282
OFFICE OF THE PRIME MINISTER VOTE: 003 MINISTERIAL POLICY STATEMENT FINANCIAL YEAR: 2015/16 VISION : A Public Sector that is responsive and accountable in steering Uganda towards rapid economic growth and development THE REPUBLIC OF UGANDA Presented to Parliament for the Debate on Estimates for Revenue and Expenditure Prof. Tarsis Bazana Kabwegyere Minister for General Duties / Office of the Prime Minister www.opm.go.ug

Parliament Watch – Your Eye on Parliamentparliamentwatch.ug/wp-content/uploads/2015/04/... · OFFICE OF THE PRIME MINISTER VOTE: 003 MINISTERIAL POLICY STATEMENT FINANCIAL YEAR:

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • OFFICE OF THE PRIME MINISTER

    VOTE: 003

    MINISTERIAL POLICY STATEMENT

    FINANCIAL YEAR: 2015/16

    VISION : A P u b l i c S e c t o r t h a t i s r e s p o n s i v e a n d a c c o u n t a b l e i n s t e e r i n g

    U g a n d a t o w a r d s r a p i d e c o n o m i c g r o w t h a n d d e v e l o p m e n t

    o

    THE REPUBLIC OF UGANDA

    Presented to Parliament for the

    Debate on Estimates for Revenue and Expenditure

    Prof. Tarsis Bazana Kabwegyere

    Minister for General Duties / Office of the Prime Minister

    w w w . o p m . g o . u g

  • Office of the Prime Minister Ministerial Policy Statement

    Table of Contents

    Forward ......................................................................................................................................... i

    Abbreviations and Acronynms ................................................................................................... ii

    Structure of the Ministerial Policy Statement .............................................................................. iv

    Executive Summary ..................................................................................................................... vi

    V1: Vote Overview ....................................................................................................................... 1

    V2: Vote Performance for FY 2014/15 and Planned Outputs for FY 2015/16 ........................... 2

    V3: Detailed Planned Outputs for FY 2015/16 .......................................................................... 16

    V3.1: Vote Function Profiles, Programme/Project Profiles and Work plan Outputs ................. 25

    V3.2: Past and Medium Term Key Vote Output Indicators ....................................................... 82

    V3.3: Key Unit Costs of Services Provided and Services Funded ............................................ 83

    V3.4: Allocations by Class of Output over the Medium Term .................................................. 83

    V3.5: Major Capital Investments ............................................................................................... 84

    V3.6: Vote Actions to Improve Sector Performance ................................................................. 87

    V4: Proposed Budget Allocations for 2013/14 and the Medium Term ...................................... 88

    V4.1: Past Outturns and Medium Term Projections by Vote Function ..................................... 89

    V4.2: Key Changes in Vote Resource Allocation ..................................................................... 89

    V4.3: 2014/15 and 2015/16 Budget Allocations by Item .......................................................... 90

    V5: Vote Cross-Cutting Policy and Other Budgetary Issues ..................................................... 91

    Annex 1: Annual Cash Flow Plan

    Annex 2: Overview of Wage Estimates

    Annex 3: Staff Lists

    Annex 4: Staff Recruitment Plan

    Annex 5: Vote Procurement Plan

    Annex 6: Pension and Gratuity Details

  • Office of the Prime Minister Ministerial Policy Statement

    Page i

    Foreword

    The Right Honourable Speaker,

    A. INTRODUCTION In accordance with the Public Finance Management Act, 2015, Section 13(13) on the

    Annual Budget and the adjusted budget process for FY 2015/16 for Central Governments, I

    have the honour to present to the 9th Parliament the Ministerial Policy Statement of Vote 003

    Office of the Prime Minister for FY 2015/16.

    For the FY 2015/16, the preparation of Vote 003 Budget Framework Paper (BFP),

    Ministerial Policy Statement and detailed Budget Estimates centred around the Vote

    Functions and attainment of specific outputs.

    B. MANDATE

    Article 108 A of the Constitution mandates the Prime Minister to:

    (i) Be the Leader of Government Business in Parliament and be responsible for the

    coordination and implementation of Government Policies across Ministries,

    Departments and other Public Institutions.

    (ii) Perform such other functions as may be assigned to him or her by the President or as

    may be conferred on him or her by the Constitution or by law.

    C. FUNCTIONS.

    The Office is responsible for the following functions:

    (i) Leading Government Business in Parliament;

    (ii) Monitoring and Evaluation of the implementation of Government Policies and

    Programmes;

    (iii) Coordinating the implementation of Government Policies, Programmes and Projects;

    (iv) Coordinating the implementation of the National Development Plan (NDP);

    (v) Propagating the National Vision, defining National Character, National Values and

    National Common Good for development;

    (vi) Coordinating and providing public relations to ensure a good Government image;

    (vii) Coordinating the development of capacities for prevention, preparedness, and

    response to natural and human induced disasters and refugees; and

    (viii) Coordinating and monitoring the implementation of Special Government Policies

    and programmes for Karamoja, Northern Uganda, Luwero-Rwenzori, Bunyoro and

    Teso Affairs.

    Prof. Tarsis Bazana Kabwegyere

    Minister for General Duties

    Office of the Prime Minister

  • Office of the Prime Minister Ministerial Policy Statement

    Page ii

    Abbreviations and Acronyms

    ALREP Agricultural Livelihoods Recovery Programme

    ATIA Access To Information Act

    AU African Union

    BFPs

    CMEBP

    Budget Framework Papers

    Coordination Monitoring Evaluation Budgeting and Planning

    DEC's District Executive Committee

    FY Financial Year

    FFS

    GAPR

    GAHPR

    GEF

    GIS

    HCIII

    Farmer Field Schools

    Government Annual Performance Report

    Government Half-Annual Performance Report

    Government Evaluation Facility

    Geographical Information System

    Health Centre Three

    HCIV Health Centre Four

    HISP

    HOD

    Household Income Support Project

    Heads of Department

    ICT

    IDPs

    Information Communication Technology

    Internally Displaced Persons

    IGAs Income Generating Activities

    IGAD Inter Governmental Authority on Development

    KALIP Karamoja Livelihoods Programme

    JBSF Joint Budget Support Framework

    JCB

    KIDP

    Joint Cross Boarder

    Karamoja Integrated Development Programme

    LG Local Government

    LR Luwero- Rwenzori

    LRDP Luwero-Rwenzori Development Plan

    MDAs

    MDGs

    Ministries Departments and Agencies

    Millennium Development Goals

    M &E

    MTEF

    Monitoring and Evaluation

    Medium Term Expenditure Framework

    NDP National Development Plan

    NECOC National Emergency Coordination Operation Centre

    NGOs

    NIMES

    Non-Government Organizations

    National Integrated Monitoring and Evaluation Strategy

    NPA

    NULEP

    National Planning Authority

    Northern Uganda Livelihood Program

    NUSAF II Northern Uganda Social Action Fund (Phase II)

    OPM Office of the Prime Minister

    PCC Policy Coordination Committee

  • Office of the Prime Minister Ministerial Policy Statement

    Page iii

    PFA Prosperity For All

    PIRT Presidential Investors Round Table

    PMC Project Management Committee

    PRDP Peace, Recovery and Development Plan

    PWDs

    PSM

    People Living with Disabilities

    Public Sector Management

    ROM Result Oriented Management

    SACCOs

    SIP

    Saving and Credit Cooperatives

    Strategic Investment Plan

    SMC

    TCC

    TMC

    TWG

    Senior Management Committee

    Technical Implementation Coordination

    Top Management Committee

    Technical working Group

    UVAB Uganda Veterans’ Association Board

    UXOs Unexploded Ordinances

  • Office of the Prime Minister Ministerial Policy Statement

    Page iv

    Structure of the Ministerial Policy Statement

    The Public Finance management Act, 2015, Section 13 (13) Annual Budget requires that:

    “The Minister responsible for a vote, ministry or the head responsible for a Vote, shall by

    the 15th of March submit to Parliament, the policy statements for the proceeding financial

    year, for the Ministries or the other votes, as the case may be.

    Vote Functions:

    The Office of the Prime Minister (Vote 003) comprises of four Vote Functions namely;

    1301- Policy Coordination, Monitoring and Evaluation

    1302- Disaster Preparedness, Management and Refugees

    1303- Management of Special Programmes

    1349- Administration and Support Services

    Structure

    The Ministerial Policy Statement of the Office of The Prime Minister is structured as

    follows:

    VI. Vote Overview

    i. Vote Mission statement

    ii. Summary of Medium Term : Budget allocations

    iii. Table V1.1 Overview of Vote Expenditures

    iv. Chart V1.1 Medium Term Budget projections by Vote function

    v. Vote outcomes and Outcome indicators

    V2 Vote performance for the FY 2014/15 and Planned Output for 2015/16

    vi. Past Vote Outputs

    vii. Preliminary 2014/15 performance

    viii. Table V1.3 past and 2015/16 Planned key outputs

    V3 Detailed Planned Outputs for Financial Year 2015/16

    ix. 2015/16 Planned outputs

    x. Table V3.1 Vote Function profile, programme/project profiles and work plan outputs

    xi. Table V3.2 Past Medium Term Vote Output Indicators

    xii. Measures to improve performance

    xiii. Table V3.3 Allocations to key sector and service delivery outputs over the medium term

  • Office of the Prime Minister Ministerial Policy Statement

    Page v

    Vote investment Plans

    Table V3.4 Allocations by class of output over the medium Term

    Table V3.5 Major Capital Investments

    Priority Vote actions to improve Sector performance

    Table V3.6 Vote actions to improve sector performance

    V4. Proposed Budget allocation for 2015/16 and Medium Term

    Table V4.1 Past outturns and Medium Term projections by Vote Function

    i) The Total Budget over the Medium term

    ii) The major expenditure allocations in the Vote for 2015/16

    iii) The major planned changes in resource allocations within the Vote for 2015/16

    Table V4.2 key changes in Vote Resource allocation

    Table V4.3 2014/15 and 2015/16

    V5. Vote cross Cutting Policy and other budgetary issues

    Cross-cutting Policy issues

    a. Gender and Equity

    b. HIV/AIDS

    c. Environment

    Staff Establishment Structure

    i. Detailed costed Staff List by February 2015

    ii. Staff Recruitment Plan 2015/16

    Conclusion: Comments, Responses and Recommendations on Issues Raised by

    Parliament and other Institutions

    This Section provides comments and responses to issues raised by the Parliamentary

    Committee on Presidential Affairs on the Ministerial Policy Statement and Budget Estimates

    for the Financial Year 2014/15. This is the last section (Annex) and is found on page 163.

