Sudbury Integrated Nickel OperationsA Glencore Company
City of
Sudbury10km
Nickel Rim
South Mine
Sudbury
Smelter
Strathcona Mill
Fraser Mine
City of
Sudbury
Craig MineOnaping Depth Project
Our Need to AdaptOnaping Depth & Nickel Rim Depth Mines
3
• Polymetallic
• Depth ~ 2.5km
• Ambient rock temp > 40C
• 1.5 - 2km from existing infrastructure
• Designed for non-diesel
(Battery Electric Fleet)
• 1.55Mtpy productive output
• 100+ pieces of BEV Gear
• Financial Challenging
Operational
Alignment &
Discipline
Technology
Application
Technology
Step Change
~20%~100%
~400%
5
Improvement Potential Through InnovationInnovation Strategy
Aligned Strategic Priorities
Management Systems
Data Analytics
Digital Transformation
Autonomous Mining Operations
Battery Electric Equipment
Continuous Mucking
Cutting Technology
6
Battery Electric Vehicle CollaborationA Template for Success
Ventilation reduction40%
ELIMINATED
• Return Air Ventilation Ramp
• Fresh Air Raise
• 3 Ventilation Fans
• 5 Ore Passes
45%+Less Power & Refrig.
23%Reduced Shaft
Diameter
9-MONTHSBEV Guidelines
22+ Companies & OEM’s
DESIGN
• Battery haul trucks regenerate
power hauling down ramp
• All major OEM’s developing
fleet & roadmap
AVAILABILITY
• Technology exists (Personnel
carriers, drills, 7T LHDs,20T
trucks, 18T LHD
• Only missing prime movers
(primarily 30-40T trucks)
7
2017 Innovation ProgressDemonstrating the Power of Alignment & Collaboration
Modern BI Trials
Autonomous Mucking at NRS The Connected Worker & Wi-Fi to the Face
5 BEV’s deployed in 2017; 3 more in Q1
OT/IT ConvergenceThe First Paradigm Shift
2012: Gain trust through quick
wins; stop working in isolation
2012-17: Quarterly OT/IT link
meetings to maintain
collaboration
2017: OT/IT combining efforts to trial enabling technology for
innovation
Operations Management System Onaping Depth Project
Productivity Improvement25%
Onaping Depth
To be used by operators at 1200L and 57 Decline faces to track shift progress
Functionality
1. Auto generate shift schedule
based on last shift heading
status
2. Assign operators to mining
tasks and equipment pre-shift
3. Task assignment &
expectations delivered to
operator tablet
4. Operators enter progress and
delays into tablet during shift
5. Corrective actions and other
decisions facilitated by
visibility of information
Goal
Maximize face utilization/advancement
Minimize time to access ore body
Mobile and desktop application
12
User Engagement & Ownership
• Focus development on usability and value
• Engage users so they are key to the process
• Users become owners
• Keeping up with demand is the new
challenge!
2018-19 Tech & Innovation Initiatives
2017 2018 2019
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Enabling Technology
Ubiquitous Wi-Fi
Private LTE/5G Trials
Telemetry & Location Tracking
One Device/The Connected Worker
Mine Systems
OMS Enhancements
Mine Planning/Design Solution
Mining Software Platform Selection
BI & Data Analytics
Automation & Emerging Technology
Autonomous Equipment
Battery Electric Equipment
Continuous Mining Trial
Cutting Technology Investigation
Deep Mining Technology