00 4300.00 1597.400 0.000 1597.400
209 4300.00 4300.00 1597.400 0.000 1597.400
210 4300.00 4300.00 1597.400 -282.992 1597.400
211 4300.00 4300.00 1597.400 282.992 1597.400
212 4300.00 4300.00 1369.200 0.000 1369.200
213 4300.00 4300.00 1369.200 0.000 1369.200
214 4300.00 4300.00 1369.200 -242.565 1369.200
215 4300.00 4300.00 1369.200 0.000 1369.200
216 4300.00 4300.00 2298.800 0.000 2298.800
217 4300.00 4300.00 2298.800 0.000 2298.800
218 4300.00 4300.00 2298.800 0.000 2298.800
219 4300.00 4300.00 2298.800 -84.347 2298.800
220 4300.00 4300.00 2298.800 84.347 2298.800
221 4300.00 4300.00 1970.400 0.000 1970.400
222 4300.00 4300.00 1970.400 0.000 1970.400
223 4300.00 4300.00 1970.400 -72.298 1970.400
224 4300.00 4300.00 1970.400 72.298 1970.400
225 4300.00 4300.00 594.000 0.000 594.000
226 4300.00 4300.00 594.000 0.000 594.000
227 4300.00 4300.00 594.000 -242.565 594.000
228 4300.00 4300.00 594.000 242.565 594.000
229 4300.00 4300.00 1597.400 0.000 1597.400
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
Page 19
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
5.1.2 Design Parameters
Yield Strength - f5 ~ f18 : fy1 , f19 ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
f_clb : Clear Cover for bottom of footing reinforcement
Loc. : Location of Critical Point from left side of footing
Unit(N/mm2,mm)
fck fy1 fy2 f_cl f_clt f_clb
18.50 390.00 390.00 75.0 75.0
5.2 REQUIRED REINFORCEMENT
5.2.1 Reinforcement Formula
- Shrinkage and temperature reinforcement (BS 8110. Part1. Table 3.25)
As1 = fac b h
fy = 250 N/mm2 , fac = 0.0024
fy = 460 N/mm2 , fac = 0.0013
- Design formula BS CODE 3.4.4.4
K' = 0.156 where redistribution does not exceed 10%
K = [Mux or Muy]
bd2fcu
If K <= K' , compression reinforcement is not required.
z = d ( 0.5 + 0.25 - K
0.9 ) but not greater than 0.95d
As2 = M
0.95fyz
f'y = 500 MPa = > As2 = M
0.87fyz
If Sleected As{Max(As1,As2)} < Using As , then OK!!
The moment for reinforcement design is calculated at face of pier per any section.
The temperature and shrinkage steel is considered in the bottom layer only.
Where ,
Mux or Muy = design ultimate moment, d=effective depth, fcu(fck) = strength of concrete
fy = strength of reinforcement, z = lever arm, b = width of then setcion
If Selected As < Using As, then OK!!
5.2.2 Check of Footing Reinforcement
Footing Name : A100-E-006 GroupType : Octagonal
- X direction (Unit Width)
Sec.Nam L.Comb. Using Bar (mm) Width b (m) d (mm)
S1 Blocktop Center 1.000 2812.500 2454.369
botom Center 1.000 2812.500 2454.369
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
75.0
Loc. (m) As (mm2
)
5 - f25 @ 200
5 - f25 @ 200
Page 20
Calculation Sheetof
Foundation
Project Na. : .
Project No. : [POCR] Foundation Calculation-..
Client : .
Sec.Nam L.Comb. Result
S1 Blocktop 2454.369 1885.000
bottom 2454.369 1885.000
- Y direction (Unit Width)
Sec.Nam L.Comb. Using Bar (mm) Width b (m) d (mm)
S1 Blocktop Center 1.000 2787.500 2454.369
botom Center 1.000 2787.500 2454.369
Sec.Nam L.Comb. Result
S1 Blocktop 2454.369 1885.000
bottom 2454.369 1885.000
11/12/2015
Copyright (c) GS E&C. All Rights Reserved
As1(mm2
)Using As(mm2
)
OK
OK
Loc. (m) As (mm2
)
5 - f25 @ 200
5 - f25 @ 200
As1(mm2
)Using As(mm2
)
OK
OK