  • Office of the Prime Minister Ministerial Policy Statement

    Page vi

    Executive Summary

    This section presents the achievements for the Financial Year 2014/15 (July 2014-March

    2015), and highlights of the outputs to be delivered during the next Financial Year 2015/16.

    Achievements for the Financial Year 2014/15 (July 2014-March 2015)

    The Office of the Prime Minister during the Financial Year 2014/15 had an approved budget

    of Ushs.192.14bn shillings for both Development and Recurrent activities (o/w: Wage

    Ushs.2.58bn; Non-wage Ushs.48.23bn; GoU Development Ushs.80.50bn and Donor

    Development Ushs.60.83bn).

    The Office registered a number of achievements in accordance with the planned outputs for

    the Financial Year 2014/15 and within the available resource envelope. The key

    achievements by vote function are highlighted as follows:

    A) VOTE FUNCTION 1301: POLICY COORDINATION, MONITORING AND

    EVALUATION

    Parliamentary Business and Strategic Coordination under the Executive Office (Prime

    Minister, Second Deputy Prime Minister and Government Chief Whip)

    1. Provided strategic leadership for Government Business in Parliament through coordinating the programming of the legislative agenda and attendance of Cabinet

    Ministers to their parliamentary responsibilities of responding to questions, and

    presenting Government Bills and Ministerial Statements in Parliament. This was

    instrumental in the passage by Parliament of fifteen (15) Bills, conclusion of twenty

    three (23) Committee Reports, passage of eighteen (18) Motions, presentation of

    thirty (30) Ministerial Statements and the conclusion of six (6) Petitions, ten (10)

    questions for oral responded to.

    2. The Prime Minister and the 2nd Deputy Prime Minister presided over strategic coordination of various government undertakings such as chairing the

    preparatory meetings for the Presidential Investors’ Round Table (PIRT) which took

    place in January/February 2015 to review progress in implementation of the Fourth

    Phase of the PIRT, coordinating the Joint Budget Support leading to holding of the

    meeting between the Joint Policy Coordination Committee (PCC) and the Joint

    Budget Support Framework Development Partners Policy Committee (JBSF DP-PC)

    on 15th July 2014 where the Fifth Round of the Joint Assessment Framework (JAF

    5) was concluded and the Sixth round of the Joint Assessment Framework (JAF 6)

    Matrix of Indicators and Targets was agreed; holding consultations with the United

    Nations Representatives (United Nations Country Team – UNCT) on the

    establishment of a high-level modality for Government engagement with the United

    Nations Agencies, implementation of undertakings from the Uganda Mineral Sector

    Retreat which took place on 16th December 2013 at State House Entebbe

    3. The Prime Minister and his Deputy oversaw many other strategic coordination platforms such as the Annual Monitoring Committee meeting for the Peace

    Recovery and Development Programme (PRDP 2); the Cabinet Committee on

    Constitutional Amendments and a Committee Report to Cabinet was finalized, the

  • Office of the Prime Minister Ministerial Policy Statement

    Page vii

    Presidential advisory Committee on the Budget (PACOB) which compiled and

    submitted a report to H.E the President on the Budget Strategy for FY 2015/16 and

    other strategic coordination meetings on the ongoing development of the

    Sustainable Development Goals (SDGs) , Environment and management of

    wetlands, the Climate Change Policy, Oil Companies and Taxation.

    4. The Prime Minister facilitated government international engagement to promote investment and international cooperation where international delegations on

    development were hosted from North Korea, Netherlands and Egypt.

    5. The Prime Minister and the 2nd Deputy Prime Minister officiated at a number of events and explained government policies such as monitoring Implementation of

    public policies, programmes and projects in Rubirizi and Kumi Districts, handling

    resettlement of the landless Sebei, etc.

    6. Coordinated a number of Government policies such as the Public Sector Management programmes, cross cutting issues in Government, National budgeting

    process, production of the Annual Performance implementation reports, etc

    7. Provided leadership towards the reconciliation of the warring Muslim factions. 8. Monitored implementation of Government policies, programmes and projects in

    Rubirizi, Kabarole, Kasese, Kamwange, Busoga, Kiruhura, Mbarara, Kisoro, Sebi

    and Kumi district Local Governments.

    Information and National Guidance

    1. Implemented the Government Communication Strategy through a series of activities

    like completing the Development of the Government Web Portal (www.gov.ug),

    collecting and uploading information onto the Government web portal and OPM

    website for improved coordination of Government communication, conducting a

    survey in seven (7) Ministries to assess the status of the Government Communication

    Units, holding three consultative meetings with Government Public Education Sub-

    Region Coordinators in Lango and Acholi Sub regions, facilitating social media

    monitoring activities on the use of free Government Airtime, holding meetings with

    the Districts in Central Region on issues of Service Delivery and formed Media

    Regional Teams, and training of all Communication Officers across MDAs, etc.

    2. Carried out Assessment of UBC Inventory in Eastern Region.

    3. Facilitated Media Management Activities on T/V and Radio talk shows.

    4. Conducted Media and Publicity on the 52nd Independence Celebrations

    5. Finalized a roadmap for developing the National Guidance Policy. Accordingly, a

    task force to lead and manage the process was appointed and inaugurated

    6. Conducted Sensitization meetings on National Values, National Interest, and

    National Common Good in Primary schools in six sub-regions of Acholi, Ankole,

    Bunyoro, Kigezi, Lango and West Nile Sub-regions of Uganda.

    7. Conducted Pre-sensitization in Hoima and Kabarole districts.

    8. Collected Data on Common Good and National Values in the districts of

    Kiryandongo, Kitgum, Pader and Amuru .

  • Office of the Prime Minister Ministerial Policy Statement

    Page viii

    9. Conducted Sensitization meetings on National Values, interests and Common Good

    in eighteen (18) Primary Teachers Training Colleges of, Elgon/Busoga/Bukedi sub

    regions.

    10. Collected Materials for the Newsletter Premier Magazine Vol. 13 in Acholi,

    Karamoja and West Nile Regions.

    11. Collected data and carried out one (1) support supervision on the use of Social Media

    in the districts of Mubende, Kayunga, Mityana and Mpigi.

    12. Conducted one (1) training session for PRO’s and Media Activists in presentation

    and appearance on Talk shows TV and Radios.

    Monitoring and Evaluation

    1. Produced the Draft Government Annual Performance Report (GAPR) 2013/14 and Government Half Annual Performance Report (GHAPR) for 2013/14 and 2014/15

    respectively the which were discussed in the two government retreats for Cabinet

    Ministers, Ministers of State, Permanent Secretaries and representative of Local

    Governments in December 2014 and March 2015

    2. Conducted on spot field visits to verify submissions from MDAs which informed the GAPR and GHAPR for FY 2013/14 and 2014/15.

    3. Carried out comprehensive Prime Minister Integrated Management Information System (PIMIS) study on Gov’t M&E systems and a report produced.

    4. Developed and disseminated the Implementation strategy for National Policy on Public sector M&E

    5. Held Quarter two (2) National Monitoring and Evaluation technical Working Group (NM&E TWG) meeting

    6. Trained staff locally & internationally on Monitoring, Evaluation, Information systems & Project management

    7. Trained all technical officers from MDAs, CAOs and Local Government Planners on Target setting & Indicator profiling.

    8. Carried out a needs assessment for redesigning and development of a more robust Government Evaluation Facility (GEF)

    9. Held Barazas, “peoples accountability foras” in Eight (8) district local Governments (Isingiro, Kumi, Lira, Lyatonde, Kayunga, Kabaale, Adjumani and Rukungiri)

    Policy Implementation and Coordination

    1. The Fourth Presidential Investors’ Round Table (PIRT IV) implementation progress

    report was finalized and discussed by the main PIRT meeting. There was good

    progress recorded on joint undertakings between Government and private investors.

    2. A final draft Coordination report for FY 13/14 has been finalized. The report

    highlights the outcomes and challenges of the current Government coordination

    mechanisms.

    3. The Final draft of the National Coordination Policy was finalized and a Cabinet

    Memorandum forwarded to Cabinet.

  • Office of the Prime Minister Ministerial Policy Statement

    Page ix

    4. The Public Sector Management sector agreed to common undertakings to guide the

    sector in the FY 2015/206.

    5. A National Partnership Forum comprising Government and all development partners

    was established and launched to guide and ensure alignment of external financial

    support to the NDP II and ruling party manifesto.

    6. Government and the United Nations County Team jointly developed a UN-

    Development Assessment Framework to guide integrated development planning.

    The Framework will ensure that Government and UN-Country team deliver as one.

    7. Inducted 48 Districts Nutrition Coordination Committees on their roles to expedite

    the implementation of the Uganda Nutrition Action Plan.

