A Design-Build ProjectReplacement of I-81
Structures 18942 & 18944over Route 808 Halls Bottom
Road and Sinking Creek
Washington County, Virginia
March 7, 2016
State Project No.: 0081-095-038, P101, RW201, C501, B675, B676
Federal Project No.: IM-081-1(342)Contract ID Number: C00107116DB85
Submitted By:
In Conjunction With:
In Association With:
I-81 Over Maury River
Exis ng I-81 Structures
Exis ng I-81 Structures
Exis ng I-81 Structures
ORIGINALVOLUME 1:
Letter of Submittal and Attachments
ATTACHMENT 4.0.1.1 Replacement of Structures 18942 and 18944 over Rte. 808 Halls Bottom Rd. and Sinking Creek
LETTER OF SUBMITTAL AND ATTACHMENTS CHECKLIST
i of ii
Offerors shall furnish a copy of this Letter of Submittal Checklist, with the page references added, with the Letter of Submittal.
Technical Proposal Component Form (if any) RFP Part 1 Cross Reference
Page Reference
Letter of Submittal and Attachments Checklist Attachment 4.0.1.1 Section 4.0.1.1 i-ii
Acknowledgement of RFP, Revisions, and/or Addenda Attachment 3.6 (Form C-78-RFP) Sections 3.6, 4.0.1.1 iii
Letter of Submittal NA Sections 4.1 Vol. 1: Pages 1-2
Letter of Submittal on Offeror’s letterhead NA Section 4.1.1 Vol. 1: Pages 1-2
Offeror’s official representative information NA Section 4.1.1 Vol. 1: Page 1 Authorized representative’s original signature NA Section 4.1.1 Vol. 1: Page 2 Declaration of intent NA Section 4.1.2 Vol. 1: Page 1 120 day declaration yes Section 4.1.3 Vol. 1: Page 1 Point of Contact information yes Section 4.1.4 Vol. 1: Page 2 Principal Officer information NA Section 4.1.5 Vol. 1: Page 2 Final Completion Date NA Section 4.1.6 Vol. 1: Page 2 Proposal Payment Agreement or Waiver of Proposal Payment
Attachment 9.3.1 or 9.3.2 Section 4.1.7 Vol. 1:
Appendix 4.1.7
Certification Regarding Debarment Forms Attachment 11.8.6(a) Attachment 11.8.6(b) Section 4.1.8 Vol. 1:
Appendix 4.1.8 Written statement of percent DBE participation NA Section 4.1.9 Vol. 1: Page 2
ATTACHMENT 4.0.1.1 Replacement of Structures 18942 and 18944 over Rte. 808 Halls Bottom Rd. and Sinking Creek
LETTER OF SUBMITTAL AND ATTACHMENTS CHECKLIST
ii of ii
Technical Proposal Component Form (if any) RFP Part 1 Cross Reference
Page Reference
Attachments to the Letter of Submittal NA Section 4.2 Vol. 1: Pages 3-12
Confirmation that the information provided in the SOQ submittal remains true and accurate or indicates that any requested changes were previously approved by VDOT
NA Section 4.2.1 Vol. 1: Page 3
Organizational chart with any updates since the SOQ submittal clearly identified NA Section 4.2.1 Vol. 1:
Page 9
Revised narrative when organizational chart includes updates since the SOQ submittal NA Section 4.2.1 Vol. 1:
Pages 3-8
Conceptual Roadway Plans – Plan View NA Section 4.2.2 Vol. 2: Page 15
Conceptual Roadway Plans – Typical Sections NA Section 4.2.2 Vol. 2: Page 14
Conceptual Bridge Plans – Plan View NA Section 4.2.3 Vol. 2: Page 18
Conceptual Bridge Plans – Transverse Section NA Section 4.2.3 Vol. 2: Pages 21-22
Conceptual Bridge Plans – Abutment/Pier Configuration NA Section 4.2.3 Vol. 2: Page 20
Proposal Schedule
NA Section 4.2.4 Vol. 1: Pages
10-12 Vol. 2: Pages
23-25 Proposal Schedule NA Section 4.2.4.1 Vol. 2: Pages
23-25 Proposal Schedule Narrative NA Section 4.2.4.2 Vol. 1: Pages
10-12 Proposal Schedule in electronic format (CD-ROM)
NA Section 4.2.4 Included with
Proposal Package
Letter of Submittal Attachment Page 3 Section 4.2.1 Organizational Chart and Narrative
Replacement of I-81 Structures 18942 & 18944 over Rte. 808 Halls Bottom Rd. and Sinking Creek
The organizational chart and Key Personnel proposed in the SOQ remains true and accurate for the Orders Design-Build Team. The following narrative and organizational chart describes the functional relationships of the team members and the clear “chain of command” to the DBPM. The departure of one of Orders Construction’s staff has necessitated a slight change to the team but as noted above this was not a Key Personnel on the team. The changes to the narrative and the organizational chart are highlighted in yellow. TEAM STRUCTURE
Orders Construction Company (Orders) will be responsible for managing the project in its entirety, supervising the construction, and performing major elements of the construction work. Additional subcontractors for various specialty items such as guardrail, signage, and pavement striping will be under direct subcontract to Orders. Whitman, Requardt & Associates, LLP (WRA) will lead the design effort for all aspects of the project and will be responsible for the design QA/QC. The Orders Team includes highly qualified subconsultants that bring specific expertise to enhance the team and ensure a quality project for VDOT. A complete list of team members follows and an organizational chart of the Team is included. Orders Construction Company, Inc. (Orders) - Offeror, Legal Entity, Lead Contractor Orders is a family-owned business now being managed by third- and fourth-generation highway contractors and Registered Professional Engineers. Orders was founded in 1964 as a general contractor specializing in bridge construction for West Virginia clients and has grown to become a widely diversified supplier of construction services to a broad range of clients from the Mid-Atlantic to the Midwest. Whitman, Requardt & Associates, LLP (WRA) – Lead Designer WRA is a full service architectural and engineering firm that was founded over 100 years ago primarily serving state and local governments in the Mid-Atlantic region of the United States. WRA will serve as the Lead Designer for this project and will be responsible for the design QA/QC as well as managing survey work performed by our survey subconsultant. WRA has been performing work for state and local governments in Virginia for over 65 years and has extensive experience with Design-Build projects for VDOT. Subconsultants The Orders/WRA Team is comprised of highly qualified individuals and subconsultants extremely knowledgeable in VDOT policies and procedures and experienced with similar VDOT Design-Build projects. The following team of subconsultants has been carefully selected based on their relevant past experience and established working history of project success with VDOT, Orders Construction, and/or WRA: A. Morton Thomas & Associates, Inc. (AMT) will provide the Quality Assurance Management and Inspection for the Orders Team. For nearly 60 years, AMT has been a respected provider of transportation design and construction phase expertise in Virginia, including Design-Build projects. ECS-Mid-Atlantic, LLC (ECS) will provide QC Testing & Lab Services for the Orders Team. Founded in 1988, ECS has a staff of over 600 employees in the Mid-Atlantic region and is currently working on three Design-Build projects across the Commonwealth. Schnabel Engineering Consultants, Inc. (SE) will provide a Quality Assurance Lab for the Orders Team. Schnabel’s in-house soil, materials, and asphalt laboratories are accredited by AASHTO Materials Reference Laboratory (AMRL) and the US Army Corps of Engineers (USACE) in their Richmond, Blacksburg, and Newport News offices.
Letter of Submittal Attachment Page 4 Section 4.2.1 Organizational Chart and Narrative
Replacement of I-81 Structures 18942 & 18944 over Rte. 808 Halls Bottom Rd. and Sinking Creek
H&B Surveying and Mapping, LLC (H&B) a Virginia-Certified, DBE/WBE (Woman-Owned Business) founded in 2009 will provide Surveying and Subsurface Utility Locating for the Orders Team. Since 2010, H&B Surveying and Mapping, LLC has teamed with WRA to provide surveying services on over 75 projects throughout Virginia including VDOT Design-Build projects including Walney Road Bridge and Road Widening in Fairfax County and Fall Hill Avenue Bridge Reconstruction and Widening project in the Fredericksburg, VA. H&B is currently contracted with WRA on 9 On-Call Contracts with VDOT, the City of Richmond, the Town of Blacksburg, and Montgomery and Chesterfield Counties. KEY PERSONNEL
Key personnel Resume Forms were included in Attachment 3.3.1 located in Appendix C of the SOQ. A brief summary of key personnel is described below, and more detailed project experience for each are listed on the Resume Forms.
Design‐Build Project Manager – Charlie Stokes (Orders – 42 years of experience) Charlie Stokes (DBPM) Will serve as the project’s DBPM and will have ultimate responsibility for the project delivery. He has been constructing VDOT roads and bridges for 42 years, and has served as Project Manager on numerous VDOT projects, including DBPM on the Route 60 Main Street Bridge Replacement (Design-Build) in Clifton Forge, VA; the DBPM on the Wolf Creek Bridge Replacement (Design-Build) in Giles County; PM on the Route 419 and East Main Street Interchange Bridge, Salem, VA; and PM on the Route 23/Kane Avenue in Gate City, VA. Throughout his career Charlie has excelled in bringing large transportation projects to completion on time and within budget from projects on the Capital Beltway to structures over South Holston Lake in Washington County and the Flannagan Reservoir in Dickenson County. Quality Assurance Manager – Chad McMurray, PE, PMP, CCM, DBIA (AMT - 21 years of experience) Chad McMurray (QAM) will report directly to the DBPM and will have direct, independent access to VDOT. Chad has performed this role previously on the $90 million Route 460 Connector Phase I Design-Build roadway and bridge project in the Bristol District. As the QAM, Chad will be responsible for the Quality Assurance program and will coordinate with VDOT, supervise project QA inspection staff, and coordinate with the QA testing firm, Schnabel Engineering, Inc. Through this effort he will ensure conformance with the Contract Documents including the Approved for Construction plans and specifications. Chad will have overall responsibility for the development of and adherence to the Design-Build QA/QC Plan including coordination with the Design QA/QC Manager, Mark Vasco, PE. Chad will serve as a direct report to the DBPM but will function independently from the Construction QC Manager, auditing and monitoring Orders Construction Quality Control Program. He will have the authority to stop construction activities to ensure compliance with the specifications and issue Non-Compliance Reports (NCRs) if necessary. In addition, Chad will submit monthly written reports on the status of the QA Program to both VDOT and the Orders Design-Build Team. Design Manager – Michael Russell, PE (WRA – 27 years of experience) Michael Russell (DM) will also report directly to the DBPM. Mike has 27 years of experience designing and managing transportation projects and programs for VDOT. He is currently the Design Project Manager on the I-81 New River Bridge Replacement project in the Salem District which has similar traffic, MOT, and geological constraints that will be encountered on this project. He will be responsible for providing a quality product, meeting all design milestones, continual Design-Build Team coordination and ensuring the Design QA/QC Manager’s involvement throughout the design phase. Mike is responsible for ensuring all design work is performed in accordance with current VDOT Policies, Procedures and Guidelines. He will manage all aspects of design including but not limited to roadway; structural; hydraulic; traffic; MOT; environmental; and
Letter of Submittal Attachment Page 5 Section 4.2.1 Organizational Chart and Narrative
Replacement of I-81 Structures 18942 & 18944 over Rte. 808 Halls Bottom Rd. and Sinking Creek
geotechnical. He will assign resources as needed; oversee the design subconsultant for survey; coordinate design and review schedules; develop and implement corrective measures if necessary; and ensure environmental compliance measures are integrated into the design. He will coordinate the design and construction with the Environmental Permitting Coordinator, Taylor Sprenkle, to ensure all commitments are achieved by the project. Mike will maintain involvement in the project once construction begins to oversee any plan modifications and shop drawings, and review construction activities with the CM as work progresses. Construction Manager – Kevin Conner (Orders – 32 years of experience) Kevin Conner (CM) will also report to the DBPM and be responsible for overseeing the project site for the duration of construction. He will be responsible for managing the overall construction process, including all construction quality control activities. Kevin has over 32 years of experience and has been employed with Orders for 11 years. He is responsible for successfully completing numerous roadway and bridge projects for VDOT and WVDOH, including working with Project Manager Charlie Stokes on VDOT’s Design-Build Route 60 Main Street Bridge Replacement project in Clifton Forge and the I-81 Maury River Bridge Replacement project in Rockbridge County (designed by WRA). Kevin currently holds a Virginia DEQ Responsible Land Disturber Certification (RLD) #RLD02695 and a VDOT Erosion and Sediment Control Contractor Certification (ESCCC) #1559C. Kevin will also serve as the project’s Construction Environmental Manager. ORGANIZATIONAL CHART
The Orders Design-Build Team Organizational Chart on Page 7 identifies key personnel members and depicts the reporting structure of the Team. Solid lines identify the direct lines of reporting relationships of our team members from the DBPM to the Design, Construction and QA team. Dashed lines represent indirect reporting relationships and obligations to the DBPM and the team members. Furthermore, the reporting structure for the Quality Assurance shows a clear separation between the Construction Quality Control Inspection and field/laboratory testing duties.
As a continuation of the functional relationships for Key Personnel described above, the following narrative further defines the roles and functional relationships of the additional team members. Each of these team members were carefully chosen based on their extensive experience and well-established working relationships on previous projects.
Safety Manager Safety Manager: Jeff Dixon, CSP reports to the CM and serves as the Company Safety Director for Orders Construction. Jeff ensures all projects are operating safely and in accordance with OSHA regulations. Jeff is a Certified Safety Professional and has been working with Orders Construction for 10 years. Jeff is responsible for safety training to all Orders employees, ensuring they have all the required personal protective equipment. Jeff is also in charge of all pre-employment training and certifications, and compliance with all job-specific safety plans.
