15
Overcoming Paradigms on the Road to Innovation The Power of Alignment & Collaboration December 2017

Overcoming Paradigms on the Road to Innovation The … · Overcoming Paradigms on the Road to Innovation The Power of Alignment & Collaboration ... Reduced Shaft Diameter 9-MONTHS

Embed Size (px)

Citation preview

Overcoming Paradigms on the Road to InnovationThe Power of Alignment & Collaboration

December 2017

Sudbury Integrated Nickel OperationsA Glencore Company

City of

Sudbury10km

Nickel Rim

South Mine

Sudbury

Smelter

Strathcona Mill

Fraser Mine

City of

Sudbury

Craig MineOnaping Depth Project

Our Need to AdaptOnaping Depth & Nickel Rim Depth Mines

3

• Polymetallic

• Depth ~ 2.5km

• Ambient rock temp > 40C

• 1.5 - 2km from existing infrastructure

• Designed for non-diesel

(Battery Electric Fleet)

• 1.55Mtpy productive output

• 100+ pieces of BEV Gear

• Financial Challenging

4

Overcoming ParadigmsStrategy & Tenets

Operational

Alignment &

Discipline

Technology

Application

Technology

Step Change

~20%~100%

~400%

5

Improvement Potential Through InnovationInnovation Strategy

Aligned Strategic Priorities

Management Systems

Data Analytics

Digital Transformation

Autonomous Mining Operations

Battery Electric Equipment

Continuous Mucking

Cutting Technology

6

Battery Electric Vehicle CollaborationA Template for Success

Ventilation reduction40%

ELIMINATED

• Return Air Ventilation Ramp

• Fresh Air Raise

• 3 Ventilation Fans

• 5 Ore Passes

45%+Less Power & Refrig.

23%Reduced Shaft

Diameter

9-MONTHSBEV Guidelines

22+ Companies & OEM’s

DESIGN

• Battery haul trucks regenerate

power hauling down ramp

• All major OEM’s developing

fleet & roadmap

AVAILABILITY

• Technology exists (Personnel

carriers, drills, 7T LHDs,20T

trucks, 18T LHD

• Only missing prime movers

(primarily 30-40T trucks)

7

2017 Innovation ProgressDemonstrating the Power of Alignment & Collaboration

Modern BI Trials

Autonomous Mucking at NRS The Connected Worker & Wi-Fi to the Face

5 BEV’s deployed in 2017; 3 more in Q1

OT/IT ConvergenceThe First Paradigm Shift

2012: Gain trust through quick

wins; stop working in isolation

2012-17: Quarterly OT/IT link

meetings to maintain

collaboration

2017: OT/IT combining efforts to trial enabling technology for

innovation

Operations Management System Onaping Depth Project

Productivity Improvement25%

Onaping Depth

To be used by operators at 1200L and 57 Decline faces to track shift progress

Functionality

1. Auto generate shift schedule

based on last shift heading

status

2. Assign operators to mining

tasks and equipment pre-shift

3. Task assignment &

expectations delivered to

operator tablet

4. Operators enter progress and

delays into tablet during shift

5. Corrective actions and other

decisions facilitated by

visibility of information

Goal

Maximize face utilization/advancement

Minimize time to access ore body

Mobile and desktop application

Operations Management System

11

Mobile Apps and Our OMS Journey…

Collaboration/

12

User Engagement & Ownership

• Focus development on usability and value

• Engage users so they are key to the process

• Users become owners

• Keeping up with demand is the new

challenge!

13

Glencore – Fatal Hazard Mobile App Video

2018-19 Tech & Innovation Initiatives

2017 2018 2019

Q4

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Enabling Technology

Ubiquitous Wi-Fi

Private LTE/5G Trials

Telemetry & Location Tracking

One Device/The Connected Worker

Mine Systems

OMS Enhancements

Mine Planning/Design Solution

Mining Software Platform Selection

BI & Data Analytics

Automation & Emerging Technology

Autonomous Equipment

Battery Electric Equipment

Continuous Mining Trial

Cutting Technology Investigation

Deep Mining Technology

Thank You