    Operation of Louisiana Low Turbulence (LLT)Clarifiers

    Vadim Kochergin

    Audubon Sugar Institute

    Presented at the

    Jamaica Association of Sugar Technologists

    Annual Conference,

    November 4, 2011, Ocho Rios, Jamaica

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    2/23

    Rapidorr 444

    CFD Modeling

    Chetty and Davis, 2001

    Large Scale Turbulent Eddies in an Industrial

    Clarifier

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    3/23

    Design Concepts

    Large scale turbulent eddies created by juiceintroduction need to be reduced.

    Velocity in the feed channels should remain

    relatively high to eliminate plugging/scaling. Uniform distribution of feed inlets and outlets

    in order to have uniform vertical juice

    velocities to make full use of the cross-

    sectional area of the clarifier.

    Minimize any non-vertical flows within a

    clarifier.

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    4/23

    Proof of Concept- 25 m3/hr flow

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    5/23

    Proof of Concept

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    6/23

    Basic TRD Layout

    Side View

    Top View

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    7/23

    Industrial Trials 2009 Grinding Season

    Turbidity, suspended solids, and flocculant usage

    were monitored for the three clarifiers at Westfield

    Sugar Mill.

    a 20 ft. diameter Graver

    a 20 ft. diameter Graver retrofitted with the new design

    a 30 foot diameter Dorr, with two mud boots

    * High mud levels -200-300 Lbs per ton of cane was notuncommon

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    8/23

    Turbidity- Comparison 2009 season

    20

    30

    40

    50

    60

    70

    80

    90

    100

    110

    10/7/2009 10/27/2009 11/16/2009 12/6/2009 12/26/2009 1/15/2010

    Turbidity(N

    TU)

    Date

    GraverModified

    Dorr

    Poly. (Graver)

    Poly. (Modified)

    Poly. (Dorr)

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    9/23

    Results

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    10/23

    Observations

    Season 2009/2010

    Clarifier showed better performance compared toGraver and Dorr at the same mill

    Bagacillo in clear juice was observed due to air

    entrainment in the pre-distributor

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    11/23

    Turbulence Reduction Device

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    12/23

    Updated clarifer design 2010

    Sterling, LA

    Residence time 30-40 minutes

    Redesigned feed distributor

    Material of construction- Cromgard Steel

    (American Utility Metals)

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    13/23

    Clarifier Retrofit

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    14/23

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    15/23

    Water test Sterling, Summer 2010

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    16/23

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    17/23

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    18/23

    Sterling Clarifier Turbidity Comparison

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    19/23

    Controlled Tests

    Two separate tests were conducted in which the

    flowrate to the LLT was increased from 750 to

    1000-1100 GPM to test the limits of the clarifierthroughput

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    20/23

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    21/23

    Controlled Tests Summary

    No air entrainment at 1100 GPM ( 50 % increasecompared to the standard operating flowrate of 750GPM)

    No mud flocs / bagacillo in clear juice

    No significant change in turbidity

    Using the same amount of flocculant as at 750 GPM

    Mud consistency remained constant during second test. Flocculant was increased with increased flowrate.

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    22/23

    Conclusions

    Air entrainment problem has been resolved withimproved pre-distribution

    No air entrainment was observed even at 50 % increase

    compared to nominal throughput

    LLT design showed on average 20 % better performancethan SRT design at lower residence time (35 min vs 45

    min)

    Slightly more flocculant was used as compared to the

    SRT. Flocculant use optimization has not beenperformed

    Capital cost of LLT design was estimated at about 30-40

    % of SRT design

  • 8/12/2019 Operation of Louisiana Low Turbulence (LLT) Clarifiers

    23/23

    Acknowledgements

    American Sugar Cane League for providing partial

    funding for the project

    Personnel of Sterling, Lula, Westfield and EnterpriseSugar Mills