Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Embed Size (px)

Citation preview

Page 1: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Overland Park, KansasOctober 16, 2008

Southern Star Central Gas Pipeline

Fall Customer Meeting

Page 2: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Bob Bob BahnickBahnick

Senior Vice President, Senior Vice President,

Operations & Technical ServicesOperations & Technical Services

Page 3: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

2008 Pipeline Integrity Work

Install 7 sets of launchers/receivers for 2008-2009 ILI investigations

Complete 9 ILI investigations covering 415 miles and 11.7 miles HCA

Pressure test KPL 16” covering 2 miles HCA Replace 762’ Carrollton 8” covering 0.1 miles HCA Replace 1,015’ Sedalia 12” covering 0.2 miles HCA Complete integrity tests of the McLouth Storage Field.

EJC 26 inch ILI run, 9.5 milesEJC 1&2 16inch ILI run, 2.1 milesPressure test an additional 9.21 miles

Page 4: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

2009 Pipeline Integrity Work

Install 7 sets of launchers/receivers for 2009 and 2010 ILI investigationsMake modification to line FS (Southern Trunk from Tom’s Corner to the Rangeline 16”) to allow pigging. Will require replacement of 16 inch pipe with 20 inch pipe under a Hwy crossingComplete 12 ILI investigations covering 241 miles and 18.1 miles HCAComplete 4 pressure tests covering 5.7 miles HCAComplete 8 ILI runs in the storage fields covering 24.6 milesComplete integrity test of Colony Storage fields by hydro-testing 17.1 miles of pipe

Page 5: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Daryl Daryl JohnsonJohnson

Vice-President, Rates & Vice-President, Rates & Regulatory AffairsRegulatory Affairs

Page 6: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

CP07-89 – North Welda CP07-89 – North Welda StorageStorage

Southern Star Central Filed 2/23/07

Sought authority to:Expand certificated boundary

Redefine the caprock

Install storage gas recycle system

Protests were filed and eventually withdrawn

Answered FERC data requests June - Nov

Order issued on 7/16/08 Approved redefining caprock

Approved installing recycle system

Denied lateral expansion of boundary

SSC requested rehearing for limited lateral expansion – awaiting order

Page 7: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Southern Star Central Filed 10/05/07

Sought authority to:Expand certificated boundary

Redefine the caprock

Enhance existing storage gas recycle system

No Protests were filed

Answered FERC data requests Dec - Feb

Order issued on 5/9/08Approved redefining caprock

Approved enhancing recycle system

Denied lateral expansion of boundary

SSC requested rehearing/clarification of lease acquisition rights – Approved 8/6/08

CP08-4 – South Welda CP08-4 – South Welda StorageStorage

Page 8: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Southern Star Central Filed 12/1/2006

Protests filed with FERC 12/2006

Order accepted subject to refund 12/29/2006

Technical Conference 2/2/2007

Data Requests and Responses 2/2007-5/2007

Objections Withdrawn by 7/3/2007

Order approving filed rates issued 7/23/08

Fuel Filing RP07-96Fuel Filing RP07-96

Page 9: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Fuel Filing RP08-84Fuel Filing RP08-84Southern Star Central Filed 11/30/2007

Protests filed with FERC 12/2007

Order accepted subject to refund 12/28/2007

Technical Conference 2/8/2008

Data Requests and Responses 2/22/2008-3/5/2008

Initial Comments filed by 3/19/2008

Reply Comments filed by 4/2/2008

Southern Star sent Initial Offer of Settlement on 4/14/2008

Reached an Agreement in Principle on 5/20/08

Filed Settlement on 5/30/08 – Approved 7/3/08

Billed settlement fuel rates beginning 6/1/08

Page 10: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Limited Waiver Filing Limited Waiver Filing RP08-443RP08-443

Southern Star Central Filed 7/11/08

PurposeWaive any overruns, balancing fees and cash-outs caused by the retro-active application of the fuel settlement rates in Docket No. RP08-84