    8. Finalized a UNAP National Advocacy and Communication strategy.

    9. Finalized a draft Nutrition Monitoring and Evaluation Strategy.

    10. Developed an Issues paper on Nutrition for incorporation in the NDP II.

    11. Developed and incorporated the PSM-Issues paper in the NDP II.

    12. Developed the PSM-Sector BFP for FY 2015/2016

    B) VOTE FUNCTION 1302: DISASTER PREPAREDNESS, MANAGEMENT AND

    REFUGEES

    Disaster Preparedness and Management

    1. Procured 2,868 acres of land to relocate 1000 households at risk of land slides in the

    Elgon region

    2. Completed finishes for 25 houses in Kiryandongo

    3. Distributed food and non-food relief items to in 31 districts (598,300kgs of Maize

    flour and 184,000kgs of beans and 13,960 iron sheets, 7,850tarpaulines, 3,040

    blankets, 1,950 jerrycans, 2,700 plastic cups and 2,600 plates, 1,660 mosquito nets

    and I,550 saucepans and 150 basins to 24 districts

    4. Produced Risk, Hazard & Vulnerability draft reports, profiles and maps for Busoga,

    Acholi and West Nile sub regions.

    5. Conducted a dissemination workshop on Disaster Preparedness and Management

    Policy in Kabarole, Kamuli, Buyende and Luuka districts.

    6. Held eight (8) Peace and four (4) Disaster Risk Reduction (DRR) platform meetings

    for coordinating disaster preparedness and management activities

    7. Launched the mini NECOC at Postel building during the celebrations to mark the

    DRR week

    8. Carried out Simulation exercises to test NECOC.

    9. Produced a Draft Disaster Management Bill

  • Office of the Prime Minister Ministerial Policy Statement

    Page x

    10. Completed back filling of two acres of land at Namanve which has facilitated

    commencement of the preliminary construction works of National Store

    11. Trained DDMCs and DDPCs for Iganga, Busia, Butaleja, Ngora & Kanungu

    districts

    12. Organized 3 regional trainings on DRR in conjunction with Education sector for

    districts of Karamoja, Acholi & West Nile, and Western & South Western Uganda.

    13. Carried out disaster assessments in the districts of Namutumba, Buhweju, Kumi,

    Moyo, Koboko, Nebi, Kabale, Rakai, Amuria, Rukungiri, Mbarara, Alebtong,

    Bukomansimbi, Rubirizi districts

    Produced a situational report highlighting the effects of “Marburg and Ebola” epidemics

    Refugees Management

    1. Demarcated thirty (30,000) plots for settling 141,000 refugees

    2. Surveyed Kiryandongo refugee settlement

    3. Carried out renovation works on six (6) staff houses in Kyangwali settlement camp

    4. Registered and received 34,650 South Sudanese refugees.

    5. Supplied refugees and host communities’ twenty three thousand (23,000) seedlings

    to improve their livelihood.

    6. Carried out four (4) missions in the South west sub region (Kyangwali, Kyaka 2,

    Rwamwanja, Nakivale and Oruchinga)

    7. Provided 3,827 refugees with IDs and issued 35 refugees with CTDs

    8. Carried out fifteen (15) OPM/UNHCR supervisory missions to South West and West

    Nile

    9. Conducted one monitoring mission to South Western sub-region to agree on new

    environment interventions

    10. Held 7 REC Sessions in Jinja district where 9,805 individuals in 5,116 households

    were granted individual refugee status

    11. Facilitated the Hon. Minister to travel to Geneva with Commissioner for Refugees to

    attend the EXCOM from 26th Sep. to 1st October 2014.

    12. Conducted Asylum profiling for 3090 individual Refugees.

    13. Resettled 15,614 Congolese Refugees in Rwamwanja and Kyangwali Refugee

    Settlements.

    C) VOTE FUNCTION 1303: MANAGEMENT OF SPECIAL PROGRAMS

    C1 Northern Uganda

  • Office of the Prime Minister Ministerial Policy Statement

    Page xi

    The key achievements realized under each of the projects implemented in Northern Uganda

    include:

    Post-war Recovery and Presidential Pledges

    1. Procured and distributed six (6) hydra form machines

    2. Procured and distributed three thousand one hundred forty five (3,145) cattle under

    the restocking programme for the four sub-regions of Northern Uganda (Acholi,

    Lango, Teso and West Nile). The restocking programme started in FY 2013/14 and

    so far 17,899 cattle have been procured and distributed to the beneficiaries. The

    target up to the end of FY 2014/15 is 36,499.

    3. Procured and delivered thirty one thousand (31,000) hand hoes for women and youth

    groups

    4. Procured and delivered four hundred (400) sewing machines for women and youth

    groups to OPM stores

    5. Procured and delivered three thousand (3,000) bags of cement and five thousand

    (5,000) iron sheets to OPM stores

    6. Held eight (8) sub regional meeting at Gulu regional office to review PRDP work

    plans

    7. Carried out one (1) monitoring visit on the restocking program for the Northern

    Ugnada in the sub-regions of West Nile, Lira, Acholi and Teso.

    8. Disbursed UGX 0.8bn to the beneficiary districts as operational funds for the

    restocking programme

    9. Held three PRDP TWG meetings to review Local Government PRDP work plans.

    10. Held six monthly coordination meetings at OPM, Gulu and Soroti regional offices to

    harmonize PRDP work plans.

    11. Held one training session for 150 beneficiaries of Hydra form technology at Abia

    institute in Alebtong district.

    ALREP

    1. Conducted Exit training for ALREP staff

    2. Conducted a Regional Closure workshop in Gulu

    3. Organized the 12th Programme Steering committee meetings

    4. Trained 78 (36m/42f) beneficiaries in animal traction in Akokoro Sub County, Apac

    district.

    5. Distributed 37 long horned oxen to 143 (85m/63f) beneficiaries in Akokoro sub county,

    Apac district.

    6. Consultants from Kawanda Research Station trained 371 (251m/120f) progressive

    farmers from Lango sub region in practical value addition.

  • Office of the Prime Minister Ministerial Policy Statement

    Page xii

    7. Distributed 98 kg of groundnut foundation seeds to 7 groups of progressive farmers in

    Apac, Kole and Oyam districts.

    8. Trained 11 district production staff from Apac, Kole and Oyam districts on artificial

    insemination

    9. Distributed 26 dairy heifers to 26 progressive farmers in Aduku and Ibuje sub counties

    in Apac district.

    10. Distributed 146 bags of Napier grass and 10.5 kgs of Calliandra to 42 progressive

    farmers.

    11. Trained 187 (125m/62f) progressive farmers on basic animal husbandry in preparation

    for receiving dairy animals.

    12. Trained 316 (176m/140f) farmers on animal traction, trained 41 pairs of oxen and made

    39 yokes, 12 strops, 10 ox-chains, 6 controlling ropes and 14 halters in Alebtong and

    Otuke district.

    13. Monitored VSLAs groups in which savings reached UGX 20,714,000 and loan amount

    of UGX 18,546,000 during the quarter.

    14. Trained 176 (70m/106f) members from 11 groups on financial linkages with Micro

    finance institutions in Apac, Kole and Oyam districts.

    15. Supplied 830 bicycles for the Project Management Committees in Acholi, Lango and

    Teso sub regions.

    16. Completed the construction of 6 Produce Stores and latrines in Koch Goma Sub County

    in Nwoya District; Pabbo Sub County in Amuru District, in Laguti and Purongo sub

    counties in Pader District and in Lapono and Adilang Sub Counties in Agago District

    17. Completed the fencing of valley dam in Akwang Sub County, Kitgum District

    18. Completed the construction of 02 shallow wells in Apala Sub County in Alebtong

    Districts

    19. Completed the construction of 7 markets of 40 stalls each in Patongo and Alero sub

    counties in Agago district, in Atanga Sub County in Pader District, in Morungatuny and

    Kuju Sub Counties in Amuria district, in Koro Sub-County in Gulu District, and in

    Alero Sub-County in Nwoya District; and 07 markets of 80 stalls each in Palabek Kal in

    Lamwo district, in Mucwini sub county in Kitgum district, in Palabek Gem sub county

    in Lamwo district, in Abok sub county in Oyam District, in Bungatira and in Unyama

    Sub Counties in Gulu and in Toroma sub county, Katakwi district

    20. Completed the construction of 02 Agricultural/community centres in Puranga and Lapul

    sub counties in Pader District

    21. Completed the drilling of 15 boreholes with cattle troughs in Agago, Amuru, Kitgum,

    Lamwo, Nwoya, Otuke, Katakwi and Amuria districts and 01 borehole without cattle

    trough in Kole district

    22. Completed the construction of 01 warehouse at Elegu in Atiak Sub County, Amuru

    District.

  • Office of the Prime Minister Ministerial Policy Statement

    Page xiii

    23. Completed the construction of 01 slaughter slab, 2-stance VIP latrine, and fencing of 03

    sub county production offices in Iceme, Aleka and Acaba in Oyam district

    24. Captured the geo references of projects in Gulu, Amuru and Nwoya districts.

    25. Verified the output of CESVI grant for developing productive infrastructure and assets

    to improve agriculture production and profitability in Lango sub region.

    26. Verified the output of ACTED grant for building productive infrastructure to support

    agriculture and livelihoods in Amuru, Nwoya and Gulu Districts.

    27. Conducted impact studies on ALREP support on strengthening the capacity of District

    Local Government and implementing Labour intensive works in 15 districts in Acholi,

    Teso and Lango sub regions.

    28. Supplied 73 agro-processing equipments through matching grants to agro-processors in

    Acholi, Lango and Teso sub regions

    29. Completed the improvements of 88 Agro-input shops for agro-input dealers

    30. Supported the licensing of 88 Agro-input shops and 88 agro-input dealers

    31. Constructed 2-stance VIP latrine at Elegu warehouse, 5 stance VIP latrine at Kole fish

    market

    32. Conducted ALREP closure workshop involving officials from the 15 ALREP

    operational districts, EU Delegation, MoFPED, OPM, Steering committee and the

    media.

    33. Trained 15 District Focal Point Officers and 15 Clerk of Works from the 15 ALREP

    operational districts in computer operations.