Design Structural/Bridge Engineer: Jeremy Schlussel, PE reports to the DM and will be in charge of structural engineering for the project including the I-81 Bridges and associated retaining walls. Jeremy has extensive experience designing bridge projects for VDOT including the I-81 New River Bridges in the Salem District and the I-81 Maury River and Buffalo Creek bridge replacement projects in the Staunton District. Jeremy serves as Structure Design lead for all of WRA’s VDOT Design-Build projects as well as managing over 200 bridge improvement tasks for VDOT’s Structure and Bridge Division under On-Call contracts over the last 10
Letter of Submittal Attachment Page 6 Section 4.2.1 Organizational Chart and Narrative
Replacement of I-81 Structures 18942 & 18944 over Rte. 808 Halls Bottom Rd. and Sinking Creek
years. He will lead production efforts for all structural engineering designs including plans, estimates and specifications for the project. Jeremy will also review structural shop drawings and assist the DBPM, CM and DM during construction. Roadway Engineer: Brad Stipes, PE has 27 years of experience will report to the DM and lead the roadway design efforts for the project. He is currently serving as the lead designer on the I-81 Bridge Replacement Project over the New River, a $98 million project in the Salem District. He has extensive working relationships with the Location & Design Staff in the Bristol District having worked on numerous Bristol District projects for more than 20 years, including WRA’s current Statewide On-Call design contract. Brad has worked on numerous highway and roadway projects and understands VDOT policies and procedures, particularly as they relate to interstate projects.
Geotechnical Engineer: Jeff Basford, PE has over 15 years of experience in subsurface explorations, geotechnical analysis, design of pavement sections and shallow and deep foundations, slope stability analysis, concrete and geosynthetic reinforced earth retaining structures, and in-situ testing and verification during construction. Jeff is currently the Lead Geotechnical Engineer on the I-81 New River Bridge Replacement project in the Salem District, and was the Lead Geotechnical Engineer on both the I-81 Maury River and Buffalo Creek Bridge Replacement projects in the Staunton District. He has also been involved on numerous Design-Build projects for WRA in Virginia and Maryland. Jeff has a complete understanding of the VDOT Manual of Instruction, Chapter 3. Jeff will report to the DM and collaborate with the Structural Design Engineer and CM.
MOT/Traffic Engineer: Dana Trone, PE, PTOE Dana has over 19 years of experience in traffic engineering including development of transportation management plans (TMP); MOT design; lighting; signing; ITS; and pavement marking plans. Dana has developed several TMPs for bridges with construction on and over interstates in Virginia, including numerous Design-Build projects. She is extensively familiar with the Traffic Engineering Handbook, MUTCD, Highway Safety Design Manual and Virginia Work Area Protection Manual. Dana will report to the DM, Mike Russell and collaborate with the Construction MOT Manager, Steve McKee.
Drainage/Hydraulics Engineer: David Gertz, PE will report to the DM and lead the design efforts for drainage and SWM. David has over 36 years of experience in roadway drainage design and stormwater management, and has designed numerous projects for VDOT utilizing the new Virginia stormwater regulations that took effect in July 2014. David has worked on VDOT projects as the Lead Drainage/Hydraulics Engineer continuously for the last 25 years. He most recently served as Lead Drainage/Hydraulics Engineer for the Berkmar Extension section of VDOT’s Route 29 Solutions Design-Build project in Albemarle County.
Environmental Permitting: Taylor Sprenkle will report to the DM and secure all environmental permits needed for the project. Taylor has over 12 years of experience with environmental reviews and permitting required for transportation projects including the I-81 Truck Climbing Lanes in Montgomery County and the 17-mile Route 460 project in the City of Suffolk and Isle of Wight County. Taylor will work closely with the Construction Environmental Manager, Kevin Conner, to ensure all permit requirements are fulfilled.
Utility Design Engineer: Gary Fern, PE has 35 years of experience in utility designs/relocations and has worked on numerous VDOT On-Call Utility Design contracts as well as On-Call contracts for Virginia localities and public service authorities. He is currently responsible for the utility relocation design for the entire Route 29 Solutions Design-Build project. Gary will report to the DM, Mike Russell, and will interact closely with the CM, Kevin Conner, as necessary.
Letter of Submittal Attachment Page 7 Section 4.2.1 Organizational Chart and Narrative
Replacement of I-81 Structures 18942 & 18944 over Rte. 808 Halls Bottom Rd. and Sinking Creek
Erosion and Sediment Control Reviewer: Glenn Wilson has 18 years of experience in E&S Control design and other water resources engineering services for transportation projects. He is thoroughly familiar with the water quality requirements of USACE, DCR, VDOT’s Drainage Manual, Virginia’s SWM Handbook, Virginia E&S Control Handbook and related VDOT IIM’s. He is a certified DCR Combined Administrator (Certificate #684). Glenn will report to the DM and collaborate with the Construction Environmental Manager.
Design QA/QC Design QA/QC Manager, Mark Vasco, PE will report to the DM. Mark will coordinate with the QAM to integrate the Design QA/QC plan into the Design-Build Project QA/QC plan and will ensure that all design quality control procedures are completed in accordance with that plan. He will verify that QC and interdisciplinary reviews, including comment resolution, are made prior to submissions. Mark has more than 32 years of experience in the design of transportation projects with extensive experience in both highway and maintenance of traffic designs, and has extensive experience with VDOT Design Manuals; IIMs; design standards; and VDOT/AASHTO criteria. Mark recently served as the Design QA/QC Manager on the Fall Hill Ave. & Mary Washington Blvd. Extension Design-Build project. Construction QC Construction QC Manager (CQC): Steve Short has over 21 years of experience managing QC activities on various construction projects across Virginia including the Route 35 Bridge Replacement Design-Build project in Courtland, and provided QA inspection services for VDOT’s Route 61 Bridge over the New River Design-Build project in Narrows. He will report to the CM and will be responsible for managing all QC work for Orders, including coordinating the ECS’s QC testing lab and testing technicians. Steve is extensively knowledgeable in all of VDOT Construction requirements, specifications, and testing methods and will coordinate with the QAM and the DBPM on the QC components of the project. Construction Project Controls/DBE Compliance: Cheri George will report to the DBPM and currently serves as the Office Manager for the Virginia office of Orders Construction. Cheri oversees day to day project controls and DBE compliance for all projects in Virginia. Cheri has a history of 25 years in this capacity. Grading/Roadway Superintendent, Construction MOT Manager: Steve McKee will report to the CM and will be responsible for all phases of on-site roadway construction, including personnel supervision, job site safety, and subcontractor management. Steve possesses current ESCCC, Intermediate Work Zone Traffic Control, and ACI Concrete certifications. Steve has worked on the VDOT’s Route 60 Main St. Bridge Design-Build project in Clifton Forge, Virginia and the Route 250 Bridge Replacement project in Highland County. Design/Construction Coordinator and Public Relations Manager, &: Adam Sauders, will assist the DBPM and the CM by combining these roles. Adam will be responsible for coordinating project reviews during design and processing RFIs during construction. He will assist the DBPM with the initial schedule development and ongoing updates. He will also serve as Public Relations Manager and interface closely with the Bristol District Public Affairs section and the SWRO-TOC. The Orders Design-Build Team was carefully assembled based on each firm’s intimate knowledge of the site, existing working relationships internally and with VDOT, and their specific expertise to manage the project risks. The WRA design team has worked together extensively on major I-81 bridge replacement projects successfully managing very similar risks to those on this project including extensive MOT and geotechnical constraints. The risk management plan is developed to adapt quickly with mitigation and contingency plans in place prior to construction beginning. Partnering during construction ensures issues are quickly resolved
Letter of Submittal Attachment Page 8 Section 4.2.1 Organizational Chart and Narrative
Replacement of I-81 Structures 18942 & 18944 over Rte. 808 Halls Bottom Rd. and Sinking Creek
with minimal impact to project schedule. The Orders DB Team relationships forged on previous similar interstate projects such as the I-81 Maury River Bridge Replacement Project and the I-64 Maury River Bridge project are being leveraged to present a Team to VDOT with a proven track record of effectively managing and delivering Design-Build projects for the Department. These examples of corporate partnership combined with the professional relationship enjoyed by Charlie Stokes, the DBPM and Mike Russell, the DM that dates back to the early 1990’s, further illustrates the mutual respect and ability to partner that the team members have firmly in place. The Orders Design-Build Team has fully embraced the Design-Build program that has evolved over the past several years with VDOT and is a proven leader in the Design-Build arena in Virginia.
Letter of Submittal and Attachments Page 9 Section 4.2.1 Organizational Chart and Narrative
Replacement of I-81 Structures 18942 & 18944 over Rte. 808 Halls Bottom Rd. and Sinking Creek
ORGANIZATIONAL CHART
Letter of Submittal Attachment Page 10 Section 4.2.4.2 Schedule Narrative
Replacement of I-81 Structures 18942 & 18944 over Rte. 808 Halls Bottom Rd. and Sinking Creek
PROPOSAL SCHEDULE NARRATIVE The Orders Construction team has developed a Proposal Schedule Narrative that describes our plan to execute the work in accordance with the Contract Documents. The narrative also provides a description and explanation of the Critical Path and assumptions relative to productivity and critical activities. Project Milestones
Key Milestone Milestone Date CTB Approval/Notice of Award March 25, 2016 DB Contract Execution April 20, 2016 Notice to Proceed May 24, 2016 Scope Validation Period Complete September 20, 2016 Begin Construction Activities August 4, 2016 Final Completion September 4, 2018
Work Breakdown Structure The Work Breakdown Structure (WBS) is a multi-level, hierarchical arrangement of the work to be performed on the project. The Orders Construction Team has laid out the WBS to enable identification of design and construction phases of the project. Design is broken down into various components such as Geotechnical, Survey, Permitting, 60% Design, Final Design, etc. Construction is subdivided into median work, north bound bridge work, south bound bridge work, and final pavement. Additionally, an activity coding structure will be utilized in the project schedule to facilitate the organization of the CPM schedule data output in respective disciplines. Calendars
Calendar Non-Work Period 7 Day Calendar Standard 5 day work week with holidays Standard Construction Calendar w/ weather and holidays
Paving Calendar November 20 – March 19 The Orders Construction Team’s approach to adverse weather differs depending on the type of work being performed. Project durations are based on working five 10-hour days with 4 weather impacted days per month for construction activities. Paving is restricted based on anticipated acceptable temperatures for asphalt placement. Admin and Design activities occur on a 5 day work week taking into consideration VDOT holidays. This approach for construction activities yields 48 weather days per year excluding paving operations. Since most bridge activities can continue immediately after impacting weather ceases, Orders has found that anticipating 4 weather days per month is a good average for most projects. In addition, Saturdays will be utilized as make-up days should weather impacts exceed the expected. Plan and Strategy Design will begin immediately upon notice of intent to award. The design phase includes investigative activities such as supplemental field surveys, geotechnical borings and laboratory analysis, and scope validation. Preparation of roadway and bridge plans including preliminary engineering, final plan development, hydrologic and hydraulic analysis, drainage and stormwater management design, development
Letter of Submittal Attachment Page 11 Section 4.2.4.2 Schedule Narrative
Replacement of I-81 Structures 18942 & 18944 over Rte. 808 Halls Bottom Rd. and Sinking Creek
of the Transportation Management Plan, and an Advance Work Package. The schedule includes time for VDOT review and approval of plans and reports and the release for construction plans. Other activities performed in the design phase include environmental permitting, utility delineation and coordination, and meeting with the Board of Supervisors for Halls Bottom Road closure. Upon receipt of the notice to proceed, the design and construction teams will work on scope validation in conjunction with VDOT. During this time frame, field work and initial coordination of construction permits will begin. These permits include the VSMP permit, Water Quality Permit, and FAA approval. Development of final construction documents will begin at that after 60% plans have been reviewed by VDOT. At this point, the final details will be included in the documentation for each permit and the construction permits will be obtained. There will be an Advance Work Package developed for the project that will allow the Team to begin working on the grading of the median for the temporary traffic shifts. Once this Advance Work Package has been reviewed by VDOT with the 60% plans, construction operations will commence, which begins with mobilization, initial MOT, and initial E&S. The Team will then begin work on modifications required to the median to allow the temporary shift of traffic that will be utilized at different times by both north bound and south bound traffic as each of those respective bridges are constructed in sequence. Upon issuance of the RFC Bridge Plans, the Team will begin constructing the median bridge that will be required for the temporary shift of traffic to the median for the NB and SB bridge construction. Upon completion of that median bridge and grading work, the NB traffic will be switched to the median while the existing NB bridge is demolished and the new bridge is constructed. Grading, drainage, and paving work for the NB lanes will take place concurrently and will be paved through the intermediate course. NB traffic will then be switched back to the new NB bridge and lanes and SB traffic will be shifted to the median for SB bridge demolition an construction. Grading, drainage, and paving through the intermediate course for the SB lanes will occur concurrent to SB bridge construction. Upon completion of the SB bridge, SB traffic will be returned to current traffic patterns and final paving and pavement marking will take place for both NB and SB lanes. The Team will then perform final clean-up and punch list activities, demolish the temporary median work that had been used for NB and SB traffic shifts, and then demobilize. Critical Path The critical path of the project is shown on the included schedule. It includes various pre-construction activities and then is generally controlled by the various bridge construction activities ending with the final paving and pavement markings, clean-up and demolition of the temporary median work and finally demobilization. Schedule Management The Orders Construction Team will coordinate the scope of all project related activities to establish a timely critical path method (CPM) job schedule that will help ensure on-time completion and identify potential risks. Project controls will be centralized in the local project office. The Design-Build Project Manager is responsible for the implementation of the project controls system. Upon award of the contract, the Team will plan and schedule the entire project based on the conceptual design drawings. To control time spent on activities, we will develop a detailed, time-phased CPM project schedule, prepared with timelines outlined within the scope of work.
