OPEN HOLE COMPLETION SYSTEMSKENTUCKY OIL & GAS ASSOCIATION 2014

Ryan Henderson

Technical Sales Director

Peak Completions

Open Hole Completion Agenda

• Open Hole System History• Open Hole System benefits• Open Hole Multi Stage Completion overview• Typical Berea Design• Typical Lower Huron Shale Design• New Technology• Questions

History of Open Hole Completion Systems

• OH Packer and Sleeves were designed in 1980’s• First OH Packer and Sleeves were RIH in Canada in mid

90’s• First RIH in the U.S. in the Permian Basin and Granite

Wash formations in the early 2000’s– Max stages 8

• First Cemented Sliding Sleeve RIH 2003• First Swell Packer RIH 2005• First Inflatable ECP RIH as a zonal isolation

barrier/packer for Open Hole Frac Sleeves 2006• First Cemented Toe initiation sleeve – 2010• First Cluster system designed and RIH – 2010

Benefits

Most common reasons:1. Low Pressure zones 2. Fear of cement damaging production zone3. Fear of isolating naturally occurring fractures4. Limited availability of water5. Efficiency

Lower Completion Cost:1. Fewer well Bore Intervention Services Required2. Less time to stimulate3. Faster Well Cleanup for Production4. Reduced pump down fluid volumes5. Improved isolation 6. Reduced time to bring well to market

General Deployment

• The horizontal open hole section of the well is divided into sections.

• The sliding sleeves are centered in these sections.• The first section is isolated by the Bottom of the well

and the first packer.• The other sections are isolated with one packer on each

end.• Production String with Sleeves either run as long string

or as liner.• Production string or liner is anchored by means of a

anchor packer or by cementing the vertical section

General Deployment

Basic System – Ball Actuated Sliding Sleeve

Ball Actuated Sliding Sleeves, also know as “Frac Sleeves”1. Opened by a specific measured ball. Smallest to largest.2. Lock into open position when opened.3. Ball Seat is (*now) made of drillable material.4. Ball Seats rotationally locked to allow drill out.5. Variable Shear6. *Over 40 stages

Closed/RIH position

Open position

Single Point of Entry Frac Sleeve pressure chart

Single Ball seat openSlowed down rate due to theball getting 50 bbls from the seat

Ball Seat Mill out

• Seats have a large chamfer that allow the ball to roll off of seat.

• Mill outs are executed on Coil Tubing or Tubing (Work over rig)

• 5 Blade junk mill

Cast Iron Ball seat

Open Hole Packers

PREDATOR™ OPENHOLE SYSTEM

Mono-Pak™

KEY BENEFITS Time and cost savings• Hydraulically set element

allowing instantaneous isolation• Body lock ring ensures the

elements can handle pressure variances and from multiple directions

Optional shear release system for full retrieval

TECHNICAL FEATURES

High differential rating Shorter, less exposed OD,

full ID Dual anti-preset & anti-

swab Internal shifting piston

SINGLE ELEMENT, HIGH-PRESSURE OPENHOLE ISOLATION PACKER

PREDATOR™ OPENHOLE SYSTEM

Predator™ Packer

KEY BENEFITS Time and cost savings• Hydraulically set element

allowing instantaneous isolation

• Body lock ring ensures the elements can handle multiple pressure reversals

Optional shear release system for full retrieval

TECHNICAL FEATURES High differential rating Shorter, less exposed OD, full

ID Dual anti-preset & anti-swab True independent dual

element system Internal shifting piston

PREMIUM DUAL ELEMENT, HIGH-PRESSURE OPENHOLE ISOLATION PACKER

ECP (External Casing Packer)

Inflatable ECPs

KEY BENEFITS TECHNICAL FEATURES• Hydraulic Initiation• Expansion ratio 2:1• Inflated with Water, Mud, N2, CO2

or Cement• Variety of element lengths to

form barrier to annular flow• 3’ & 10’ Seal or element lengths

Simple installation Improve wellbore isolation Conform to well bore Holds up to 4500 psi (differential) Excellent solution for vugular

holes and washouts

PREDATOR™ OPENHOLE SYSTEM

SwellShark™ Swellable Packer

KEY BENEFITS Save completion time and money Operational flexibility Simple installation No on-site specialist needed Improve wellbore isolation Conform to well bore No mechanical/moving parts