    34. 2Trained 30 districts technical staff and 30 political leaders (LCV Chairpersons and

    RDCs) of the 15 ALREP operational districts in computer operations

    35. Trained 90 District technical staff of 15 districts Acholi, Lango and Teso sub regions in

    Environmental issues

    36. Procured 830 bicycles for PMCs in the various projects in 15 districts of Acholi, Lango

    and Teso.

    37. Procured and distributed Livestock equipment and tools to the 15 districts of Acholi,

    Lango and Teso sub regions.

    38. Collected UGX 12,738,750 from 43 beneficiary mini-groups in Apac, Kole and Oyam

    districts as cost-share contribution for procurement of ox-planters, ox-weeders and ox-

    harrows.

    39. Disseminated the findings of Value Chain Analysis survey to 135 district staff and

    farmers in Apac, Kole and Oyam districts

    40. Created linkages among 88 famers and produce buyers from Apac and Kole in order to

    improve information about access market for agricultural produce.

    41. Procured 9 grinding mills at UGX 70,223,400 for value addition in Apac, Kole and

    Oyam districts

  • Office of the Prime Minister Ministerial Policy Statement

    Page xiv

    42. Fabricated and distributed 100 ox-carts to74 farmer groups and 8 bulking stores in

    Apac, Kole and Oyam districts

    43. Trained 45 farmers in operation and maintenance of the grinding mills in Apac, Kole

    and Oyam districts.

    44. Developed and distributed guidelines for reference on Farmer Level Seed

    Multiplication System in Apac, Kole and Oyam districts.

    45. Procured and distributed Artificial insemination items aimed at improving the local

    breeds of livestock in Apac, Kole and Oyam districts.

    46. Trained 54 Community Animal Health Workers (CAHWs) in Apac, Kole and Oyam

    districts on disease diagnosis, prevention and surveillance

    47. Collected UGX 46,458,000 from 87 progressive farmers as cost-share contribution for

    the dairy animals and UGX 2,280,000 from 38 progressive farmers for pastures grazing

    land in Apac, Kole and Oyam districts

    48. Distributed 157 dairy animals (75% crosses of Friesian breed) to progressive farmers in

    Apac, Kole and Oyam districts

    49. Trained 70 progressive farmers in Apac, Kole and Oyam districts in establishments and

    management of napier cuttings and calliandra grass seeds for feeding the dairy heifers.

    50. Trained 81 members from nine dairy associations to promote dairy production within

    Oyam, Kole and Apac districts.

    51. Distributed milk equipment to dairy associations in Apac, Kole and Oyam districts

    52. Trained 230 progressive farmers in Apac, Kole and Oyam districts on basic animal

    husbandry practices and feed formulation

    53. Distributed 60 ox-weeders and 60 ox-harrows to 60 farmer groups of 430 progress

    farmers in Lira, Alebtong and Otuke

    54. Disseminated the findings of Value Chain Analysis to 41 progressive farmers in

    Alebtong district

    55. Established links of 225 input dealers and produce buyers of cassava stems and tubers,

    oil seeded crops and agricultural chemicals and improved seeds in Lira, Alebtong and

    Otuke

    56. Distributed 31 ox-carts to progressive farmers in Lira, Alebtong and Otuke districts

    57. Distributed and installed 5 grinding mills, 1 maize sheller and 3 rice shellers and hullers

    at UGX 76,393,400 for value addition in Lira, Alebtong and Otuke districts

    58. Trained 65 operators in operation and maintenance of value addition machinery in Lira,

    Alebtong and Otuke districts

    59. Rehabilitated 13.5 km Adipala Agonga Road in Amuria district

    60. Completed fencing of Akwang valley dam in Kitgum District

    61. Completed 02 shallow wells in Apala Sub County, Alebtong District

  • Office of the Prime Minister Ministerial Policy Statement

    Page xv

    62. Completed 01 cattle crush in Apoi, Akokoro Sub County, Apac District

    63. Distributed moisture meters (7), tarpaulins (14), pallets (56), weighing scales(7),

    sampling spears(7) and record books (7) for improving post harvest handling during

    storage

    64. Distributed 75 ox carts to progressive farmers in Lango sub region.

    65. Completed construction of 74 km of community access roads in Apac, Lira, Kole and

    Oyam districts.

    66. Paid UGX 316,776,792 for Cash for Work and UGX 557,707,325 for the

    mechanisation during opening / rehabilitation of community access roads.

    67. Completed the construction of 4 District Production offices in Kole, Oyam, Agago and

    Lamwo districts

    68. Completed the construction of 2 Sub-county production offices in Ngariam and

    Kapujan sub counties in Katakwi District

    69. Completed the construction of 01 Animal and Plant Diagnostic Laboratory in Amuria

    district

    70. Completed the fencing of the District Production Office in Amuria District

    71. Supplied and installed solar power units in 5 District production offices of Amuru,

    Nwoya, Agago, Lamwo & Kole and 20 Sub County production offices in Kitgum,

    Pader, Lira, Otuke, Alebtong, Katakwi and Amuria Districts

    72. Drilled 27 boreholes (15 new and 12 rehabilitated) in Apac, Lira, Kole and Oyam

    districts.

    73. Completed construction and technical handover of 14 cattle crushes in Apac (6), Lira

    (4) and Oyam (4).

    74. Completed construction and technical handover of 12 latrines at market centres in Apac

    (3), Lira (3), Kole (3) and Oyam (3).

    75. Completed construction of 04 markets with water harvesting facilities and a 5 – stance

    76. Constructed drainable latrine, in each in the sub counties of Abarilela in Amuria

    District, Usuk in Katakwi District and Patongo in Agago District

    77. Completed construction of 01 warehouse in Elegu, Atiak Sub county in Amuru District

    78. Completed construction of 02 Agricultural produce stores and 2 – stance drainable

    latrines in Lapono and Adilang Sub Counties, Agago District

    79. Completed 01 animal and plant diagnostic laboratory in Amuria Town Council in

    Amuria district

    80. Completed 01 slaughter slab with 2-stance drainable latrine, waste pits and incinerator

    in Aduku Sub County, Apac District and one slaughter slab, 2-stance drainable latrine,

    waste pit and incinerator in each of the sub counties of Acaba, Iceme and Aleka in

    Oyam District.

  • Office of the Prime Minister Ministerial Policy Statement

    Page xvi

    81. Procured office supplies (office stationery, equipment and tools) to 6 districts of Gulu,

    Agago, Amuru, Pader, Lamwo and Amuria

    82. Subscribed for internet access for 1 month for 15 ALREP operational districts in

    Acholi, Lango and Teso sub regions

    83. Procured equipment, stationery and printer cartridges for Gulu, Amuria, Lamwo,

    Amuru, Pader and Agago districts

    84. Conducted interviews and filming of the TV documentary to showcase ALREP’s

    achievements.

    85. Conducted interviews of stakeholders and beneficiaries for the development of ALREP

    story book

    Karamoja sub region

    The achievements registered by the projects implemented in Karamoja sub-region include:

    Karamoja Intergrated Development Programme (KIDP)

    1. Disbursed funds for the construction of ten (10) valley tanks to Ministry of Water

    and Environment (MoWE) and work are on going

    2. Procured and distributed one thousand two hundred fifty (1,250) Ox-ploughs

    3. Procured and distributed one thousand (1,000) heifers for selected groups in Karamoja

    4. Procured and distributed two thousand (2,000) Oxen to farmers in Karamoja

    5. Branded thirteen thousand (13,000) cattle in Karamoja

    6. Supported Uganda Prison Services (UPS) to open land for production of food for

    feeding program for primary schools in Karamoja sub-region. So far three hundred

    fifty (350) tons of maize have been harvested

    7. Procured and distributed five hundred and fifty (550) sewing machines for women

    and youth groups

    8. Procured one (1) Station wagon for the Hon. MSKA

    9. Conducted three (3) KIDP TWG regional meetings.

    10. Conducted eight (8) National KIDP TWG meetings.

    11. Facilitated one Elders’ meeting.

    12. Facilitated one exposure visit and study tour for North Karamoja Mothers Union.

    13. Facilitated the evaluation of the Disarmament exercise in Karamoja which was

    conducted by Ministry of Defence as per KPC resolution.

    14. Facilitated two monitoring exercises of Government programs and mobilization

    visits

    15. Conducted one peace and security meeting which was chaired by HE the President at

    Morulinga State Lodge

    16. Facilitated two meetings with selected farmers and agricultural officers to determine

    appropriate technology.

    17. Supported UWESO to look after 30 homeless Karimojong children.

    Karamoja Livelihoods Program (KALIP)

    1. Conducted one(1) regional closure workshop

  • Office of the Prime Minister Ministerial Policy Statement

    Page xvii

    2. Organized the 12th Programme Steering committee meeting

    3. Supported 5 monitoring trips for district officials

    4. Supported 3 inter-district meetings

    5. Distributed 9 refrigerators to the districts of Amudat (3), Kaabong (2), Kotido (2) and

    Nakapiripirit (2) for animal health improvement.

    6. Distributed 1,560 T-Shirts to the school and community crime prevention clubs/groups.

    7. Released UGX 2,550,000 to the DPCs of Amudat and UGX 2,836,000 for Nakapiripirit

    for community policing activities

    8. Conducted interviews of stakeholders and beneficiaries for the development of KALIP

    story book.

    9. Conducted interviews and filming for production of a documentary on KALIP success

    that will be serialised on NTV Uganda to improve KALIP visibility.

    10. Excavated 20 valley tanks as follows: Akado in Abim Sub County in Abim district,

    Akurion-Pilil in Amudat Sub County in Amudat district, Longurangole in Kapedo Sub

    County in Kaabong district, Nadomeit in Kaabong East Sub County in Kaabong

    district, Nasak-Napura in Panyangara Sub County in Kotido district, Nakonyen in

    Tapac Sub County in Moroto district, Sakale in Nabilatuk Sub County in Nakapiripirit

    district, Nagirongole in Lotome Sub County in Napak district, Kakutalem in Ngoleriet

    Sub County in Napak, at Lomogol and Lokitelaekoroit in Nakapiripirit district,

    Kangorok and Waliwal in Kotido district, Akeler and Puno in Abim district, Lokithile

    and Akwapua in Moroto district, Lodoon and Nangirongole in Napak district

    and Lokirimo and Kalopungongole in Kaabong district district.

