Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant

Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant

Embed Size (px)

Citation preview

Page 1: Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant

Paul CookIrvine Ranch Water DistrictGeneral Manager

February 21, 2013

Shared Services:

Baker Water Treatment Plant

Page 2: Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant

Background on IRWD

Page 3: Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant

3

Water, Wastewater, Water Recycling, Urban Runoff

California Special District governed by a publicly-elected Board

IRWD customer base:• Residential population: 350,000• Daytime population: over 500,000• Service connections: 102,381

IRWD service area:• 181 square miles (20% of Orange County)• All or part of six cities and unincorporated county:

About Irvine Ranch Water District

IrvineTustin

Orange

Lake ForestNewport Beach

Costa Mesa

Page 4: Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant

IRWD services and system statistics:

Potable Water: Three treatment plants, 25 wells, 1,500 miles of pipelines

Wastewater: Nearly 1,000 miles of sewage collection pipelines

Recycled Water: Two water recycling facilities (28 MGD + 5.5 MGD) and approximately 500 miles of recycled water pipelines

Urban Runoff Treatment: The San Joaquin Marsh and 31 built and planned man-made wetland treatment sites

About the Irvine Ranch Water District

Page 5: Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant

IRWD Shared Services

Page 6: Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant

Baker Water Treatment Plant

Page 7: Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant

Project Objectives:

Baker Water Treatment Plant

1. Improve potable water supply reliability for southern Orange County by constructing a local regional water treatment facility.

2. Collaborate with multiple retail water agencies to optimize treatment capacity and conveyance.

3. Design facility to treat raw water from three sources, blended or as individual sources.

4. Utilize modern treatment technology toproduce water that meets standardsstricter than current regulatoryrequirements.

5. Minimize waste by operating plant at greater than 99% recovery efficiency.

Advanced water treatment facility with microfiltration membranes,

UV disinfection, and chloramines for residual disinfection

Page 8: Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant

DiemerPlant

Santiago Lateral

Lower Feeder

Irvine Lake

AMP

BakerPipeline

Baker Plant Site

LakeMathews

SouthCountyPipeline

South OC Regional Imported Water Distribution System

Why this project?• Optimize available capacity in the Baker Pipeline.

(43.5 cfs; 28,200 AFY; 63,300 homes)

Why at IRWD?• Utilize existing storage and conveyance facilities.

• IRWD operates other membrane treatment facilities.

At what cost?

• Total cost estimate: $79 million.

• All-in cost: $898 per acre-foot.

Baker Water Treatment Plant

Page 9: Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant

Agency Flow Rate, cfs (MGD)

Capacity

ETWD 5.0 (3.2) 11.5%IRWD 10.5 (6.8) 24.1%

MNWD 13.0 (8.4) 29.9%SMWD 13.0 (8.4) 29.9%TCWD 2.0 (1.3) 4.6%TOTAL 43.5 (28.1) 100.0%

Multi-agency project with six primary stakeholders

Capacity Ownership Split:

Baker Water Treatment Plant

* MWDOC does not own capacity, but participated in the Feasibility Study and will facilitate the purchases of untreated water from the Metropolitan Water District.

Moulton Niguel Water District

Page 10: Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant

Site Is Part of Overall IRWD Baker Property

Page 11: Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant

Project Site at Construction Completion

16 MG RESERVOIR

16 MG RESERVOIR

PRODUCT WATERPUMP STATION

CT BASIN

Page 12: Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant

12