Letter of Submittal Attachment Page 12 Section 4.2.4.2 Schedule Narrative
Replacement of I-81 Structures 18942 & 18944 over Rte. 808 Halls Bottom Rd. and Sinking Creek
The schedule will identify the necessary procurement and construction activities for each phase of the project. Various calendars will be incorporated into the project schedule to reflect holidays, seasonal work, owner requirements, etc. The activities within the CPM schedule will be organized according to a WBS that has been developed for the project. An Activity Coding Structure will be used in the project schedule to organize data output. The project schedule will be the tool used for coordination of activities and crews. Schedule updates will also be used by the DB Project Manager to review progress, identify areas of potential concern, and coordinate efforts of team members. Detailed schedules are used to plan and monitor specific items of work and will be prepared as necessary to deal with individual work packages and activities as needed. As work progresses, start dates, finish dates, percent complete, and remaining durations will be updated to report progress of each work activity. The Team will update the schedule on a monthly basis, review the results internally and with the Owner, and prepare the required reports for submission. When changes or unforeseen conditions arise that impact the project schedule, the Team will immediately notify VDOT and begin incorporating changes into the “living” CPM schedule. If changes to any activity or phase in the schedule results in schedule impacts, the DB Project Manager will develop a detailed Schedule Impact Analysis for submission and review by VDOT. The Team will utilize the schedule to monitor project progress and implement recovery measures when needed to keep the project on track. The Orders Construction Team is committed to meeting or improving upon the proposed schedule to better serve VDOT, the stakeholders, and the traveling public. The Orders Team has developed a Proposal Schedule and Narrative that demonstrates our understanding of the project and the interrelationships of all project elements. It takes into account internal plan reviews, VDOT plan reviews and approvals, environmental permitting, fabrication time, and construction activities in accordance with the requirements of the RFP.
March 7, 2016 ORIGINAL
VOLUME 2: Roadway and BridgeDesign Concept Plans and Proposal Schedule
I-81 Over Maury River
Exis ng I-81 Structures
Exis ng I-81 Structures
Exis ng I-81 Structures A Design-Build ProjectReplacement of I-81
Structures 18942 & 18944Over Route 808 Halls Bottom Road and Sinking Creek
Washington County, VirginiaState Project No.: 0081-095-038, P101, RW201, C501, B675, B676
Federal Project No.: IM-081-1(342)Contract ID Number: C00107116DB85
In Conjunction With:
In Association With:
Submitted By:
TO: BRISTOL, VA TO: ABINGDON, VA
RTE. I-81 NB
RTE. I-81 SB
(RTE. 808)
HALLS
BOTT
OM
RO
AD
SINKIN
G CREEK
135
100
105
11511
0 120
125 130
RTE. I-81 SB
RTE. I-81 NB
THESE PLANS ARE UNFINISHED
AND UNAPPROVED AND ARE NOT
TO BE USED FOR ANY TYPE
OF CONSTRUCTION OR THE
ACQUISITION OF RIGHT OF WAY.
111+89.8
9
ST
ATIO
N
125+3
8.8
4
ST
ATIO
N
PROJECT 0081-096-038, P101, C501
118+4
8.9
1
ST
ATIO
N
120+2
7.7
7
ST
ATIO
N
B675, B676
PROJECT 0081-096-038,
1348.95
1348.95
1348.95
178.86
178.86
0.034
0.034
0.255
0.255
0.255
1170.09
1170.09
1170.09 0.221
0.221
0.221
4PLAN SHEET (FUTURE WIDENING)3APROFILE SHEET3PLAN SHEET2ATYPICAL SECTIONS1TITLE SHEET
INDEX OF SHEETS
ADT (2012)
ADT (2041)
V (MPH)
REVISED
STATE LINECOUNTY LINECITY,TOWN OR VILLAGERIGHT OF WAY LINEFENCE LINEUNFENCED PROPERTY LINEFENCED PROPERTY LINEWATER LINESANITARY SEWER LINEGAS LINEELECTRIC UNDERGROUND CABLETRAVELED WAYGUARD RAILRETAINING WALLRAILROADSBASE OR SURVEY LINE
LEVEE OR EMBANKMENTBRIDGESCULVERTSDROP INLETPOWER POLESTELEPHONE OR TELEGRAPH POLESTELEPHONE OR TELEGRAPH LINESHEDGETREESHEAVY WOODSGROUND ELEVATIONGRADE ELEVATION
CONVENTIONAL SIGNS
30
30
+50
DATUM LINE
DATUM LINE
173
175
T/Tg
E
6" W
8" S
4" G
PLPL
SCALE
FUNCTIONAL CLASSIFICATION AND TRAFFIC DATA
D (%) (design hour)
T (%) (design hour)
1
WHERE OTHERWISE NOTED.
THE ORIGINAL APPROVED TITLE SHEET(S), INCLUDING ORIGINAL
SIGNATURES, ARE FILED IN THE VDOT CENTRAL OFFICE PLAN LIBRARY.
ANY MISUSE OF ELECTRONIC FILES, INCLUDING SCANNED SIGNATURES,
IS ILLEGAL AND ENFORCED TO THE FULL EXTENT OF THE LAW.
ALL CURVES ARE TO BE SUPERELEVATED, TRANSITIONED AND
DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION
AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT.
THIS PROJECT IS TO BE CONSTRUCTED IN ACCORDANCE WITH THE
FOR SECTION NUMBERS)
(SEE TABULATION BELOW
STATE
PROJECT
NO.
SECTIONEQUALITIES
FEET
LENGTH INCLUDINGFEDERAL AID
PROJECT NO.FEET FEETMILES MILES
LENGTH EXCLUDINGTYPE
PROJECTDESCRIPTIONBRIDGE(S) BRIDGE(S)TYPE
CODE
UPC
NO.
BRIDGE
PROJECT
NO.
TIER 2 PROJECT
AND BRIDGE STANDARDS, 2009 MUTCD, 2011 VIRGINIA SUPPLEMENT TO
THE MUTCD, 2011 VIRGINIA WORK AREA PROTECTION MANUAL AND AS
AMENDED BY CONTRACT PROVISIONS AND THE COMPLETE ELECTRONIC
PDF VERSION OF THE PLAN ASSEMBLY.
DEPARTMENT'S 2007 ROAD AND BRIDGE SPECIFICATIONS, 2008 ROAD
SIGNATURES AND THE OFFICIAL PLAN ASSEMBLY IN ELECTRONIC
AS AWARDED, HAS BEEN SEALED AND SIGNED USING DIGITAL
FORMAT IS STORED IN THE VDOT CENTRAL OFFICE PLAN LIBRARY,
INCLUDING ALL SUBSEQUENT REVISIONS, WILL BE THE OFFICIAL
CONSTRUCTION PLANS. FOR INFORMATION RELATIVE TO ELECTRONIC
FILES AND LAYERED PLANS, SEE THE GENERAL NOTES.
THE COMPLETE ELECTRONIC PDF VERSION OF THE PLAN ASSEMBLY
STATEFEDERAL AID STATE
PROJECT PROJECTROUTE
VA.
APPROVED FOR CONSTRUCTION
DATE
PROJECT SHEET NO.
VIRGINIA
SIC SEMPER TYRANNIS
SHEET
NO.
3/4/2016
D107116001.dgn
Plotted By: awarren
11:35:01 AM
N:\DB45016\CADD\D107116001.dgn
1
CHIEF ENGINEER
PR
OJE
CT
MA
NA
GE
R
SU
RV
EY
ED
BY,
DA
TE
DE
SIG
N
BY
DEPARTMENT OF TRANSPORTATION
PLAN AND PROFILE OF PROPOSED
STATE HIGHWAY
DEPARTMENT OF TRANSPORTATION
PLAN AND PROFILE OF PROPOSED
STATE HIGHWAY
VIRGINIA
SIC SEMPER TYRANNIS
COMMONWEALTH OF VIRGINIA
DATE
RECOMMENDED FOR APPROVAL
DATE
DATE
VDOT PROJECT MANAGER
(DESIGN-BUILD FIRM) PROJECT MANAGER
DATE (DESIGN-BUILD FIRM) DESIGN MANAGER
FOR CONSTRUCTION
OR PPTA PROGRAM MANAGER
VDOT DISTRICT CONSTRUCTION ENGINEER
DATE
APPROVED FOR RIGHT OF WAY ACQUISITION
DATE
RECOMMENDED FOR APPROVAL
DATE
DATE
VDOT PROJECT MANAGER
(DESIGN-BUILD FIRM) PROJECT MANAGER
DATE (DESIGN-BUILD FIRM) DESIGN MANAGER
FOR RIGHT OF WAY ACQUISITION
DATE
CHIEF ENGINEER
CHIEF OF POLICY
OR PPTA PROGRAM MANAGER
VDOT DISTRICT CONSTRUCTION ENGINEER
0
Copyright 2015, Commonwealth of Virginia
SU
BS
UR
FA
CE
UTILIT
Y
BY,
DA
TE
WIDENED IN ACCORDANCE WITH STANDARD TC-5.11 ULS, EXCEPT
81
200' 400'
Population WASHINGTON COUNTY 54,876 (2010 Census)
0081-095-038
P101
C501
RW201
B675
B676
IM-081-1(342)
IM-081-1(342)
IM-081-1(342)
IM-081-1(342)
IM-081-1(342)
107116
107116
107116
107116
107116
PENG
ROWA
1000
XXXX
XXXX
TO: 1.83 MILES SOUTHWEST OF RTE. 611 SPRING CREEK RD.
FROM: 0.94 MILES NORTHEAST OF RTE. F310
CREEK RD.
TO: 1.83 MILES SOUTHWEST OF RTE. 611 SPRING
FROM: 0.94 MILES NORTHEAST OF RTE. F310
BOTTOM ROAD (RTE. 808)
BRIDGES CARRYING RTE I-81 OVER HALLS
PREL. ENG.
BRIDGE
BRIDGE
R/W
CONSTR.
Project Lengths are based on Rte. I-81 Construction Baseline.
Fr: 0.94 MILES NORTHEAST OF RTE. F310
To: 1.83 MILES SOUTHWEST OF RTE. 611 SPRING CREEK RD.
46,066
72,000
DHV (2041) 7,200
75 MPH
22%
50%
RURAL PRINCIPAL ARTERIAL (GS-1)
GEOPAK Computer Identification No. 107116
DESIGN PACKAGE (GEOPAK).
THIS PROJECT WAS DEVELOPED UTILIZING THE DEPARTMENT'S ENGINEERING
DESIGN-BUILD PROJECT
OVER RTE. 808 (HALLS BOTTOM RD.) AND SINKING CREEK
REPLACEMENT OF I-81 STRUCTURES 18942 & 18944
WASHINGTON COUNTY
John Sproles, V
DO
T
Whit
man, R
equardt, &
Associates
FOR INDEX OF SHEETS SEE THIS SHEET
P101
0081-095-038
0081-095-038
73.71'
46.06'
3
Page 13
0
SCALE
5' 10'
Point of Finished Grade
12'
75 MPH
30' Clear Zone
75 MPH
30' Clear Zone
Point of Finished Grade
Point of Finished GradePoint of Finished Grade
12' 6'
4' Paved
12' 12'6' 12' Paved
4' Paved
75 MPH
30' Clear Zone
75 MPH
30' Clear Zone
I-81 over Halls Bottom Road (Southbound)
I-81 over Halls Bottom Road (Northbound)
LProp. Rte. I-81 SB Constr. B
LProp. Rte. I-81 NB Constr. B
Rural Principal Arterial (Freeway) - 75 MPH Design Speed - VDOT Standard GS-1
Rural Principal Arterial (Freeway) - 75 MPH Design Speed - VDOT Standard GS-1
See Inset 'B'
See Inset 'B'
Approx. Rte. I-81 Constr. BL
(I-81 BUILD)
TYPICAL SECTIONS
Std. GS-11Std. GS-11
Std. GS-11Std. GS-11
12' Paved Shoulder
Varies
Varies
6:1
2'
GR-2A
3.1%3.1%
Sta. 218+54.31 to Sta. 219+94.26
Note: Bridge NBL Construction BL
Sta. 318+83.40 to Sta. 220+22.00
Note: Bridge SBL Construction BL
2'
LApprox. Rte. I-81 Constr. B
6:1
Northbound Section Shows Typical Condition without Guardrail
Southbound Section Shows Typical Condition with Guardrail
Station 320+22.00 to Station 322+58.81
Station 314+83.87 to Station 318+83.40
Northbound Section Shows Typical Condition without Guardrail
Southbound Section Shows Typical Condition with Guardrail
Station 219+94.26 to Station 222+39.97
Station 214+80.56 to Station 218+54.31
3.1%3.1%
THESE PLANS ARE UNFINISHED
AND UNAPPROVED AND ARE NOT
TO BE USED FOR ANY TYPE
OF CONSTRUCTION OR THE
ACQUISITION OF RIGHT OF WAY.
2:1 (S
EE NOT
E 3)
123
4
Mainline Shoulder
2" Asphalt Concrete Surface Course, Type SM-12.5E @ 220 LBS/SY1
4
3
2
5
10" Asphalt Concrete Base Course, Type BM-25.0A
2" Asphalt Concrete Intermediate Course, Type IM-19.0E @ 230 LBS/SY
12" Aggregate Material #1
5
Inset 'B'
and profile sheets for details of superelevation transitions.