    11. Trained Water User Committees for the valley tanks in Abim, Kotido and Kaabong

    12. Completed and commissioned Kangole police station in Napak district commissioned

    by Minister of Karamoja Affairs

    13. Furnished Kangole police station with office tables, chairs and filing cabinets

    14. Completed fencing of 7 police posts of Kanu in Abim district, Karita in Amudat

    district, Lobalangit in Kaabong district, Kacheri in Kotido district, Rupa in Moroto

    Moroto district, Lolachat in Nakapiripirit district and Lokopo in Napak district

    15. Drilled and installed 5 boreholes at police posts of Kanu in Abim district, Kacheri in

    Kotido district, Rupa in Moroto district, Lolachat in Nakapiripirit district and Lokopo in

    Napak district

    16. Drilled boreholes at Kanu, Kacheri and Rupa police posts to provide clean water for

    police officers.

    17. Constructed 1 regional veterinary laboratory in Moroto

    18. Constructed 1 district production office Amudat

    19. Constructed a production office at Karita sub-county

    20. Returned 40 contractors to rectify defects observed at their sites

  • Office of the Prime Minister Ministerial Policy Statement

    Page xviii

    21. Installed 16 solar power units at 12 sub-county and 4 district production offices

    22. Supplied an assortment of veterinary laboratory equipment to 7 districts and cold-chain

    and animal vaccination kits to sub-county production offices

    23. Supplied 1 deep freezer and 2 big refrigerators to regional laboratory

    24. Supplied and 1 installed solar power at the regional veterinary laboratory

    25. Completed the construction and technical handover of Alerek and Abim sub county

    production offices in Abim district.

    26. Rectified the defects on completed production offices in Kaabong, Nakapiripirit and in

    Amudat district.

    27. Completed the construction and technical handover of Lokopo police post.

    28. Construction of Kangole police post progressed to the level of plastering

    29. Completed the perimeter fencing of Kanu police post in Abim district.

    30. Distributed assorted furniture to all the 30 Sub-County and 7 district production offices

    comprising 103 office desks, 103 office chairs, 194 guest chairs, 74 conference tables,

    296 conference chairs and 103 filing cabinets.

    31. Supplied and installed solar power units at 10 Sub County/Town Council and 2 District

    Production Offices in Karamoja

    32. Supplied furniture to Moroto regional laboratory

    33. Supplied wireless internet modems to 7 district production offices

    34. Distributed 9 refrigerators to the districts of Amudat (3), Kaabong (2), Kotido (2) and

    Nakapiripirit (2) for animal health improvement. S

    35. upplied and installed solar power units at 10 Sub County/Town Council and 2 District

    Production Offices in Karamoja

    Dry lands Integrated Development Project

    1. Conducted a baseline survey in the 4 project districts of, Nakapiripirit, Napak, Moroto

    & Amudat to provide the initial data/information to inform project implementation

    2. Paid Technical fee to MDA Centre of UgX440,000,000

    3. Paid contract staff salaries a total of Ugx 581,234,500 for Nov 2014 to March 2015

    C3 NUSAF 2

    1. Disbursed a sum of UGX 26,216,143,686 to districts as operations fund and to

    facilitate EPRA processes in Karamoja Districts;

    2. Received Subproject accountability which is at 83.8% and subprojects completion

    status at 83.2%.

    3. Oriented 6 NDOs of new districts to NUSAF2 operations.

  • Office of the Prime Minister Ministerial Policy Statement

    Page xix

    4. Completed 33 CIR subprojects were commissioned in Karamoja sub region.

    5. Held 3 Technical working committee meetings.

    6. Produced 5 page supplements in the New Vision on NUSAF2 in Acholi and

    Bunyoro.

    7. Produced 2 Articles in the East African and 3 Full Page story series in the Monitor.

    8. Produced 4 half page story series in the New Vision and produced 2 Publications in

    the New Vision on impact of NUSAF2 in Teso, Bukedi and Elgon sub regions.

    9. Produced 1 Article on commissioning of NUSAF2 in Karamoja.

    10. Supported UMCAT student writing contest on NUSAF2

    C4 Luwero-Rwenzori

    1. Paid 8,496 civilian veterans a one off gratuity

    2. Disbursed grants worth UGX4.4bn to the sixteen (16) LRDP districts (Kasese,

    Kabarole, Ntoroko, Bundibugyo,Kyenjojo, Kyegegegwa ,Mityana ,Mubende,

    Kiboga ,Kyankwanzi, Luwero, Kayunga, Mukono, Nakasongola,Nakaseke and

    Wakiso) to support community driven enterprises to enhance their household

    incomes

    3. Facilitated thirty two (32) micro projects to enhance household incomes for youth,

    women and farmer groups, and PWDs0

    4. Established eight (8) crop nurseries and seven (7) mother gardens in former war

    zones (Butambala, Lwengo, Mukono, Kiboga and Nakaseke districts)

    5. Completed 50% of the construction works for Nalutuntu Health Centre III

    6. Undertook twelve (12) technical support supervision and monitoring missions in 43

    district local Governments of LRDP

    7. Undertook four (4) political monitoring missions in the Luwero Rwenzori sub-region

    8. Undertook 1 Monitoring and supervision mission of the anti-poverty campaign.

    9. Held 3 series of meetings with district technical staff in Kabarole, Luwero &

    Wakiso to harmonize LRDP district work-plans

    10. Held three (3) LRTWG meetings.

    C5 Bunyoro Affairs

    1. Finalized the draft Bunyoro Integrated Affirmative Development Plan (BIADP)

    which is ready for Cabinet approval. The plan highlights Government proposed

    costed strategic interventions in this sub region and provides a roadmap for

    implementation with clear time lines.

    2. Procured and distributed three thousand (3,000) hand hoes for the vulnerable groups

  • Office of the Prime Minister Ministerial Policy Statement

    Page xx

    3. Completed the renovations and furnishing of the liaison office in Hoima office which

    was commissioned.

    4. Undertook eight (8) political monitoring and supervision missions of Government

    development programs and projects in the sub-region

    5. Undertook two (2) bench marking visits

    C6 Teso Affairs

    1. Finalized the draft Teso Development Plan (TDP) which is ready for Cabinet

    approval. The plan highlights Government proposed costed strategic interventions in

    this sub region and provides a roadmap for implementation with clear time lines.

    2. Procured one Hydra form machine for Serere districts.

    3. Procured 1160 bags of Cement for religious institutions

    4. Procured 2500 Iron sheets for Tisai Island

    5. Held one Policy Committee Meeting

    6. Held three coordination meetings at OPM Soroti regional office

    7. Held three (3) PRDP performance monitoring exercises for Teso sub-region

    8. Transferred UGX 0.280 billion to Kumi District Local Government (o/w UGX

    0.260Bn for training of youth in Hydraform technology and construction of

    Mukongoro Police Post and Police staff quarters and UGX 0.02Bn roofing of

    Omatenga Antenatal Unit)

  • Office of the Prime Minister Ministerial Policy Statement

    Page xxi

    D. VOTE FUNCTION 1349 ADMINISTRATION AND SUPPORT SERVICES

    1. Produced fourth Quarter and Annual Performance Progrss Report Performance for

    FY 2013/14,Quarter one (1) and Quarter two (2) progress reports for FY 2014/15

    2. Completed and submitted Final Accounts for FY 2013/14 to Accountant General

    3. Facilitated eight (7) Top Management and 22 Heads of department meetings.

    4. Retired 96 % of Accountabilities.

    5. Implemented Audit recommendations.

    6. Responded to PAC queries of FY 2012/13

    7. Labelled equipment and updated Assets register.

    8. Developed Draft Training Policy and Guidelines.

    9. Developed training plan for FY2014/15

    10. Procured sixty one (61) Desk tops, sixteen (160 laptops, twenty three (23)

    Tablets/Ipads I Mac for OPM and sixteen (16) firewall licenses

    11. Procured and catalogued nine hundred twenty (920) new library documents

    12. Participated in the annual Cancer Run on 31st September 2014

    13. Developed concept paper on Gender Mainstreaming in OPM

    14. Operationalized the new modern OPM library and Resource center.

    15. Facilitated OPM website and social media platforms where at least one new news

    article is published every day

    16. Produced the Draft of OPM Risk management Plan.

    Planned Priorities for FY 2015/16

    The Office of the Prime Minister during the FY 2015/2016 expects to achieve the following

    outputs through its respective Vote Functions.

    A) VOTE FUNCTION 1301: POLICY COORDINATION, MONITORING AND

    EVALUATION

    Executive Office (Prime Minister, 2nd Deputy Prime Minister and Government Chief

    Whip)

    1. Strategic coordination meetings organized and facilitated. (Policy Coordination

    Committee-PCC, Policy Committee on Environment - PCE, Presidential Investors’

    Round Table – PIRT, Prime Minister’s Private Sector Forum, and many other

    coordination platforms and meetings).

  • Office of the Prime Minister Ministerial Policy Statement

    Page xxii

    2. Government Business in Parliament coordinated, parliamentary proceedings

    monitored and the whipping capacity strengthened.

    3. Political monitoring of implementation of government policies and programmes in

    the districts undertaken.

    4. Prime Minister’s Delivery Unit established which will institute a framework for

    signaling government priorities and providing visible internal focus for all MDAs

    5. International engagements of the Executive Office facilitated.

    6. Public Relations and Communications of the Office of the Prime Minister effectively

    managed.

    Information and National Guidance

    1. Two (2) Media Policies reviewed.

    2. One hundred (100) Public education programmes on radio and TVs coordinated.

    3. Twelve (12) consultative meetings with media owners, editors and reporters to

    improve Government-Media relations held

    4. Fifty two (52) Weekly Publicity coordination meetings held to harmonize press

    releases and press conferences.