SSC cannot waive tariff provisions without FERC authority

Order approving waivers issued 8/15/08

Page 11: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Rate Case - RP08-350Rate Case - RP08-350

SSC Filed 4/30/08

Numerous Protests were filed in May

Order issued 5/29/08 accepting rate increase, subject to refund and suspending until 11/01/08

Pre-Hearing Conference held on 6/10/08 and discovery began

Answered approx. 1,000 data requests

Page 12: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Rate Case - RP08-350Rate Case - RP08-350

Cost of ServiceRP04-276 RP08-350

Settled Filed

Storage 20.1$ 34.2$

Production Area 80.1 106.2

Market Area 77.8 117.0

Total COS 178.0$ 257.4$

Page 13: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Rate Case - RP08-350Rate Case - RP08-350

Storage RatesRP04-276 RP08-350

Settled Filed Increase

FSS - Deliverability 0.0218$ 0.0371$ 0.0153$ FSS - Capacity 0.0010$ 0.0018$ 0.0008$ FSS - Injection 0.0077$ 0.0116$ 0.0039$ FSS - Withdrawal 0.0077$ 0.0116$ 0.0039$

ISS - Capacity 0.0020$ 0.0036$ 0.0016$ ISS - Injection 0.0077$ 0.0116$ 0.0039$ ISS - Withdrawal 0.0077$ 0.0116$ 0.0039$

Page 14: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Rate Case - RP08-350Rate Case - RP08-350

Firm Transportation RatesRP04-276 RP08-350

Settled Filed Increase

FTS-P - Reservation 0.1974$ 0.2682$ 0.0708$ FTS-P - Commodity 0.0065$ 0.0080$ 0.0015$ FTS-P - Commodity Bal. 0.0012$ 0.0009$ (0.0003)$

FTS-M - Reservation 0.1139$ 0.1705$ 0.0566$ FTS-M - Commodity 0.0050$ 0.0049$ (0.0001)$ FTS-M - Commodity Bal. 0.0012$ 0.0009$ (0.0003)$

Page 15: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Rate Case - RP08-350Rate Case - RP08-350

First settlement conference was held on 10/7/08

All parties stated their positions/issues

All parties agreed on the following:SSC’s Motion Rate Filing

Next Settlement Conference

What we hope to accomplish

Page 16: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Rate Case - RP08-350Rate Case - RP08-350

Motion Rate Filing will include the following:

Rates will reflect plant in-service at 10/31

Reflect reductions in cost of service related to the fuel settlement in RP08-84

Correction of Stmt D in original filing

Motion Rate Filing will NOT include the following:

Tariff sheets to eliminate Section 32 – Third Party Storage

Tariff sheets to charge transportation commodity rate on gas transported to storage

Tariff sheets to charge transmission fuel on gas withdrawn from storage

Motion RateMotion Rate FilingFiling

Page 17: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Rate Case - RP08-350Rate Case - RP08-350

SSC will provide the active parties an Offer of Settlement on October 29th

Parties will have a 2 day settlement conference in Wash. DC beginning at 1pm on November 12.

What we hope to accomplish:

Achieve an Agreement in Principle by the end of November and place settlement rates into effect prior to billing November business.

Next Settlement ConferenceNext Settlement Conference

Page 18: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Gary HinesGary HinesManager - Gas Manager - Gas ManagementManagement

Page 19: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

19

Gas Management UpdateGas Management Update

Storage Inventory & Fall Shut-In Tests

Remaining 2008 Planned Maintenance

Upcoming 2009 Planned Maintenance

Weather

Gas Quality Waivers

Page 20: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

National EIA – 5 Year National EIA – 5 Year ComparisonComparison

Note: The shaded area indicates the range between the historical minimum and maximum values for the weekly series from 2003 through 200.

Source: Form EIA-912, "Weekly Underground Natural Gas Storage Report." The dashed vertical lines indicate current and year-ago weekly periods.