4. Maximum superelevation of 3.1% shown on typicals; see plan
reinforcement.
Sta. 217+93 (Northbound) will have a slope of 1.5:1 with geogrid
3. Sta. 315+00 to Sta. 318+53 (Southbound) and Sta. 216+00 to
2. Benching required at sliver fill locations.
typical section to match the proposed bridge.
1. The I-81 Build typical section will transition to the I-81 Future
NOTES:
12" + 2" Aggregate Base Material, Type 1, No. 21B.
6:1
GR-2
plastic/elastic embankment soils shall be required.
NOTE: Subgrade preparation and reworking of the upper 2 ft of the existing
2A
2A
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
3/4/2016
PROJECT MANAGER
SURVEYED BY
DESIGN SUPERVISED BY
DESIGNED BY
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
awarren
View:
Printer:
Creator:
P101, RW201, C501
81Whitman, Requardt, & Associates
Mike Russell, P.E.
John Sproles, VDOT
0081-095-038
0081-095-038
Page 14
DB638 PG696
13.78 AC.
Tax# 143-A-25
PB32 PG60
PB55 PG30
1.43 AC.
Tax# 143-A-7
PB55 PG30
1.43 AC.
Tax# 143-A-7
PB55 PG30
1.43 AC.
Tax# 143-A-7
ELSHAMLY ABDELFATTAH
FELECIA ABDELFATTAH
W/
Guy
138 6
BV
U #954-
Power Pole
#7
Tele. Pole
WV
T
#AP-1901 14
65-8
Tele. Ped.
WV
Valve
Blow
off
ValveBlo
woff
183.6
8'
RT
+80.6
4IR
F
183.7
0'
RT
+78.7
2IR
F
183.9
6'
RT
+63.9
5IR
F
46.9
1' RT
+45.8
6V
DH
Mon.
10.95' RT
+85.47
VD
H
Mon.
115.9
6' LT
+54.14
VD
H
Mon.
(B)(A)
(C)(D)
(D) Inv. Out = 1930.88'
(C) Inv. Out = 1930.65'
(B) Inv. In = 1930.51'
(A) Inv. In = 1930.63'
24" Metal Pipe
In Pl. 20.5' Of Twin
(A)(B)(C)
(D)(E)
(F)
Inv. Out = 1926.54'
Inv. In = 1928.62'
In Pl. 64.5' Of 30" Conc. P
ipe
In Pl. F
ES
15" RCP
Conc.
Ditch
Rip Rap
Sig
n
Sig
n
Mixed Medium Hardwoods
Metal Guardrail
Metal Guardrail
Metal Guardrail
Metal Guardrail
Interstate 81 SBL (Asphalt)
Interstate 81 NBL (Asphalt)
Interstate 81 SBL (Asphalt)
Interstate 81 NBL (Asphalt)
Brush
Conc. Ditch
Conc. Ditch
Rte. 808
Halls B
otto
m Rd. (Asp
halt)
Rte. 8
08 Halls Botto
m
Rd. (
Asphalt)
Gate
Metal Guardrail
Metal Guardrail
Conc.
Conc.
Sinking Creek
Sin
kin
g Creek
Sinking Cree
k
Sin
kin
g Creek
Sig
n
Hardwoods
Mixed Medium
Hardwoods
Mixed Medium
36"
Waln
ut
24"
Waln
ut
12"
Waln
ut
10" T
win
Waln
ut
Asphalt
Shed
Brush
Grass
Conc. Ditch
Conc. Ditch
Conc. Ditch
Brush
Grass Median
Brus
h
Mixe
d Me
dium
Hard
woods
Metal Guardrail
Metal Guardrail
Metal Guardrail (2)
Metal Guardrail
F-022 Singingwood Lan
e (Asphalt)
F-022 Singing
wood
Lane (
Asphalt)
Rte. 1010
Hedgerow
Hill (
Asphalt)
Grass Median
Brush
Brush
Conc. Ditc
h
and BrushMixed Small Hardwoods
Brush
Conc. Ditch
Conc. Ditch
Sig
n
Sig
n
Sig
n
Metal
Guardrail
Brush
Mixed Medium Hardwoods Brush
Grass Median
4' Wire Fence
Metal Guardrail
Asphalt Shoulder
Asphalt Shoulder
Asphalt Shoulder
Asphalt Shoulder
Conc. Ditch
Sig
n
4' Wire Fence
4' Wire F
ence
Metal Guardrail
Metal Guardrail
Conc. Ditch
Brush
4' Wire Fence
4' Wire
Fence
4' B
arbed
Wire F
ence
And BrushMixed Medium Hardwoods
And BrushMixed Me
dium Hardwoods
And BrushMixed Me
dium Hardwoods
4' Wire Fence
4' Wire Fence
Wire F
ence
4' Bar
bed
4' B
arbed
Wire
Fence
Gravel
4' Bar
bed
Wire
Fence
Conc. Ditc
h
And BrushMixed Medium Hardwoods
And Brush
Mixed Medium Hardwoods
Grass
Conc. Ditch
and BrushMixed Small Hardwoods
4' Barbed Wire Fence
4' Barbed
Wire Fenc
e
Sign
Conc.
Spring
and Brush
Mixed S
mall Har
dwoods
Metal Guardrail
4'
Wire Fence
Gravel
Grass
Grass
4' Wire Fence
4' Wire Fence
Wire Fence
4' Barbed
Asphalt Shoulder
Asphalt Shoulder
Asphalt Shoulder
Asphalt Shoulder
4' Wire Fence
4'
Wire Fence
Sig
n
4'
Wire Fence
Metal Guardrail
Spring
Mixed Medium Hardwoods
4' Wire Fence
Sig
n
Post
Post
Sign
Asphalt Shoulder
DeckBridgeConc.
DeckBridgeConc.
SignSign
26" Maple
Sign
VD
OT
Superstr
ucture #2041
With Steel
Guardrail A
nd
Metal
Rails,
Piers,
Concrete Parapet
Walls
Of 5 Steel I-
Bea
ms, 3
Concrete
Concrete Brid
ge Deck, 4 Spans
VDOT Superstructure #2040With Steel Guardrail And Metal Rails,Piers, Concrete Parapet WallsOf 5 Steel I-Beams, 3 ConcreteConcrete Bridge Deck, 4 Spans
Conc. Pier
Conc. Pier
Conc. Pier
Con
c. Pier
Con
c. Pier
Con
c. Pier
Con
c. Abutm
ent
Conc.
Abutm
ent
Conc.
Abutm
ent
0.5' Conc. Curb
0.5' Conc. Curb
0.5' Conc. Curb
0.5' Conc. Curb
0.5' Conc. Curb
0.5' Conc. Curb
0.5' Conc. Curb
0.5' Conc. Curb
Con
c.
Conc.
92.83' LT
+28.68
VDH
Mon.
Sinking Creek
Stream Tra
verse
Creek
Conc. Wingwall
Conc. WingwallConc. Wingwall
Conc.
Win
gwall
Conc.
Win
gwall
Conc.
Win
gwall
ProtectionSlope Conc.
ProtectionSlope Conc.
ProtectionSlope Conc.
ProtectionSlope Conc.
Conc. Slope Protection
23
24
25
26
27 28 29 30 31 3
2
33 34
35
36
37
38
=
02°5
4'4
6" Lt.
PI 2
7+0
7.4
6
=
01°45'3
6" Lt.
PI 3
4+2
0.5
9
Interstate 81 - Survey Baseline
Interstate 81 - Survey Baseline
Interstate 81 - Survey Baseline
61
62
63
64
65
66
67
68
69
70
71
Begin Sin
kin
g Creek Strea
m
Traverse
PO
T 60+0
0.0
0
End Sinking Creek Stream
Traverse
POT 72+18.07
=6
3°3
0'2
9"Rt.
PI 66+8
6.60 Sin
kin
g Creek Strea
m
Traverse
PI 3
0+19.2
6 Interstate 81 Survey Baseline
=11°37'54" Rt.
PI 67+96.44
=5
6°5
5'0
5"Lt.
PI 6
4+8
3.18
the Survey Limits.
Appear to be Outside
Box and Drainfield
The Distrubution
#59-123 (1959)
Septic Plan
Unable to Draw
and Septic Records.
Unable to Obtain Well
and Septic Records.
Unable to Obtain Well
61.10' R
T+9
7.6
6V
DH
Mon.
51.5
8' R
T+4
1.91
VD
H
Mon.
24.47' LT
+48.16VDH
Mon.
346.93' RT
+69.69
VDH
Mon.
152.07' LT+04.01VDH Mon.
331.5
3' L
T+7
4.5
6V
DH
Mon. (B
roken)
78.2
0' R
T+3
3.2
7V
DH
Mon. (B
roken)
Abutm
ent
Con
c.
Gravel Road
8" DogwoodSig
n
Conc. Wall
Conc.
Win
gwall
End Parapet Wall
End Parapet Wall
End Parapet Wall
End Parapet Wall
End Parapet Wall
End Parapet Wall
End Parapet Wall
10.86' RT
+65.18
BM #1
Metal Guardrail
Conc. Ditch (Buried)
Fr. Dwl.
1 -1/2 Sty.
#20214
N55°09'20"E 95.16'
N41°56'35"E 200.32'
N68°15'51"E 225.61'
N32°58'
24"E 165
.28'
(F) In
v.
Out
= 19
27.6
6'
(E) In
v.
Out
= 19
27.5
9'
(D) In
v.
Out
= 19
27.5
8'
(C) In
v. In =
1928.2
4'
(B) In
v. In =
1928.2
5'
(A) In
v. In =
1928.2
3'
VD
OT #2081
72"
X 72"
Box
Culvert
In Pl. 6
5.0'
Of Triple
Conc. Ditch CL (Fille
d with
Rock)
Conc. Ditch CL
(Filled with R
ock)
Inv. In = 1951.97'In Pl. Headwall
Inv.
Out
= 19
48.0
1'In Pl. 8
7.9'
Of 18
" Conc. Pip
e
#6433
VDOT Bridge
Conc. Wingwall
No. 0081-095
-014, (A6830)Per R
oute 81, VDOT Pr
ojectEx. Lim
ited Access
Line
No. 0081-0
95-014, (A
6830)
Per Rout
e 81, VDOT P
roject
Ex. Limite
d Access
Line
No. 0081-095-014, (A6830)
Per Route 81, VDOT Project
Ex. R/W And Limited Access Line
No. 0081-095-014, (A6830)Per Route 81, VDOT ProjectEx. R/W And Limited Access Line
Project No. 0
081-095-014, (A6830)
Ex. R/
W Per R
oute 8
1, V
DOT
Proje
ct No. 0
081-0
95-01
4, (A6
830)
Ex. R/W
Per R
oute 8
1, VDOT
No. 00
81-095
-014, (
A6830)
Per Ro
ute 81, VDOT
Proj
ect
Ex. Li
mited
Access Li
ne
Project No. 0081-095-014, (A6830)
Ex. R/
W Per R
oute 8
1, V
DOT
Project N
o. 00
81-09
5-014, (A
6830)
Ex. R/W
Per
Route 8
1, VDOT
No. 0081-095-014, (A6830)
Per Route 81, VDOT Project
Ex. R/W And Limited Access Line
PL
PL
PL
PL
PL
PL
PL
PL
PL
Approx. Location Per GIS
Approx. L
ocation Per GIS
Approx. L
ocation Per GIS
Approx. Location Per GIS
Approx. Location
Per
GIS
Approx. Location
Per
GIS
Approx. Location Per GIS
R/
W-2
R/W-1
R/
W-2
R/W-1
6' Cattle Pass
6' Cattle Pass
ROADWAY ENGINEER
Richmond, Virginia
Whitman Requart & Associates
HYDRAULIC ENGINEER
Richmond, Virginia
Whitman Requart & Associates
REFERENCES
( PROFILES, DETAIL & DRAINAGE
DESCRIPTION SHEETS, ETC. )
3
3
0
SCALE
50' 100'
LEGEND
Denotes Construction Limits in Cuts
Denotes Construction Limits in Fills
C
F
Denotes Proposed Pavement
Denotes Demolition of Pavement
Note : Figures in brackets and dot - dashed linesdenote Permanent Easements.
Note : Figures in parenthesis and dot - dot - dashedlines denote Temporary Easements.
THESE PLANS ARE UNFINISHED
AND UNAPPROVED AND ARE NOT
TO BE USED FOR ANY TYPE
OF CONSTRUCTION OR THE
ACQUISITION OF RIGHT OF WAY.
Denotes Pavement Planing and Build-Up
Future Widening
Mainline Profile
4
3A
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
3/4/2016
PROJECT MANAGER
SURVEYED BY
DESIGN SUPERVISED BY
DESIGNED BY
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
awarren
View:
Printer:
Creator:
0081-095-038
P101, RW201, C501
81
0081-095-038
Whitman, Requardt, & Associates
Mike Russell, P.E.
John Sproles, VDOT
(Dry Swale - Level 1 Design)
Stormwater Management Facility Req'd.
UD-4 (6") Underdrain Req'd.
UD-4 (6") Underdrain Req'd.
(Dry Swale - Level 1 Design)Stormwater Management Facility Req'd.
GRADE TO DRAIN
GRADE TO DRAIN
L
L L
L
L
L
ST'D. GR-2A REQ'D.
ST'D. GR-2A REQ'D.
ST'D. GR-2A REQ'D.
ST'D. GR-11 REQ'D.
ST'D. GR-11 REQ'D.
ST'D. GR-9 REQ'D.