    5. Twelve (12) monthly magazines for Ministry of Information and National Guidance

    produced.

    6. Four (4) Quarterly Newsletter produced.

    7. Twelve (12) sensitization sessions on social media support held

    8. Access to Information Act implemented and fast tracked.

    9. Fifteen (15) Supervision field trips undertaken to strengthen the link between Central

    Government and the District Information Officers.

    10. 8 MDAs supported in developing respective communication strategies.

    11. The production and dissemination of fifteen (15) audio-visual messages coordinated.

    12. 1,500 copies of Information Education Communication materials on National

    Guidance produced.

    13. National Values, National Objectives, National Interest and National Common Good

    propagated in 45 Primary Teachers Colleges.

    14. Draft National Guidance Policy produced and approved.

    15. Sensitization on National signs and symbols, National anthem and National identity

    carried out.

    16. Research on public understanding of National Guidance issues conducted in four

    regions.

    17. Six double cabin pickups procured

  • Office of the Prime Minister Ministerial Policy Statement

    Page xxiii

    Monitoring and Evaluation

    1. National Monitoring & Evaluation Policy implemented

    2. 8 National Technical Working Group and Subcommittee meetings on Evaluation and

    Monitoring & Oversight (M&O) conducted.

    3. Government Annual Performance Report for FY 2014/15 and Half Annual

    Performance report for FY 2015/16 produced and discussed during the respective

    Government Performance Retreats.

    4. Citizens’ information fora (Barazas) carried out in 32 districts.

    5. National Integrated Monitoring and Evaluation Strategy (NIMES) implemented.

    6. The Government Evaluation Facility (GEF) to strengthen the evaluation functions in

    Government maintained.

    7. Evaluation of 2 key policies or programmes/projects conducted;

    8. Partnership Policy M&E framework developed;

    9. A functional M&E Management Information System (MIS) established

    Policy Implementation and Coordination

    1. Progress report on the implementation of recommendations of the Fifth Presidential

    Investors’ Tables (PIRT V) produced.

    2. Delivery Unit supported through Government Coordination Framework Mechanism.

    3. Evaluation of the Presidential Investors’ tables PIRT I to PIRT IV carried out

    4. Evaluation of the Institutional Coordination Framework conducted.

    5. Coordination of Platforms (National Partnership Forum, GOU-UN Engagement,

    GOU- SME etc ) operationalized.

    6. National Coordination Policy approved and operationalized

    7. Joint Public Sector Management Review (JPSMR) for FY 2014/15 conducted.

    8. Sector Plans aligned to the NDPII and the ruling party manifesto.

    9. Report on Implementation of the Uganda Nutrition Action Plan (UNAP) produced

    10. Nutrition Forum (2015) held

    11. Public Sector Management -Sector BFP developed.

  • Office of the Prime Minister Ministerial Policy Statement

    Page xxiv

    B) VOTE FUNCTION 1302: DISASTER PREPAREDNESS, MANAGEMENT AND

    REFUGEES

    Disaster Preparedness and Management

    1. Nine hundred (900) households at risk of landslides in the Elgon sub region resettled

    in Bulambuli

    2. One thousand five hundred (1500) acres of land purchased.

    3. Preparation of ground and construction of wall fence for the planned NECOC in

    Namanve carried out.

    4. One (1) National relief stores in Namanve constructed.

    5. Fifty (50) district Risk Hazard, Vulnerability and disaster assessment report, profile

    and maps produced.

    6. Emergency assessments and provision of 20,000 MT of relief food and 5,000

    assorted non-food relief items for disaster victims procured.

    7. Disaster Preparedness and Management Bill developed.

    8. One (1) Twelve (12) Ton truck, two (2) Trailers and one double cabin pick up

    procured

    9. Development and implementation of one National and fifty (50) Districts Disaster

    Preparedness and Contingency Plans

    10. Resettlement of 900 families of Ugandans expelled from neighbouring countries and

    other landless persons.

    Refugees Management

    1. Sixty thousand (60,000) new refugees received and re-settled

    2. Twelve thousand (12,000) new plots demarcated for settling refugee new arrivals

    3. One thousand five hundred (1500) Refugee and 300 host community House Holds

    supported with seedlings

    4. Two (2) livelihood sensitization meetings conducted in refugee settlements

    5. Ten thousand (10,000) Asylum seekers profiled

    6. Twelve (12) Refugee Eligibility Committee meetings, 12 Eligibility sessions and12

    Refugee Appeals Board sessions held

    7. Twelve thousand (12,000) Refugees provided with Identity and 1500 refugees

    provided Conventional Travel documents

    8. One thousand two hundred (1200) Counselling sessions for refugees conducted

    9. Contribution to international organizations done

    10. One (1) Tripartite meeting with Congo government held

    11. Alternative durable solutions for protracted refugee caseloads implemented

  • Office of the Prime Minister Ministerial Policy Statement

    Page xxv

    12. Voluntary repatriation of Congolese refugees conducted

    13. Systematic survey of Nakivale Refugee Settlement undertaken.

    14. Quarterly livelihood monitoring missions conducted

    15. Ten (10) OPM staff houses in Nakivale renovated

    16. National Refugee Policy Developed

    C) VOTE FUNCTION 1303: MANAGEMENT OF SPECIAL PROGRAMS

    C1 Northern Uganda

    The key planned priorities under each of the three projects implemented in Northern Uganda

    include:

    Post-war Recovery and Presidential Pledges

    1. Seven hundred (700) Oxen for youth and women groups to promote Commercial

    agriculture procured.

    2. One thousand (1,200) ox ploughs for youth and women groups to promote

    Commercial agriculture procured.

    3. Thirty four thousand (34,000) hand hoes procured for women and youth groups and

    other farmers.

    4. One hundred (100) Cassava chippers for youth and women groups Procured.

    5. Ten thousand (10,000) bags of cement for special interest groups/institutions

    procured.

    6. Butaleja Produce Store construction works completed.

    7. Six hundred (600) bicycles procured for selected youth and religious leaders

    8. Eighteen thousand six hundred (18,600) cattle for restocking the Sub regions of West

    Nile, Lango, Teso and Acholi procured.

    9. Lango Chiefs Complex (Palace, offices and cultural center) construction works

    completed.

    10. Thirty three (33) Low cost houses for vulnerable groups (former IDPs) in Northern

    Uganda constructed

    11. Five hundred (500) Sewing Machines for Women and Youth groups procured.

    12. Five (5) tractors for distribution to farmer groups procured.

    13. One hundred sixty (160) Motorcycles for distribution to selected youth groups and

    religious leaders procured.

    14. Installation of solar power completed for the Fifty four (54) Acholi Chiefs houses

    15. Two hundred (200) bicycle repair kits and 200 motorcycle repair kits procured

  • Office of the Prime Minister Ministerial Policy Statement

    Page xxvi

    C2 Karamoja Sub Region

    The key planned priorities under each of the three projects implemented in Karamoja sub-

    region include:

    Karamoja Intergrated Development Programme (KIDP)

    1. 2,000 Heifers procured and distributed

    2. 1,600 Oxen for farmer groups procured and distributed

    3. 800 Ox-ploughs procured and distributed.

    4. Ten (10) parish valley tanks (Parish dams) constructed

    5. 100 bulls and 100 Heifers for Cattle breed improvement for selected farmers

    procured and distributed in Collaboration with Nabwin.

    6. Five hundred (500) improved HE goats provided to farmers in Karamoja sub-region

    7. 25,000 Cattle in Karamoja branded.

    8. Irrigation water provided to sixteen (16) famers in Karamoja

    9. 1,000 bags of cassava cuttings procured and distributed to farmers in Karamoja

    10. Five (5) dormitory blocks for selected primary school in Karamoja constructed.

    11. Uganda Prison Services supported to produce food for schools in Karamoja .

    12. Six (6) cattle dips constructed

    13. Ten thousand (10,000) Iron sheets procured

    14. One (1) tractor for Koblin Rehabilitation Centre procured

    15. Koblin Rehabilitation Centre supported with UGX. 0.2bn

    16. Fifty (50) housing units constructed for grinding machines for youth and women

    groups

    17. Two (2) double cabin pickups, and one (1) station wagon procured

    18. Twenty (20) micro projects supported

    19. Eight (8) kitchens constructed in selected schools in the sub region

    20. 7000 Basins and 7000 Jericans procured and distributed

    C3 Dry lands integrated development project

    1. Continued capacity building and equipping of 20 community agricultural and 20

    community livestock workers undertaken ,

    2. 1 community managed artificial insemination centre established,

    3. 6 farmer training and demonstration centres established,

    4. 40 tons of subsidised agricultural planting seeds procured and distributed,

  • Office of the Prime Minister Ministerial Policy Statement

    Page xxvii

    5. 80 tons of subsidized fertilizers procured and distributed,

    6. 80 nr improved goat and shoal breeds procured and distributed

    7. 80 nr improved cattle breeds procured and distributed

    8. 2 tree nurseries established for natural resource management

    9. 10 micro irrigation kits installed

    10. Water management interventions initiated

    11. 2 rounds capacity building trainings to government extension staff done

    12. Community mobilization and institutional capacity development, gender trainings

    done in agriculture and Environment

    13. 1 piped water scheme based on a motorized borehole(s) constructed

    14. 3 parish level valley dams/tanks constructed

    15. 4 village level water ponds constructed

    16. 15 solar mini-grid systems set up

    17. 150 energy saving household cooking stoves distributed/built

    18. 20 biogas units built

    19. 1 farmer training and information centre set up

    20. 2 rounds community capacity building in implementation and management of

    infrastructure activities conducted

    21. Community mobilisation and extension work in energy, infrastrcture and ICT

    offered

    22. Support the operations of training and operations of 90 community health workers

    23. Medical drugs and supplies to 7 Health Centres procured and distributed

    24. 1 Round refresher training of 50 health workers conducted

    25. 6 rain water harvesting systems in primary schools installed

    26. 4 school boreholes sunk

    27. Installation 4 solar systems in 4 schools done

    28. Sustainable school feeding program initiated in 15 primary schools in partnership

    with other development partners.