Page 21: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

SSC Storage EIASSC Storage EIA

Page 22: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Current Storage Status42Current Storage Status42

Shut-In Tests Underway

Through first week of November

Why Perform A “High-Inventory” Test?GT&C Section 13.4

Fall High Inventory

“…perform the end-of-the-injection-cycle shut-in pressure test on each field at the point in time when SSC

reasonably believes the field is at or near

the highest inventory level that will

be achieved…”

Page 23: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

23

Remaining 2008 Planned Remaining 2008 Planned MaintenanceMaintenance

None Planned!

However…Performing pipeline in-line inspection verification digs

Additional identified anomalies may warrant pressure or throughput reductions

Some minor additional construction activities

Best way to stay abreast:Ensure you receive the Planned Service Outage (PSO) emails

How to find out?

CSI report CSI050

Contact Type: Planned Service Outage

How Can We Make Notifications Better???

Page 24: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

HDD & CDD for YTD vs. Averages

Page 25: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Current Gas Quality Current Gas Quality WaiversWaivers

Line Segment 190 & KMIGT-Franklin (LocID 16593)

CO2 waiver (see posted requirements)

Line Segment 315 & 377 (Straight-Blackwell)CO2 waiver (see posted requirements)

Always Evaluating Others

Page 26: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Dale Dale SandersSanders

Contract AdministrationContract Administration

Page 27: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Order 712

Issued June 19th, 2008

Major modifications to regulations for Cap. Release

Page 28: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Highlights

Price caps removed on Short Term Cap. ReleasesAsset Management Arrangements

(AMA)

Page 29: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Reminders

Change in Customer Look-up on Capacity Release Offer Screens

Page 30: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Reminders

Unique Usernames and Passwords

Page 31: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Reminders

Password Resets

Pre-Approved Bidders List

Page 32: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

David David BristowBristow

Manager Scheduling & BillingManager Scheduling & Billing

Page 33: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

33

Operational Flow Order (OFO)Operational Flow Order (OFO)

By Definition from Tariff:order issued to alleviate conditions which threaten or could threaten the safe operations or system integrity or to maintain operations required to provide efficient and reliable firm service.

Who does this affect?Rate Schedules ITS, ISS, TSS, FSS, STS, SFT and FTSPoint Operators with operational control of receipt/delivery point(s)

Who Does Southern Star Notify?Those individuals on the CSI OFO Distribution List

All customers must have an OFO contactAll customers must have an OFO contact

Page 34: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

34

Operational Flow Order Operational Flow Order (OFO) (cont’d)(OFO) (cont’d)

Categories of OFO’s:Standard

Preventative Action to neutralize and/or reduce threats

EmergencyImmediate Action needed to neutralize and/or prevent threats

Page 35: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

35

Operational Flow Order Operational Flow Order (OFO) (cont’d)(OFO) (cont’d)

Types of OFO’s:Storage Injections & Withdrawals

System Maintenance

Line Segment Specific

Peak Hour Deliveries

System Balance“North/South” Balance

Any Other Deemed Necessary To Protect System Integrity

Page 36: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Jim NeukamJim NeukamManager – Customer Services Manager – Customer Services

& Business Development& Business Development

Page 37: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Customer Services & Business Development Goals & Objectives

Customer Service & Account Management Develop in-depth, working knowledge of customer contracts and their business needs and challenges

Promptly address and respond to Customer questions and requests

Ensure innovative and effective solutions to Customer expectations

Develop and coordinate Customer meetings and follow-up visits

Page 38: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Customer Services & Business Development Goals & Objectives (Cont.)

Gas Supply & InterconnectsIdentify, evaluate, and pursue enhanced gas supply opportunities

Manage Customer Interconnect Process

Research and assess gas supply studies to ensure adequate gas supply

Page 39: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Customer Services & Business Development Goals & Objectives (Cont.)