ST'D. GR-11 REQ'D
ST'D. GR-9 REQ'D.
Sta. 124+11.12, Offset = 32.24' RT Rte I-81 Constr. B
Sta. 224+25.00 Rte. I-81 NB Constr. B
End Construction
Sta. 125+38.84, Offset = 31.32' LT Rte I-81 Constr. B
Sta. 325+25.00 Rte. I-81 SB Constr. B
End Construction
Sta. 112+50.43, Offset = 43.32' LT Rte I-81 Constr. B
Sta. 312+42.00 Rte. I-81 SB Constr. B
Begin Construction
Sta. 111+89.89, Offset = 43.37' RT Rte I-81 Constr. B
Sta. 211+98.00 Rte. I-81 NB Constr. B
Begin Construction
REQ'D.
ST'D. MB-3A
REQ'D.
ST'D. MC-3BREQ'D.
ST'D. MC-3B
EXISTING GUARDRAIL
REMOVE AND REPLACE
Curve SBBL301-1
PI = 312+10.93
T = 1,210.93'
L = 2,402.00'
R = 7,664.00'
300+00.00PC =
PT = 324+02.00
Curve NBBL201-1
PI = 211+04.46
T = 1,194.46'
L = 2,369.86'
R = 7,664.00'
199+10.00PC =
PT = 222+79.86
Curve BL101-1
PI = 111+38.61
T = 1,238.61'
L = 2,455.97'
R = 7,664.00'
99+00.00PC =
PT = 123+55.97
Northbound I-81 Constr. B
Southbound I-81 Constr. B
212
213
214
215
216
217
218
219
220
221
222
PT222
+79.8
6223
224
225
226
227
311
312
313
314
315
316
317
318
319
320
321
322
323
324
PT324+0
2.0
0
325
326
327
111
112
113
114
115
116
117
118 119
120 121
122
123 PT12
3+5
5.9
7
124 125 12
6 127
GUARDRAIL
EXISTING
TIE TO
GUARDRAIL
TIE TO EXISTING
TYPE I REQ'D.
ST'D. GR-FOA-2,
Lr = 98'
V = 75 MPH
E= 3.1%
Lr = 98'
V = 75 MPH
E= 3.1%
Lr = 98'
V = 75 MPH
E= 3.1%
GUARDRAIL
TIE TO EXISTING
TERMINAL
ST'D. MB-3A
TYPE I REQ'D.
ST'D. GR-FOA-2,
REQ'D.
ST'D. MC-3B
PROTECTION
PROP. PIER
TYPE I REQ'D.
ST'D. GR-FOA-2,
REQ'D.
ST'D. GR-11
TYPE II REQ'D.
ST'D. GR-FOA-2,
REQ'D.
ST'D. MC-3BREQ'D.
ST'D. GR-2A
TYPE II REQ'D.
ST'D. GR-FOA-2,
ST'D. GR-11 REQ'D.
CLASS I RIPRAP
12'
12'
12'
4'
12'
12'
12'
4'4'
12'
12'
12'
12'
12'
12'
4'
TYPE I REQ'D.
ST'D. GR-FOA-2,
73.71'
46.06'
REQ'D.
ST'D. GR-2
ROBERT C. FULLER
DON G. QUESENBERRY
LAURA MILDRED H. QUESENBERRY
LAURA H. QUESENBERRY
LAURA H. QUESENBERRY
LAURA H. QUESENBERRY
Page 15
1,920_
1,925_
1,930_
1,935_
1,940_
1,945_
1,950_
1,955_
1,960_
1,965_
1,970_
1,975_
1,980_
1,985_
Rte. I-81 Northbound Profile
Rte. I-81 Southbound Profile
1,930_
1,935_
1,940_
1,945_
1,950_
1,955_
1,960_
1,965_
1,970_
1,975_
1,980_
1,985_
1,990_
1,995_
1,935_
1,940_
1,945_
1,950_
1,955_
1,960_
1,965_
1,970_
1,975_
1,980_
1,985_
1,990_
1,995_
1,930_
1,920_
1,925_
1,930_
1,935_
1,940_
1,945_
1,950_
1,955_
1,960_
1,965_
1,970_
1,975_
1,980_
1,985_
3A
3A
THESE PLANS ARE UNFINISHED
AND UNAPPROVED AND ARE NOT
TO BE USED FOR ANY TYPE
OF CONSTRUCTION OR THE
ACQUISITION OF RIGHT OF WAY.
00
3/4/2016
d107116003a.dgn
Plotted By: awarren11:35:23 AM
N:\DB45016\CADD\d107116003a.dgn
PROJECT MANAGER
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
PROJECT SHEET NO.
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
P101, RW201, C501
81
ROADWAY ENGINEER
Richmond, Virginia
Whitman, Requardt & Associates
50'
10'
VERT. 1"=10'HOR. 1"=50'
SCALE:
Whitman, Requardt, & Associates
John Sproles, VDOT
0081-095-038
0081-095-038
LL
1,974.2
5 STA = 218+00.00
EL = 1,957.69
-2.75% +3.09%
L = 1,204.00
K = 206
ex = 8.79'
1,977.0
1
Sta. 224+25.00
End Constr. Rte. I-81 NB B
Sta. 211+98.00
Begin Constr. Rte. I-81 NB B
219+00.00 220+00.00 221+00.00 222+00.00 223+00.00 224+00.00 225+00.001,929.6
5
1,948.0
7
1,966.7
6
1,967.9
5
1,969.14
1,970.3
7
1,971.76
1,973.3
9
1,974.6
8
1,976.2
1
1,977.8
0
1,979.3
3
1,967.2
8
1,967.7
9
1,968.4
2
1,969.18
1,970.0
5
1,971.05
1,972.16
1,973.4
0
1,974.7
6
1,976.2
4
211+00.00 212+00.00 213+00.00 214+00.00 215+00.00 216+00.00 217+00.00
1,976.9
5
1,975.5
8
1,974.19
1,972.8
3
1,971.49
1,970.19
1,969.0
0
1,967.8
8
1,966.8
6
1,966.0
8
1,965.4
1
1,964.7
9
1,964.5
0
1,964.3
5
1,974.19
1,972.8
8
1,971.69
1,970.6
3
1,969.6
8
1,968.8
6
1,968.15
1,967.5
7
1,967.11
1,966.7
7
1,966.5
5
1,966.4
6
1,966.9
0
1,937.4
5
1,966.6
3
1,946.8
5
218+00.00
1,964.4
2
1,966.4
8
TRANSITION
+11.12
TRANSITIONNORMAL CROWN
+66.0
0
+28.0
0
SUPERELEVATE 3.1% TRANSITION
+47.19
+25.0
0
+42.0
0
End BridgeBegin Bridge
V = 75 MPH
L
L
1,972.4
3 STA = 318+06.00
EL = 1,958.36
-2.49% +2.98%
L = 1,128.00
K = 206
ex = 7.72'
1,979.7
2
1,972.2
3
1,971.06
1,970.0
2
1,969.0
9
1,968.2
9
1,967.6
1
1,967.0
5
1,966.6
1
1,966.2
9
1,966.10
1,966.0
2
1,966.0
7
1,966.2
4
1,966.5
2
1,966.9
3
1,967.4
7
1,968.12
1,968.8
9
1,969.7
9
1,970.8
1
1,971.95
1,973.2
1
1,974.5
9
1,976.0
5
1,977.5
1
1,978.9
8
312+00.00 313+00.00 314+00.00 315+00.00 316+00.00 317+00.00 318+00.00 319+00.00 320+00.00 321+00.00 322+00.00 323+00.00 324+00.00 325+00.00 326+00.00
1,974.7
6
1,973.5
1
1,972.2
2
1,970.9
6
1,969.7
4
1,968.5
2
1,967.2
9
1,966.3
6
1,965.4
9
1,964.8
7
1,964.3
3
1,963.9
1
1,963.6
0
1,963.5
5
1,956.5
7
1,938.3
0
1,935.18
1,937.5
9
1,957.8
1
1,967.2
2
1,968.4
4
1,969.8
9
1,971.55
1,973.17
1,974.6
0
1,976.0
5
1,977.5
1
1,978.9
9
1,980.4
5
1,981.93
Sta. 325+25.00
End Constr. Rte. I-81 SB B
SPLINE GRADE
Sta. 312+42.00
Begin Constr. Rte. I-81 SB B
TRANSITION
+42.0
0
+03.2
6
TRANSITIONTRANSITIONNORMAL CROWN SUPERELEVATE 3.1%
+96.0
0
+58.0
0
+69.3
3
+25.0
0
End BridgeBegin Bridge
V = 75 MPH
Page 16
183.6
8'
RT
+80.6
4IR
F
183.7
0'
RT
+78.7
2IR
F
183.9
6'
RT
+63.9
5IR
F
46.9
1' RT
+45.8
6V
DH
Mon.
10.95' RT
+85.47
VD
H
Mon.
115.9
6' LT
+54.14
VD
H
Mon.
(B)(A)
(C)(D)
(D) Inv. Out = 1930.88'
(C) Inv. Out = 1930.65'
(B) Inv. In = 1930.51'
(A) Inv. In = 1930.63'
24" Metal Pipe
In Pl. 20.5' Of Twin
(A)(B)(C)
(D)(E)
(F)
Inv. Out = 1926.54'
Inv. In = 1928.62'
In Pl. 64.5' Of 30" Conc. P
ipe
In Pl. F
ES
15" RCP
Conc.
Ditch
Rip Rap
Sig
n
Sig
n
Mixed Medium Hardwoods
Metal Guardrail
Metal Guardrail
Metal Guardrail
Metal Guardrail
Interstate 81 SBL (Asphalt)
Interstate 81 NBL (Asphalt)
Interstate 81 SBL (Asphalt)
Interstate 81 NBL (Asphalt)
Brush
Conc. Ditch
Conc. Ditch
Rte. 808
Halls B
otto
m Rd. (Asp
halt)
Rte. 8
08 Halls Botto
m
Rd. (
Asphalt)
Gate
Metal Guardrail
Metal Guardrail
Conc.
Conc.
Sinking Creek
Sin
kin
g Creek
Sinking Cree
k
Sin
kin
g Creek
Sig
n
Hardwoods
Mixed Medium
Hardwoods
Mixed Medium
36"
Waln
ut
24"
Waln
ut
12"
Waln
ut
10" T
win
Waln
ut
Asphalt
Shed
Brush
Grass
Conc. Ditch
Conc. Ditch
Conc. Ditch
Brush
Grass Median
Brus
h
Mixe
d Me
dium
Hard
woods
Metal Guardrail
Metal Guardrail
Metal Guardrail (2)
Metal Guardrail
F-022 Singingwood Lan
e (Asphalt)
F-022 Singing
wood
Lane (
Asphalt)
Rte. 1010
Hedgerow
Hill (
Asphalt)
Grass Median
Brush
Brush
Conc. Ditc
h
and BrushMixed Small Hardwoods
Brush
Conc. Ditch
Conc. Ditch
Sig
n
Sig
n
Sig
n
Metal
Guardrail
Brush
Mixed Medium Hardwoods Brush
Grass Median
4' Wire Fence
Metal Guardrail
Asphalt Shoulder
Asphalt Shoulder
Asphalt Shoulder
Asphalt Shoulder
Conc. Ditch
Sig
n
4' Wire Fence
4' Wire F
ence
Metal Guardrail
Metal Guardrail
Conc. Ditch
Brush
4' Wire Fence
4' Wire
Fence
4' B
arbed
Wire F
ence
And BrushMixed Medium Hardwoods
And BrushMixed Me
dium Hardwoods
And BrushMixed Me
dium Hardwoods
4' Wire Fence
4' Wire Fence
Wire F
ence
4' Bar
bed
4' B
arbed
Wire
Fence
Gravel
4' Bar
bed
Wire
Fence
Conc. Ditc
h
And BrushMixed Medium Hardwoods
And Brush
Mixed Medium Hardwoods
Grass
Conc. Ditch
and BrushMixed Small Hardwoods
4' Barbed Wire Fence
4' Barbed
Wire Fenc
e
Sign
Conc.
Spring
and Brush
Mixed S
mall Har
dwoods
Metal Guardrail
4'
Wire Fence
Gravel
Grass
Grass
4' Wire Fence
4' Wire Fence
Wire Fence
4' Barbed
Asphalt Shoulder
Asphalt Shoulder
Asphalt Shoulder
Asphalt Shoulder
4' Wire Fence
4'
Wire Fence
Sig
n
4'
Wire Fence
Metal Guardrail
Spring
Mixed Medium Hardwoods
4' Wire Fence
Sig
n
Post
Post
Sign
Asphalt Shoulder
DeckBridgeConc.
DeckBridgeConc.
SignSign
26" Maple
Sign
VD
OT
Superstr
ucture #2041
With Steel
Guardrail A
nd
Metal
Rails,
Piers,
Concrete Parapet
Walls
Of 5 Steel I-
Bea
ms, 3
Concrete
Concrete Brid
ge Deck, 4 Spans
VDOT Superstructure #2040With Steel Guardrail And Metal Rails,Piers, Concrete Parapet WallsOf 5 Steel I-Beams, 3 ConcreteConcrete Bridge Deck, 4 Spans
Conc. Pier
Conc. Pier
Conc. Pier
Con
c. Pier
Con
c. Pier
Con
c. Pier
Con
c. Abutm
ent
Conc.
Abutm
ent
Conc.
Abutm
ent
0.5' Conc. Curb
0.5' Conc. Curb
0.5' Conc. Curb
0.5' Conc. Curb
0.5' Conc. Curb
0.5' Conc. Curb
0.5' Conc. Curb
0.5' Conc. Curb
Con
c.