    29. Provision of post primary scholarships for 120 girls rolled out

    30. Educational Materials for schools procured

    31. 2 teacher of refresher training conducted

  • Office of the Prime Minister Ministerial Policy Statement

    Page xxviii

    32. Community mobilization and institutional capacity development, gender and

    extension workers in Pre Primary and Post Primary education institutions and

    Education workers program conducted.

    33. Formation and/or facilitation of Legalization and functioning of 5 farmer and

    business groups and/or cooperatives (grain banks, facilities) done

    34. Facilitation of the formation of 1 savings and credit cooperative organisation done

    35. Provision of vocational and business skills training to 40 former cattle rustlers done

    36. Construction of 1 community grain warehouse done

    37. 2 Milk collection centers constructed and functionalized

    38. 1 livestock slaughter sites set up.

    39. Construction of 2 staff housing blocks each 4 units in health centers done

    40. Construction of 2 outpatient departments (OPD) and 2 patient wards in health centres

    done

    41. Construction of 2 blocks of dormitories in model primary schools done.

    42. 3 blocks of classrooms constructed

    43. Construction of 15 low cost school kitchens with institutional cookstoves in 15

    primary schools done.

    44. Construction of 5 nr-5 stance VIP Latrine facilities in 5 schools done.

    45. 20 km of community access roads opened,

    46. 10 km of community access roads rehabilitated

    47. 1 nr 4-wheel drive ambulance station wagon vehicle procured,

    48. 8 nr 100-125 cc motor cycles procured,

    49. 1 nr 4-wheel drive double cabin pick up vehicle procured,

    50. 2 nr 4-wheel drive station wagon vehicles procured

    51. Medical Equipment for 4 health centres procured

    C4 Luwero-Rwenzori

    1. 11,000 civilian veterans paid one off gratuity (Akasiimo).

    2. Four thousand (4,000) iron sheets procured and distributed to the elderly, institutions

    and Civilian Veterans.

    3. Four thousand (4000) bags of cement procured and distributed elderly, institutions

    and Civilian Veterans.

    4. Two Tipper Lorries to support the hydra form yards procured.

    5. Ten thousand (10,000) hand hoes procured and distributed to farmer groups.

  • Office of the Prime Minister Ministerial Policy Statement

    Page xxix

    6. Two thousand (2,000) spray pumps procured and distributed to selected farmer

    groups.

    7. Ten (10) crop nurseries and banana mother gardens established for Civilian Veterans

    in former war zones.

    8. Grants to sixteen (16) LRDP districts to support community driven enterprises to

    enhance household incomes disbursed.

    9. Sixty (60) Micro projects to enhance household incomes for youth, women, farmer

    groups and PWDs supported.

    10. Construction of Nalutuntu HC III completed.

    11. Regional office constructed in Luwero district.

    12. One (1) motor vehicle for monitoring of LRDP procured.

    13. Two (2) Benchmarking visits to Asia and African countries undertaken

    14. Specialized training through institutions (Enterprise Uganda, USSIA and UCSCU)

    offered to beneficiaries of LRDP funds

    15. Ten Thousand (10,000) hand hoes procured and distributed

    C5 Bunyoro

    1. Fifty (50) micro projects to enhance household incomes for youths, women, and

    farmer groups and PWDs supported.

    2. Thirteen thousand (13,000) hand hoes procured and distributed to farmer groups.

    3. Two Thousand (2000) iron sheets procured and distributed

    4. Four thousand one hundred (4100) bags of cement procured and distributed

    5. One (1) Baseline survey on the impact of oil and gas to the wellbeing of the

    communities conducted

    6. Four (4) crop nurseries supported

    7. Three hundred (300) spray pumps procured and distributed

    C6 Teso

    1. One hundred (100) Ox-Ploughs procured

    2. Construction of Omatenga HC III completed.

    3. Construction of Kadami HC III completed.

    4. Six thousand (6000) bags of cement procured and distributed.

    5. Eight thousand (8000) Gauge 28 ordinary corrugated iron sheets for people of Tisai

    Island. Kachumbala and Angasia procured

  • Office of the Prime Minister Ministerial Policy Statement

    Page xxx

    6. UGX 0.25Bn transferred to support to Micro Projects for women, youth, elderly and

    PWDs

    7. 1 double cabin Pick-up for regional office procured

    8. Two Policy Committee meetings held

    9. Two consultative meetings held

    D) VOTE FUNCTION 1349 ADMINISTRATION AND SUPPORT SERVICES

    1. Vote 003 Budget Estimates for FY 2016/17 prepared.

    2. Vote Ministerial Policy Statement and detailed Budget Estimates for FY 2016/17

    prepared.

    3. Four (4) performance Quarterly progress Reports produced.

    4. Four (4) budget performance reports produced.

    5. Four (4) Quarterly Quality Assurance Exercises conducted.

    6. Vote 003 BFP for FY 2016/17 prepared and submitted to Public Sector Management

    Secretariat.

    7. Internal Policy Research and Analysis to generate evidence for implementable Policy

    options for the OPM undertaken.

    8. Vote 003 Final Accounts for FY 2014/15 produced

    9. OPM Risk Management plan finalized

    10. OPM HRM matters coordinated

    11. Responses to Audit queries compiled

    12. Internal Policy, Programme and Project Monitoring and Evaluation undertaken.

    13. Short term consultancies on policy development undertaken.

    14. Induction training of new employees conducted.

    15. OBT, Planning and Budgeting training for budget officers and end users conducted.

    16. Report on Review of Final Accounts produced.

    17. Report on Accountability and advances review produced.

  • Office of the Prime Minister Ministerial Policy Statement

    Page xxxi

    18. Report on Evaluation of internal controls, stores management, cash management &

    advances / accountability, fleet management produced.

  • Office of the Prime Minister Ministerial Policy Statement

    Page xxxii

    Unfunded Priorities and funding Gap

    The Office has a number of unfunded priorities totalling to UGX 551.24 Billion for which

    funding has not been provided for in Vote 003 MTEF for FY 2015/16 (The details of these

    priorities are provided below).

    S/NO Description of the

    unfunded priorities

    Budget

    (Ushs.bn)

    Justification

    01 Digital Migration Capital

    Investment

    69.90 It’s an international requirement for all

    countries to migrate from Analogue to

    Digital. Failure to comply will result into

    international black out which will have

    adverse consequences on the country.

    There is HE directive to MoFPED to

    facilitate UBC acquire supplier credit to

    the tune of USD 23.3 million to

    implement the project

    02 Effective Coordination of

    Government policies &

    \programmes

    4.69 Support the operationalization strategic

    Coordination Platforms of the National

    Partnership Forums, and the Forums of

    GOU and UN County Team, the GOU and

    NGO and the GUO and Small and

    Medium Enterprises.

    Kick staring the implementation of the

    National Coordination Policy

    03 Implementation of M&E

    Policy & rolling out the

    Baraza initiative

    6.00 The implementation of the National M&E

    Policy and the Baraza initiative will

    require additional resources especially for

    the operationalization of the Evaluation

    function which has hitherto not been fully

    operational, as well as facilitate the roll

    out of the Baraza initiative to all LGs in

    the country and the inclusion of LGs on

    the Government Performance Assessment

    process.

    04 Full scale implementation

    of LRDP

    98.00 The full scale implementation of the

    LRDP in 43 District Local Governments

    requires Ushs108bn every FY. However

    since FY 2011/12 the funding level has

    been maintained at Ushs10bn which

    covers only 14 districts. Additional

    funding is needed to roll out the

    implementation.

    05 Acquisition of land to

    resettle 3000 Expellees

    from Tanzania, 3,000

    vulnerable communities

    15.45 HE the President and Cabinet directives to

    resettle landless communities of the Benet

    in Sebei, the Ndorobos and the Banyoro

    that have been displaced over the previous

  • Office of the Prime Minister Ministerial Policy Statement

    Page xxxiii

    outside the Elgon region

    and emptying of wastes

    from drainable toilets in

    Bundibugyo

    years.

    The need to improve the hygienic

    condition in the Refugee reception centers

    and settlements to avoid outbreak of

    epidemics.

    06 Presidential Advisory

    Committee on Budget

    (PACOB)

    0.50 HE the President directed that the

    Presidential Advisory Committee on

    Budget be established under the Office of

    the Government Chief Whip but with

    funding provided by MFPED (a copy of

    the directive attached as Annex)

    07 Additional funding for the

    Executive Office for

    setting up the Prime

    Minister’s Delivery Unit

    (PMDU)

    3.00 This funding is required to enable the Prime Minister and Leader of Government Business to establish a framework for signalling Government

    priorities and providing visible internal

    focus for all MDAs on key government priorities

    08 Anti-Poverty programmes

    for Civilian Veterans in

    Luweero-Rwenzori sub-

    Region.

    12.54 HE the Presidents directive on Anti-

    Poverty campaign in the Luwero-

    Rwenzori Region

    09 Contribution to

    International

    Organizations (IOM)

    3.00 Uganda is a member of IOM and therefore

    required to make annual subscriptions to

    renew its membership but has always been

    in arrears. There are enormous benefits

    derived from IOM membership which

    include: helping Ugandans in the diaspora

    when being repatriated back home;

    handling the evacuation of high profile

    refugees from Uganda to other countries;

    and handling IDPs.