Business Development Identify, evaluate, and pursue new opportunities and incremental markets

Collaborate with Customers on creative business opportunities

Research gas industry projects and competitive business initiatives

Oversee projects in compliance with regulations and contractual obligations

Page 40: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Gas Supply Update – 2008 - 2009 Incremental VolumesLocation Name Location Line Segment

County/StateDesign dth/d

In-Service

Superior Pipeline – Hemphill Upgrade

16820

Alva

458 - Hemphill, TX 50,000 July 2008

DCP Midstream - Cimarron

15253

Alva

458 - Woodward, OK 65,000 November 2008

Dart Cherokee - Independence

16941

Independence

117 – Montgomery, KS

20,000 November 2008

Noble Energy – Big Timber

16942

Colby

490 – Cheyenne, OK 60,000 December 2008

Frontier Field Services - Antelope

Hills

16945

Alva

458 - Hemphill, TX 20,000 December 2008

Bluestem – North Housel

16935

Independence

260 - Labette, OK 15,000 November 2008

Bluestem – Jayhawk Upgrade

16872

Independence

495 – Wilson, KS 30,000 1st Quarter 2009

Currently there are nine other projects being assessed as viable new supply points or in pre-construction phases.

Page 41: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Available ServicesWinter 2007–2008

Production Area Firm & Interruptible Transportation

Market Area Interruptible Transportation

Park and Loan Service

Interruptible Storage Service

Page 42: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Winter Capacity Status (Markets) Kansas City Metro & North of Ottawa

LS 90, 115, 145, 180, 190, 250100% Subscribed

WichitaLS 120 & 333100% Subscribed

East of GrabhamLS 215, 225, 260,

423, , 450, 455100% Subscribed

Page 43: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Winter Capacity Status (Production)

Rawlins-HesstonLS 490, 491

100% Subscribed

West OklahomaLS 315, 377, 458

Potential Opportunity

West KansasLS 130

Potential Opportunity

South OklahomaLS 380, 400, 385

Select Opportunity

Page 44: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Grow our ServicesAccess to Additional Gas Supply from the Rockies Production

Access to Gas Supply from the New & Developing Production – Shale, etc.

Gas Storage Options – Help us define your needs!

Opportunities for New Flow Paths – Hub Services

Page 45: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

PhilipPhilipRullmanRullman

Director, Commercial Director, Commercial ServicesServices

Page 46: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

2008 Customer Satisfaction Survey

Results

Page 47: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Survey Focus Items

Overview of Results• Quality of Service• Quality of Communications• Quality of Operations• Product Related Services

Comparison of Importance & Performance

Page 48: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Overview of Results

ImportanceAverage importance: 9.1

Range from 8.3 to 9.9

PerformanceAverage performance: 8.8

Range between 8.3 to 9.5

Page 49: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Key Survey Question

Southern Star communicates with you in an honest and forthright manner

Importance – 9.9

Performance – 9.5

Page 50: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Customers Voice

We are hearing you loud and clear on areas of improvement!

Action Plan

Customer Survey Action Team will review items and develop action plan by 12/31/08

CSI Review on key items

Page 51: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

CSI Action ItemsPark & Loan Services“As far as their Park and Loan contracts are

concerned, they are not very flexible. They’re pool specific and it’s very difficult to make changes on their system”

Action Items

Modify PLS service to allow all production area pools on a contract

Completion - End of the 1st qtr 2009

Page 52: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

CSI Action ItemAuto Renom“I would like Southern Star to offer auto-

renomination. They need to have it…..”

Action Item

Assess requirements of auto-renom with customers by end of 1st qtr 2009

Project Plan has been developed but does one size fit all?

Completion pending scope refinements

Page 53: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

CSI Action ItemCSI Time-Outs“My biggest issue is the lack of notification of time-

outs and such. The system should not allow you to put nominations in if it’s already timed out….”

Action ItemsCSI will provide customers a warning message prior to their CSI session expiring.

When a customer’s session has expired, CSI will redirect their web browser to a timeout error screen with an option to log in again.

Completion – Late 2nd qtr 2009

Page 54: Overland Park, Kansas October 16, 2008 Southern Star Central Gas Pipeline Fall Customer Meeting

Mark your calendars… Spring Customer Meeting, April 23, 2009, Sheraton Kansas City

Sports Complex, Kansas City MO