Conc.
92.83' LT
+28.68
VDH
Mon.
Sinking Creek
Stream Tra
verse
Creek
Conc. Wingwall
Conc. WingwallConc. Wingwall
Conc.
Win
gwall
Conc.
Win
gwall
Conc.
Win
gwall
ProtectionSlope Conc.
ProtectionSlope Conc.
ProtectionSlope Conc.
ProtectionSlope Conc.
Conc. Slope Protection
23
24
25
26
27 28 29 30 31 3
2
33 34
35
36
37
38
=
02°5
4'4
6" Lt.
PI 2
7+0
7.4
6
=
01°45'3
6" Lt.
PI 3
4+2
0.5
9
Interstate 81 - Survey Baseline
Interstate 81 - Survey Baseline
Interstate 81 - Survey Baseline
61
62
63
64
65
66
67
68
69
70
71
Begin Sin
kin
g Creek Strea
m
Traverse
PO
T 60+0
0.0
0
End Sinking Creek Stream
Traverse
POT 72+18.07
=6
3°3
0'2
9"Rt.
PI 66+8
6.60 Sin
kin
g Creek Strea
m
Traverse
PI 3
0+19.2
6 Interstate 81 Survey Baseline
=11°37'54" Rt.
PI 67+96.44
=5
6°5
5'0
5"Lt.
PI 6
4+8
3.18
the Survey Limits.
Appear to be Outside
Box and Drainfield
The Distrubution
#59-123 (1959)
Septic Plan
Unable to Draw
and Septic Records.
Unable to Obtain Well
and Septic Records.
Unable to Obtain Well
61.10' R
T+9
7.6
6V
DH
Mon.
51.5
8' R
T+4
1.91
VD
H
Mon.
24.47' LT
+48.16VDH
Mon.
346.93' RT
+69.69
VDH
Mon.
152.07' LT+04.01VDH Mon.
331.5
3' L
T+7
4.5
6V
DH
Mon. (B
roken)
78.2
0' R
T+3
3.2
7V
DH
Mon. (B
roken)
Abutm
ent
Con
c.
Gravel Road
8" DogwoodSig
n
Conc. Wall
Conc.
Win
gwall
End Parapet Wall
End Parapet Wall
End Parapet Wall
End Parapet Wall
End Parapet Wall
End Parapet Wall
End Parapet Wall
10.86' RT
+65.18
BM #1
Metal Guardrail
Conc. Ditch (Buried)
Fr. Dwl.
1 -1/2 Sty.
#20214
N55°09'20"E 95.16'
N41°56'35"E 200.32'
N68°15'51"E 225.61'
N32°58'
24"E 165
.28'
(F) In
v.
Out
= 19
27.6
6'
(E) In
v.
Out
= 19
27.5
9'
(D) In
v.
Out
= 19
27.5
8'
(C) In
v. In =
1928.2
4'
(B) In
v. In =
1928.2
5'
(A) In
v. In =
1928.2
3'
VD
OT #2081
72"
X 72"
Box
Culvert
In Pl. 6
5.0'
Of Triple
Conc. Ditch CL (Fille
d with
Rock)
Conc. Ditch CL
(Filled with R
ock)
Inv. In = 1951.97'In Pl. Headwall
Inv.
Out
= 19
48.0
1'In Pl. 8
7.9'
Of 18
" Conc. Pip
e
#6433
VDOT Bridge
Conc. Wingwall
No. 0081-095
-014, (A6830)Per R
oute 81, VDOT Pr
ojectEx. Lim
ited Access
Line
No. 0081-0
95-014, (A
6830)
Per Rout
e 81, VDOT P
roject
Ex. Limite
d Access
Line
No. 0081-095-014, (A6830)
Per Route 81, VDOT Project
Ex. R/W And Limited Access Line
No. 0081-095-014, (A6830)Per Route 81, VDOT ProjectEx. R/W And Limited Access Line
Project No. 0
081-095-014, (A6830)
Ex. R/
W Per R
oute 8
1, V
DOT
Proje
ct No. 0
081-0
95-01
4, (A6
830)
Ex. R/W
Per R
oute 8
1, VDOT
No. 00
81-095
-014, (
A6830)
Per Ro
ute 81, VDOT
Proj
ect
Ex. Li
mited
Access Li
ne
Project No. 0081-095-014, (A6830)
Ex. R/
W Per R
oute 8
1, V
DOT
Project N
o. 00
81-09
5-014, (A
6830)
Ex. R/W
Per
Route 8
1, VDOT
No. 0081-095-014, (A6830)
Per Route 81, VDOT Project
Ex. R/W And Limited Access Line
PL
PL
PL
PL
PL
PL
PL
PL
PL
Approx. Location Per GIS
Approx. L
ocation Per GIS
Approx. L
ocation Per GIS
Approx. Location Per GIS
Approx. Location
Per
GIS
Approx. Location
Per
GIS
Approx. Location Per GIS
R/
W-2
R/W-1
R/
W-2
R/W-1
6' Cattle Pass
6' Cattle Pass
ROADWAY ENGINEER
Richmond, Virginia
Whitman Requart & Associates
HYDRAULIC ENGINEER
Richmond, Virginia
Whitman Requart & Associates
REFERENCES
( PROFILES, DETAIL & DRAINAGE
DESCRIPTION SHEETS, ETC. )
4
4
0
SCALE
50' 100'
LEGEND
Denotes Construction Limits in Cuts
Denotes Construction Limits in Fills
C
F
THESE PLANS ARE UNFINISHED
AND UNAPPROVED AND ARE NOT
TO BE USED FOR ANY TYPE
OF CONSTRUCTION OR THE
ACQUISITION OF RIGHT OF WAY.
Denotes Proposed Future Pavement Widening
Continue Beyond Project Limits
Mainline Improvements Assumed To
Construction Limits
Future Third Lane and AssociatedVA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
3/4/2016
PROJECT MANAGER
SURVEYED BY
DESIGN SUPERVISED BY
DESIGNED BY
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
awarren
View:
Printer:
Creator:
0081-095-038
P101, RW201, C501
81
0081-095-038
Whitman, Requardt, & Associates
Mike Russell, P.E.
John Sproles, VDOT
L
L
Curve SBBL301-1
PI = 312+10.93
T = 1,210.93'
L = 2,402.00'
R = 7,664.00'
300+00.00PC =
PT = 324+02.00
Curve NBBL201-1
PI = 211+04.46
T = 1,194.46'
L = 2,369.86'
R = 7,664.00'
199+10.00PC =
PT = 222+79.86
Curve BL101-1
PI = 111+38.61
T = 1,238.61'
L = 2,455.97'
R = 7,664.00'
99+00.00PC =
PT = 123+55.97
Northbound I-81 Constr. B
Southbound I-81 Constr. B
212
213
214
215
216
217
218
219
220
221
222
PT222
+79.8
6223
224
225
226
227
311
312
313
314
315
316
317
318
319
320
321
322
323
324
PT324+0
2.0
0
325
326
327
111
112
113
114
115
116
117
118 119
120 121
122
123 PT12
3+5
5.9
7
124 125 12
6 127
Lr = 98'
V = 75 MPH
E= 3.1%
Lr = 98'
V = 75 MPH
E= 3.1%
Lr = 98'
V = 75 MPH
E= 3.1%
12'
12'
12'
12'
12'
12'12'
12'
12'
12'
12'
12'65.15'
63.95'
RETAINING WALL REQ'D. REQ'D.
RETAINING WALL
RESET FENCE
REMOVE AND
12'
12'
12'
12'12'
12'
12'
12'
F
F
DB638 PG696
13.78 AC.
Tax# 143-A-25
PB32 PG60
PB55 PG30
1.43 AC.
Tax# 143-A-7
PB55 PG30
1.43 AC.
Tax# 143-A-7
PB55 PG30
1.43 AC.
Tax# 143-A-7
ELSHAMLY ABDELFATTAH
FELECIA ABDELFATTAH
W/
Guy
138 6
BV
U #954-
Power Pole
#7
Tele. Pole
WV
T
#AP-1901 14
65-8
Tele. Ped.
WV
Valve
Blow
off
ValveBlo
woff
ROBERT C. FULLER
DON G. QUESENBERRY
LAURA MILDRED H. QUESENBERRY
LAURA H. QUESENBERRY
LAURA H. QUESENBERRY
LAURA H. QUESENBERRY
Page 17
Scale: 1" = 15'-0"
None.
MANAGER
DISTRICT CONSTRUCTION
MANAGER
VDOT PROJECT
CONSTRUCTION
APPROVAL FOR
RECOMMENDED FOR
ance with Sec. 411.
The existing structures are designated Type B structures in accord-
are 140-21, 140-21A, and 140-21B.
Bridge No. of existing bridges are 2040 (SBL) and 2041 (NBL). Plan Nos.
and shall be unpainted.
All structural steel, including bearings, shall be ASTM A709 Grade 50W
ments.
Specifications and Special Provisions included in the contract docu-
These plans are incomplete unless accompanied by the Supplemental
Bridge Standards, 2008.
Standards: Virginia Department of Transportation Road and
2014; and VDOT Modifications.
Design: AASHTO LRFD Bridge Design Specifications, 7th Edition,
Bridge Specifications, 2007.
Construction: Virginia Department of Transportation Road and
Specifications:
Drainage area: 1.63 sq. mi.
Capacity: HL-93 loading.
1 - 139'-11…" steel girder span (NBL)
Span layout: 1 - 138'-7‚" steel girder span (SBL)
72'-0…" face-to-face of curb (NBL).
Width: 42'-8ƒ" face-to-face of curb (SBL).
full extent of the applicable laws.
scanned signatures is illegal. Violators will be prosecuted to the
the VDOT Central Office. Any misuse of electronic files, including
The original approved sheet, including original signatures, is filed in
REVISIONS
For Table of Revisions,
see Sheet 2.
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
No. Description Date
COORDINATED:
SUPERVISED:
DESIGNED:
DRAWN:
CHECKED:
PLANS BY:
GENERAL NOTES:
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
and Scour Code:
FHWA Construction
UPC No.
DESIGN EXCEPTION(S):
VA.
STATE
Federal Oversight Code:
NBIS Number:
Approved:
c
Recommended for Approval:
_ _ _ _ _ _ _ _ _ _Date:
Chief Engineer
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Date
Date
STRUCTURAL ENGINEER
RICHMOND, VA
WHITMAN REQUARDT & ASSOCIATES
2016, Commonwealth of Virginia
???-??Sheet 1 of 5
1
107116
81 0081-095-038, B675, B676
X471-S80000000000?????
0000000000?????
NFO
IM-081-1(342)
PROPOSED BRIDGE REPLACEMENTS ON
PROJECT 0081-095-038, B675, B676
WASHINGTON CO. - 0.94 MI. NE OF RTE. F310
RTE. 808 (HALLS BOTTOM ROAD) AND SINKING CREEK
RTE. I-81 (NBL AND SBL) OVER
FOR CONSTRUCTION
THESE PLANS NOT TO BE USED
PRELIMINARY PLANS
Designee/Developer
PLAN
Temporary shoring
Temporary shoring
Temporary shoring
Temporary shoring
Approach slab
Approach slab
Approach slab
Approach slab
Sta. 218+54.31
Abutment A
End of slab
Sta. 219+94.26
Abutment B
End of slab
Sta. 320+22.00
Abutment B
End of slab
Sta. 318+83.40
Abutment A
End of slab
Elev. 1966.41
Elev. 1966.63
Elev. 1967.74
Elev. 1967.71
138'-7‚"
139'-11…"
Rte. I-81 SBL Constr. B
Rte. I-81 NBL Constr. BL
L
70'-
4•
"1'-
8"
1'-
8"
1'-
8"
42'-
8ƒ
"1'-
8"
Varie
sVarie
s
LRte. I-81 Constr. B
Varie
sVarie
s
R = 7664'
R = 7664'
R = 7664'
35 -43'-53.76" 36 -46'-40.44"
36 -00'-21.96"34 -58'-11.64"
CR
EE
K
SIN
KIN
G
Edge of stream
Edge of stream
Edge of pavement
C Rte. 808L
Existing bridge
Existing bridge
To Bristol
To Abingdon
Varie
sVarie
s
RadialRadial
RadialRadial
LSpan a - Measured along Rte. I-81 SBL Constr. B
LSpan a - Measured along Rte. I-81 NBL Constr. B
Limits of riprap are not shown
Face of curb
Face of curb
Face of curb
Face of curb
Page 18
WRA
WRA
WRA
AND GENERAL NOTES
PROFILE
2Scale: 1" = 15'-0"
2
Date Plan No. Sheet No.Designed: ...........
Drawn: ................
Checked: ............c
No. Description Date
STRUCTURE AND BRIDGE DIVISION
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
Revisions
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATEROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
FOR CONSTRUCTION
THESE PLANS NOT TO BE USED
PRELIMINARY PLANS
2016, Commonwealth of Virginia
81 0081-095-038, B675, B676
Mar. 2016 of 5???-??STRUCTURAL ENGINEER
RICHMOND, VA
WHITMAN REQUARDT & ASSOCIATES
FillFill
FillFill
L
L
Sta. 318+83.40
Abutment A
End of slab
Sta. 320+22.00
Abutment B
End of slab
138'-7‚"
139'-11…"
Sta. 218+54.31
End of slab
Beginning of bridge
Sta. 219+94.26
End of slab
End of bridge
ABUTMENT A
ABUTMENT A ABUTMENT B
ABUTMENT B
Span a
Span aFix.Exp.
Exp.Fix.