    In case the outstanding subscription fees

    are not paid, Uganda risk losing it

    membership and thus all the benefits listed

    above

    10 Establishing a

    Government Call Centre

    0.50 There is a Cabinet directive to improve

    communication between Government and

    the public. This is intended to: Allow

    Government to communicate packaged

    information to the public; and improve

    accountability and transparency by

    enabling the public have access to

    information on government programs,

    reporting cases of poor service delivery

    and also reporting instances of abuse of

    office by public officials

    11 Government Web Portal 0.50 There is a Cabinet directive to establish a

    single point of access for all Government

    websites and web services within and

    outside the country. This is intended to

  • Office of the Prime Minister Ministerial Policy Statement

    Page xxxiv

    provide a single point of access for all

    information on Uganda thereby promoting

    the country’s tourism potential and

    investment opportunities.

    12 Budget enhancement for

    UVAB

    0.50 This funding is required over the medium

    Term as top up on the current GOU

    subvention of UGX 0.5bn to UVAB to

    bridge the gap left when donors withdrew

    their funding to the Board.

    13 Full scale Implementation

    of the Teso Development

    Plan (TDP).

    131.34 H.E the President, in May, 2011 created a

    Ministry in charge of Teso Affairs under

    the Office of the Prime Minister (OPM) to

    monitor and coordinate service delivery

    and development initiatives in the sub-

    region. However, no budgetary provisions

    were provided for the new portfolio

    created.

    The draft TDP was finalized and awaits

    Cabinet approval.

    The required cost for implementing the

    TDP over the Medium Term will be UGX

    656.7 billion

    14 Full scale Implementation

    of the Bunyoro Integrated

    Affirmative Development

    Plan (BIADP) over the

    medium Term

    182.72 H.E the President, in May, 2011 created a

    Ministry in charge of Bunyoro Affairs

    under the Office of the Prime Minister

    (OPM) to monitor and coordinate service

    delivery and development initiatives in the

    sub-region. However, no budgetary

    provisions were provided for the new

    portfolio created.

    The draft BIADP was finalized and awaits

    Cabinet approval.

    The required cost for implementing the

    BIADP over the Medium Term will be

    UGX 913.6 billion

    15 Capitalization of UBC 10.60 O/w Ushs.5bn is for rolling out the DTT

    Network; Ushs.1.6bn for implementing

    HE the President’s directive of setting up

    radios in the Karamoja sub region;

    Ushs.2.8bn for countrywide structural

    analysis of UBC Towers; Ushs.0.3bn for

    the procuring of equipment required for

    mobile Satellite uplink” to improve Live

    Coverage; and Ushs.1.2bn for upgrading

    the satellite Uplink that carries all UBC

    radio and television signals

    16 Construction and

    operationalization of the

    National Emergency

    Coordination and

    Operations Centre

    7.00 The NECOC is a Policy issue that was

    approved by Cabinet in April 2011.

    Subsequently OPM acquired land from

    UIA in Namanve to construct a fully-

    fledged NECOC to improve Preparedness

  • Office of the Prime Minister Ministerial Policy Statement

    Page xxxv

    (NECOC) and timely response to disasters in the

    Country.

    17 Budget enhancement for

    food and non-food relief

    items to cater for

    emerging disasters over

    the Medium Term

    5.00 Regular occurrences of disasters has

    resulted into high demand for relief and

    emergency response throughout the

    country yet the current budgetary

    allocations are inadequate to meet the

    demands.

    Total 551.24 This figure is likely to increase if/when

    the proposal in the NDP2 to establish a

    Special Program for Busoga Sub

    Region is implemented (details are

    being worked out

    These unfunded priorities have been communicated to MoFPED for consideration given the

    resource constraints. The implication of this is that Office of the Prime Minister may not be

    able to implement these important priorities over the Medium Term.

  • Office of the Prime MinisterVote:

    Ministerial Policy StatementOffice of the Prime Minister

    003

    The chart below shows total funding allocations to the Vote by Vote Function over the medium term:

    Table V1.1: Overview of Vote Expenditures (UShs Billion)(ii) Summary of Past Performance and Medium Term Budget Allocations

    0

    20

    40

    60

    80

    100

    120

    140

    160

    Ad

    min

    istr

    ati

    on

    an

    d S

    up

    po

    rt

    Serv

    ices

    Dis

    ast

    er

    Pre

    pare

    dn

    ess

    ,

    Man

    ag

    em

    en

    t

    an

    d R

    efu

    gees

    Man

    ag

    em

    en

    t o

    f

    Sp

    ecia

    l

    Pro

    gra

    ms

    Po

    licy

    Co

    ord

    inati

    on

    ,

    Mo

    nit

    ori

    ng

    an

    d

    Ev

    alu

    ati

    on

    Ush

    s B

    illi

    on

    2014/15 Approved Budget Estimates 2015/16 Budget Projections 2016/17 Budget Projections

    Chart V1.1: Medium Term Budget Projections by Vote Function (Excluding Taxes, Arrears)

    V1: Vote Overview

    “To instil and maintain efficient and effective systems in Government that enable Uganda to rapidly

    develop”

    The Vision is: “A Public Sector which is Responsive and Accountable in Steering Uganda Towards

    Rapid Economic Growth and Development” .

    The Mandate is: “To lead Government Business in Parliament; be responsible for the coordination

    and implementation of Government policies across MDAs including policy and management issues on

    disaster and refugees, special programs on pacification and development of Northern Uganda, Luwero,

    Karamoja,, Bunyoro, Teso, Information and National Guidance”

    (i) Vote Mission Statement

    Wage

    Non Wage

    GoU

    Ext. Fin

    GoU Total

    Total GoU + Ext Fin (MTEF)

    Development

    Recurrent

    Taxes 3.7205.100 1.640 1.800

    Total Budget 192.147111.123 145.500 146.582

    (ii) Arrears

    and Taxes

    Arrears 0.0100.000 0.003 0.000 N/A

    N/A

    N/A

    N/A

    N/A N/A

    (i) Excluding Arrears, Taxes

    2.8392.5751.930 1.570 2.575 2.704

    56.77248.22626.683 35.735 48.226 52.084

    123.71676.78577.411 63.671 80.023 88.369

    0.00060.8320.000 42.880 13.958 14.253

    183.327127.586106.023 100.976 130.824 143.157

    183.327188.418106.023 143.857 144.781 157.410

    2017/182013/14

    Outturn

    Rel. by

    End Mar

    Approved

    Budget 2015/16 2016/17

    MTEF Budget Projections2014/15

    Vote Overview

    Page1

  • Office of the Prime MinisterVote:

    Ministerial Policy StatementOffice of the Prime Minister

    003

    V2: Vote Performance for FY 2014/15 and Planned Outputs for FY 2015/16

    (i) Past Vote Outputs

    This section describes past vote performance and planned Outputs, in terms of key vote outputs

    Vote 003: OPM Achievements for FY 2014/15 (July 2014-March 2015)

    A) VOTE FUNCTION 1301: POLICY COORDINATION, MONITORING AND EVALUATION

    Parliamentary Business and Strategic Coordination under the Executive Office (Prime Minister, Second

    Deputy Prime Minister, Minister for General Duties and Government Chief Whip)

    1. Provided strategic leadership for Government Business in Parliament through coordinating the

    programming of the legislative agenda and attendance of Cabinet Ministers to their parliamentary

    responsibilities of responding to questions, and presenting Government Bills and Ministerial Statements in

    Parliament. This was instrumental in the passage by Parliament of fifteen (15) Bills, conclusion of twenty

    three (23) Committee Reports, passage of eighteen (18) Motions, presentation of thirty (30) Ministerial

    Statements and the conclusion of six (6) Petitions, ten (10) questions for oral responded to.

    2. The Prime Minister and the 2nd Deputy Prime Minister presided over strategic coordination of various

    government undertakings such as chairing the preparatory meetings for the Presidential Investors’ Round

    Table (PIRT) which took place in January/February 2015 to review progress in implementation of the

    Fourth Phase of the PIRT, coordinating the Joint Budget Support leading to holding of the meeting between

    the Joint Policy Coordination Committee (PCC) and the Joint Budget Support Framework Development

    Partners Policy Committee (JBSF DP-PC) on 15th July 2014 where the Fifth Round of the Joint Assessment

    Framework (JAF 5) was concluded and the Sixth round of the Joint Assessment Framework (JAF 6) Matrix

    of Indicators and Targets was agreed; holding consultations with the United Nations Representatives

    (United Nations Country Team – UNCT) on the establishment of a high-level modality for Government

    engagement with the United Nations Agencies, implementation of undertakings from the Uganda Mineral

    Sector Retreat which took place on 16th December 2013 at State House Entebbe

    3. The Prime Minister and his Deputy oversaw many other strategic coordination platforms such as the

    Annual Monitoring Committee meeting for the Peace Recovery and Development Programme (PRDP 2);

    the Cabinet Committee on Constitutional Amendments and a Committee Report to Cabinet was finalized,

    the Presidential advisory Committee on the Budget (PACOB) which compiled and submitted a report to

    H.E the President on the Budget Strategy for FY 2015/16 and other strategic coordination meetings on the

    ongoing development of the Sustainable Development Goals (SDGs) , Environment and management of

    wetlands, the Climate Change Policy, Oil Companies and Taxation.

    4. The Prime Minister facilitated government international engagement to promote investment and

    international cooperation where international delegations on development were hosted from North Korea,

    Netherlands and Egypt.

    5. The Prime Minister and the 2nd Deputy Prime Minister officiated at a number of events and explained

    government policies such as monitoring Implementation of public policies, programmes and projects in

    Rubirizi and Kumi Districts, handling resettlement of the landless Sebei, etc.

    6. Coordinated a number of Government policies such as the Public Sector Management programmes,

    cross cutting issues in Government, National budgeting process, production of the Annual Performance

    implementation reports, etc

    7. Provided leadership towards the reconciliation of the warring Muslim factions.

    8. Monitored implementation of Government policies, programmes and projects in Rubirizi, Kabarole,

    Kasese, Kamwange, Busoga, Kiruhura, Mbarara, Kisoro, Sebi and Kumi district Local Governments.

    Prel