TECHNICAL FEATURES• No mechanical parts• Proprietary, durable elastomer

compositions• Swells with oil-based, water-

based, or high-salinity wellbore fluids

• Variety of element lengths to form barrier to annular flow

PEAK 4-1/2” Open Hole Packer Comparison

0

2,000

4,000

6,000

8,000

10,000

12,000

5.875 6 6.125 6.25 6.375 6.5 6.75 6.875 7 7.125 7.25 7.375 7.5 7.625 7.75

4.50" Open Hole Packer ‐ Differential pressure holding capability vs hole size

5' Seal SwellPacker CapabilityMono PakCapabilityPredatorCapabilityInflatable ECPCapability

1001 Fannin Street, Suite 800Houston, Tx 77002

Liner Hanger Packers

1001 Fannin Street, Suite 800Houston, Tx 77002

PREDATOR™ OPENHOLE SYSTEM

Hydro-Pak SS™ Anchor

KEY BENEFITS

Allows for control of contraction and expansion

Full drift ID

Optional shear release system for full retrieval

TECHNICAL FEATURES

350⁰ F capable standard temperature rating

10k psi pressure rating

SOLID MANDREL, DUAL ANTI-PRESET OPENHOLE ANCHOR

KEY BENEFITS TECHNICAL FEATURES• Dual Anti-preset feature • 0k differential rating • Cased Hole liner hanger• Rotates safely in hole with use

of Peak TL running equipment• Small OD and short overall

length for efficient completion

ECONOMICAL, BRUTE STRENGTH FOR OPENHOLE APPLICATIONS

OPEN HOLE SYSTEM

STRATA PAK II™ Liner Hanger

•Internal locking system ensures packer stays set during well bore treating operations • Various optional shear release systems • Flexible setting pressure • Optional number of elements available • Premium element stack and back‐up ring system available 

STRATA PAKII – SPEC SHEET

VA, WV & KY REGIONOPEN HOLE FRAC SLEEVE AND PACKER

COMPLETION SYSTEM METHODS

Typical Berea Formation Open Hole Multi Stage Completion System Design

Berea ‐ Open Hole Multi Stage Completion System Design w/HYDRO MX & Inf

Berea Formation Open Hole INF Multi Stage Completion System Design 

Typical Berea or  Lower Huron Shale Formation Open Hole Multi Stage Completion System Design

OPEN HOLE, MULTI LATERAL FRAC SLEEVE AND PACKER COMPLETION SYSTEM

New Technology

• 40+ stages for single point of entry Frac Sleeves• HPHT• Dissolvable Frac Balls• Cluster Sleeves• Slim hole or reentry Multistage tools• Retrievable Multistage Systems• Closeable Frac Sleeves• Cemented Sleeves• Multi Lateral OH and Cemented Frac Sleeve Systems• Absolute Pressure Activated Toe Subs• Propellant Carrier Sleeves• Multiple Elastomeric types for Swellable Packers

– Extreme Temperature• Cold (<50F)• Hot (>350F)

– Fast Swell– Delayed Swell

Multilateral Process

Multilateral Process

PREDATOR™ OPENHOLE SYSTEM

Expandable™ (CLUSTER) Frac Sleeve

KEY BENEFITS Save completion time and cost Replicate perf cluster frac

designs Less equipment on location

than plug-n-perf Reduce operational complexity

TECHNICAL FEATURES Single ball opens up to – 6

sleeves per stage Flexible configurations for

limited-entry design fracturing Access to casing drift ID after

clean out

Open Hole or Cement Applications

EXPANDABLE™ FRAC SLEEVE

*Cluster Frac Sleeve

Expandable Sleeve System6 Stage –18 Cemented Expandable Sleeves

Expandable Sleeve System“Cluster Frac Sleeve System”

Sleeve #1 open

Sleeve #2 open

Sleeve #3 open

Scenario: 10 stages containing 3 clusters/sleeves per stage

New Techniques

• Multiple Sleeves Per Zone – Mimic’s Perforations (Cluster Valves)• More Zones per Well

Originally = 4-8Now – 40+

Shortening Zones = More Frac Stages= Higher IP• Frac Sleeves for cemented wellbores• Prep formation with propellant carrier sleeves (SNIPER™)• Multi Lateral Wells• Reentry Open or Cased Hole Stimulation using Multi Stage tools• Retrievable Open or Cased Hole systems• “No-Frac-ball” 1st stage cluster systems• 15/20 K equipment

Contact

Ryan HendersonTechnical Sales Director

[email protected]