L
L
Finished gradeFinished grade
Finished gradeFinished grade
-2.49% +2.98%
+3.09%-2.75%
V.C. = 1,128
C.G. Elev. 1,958.36
C.G. Sta. 318+06.00
V.C. = 1,204
C.G. Elev. 1,957.67
C.G. Sta. 218+00.00
to remain, typ.
Existing substructure
to remain, typ.
Existing substructure
min.
cl.
22'-
4"
Elev. 1938.2
Calculated 100 year storm
Elev. 1937.9
Calculated 100 year storm
min.
cl.
21'-
10"
Dry riprap Cl. I
Dry riprap Cl. I
barrier
Bridge protection
barrier
Bridge protection
1
2
1
2
Normal to abutment
water
Surveyed
water
Surveyed
NBL Constr. B
along Rte. I-81
Existing profile
SBL Constr. B
along Rte. I-81
Existing profile
DEVELOPED SECTION ALONG RTE. I-81 SBL CONSTR. B
DEVELOPED SECTION ALONG RTE. I-81 NBL CONSTR. B
Standard GS-4.
future widening of Rte. 808 to VDOT
Note: Bridge opening accommodates
Page 19
WRA
WRA
WRA
ABUTMENT DETAILS
3Scale: ‰" = 1'-0" unless otherwise noted.
4
Date Plan No. Sheet No.Designed: ...........
Drawn: ................
Checked: ............c
No. Description Date
STRUCTURE AND BRIDGE DIVISION
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
Revisions
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATEROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
FOR CONSTRUCTION
THESE PLANS NOT TO BE USED
PRELIMINARY PLANS
2016, Commonwealth of Virginia
81 0081-095-038, B675, B676
Mar. 2016 of 5???-??STRUCTURAL ENGINEER
RICHMOND, VA
WHITMAN REQUARDT & ASSOCIATES
ELEVATION
PLAN
2'-
0"2'-
0"
2'-
5"
153'-11„"
157'-0„"
12"
7"
Line through centers of bearing
C girder typ.LFace of backwall
1'-6" typ.
1'-6" typ.
15'-
1…
" typ.
(Abutment B shown, Abutment A similar)
(Abutment B shown, Abutment A similar)
End of slab
Constr.
Rte. I-81
Constr.
Rte. I-81 NBLConstr.
Rte. I-81 SBL
LB LBLB
Scale: •" = 1'-0"
TYPICAL ABUTMENT SECTION
3'-
0"
8'-0"
2'-0"2'-5"
MSE panel
Face of
MSE coping
Face of
1'-
3"
bearing
centers of
Line through
7"
12"
Approach slab
underdrain
6" pipe
backwall
Face of
seat
Face of
slab
End of
Page 20
1 OF 2
SEQUENCE OF CONSTRUCTION
4
WRA
WRA
WRA
4
Scale: ‰" = 1'-0" unless otherwise noted.
Date Plan No. Sheet No.Designed: ...........
Drawn: ................
Checked: ............c
No. Description Date
STRUCTURE AND BRIDGE DIVISION
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
Revisions
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATEROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
FOR CONSTRUCTION
THESE PLANS NOT TO BE USED
PRELIMINARY PLANS
2016, Commonwealth of Virginia
81 0081-095-038, B675, B676
Mar. 2016 of 5???-??STRUCTURAL ENGINEER
RICHMOND, VA
WHITMAN REQUARDT & ASSOCIATES
1'-8"
73'-8•"
30'-1‡"
1'-8" 2'-0"
1'-8" 2'-0"
34'-7"
37'-0"
1'-8"
STAGE 1 CONSTRUCTION
STAGE 2 CONSTRUCTION
37'-0" 37'-0"
15'-0" 15'-0" 2'-6"2'-6"15'-0"2'-6" 15'-0" 2'-6"
1'-1"
EXISTING TRANSVERSE SECTION
3'-5…" 3'-5…"
3'-5…" 3'-2•"
9
6 7 8
10 11 12
12" 12" 12"12"
3'-6"
11'-0" lane 11'-0" lane
12'-0" lane 12'-0" lane37'-0"
15'-0"2'-6" 15'-0" 2'-6"
12" 12"
2'-0" shy2'-0" shy
12" min. shy12" min. shy
11'-0" lane 11'-0" lane 12'-0" lane 12'-0" lane12" min. shyshy
12" min.
shoulder
12'-0" min.
Rte. I-81 NBL Constr. LB
2 spa. @ 11'-7•" = 23'-3"
7 86
2 spa. @ 11'-7•" = 23'-3" 4 spa. @ 10'-11•" = 47'-0„"
Page 21
2 OF 2
SEQUENCE OF CONSTRUCTION
5Scale: ‰" = 1'-0" unless otherwise noted.
5
WRA
WRA
WRA
Date Plan No. Sheet No.Designed: ...........
Drawn: ................
Checked: ............c
No. Description Date
STRUCTURE AND BRIDGE DIVISION
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
Revisions
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATEROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
FOR CONSTRUCTION
THESE PLANS NOT TO BE USED
PRELIMINARY PLANS
2016, Commonwealth of Virginia
81 0081-095-038, B675, B676
Mar. 2016 of 5???-??STRUCTURAL ENGINEER
RICHMOND, VA
WHITMAN REQUARDT & ASSOCIATES
1'-8"
1'-8"
73'-8•"46'-0ƒ"
FINAL CONSTRUCTION
PROPOSED FUTURE CONSTRUCTION
65'-1ƒ"
63'-11…"
1'-8"1'-8"
1'-8" 1'-8"
1'-8"
2'-10…"2'-10…" 4 spa. @ 10'-1 = 40'-4"
4 spa. @ 10'-1 = 40'-4"
3'-2„"
7'-0"1'-10…"1'-10„"
= 12'-11"
2 spa. @ 6'-5•"
1
1
2
2
3
34
45
5 C
A B
12'-0" lane 12'-0" lane12'-0" lane 12'-0" laneshoulder
12'-0" min.
shoulder
6'-0" min.
12'-0" lane 12'-0" lane12'-0" lane
12'-0" lane 12'-0" lane12'-0" laneshoulder
12'-0" min.
shoulder
12'-0" min.
shoulder
12'-0" min.
shoulder
12'-0" min.
Rte. I-81 NBL Constr. B
Rte. I-81 NBL Constr. B
Rte. I-81 SBL Constr. B
Rte. I-81 SBL Constr. BL
L
L
L
STAGE 3 CONSTRUCTION
46'-0ƒ"
1'-8"
2'-10…" 4 spa. @ 10'-1 = 40'-4"
1 2 3 45
12'-0" lane 12'-0" laneshoulder
12'-0" min.
shoulder
6'-0" min.
Rte. I-81 SBL Constr. BL
1'-8"
2'-10…"
1'-8"
73'-8•"
1'-8" 2'-0"
3'-5…" 3'-2„"
9 10 11 12
11'-0" lane 11'-0" lane 12'-0" lane 12'-0" lane
12" min. shy
shy
12" min.
shoulder
12'-0" min.
Rte. I-81 NBL Constr. LB
7 86
2 spa. @ 11'-7•" = 23'-3" 4 spa. @ 10'-11•" = 43'-10"
4'-9•"
4'-9•"
3'-5…" 3'-2„"
9 10
7 86
2 spa. @ 11'-7•" = 23'-3" 4 spa. @ 10'-11•" = 43'-10"
11 12
shoulder
12'-0" min.
11 12109
7 86
11'-7•"5'-0"1'-6„" 4 spa. @ 10'-11•" = 43'-10"
1'-8"
Page 22
Activity ID Activity Name Critical OriginalDuration
BL ProjectDuration
Start Finish Remaining Duration
ActualDuration
Activity %Complete
TotalFloat
Proposal ScheduleProposal ScheduleProposal Schedule 503d 503d 25-Mar-16 04-Sep-18 503d 0d 0d
AdministrativeAdministrativeAdministrative 503d 503d 25-Mar-16 04-Sep-18 503d 0d 0d
A1000 Design Start - Pre-award activities 10d 10d 25-Mar-16 07-Apr-16 10d 0d 0% 53d
A1400 Notice of Intent to Award 0d 0d 25-Mar-16* 0d 0d 0% 0d
A1410 CTB Approval/Notice to Award 0d 0d 20-Apr-16* 0d 0d 0% 0d
A1420 DB Contract Execution 0d 0d 20-May-16* 0d 0d 0% 0d
A1430 Notice to Proceed 0d 0d 24-May-16* 0d 0d 0% 0d
A2010 Scope Validation Period 120d 120d 24-May-16 20-Sep-16 120d 0d 0% 714d
A2170 Monthly Stakeholder meetings 420d 420d 24-May-16 18-Jun-18 420d 0d 0% 44d
A1900 Prep Meeting E&S (Hold Point) 0d 0d 15-Jun-16 0d 0d 0% 60d
A1910 Prep Meeting Aggregate Base (Hold Point) 0d 0d 15-Jun-16 0d 0d 0% 105d
A1920 Prep Meeting Asphalt Paving (Hold Point) 0d 0d 15-Jun-16 0d 0d 0% 222d
A1930 Prep Meeting Drainage (Hold Point) 0d 0d 15-Jun-16 0d 0d 0% 72d
A1940 Prep Meeting Clearing and Grubbing (Hold Point) 0d 0d 15-Jun-16 0d 0d 0% 66d
A1950 Prep Meeting Guardrail (Hold Point) 0d 0d 15-Jun-16 0d 0d 0% 365d
A1960 Prep Meeting Bridge Substructure (Hold Point) 0d 0d 15-Jun-16 0d 0d 0% 119d
A1970 Prep Meeting Bridge Superstructure (Hold Point) 0d 0d 15-Jun-16 0d 0d 0% 179d
A1980 Prep Meeting Retaining Wall/MSE Wall (Hold Point) 0d 0d 15-Jun-16 0d 0d 0% 119d
A1990 Prep Meeting MOT (Hold Point) 0d 0d 15-Jun-16 0d 0d 0% 53d
A2000 Prep Meeting Earthwork (Hold Point) 0d 0d 15-Jun-16 0d 0d 0% 72d
A2180 Utility Coordination/Review Meeting 0d 0d 06-Jul-16 0d 0d 0% 11d
A2160 Meeting with Board of Supervisors to Close Halls Bottom Rd 1d 1d 15-Sep-16 15-Sep-16 1d 0d 0% 29d
A1440 No Excuse Incentive Date 0d 0d 06-Jun-18* 0d 0d 0% 0d
A1450 Final Completion 0d 0d 04-Sep-18* 0d 0d 0% 0d
SurveySurveySurvey 25d 25d 20-May-16 23-Jun-16 25d 0d 14d
A1010 Send Survey Notification Letters 15d 15d 20-May-16 09-Jun-16 15d 0d 0% 14d
A1020 Supplemental Field Survey 10d 10d 10-Jun-16 23-Jun-16 10d 0d 0% 14d
Geotechnical InvestigationGeotechnical InvestigationGeotechnical Investigation 59d 59d 24-May-16 06-Sep-16 59d 0d 101d
A1030 Perform Soil Borings and Lab Work 10d 10d 24-May-16 06-Jun-16 10d 0d 0% 1d
A1040 Prepare Geotechnical Report and Recommendations 18d 18d 07-Jun-16 30-Jun-16 18d 0d 0% 13d
A1050 QA/QC and Submit Geotech Report 5d 5d 01-Jul-16 07-Jul-16 5d 0d 0% 13d
A2020 VDOT Review Geotech Report 21d 21d 08-Jul-16 28-Jul-16 21d 0d 0% 186d
A2060 Revise/Resubmit Geotech Report 10d 10d 02-Aug-16 16-Aug-16 10d 0d 0% 100d
A2070 VDOT Review of revised Geotech Report 21d 21d 17-Aug-16 06-Sep-16 21d 0d 0% 184d
PermittingPermittingPermitting 87d 87d 24-May-16 18-Aug-16 87d 0d 19d
A1080 FAA Approval 60d 60d 24-May-16 22-Jul-16 60d 0d 0% 23d
A1060 VSMP Permit 45d 45d 05-Jul-16 18-Aug-16 45d 0d 0% 19d
A1070 Water Quality Permit 45d 45d 05-Jul-16 18-Aug-16 45d 0d 0% 19d
60% Roadway Design and Advance Work Package60% Roadway Design and Advance Work Package60% Roadway Design and Advance Work Package 40d 40d 24-May-16 03-Aug-16 40d 0d 6d
A1090 60% Roadway Plans and Advance Work Package 30d 30d 24-May-16 04-Jul-16 30d 0d 0% 7d
A1100 Drainage/SWM/E&S 20d 20d 07-Jun-16 04-Jul-16 20d 0d 0% 7d
A1110 Maintenance of Traffic / TMP 20d 20d 07-Jun-16 04-Jul-16 20d 0d 0% 7d
A1120 Design QA/QC Review of Roadway Plans 5d 5d 05-Jul-16 11-Jul-16 5d 0d 0% 7d
A1130 Prepare Roadway Plans for Submission 2d 2d 12-Jul-16 13-Jul-16 2d 0d 0% 7d
A2030 VDOT Review 60% Plans 21d 21d 14-Jul-16 03-Aug-16 21d 0d 0% 11d
Final DesignFinal DesignFinal Design 41d 41d 04-Aug-16 14-Oct-16 41d 0d 91d
A1140 Roadway Plans/Incorporate/Resolve 20d 20d 04-Aug-16 31-Aug-16 20d 0d 0% 38d
A1150 Final Drainage/SWM/E&S 10d 10d 01-Sep-16 14-Sep-16 10d 0d 0% 119d
M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
2016 2017 2018
Notice of Intent to Award
CTB Approval/Notice to Award
DB Contract Execution
Notice to Proceed
Prep Meeting E&S (Hold Point)
Prep Meeting Aggregate Base (Hold Point)
Prep Meeting Asphalt Paving (Hold Point)
Prep Meeting Drainage (Hold Point)
Prep Meeting Clearing and Grubbing (Hold Point)
Prep Meeting Guardrail (Hold Point)
Prep Meeting Bridge Substructure (Hold Point)
Prep Meeting Bridge Superstructure (Hold Point)
Prep Meeting Retaining Wall/MSE Wall (Hold Point)
Prep Meeting MOT (Hold Point)
Prep Meeting Earthwork (Hold Point)
Utility Coordination/Review Meeting
No Exc
Survey
Geotechnical Investigation
Permitting
60% Roadway Design and Advance Work Package
Final Design
Proposal Schedule LT-05 Classic Schedule Layout 03-Mar-16 10:18
Primary Baseline
Second Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 1 of 3 TASK filter: All Activities
© Primavera Systems, Inc.
Page 23
Activity ID Activity Name Critical OriginalDuration
BL ProjectDuration
Start Finish Remaining Duration
ActualDuration
Activity %Complete
TotalFloat
A1160 Maintenance of Traffic / TMP 10d 10d 01-Sep-16 14-Sep-16 10d 0d 0% 38d
A1180 Prepare Roadway Plans for Submission 2d 2d 15-Sep-16 16-Sep-16 2d 0d 0% 119d
A1170 Design QA/QC Review of Roadway Plans 5d 5d 19-Sep-16 23-Sep-16 5d 0d 0% 119d
A2040 VDOT Review Final Design Plans 21d 21d 24-Sep-16 14-Oct-16 21d 0d 0% 167d
Issued for Construction DesginIssued for Construction DesginIssued for Construction Desgin 12d 12d 17-Oct-16 08-Nov-16 12d 0d 91d
A1190 Roadway Final Revisions 10d 10d 17-Oct-16 28-Oct-16 10d 0d 0% 119d
A1200 Prepare RFC Roadway Plans for Submission 1d 1d 31-Oct-16 31-Oct-16 1d 0d 0% 119d
A2050 VDOT Review RFC Plans 5d 5d 01-Nov-16 05-Nov-16 5d 0d 0% 166d
A2080 RFC Roadway Plans Issued 0d 0d 08-Nov-16 0d 0d 0% 91d
Structures DesignStructures DesignStructures Design 104d 104d 24-May-16 28-Nov-16 104d 0d 0d
A1210 Bridge Stage I Design (T S & L) 20d 20d 24-May-16 20-Jun-16 20d 0d 0% 5d
A1270 Bridge H&HA & Scour Analysis 20d 20d 24-May-16 20-Jun-16 20d 0d 0% 0d
A1280 Design QA/QC H&HA & Scour Analysis 5d 5d 21-Jun-16 27-Jun-16 5d 0d 0% 0d
A1220 Design QA/QC Stage I 5d 5d 28-Jun-16 04-Jul-16 5d 0d 0% 0d
A1240 VDOT Review Stage I Bridge Design 21d 21d 05-Jul-16 25-Jul-16 21d 0d 0% 0d
A1230 Stage II Bridge Design 60d 60d 26-Jul-16 17-Oct-16 60d 0d 0% 0d
A1260 Design QA/QC Stage II Bridge Design 1d 1d 18-Oct-16 18-Oct-16 1d 0d 0% 0d
A1250 VDOT Review Stage II Design 21d 21d 19-Oct-16 08-Nov-16 21d 0d 0% 0d
A2090 RFC Bridge Plans 5d 5d 09-Nov-16 17-Nov-16 5d 0d 0% 0d
A2100 VDOT Review RFC Bridge Plans 5d 5d 18-Nov-16 28-Nov-16 5d 0d 0% 0d
A2110 RFC Bridge Plans Issued 0d 0d 28-Nov-16 0d 0d 0% 0d
CoordinationCoordinationCoordination 220d 220d 11-Apr-16 13-Feb-17 220d 0d 0d
A1290 Design Coordination meetings April 2016 0d 0d 11-Apr-16* 0d 0d 0% 0d
A1300 Design Coordination Meetings May 2016 0d 0d 09-May-16* 0d 0d 0% 0d
A1310 Design Coordination Meetings June 2016 0d 0d 13-Jun-16* 0d 0d 0% 0d
A1320 Design Coordination Meetings July 2016 0d 0d 11-Jul-16* 0d 0d 0% 0d
A1330 Design Coordination Meetings August 2016 0d 0d 08-Aug-16* 0d 0d 0% 0d
A1340 Design Coordination Meetings September 2016 1d 1d 12-Sep-16* 1d 0d 0% 1d
A1350 Design Construction Support October 2016 0d 0d 10-Oct-16* 0d 0d 0% 0d
A1360 Design Construction Support November 2016 0d 0d 14-Nov-16* 0d 0d 0% 0d
A1370 Design Construction Support December 2016 0d 0d 12-Dec-16* 0d 0d 0% 0d
A1380 Design Construciton Support January 2017 0d 0d 09-Jan-17* 0d 0d 0% 0d
A1390 Design Construction Support February 2017 0d 0d 13-Feb-17* 0d 0d 0% 0d
ConstructionConstructionConstruction 493d 493d 08-Apr-16 04-Sep-18 493d 0d 0d
Pre-Construction ActivitiesPre-Construction ActivitiesPre-Construction Activities 175d 175d 08-Apr-16 14-Feb-17 175d 0d 3d
A1455 Prepare QA/QC Plan 21d 21d 08-Apr-16 06-May-16 21d 0d 0% 53d
A1460 Submit QA/QC Plan 1d 1d 09-May-16 09-May-16 1d 0d 0% 53d
A1470 VDOT Review QA/QC Plan 21d 21d 10-May-16 07-Jun-16 21d 0d 0% 53d
A1480 Revise and Resubmit QA/QC Plan 5d 5d 08-Jun-16 14-Jun-16 5d 0d 0% 53d
A1490 Submit Final QA/QC Plan 1d 1d 15-Jun-16 15-Jun-16 1d 0d 0% 59d
A1530 MSE Wall Fabrication 69d 69d 26-Jul-16 28-Nov-16 69d 0d 0% 0d
A1520 Mobilization 10d 10d 04-Aug-16 17-Aug-16 10d 0d 0% 7d
A1495 Begin Construction Activities 0d 0d 04-Aug-16 0d 0d 0% 24d
A1510 Initial MOT 10d 10d 18-Aug-16 01-Sep-16 10d 0d 0% 6d
A1500 Initial E&S Measures 5d 5d 19-Aug-16 26-Aug-16 5d 0d 0% 10d
A2190 Bridge Beam Fabrication 70d 70d 09-Nov-16 14-Feb-17 70d 0d 0% 4d
Phase I MedianPhase I MedianPhase I Median 142d 142d 02-Sep-16 18-May-17 142d 0d 0d
A1540 Clear and Grub Median 5d 5d 02-Sep-16 12-Sep-16 5d 0d 0% 6d
A1550 Median Grade/Drain 25d 25d 13-Sep-16 26-Oct-16 25d 0d 0% 6d
M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
2016 2017 2018
Issued for Construction Desgin
RFC Roadway Plans Issued
Structures Design
RFC Bridge Plans Issued
Coordination
Design Coordination meetings April 2016
Design Coordination Meetings May 2016
Design Coordination Meetings June 2016
Design Coordination Meetings July 2016
Design Coordination Meetings August 2016
Design Coordination Meetings September 2016
Design Construction Support October 2016
Design Construction Support November 2016
Design Construction Support December 2016
Design Construciton Support January 2017
Design Construction Support February 2017
Pre-Construction Activities
Begin Construction Activities
Phase I Median
Proposal Schedule LT-05 Classic Schedule Layout 03-Mar-16 10:18
Primary Baseline
Second Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 2 of 3 TASK filter: All Activities
© Primavera Systems, Inc.
Page 24
Activity ID Activity Name Critical OriginalDuration
BL ProjectDuration
Start Finish Remaining Duration
ActualDuration
Activity %Complete
TotalFloat
A1600 Aggregate Base Stone 6d 6d 28-Oct-16 08-Nov-16 6d 0d 0% 6d
A2120 Demo Portion Existing NB Bridge 10d 10d 28-Oct-16 16-Nov-16 10d 0d 0% 6d
A1560 Substructure including MSE Walls 45d 45d 29-Nov-16 17-Feb-17 45d 0d 0% 0d
A1570 Beams 5d 5d 21-Feb-17 28-Feb-17 5d 0d 0% 0d
A1580 Deck 25d 25d 01-Mar-17 12-Apr-17 25d 0d 0% 0d
A1590 Parapet 5d 5d 13-Apr-17 20-Apr-17 5d 0d 0% 0d
A1610 Pave and Pavement Markings 10d 10d 21-Apr-17 04-May-17 10d 0d 0% 0d
A1620 Barrier Change and Traffic Switch 10d 10d 05-May-17 18-May-17 10d 0d 0% 0d
A1630 Traffic switch 0d 0d 18-May-17 0d 0d 0% 0d
Phase II NB BridgePhase II NB BridgePhase II NB Bridge 109d 109d 19-May-17 29-Nov-17 109d 0d 0d
A1640 Demo NB Bridge 20d 20d 19-May-17 22-Jun-17 20d 0d 0% 0d
A1680 Grade 60d 60d 19-May-17 30-Aug-17 60d 0d 0% 22d
A1650 Substructure 40d 40d 23-Jun-17 30-Aug-17 40d 0d 0% 0d
A1690 Drain 30d 30d 13-Jul-17 30-Aug-17 30d 0d 0% 22d
A1660 Beams 7d 7d 01-Sep-17 14-Sep-17 7d 0d 0% 0d
A1700 Aggregate Base Stone 10d 10d 01-Sep-17 19-Sep-17 10d 0d 0% 22d
A2130 Deck 27d 27d 15-Sep-17 01-Nov-17 27d 0d 0% 0d
A1710 Pave and Pavement Markings 5d 5d 20-Sep-17 27-Sep-17 5d 0d 0% 22d
A1720 Guardrail 2d 2d 28-Sep-17 03-Oct-17 2d 0d 0% 22d
A1670 Parapet 5d 5d 02-Nov-17 09-Nov-17 5d 0d 0% 0d
A1730 Traffic switch 10d 10d 13-Nov-17 29-Nov-17 10d 0d 0% 0d
Phase III SB BridgePhase III SB BridgePhase III SB Bridge 125d 125d 01-Dec-17 13-Jul-18 125d 0d 0d
A1740 Demo SB Bridge 25d 25d 01-Dec-17 17-Jan-18 25d 0d 0% 0d
A1790 Grade 50d 50d 01-Dec-17 02-Mar-18 50d 0d 0% 15d
A1750 Substructure 48d 48d 19-Jan-18 12-Apr-18 48d 0d 0% 0d
A1800 Drain 30d 30d 06-Mar-18 24-Apr-18 30d 0d 0% 15d
A1760 Beams 7d 7d 13-Apr-18 24-Apr-18 7d 0d 0% 0d
A1770 Deck 30d 30d 25-Apr-18 15-Jun-18 30d 0d 0% 0d
A1810 Aggregate Base Stone 10d 10d 25-Apr-18 10-May-18 10d 0d 0% 15d
A1820 Pave and Pavement Markings 10d 10d 11-May-18 24-May-18 10d 0d 0% 20d
A1830 Guardrail 2d 2d 25-May-18 29-May-18 2d 0d 0% 15d
A1780 Parapet 5d 5d 18-Jun-18 25-Jun-18 5d 0d 0% 0d
A2140 Traffic Switch and remove barrier 10d 10d 26-Jun-18 13-Jul-18 10d 0d 0% 0d
Final PavementFinal PavementFinal Pavement 5d 5d 16-Jul-18 20-Jul-18 5d 0d 0d
A1840 Surface Asphalt NB and SB 4d 4d 16-Jul-18 19-Jul-18 4d 0d 0% 0d
A1850 Final Pavement Markings and Signage 1d 1d 20-Jul-18 20-Jul-18 1d 0d 0% 0d
CompletionCompletionCompletion 26d 26d 23-Jul-18 04-Sep-18 26d 0d 0d
A1860 Clean-up 10d 10d 23-Jul-18 07-Aug-18 10d 0d 0% 0d
A2150 Demo Temporary Median 15d 15d 23-Jul-18 15-Aug-18 15d 0d 0% 0d
A1880 Final Inspection 1d 1d 16-Aug-18 16-Aug-18 1d 0d 0% 0d
A1870 Punchlist 3d 3d 17-Aug-18 21-Aug-18 3d 0d 0% 0d
A1890 Demobilization 10d 10d 22-Aug-18 04-Sep-18 10d 0d 0% 0d
M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
2016 2017 2018
Traffic switch
Phase II NB Bridge
Pha
Fin
Proposal Schedule LT-05 Classic Schedule Layout 03-Mar-16 10:18
Primary Baseline
Second Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 3 of 3 TASK filter: All Activities
© Primavera Systems, Inc.
Page 25
VOLUME 2: Roadway and BridgeDesign Concept Plans and Proposal Schedule
In Conjunction With:
In Association With:
A Design-Build ProjectReplacement of I-81
Structures 18942 & 18944Over Route 808 Halls Bottom Road and Sinking Creek
Washington County, VirginiaState Project No.: 0081-095-038, P101, RW201, C501, B675, B676
Federal Project No.: IM-081-1(342)Contract ID Number: C00107116DB85
Submitted By: