35
Anton Completion Technology

Anton Completion Technology · SISO anchor seal assembly Open Hole PBR Liner hanger with top packer Tieback seal assembly PBR Top isolation packer Tubing Hanger Landing Collar Float

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

  • Anton Completion Technology

  • 2

    Contents

    01

    02

    03

    Completion Production Line

    Completion Technology

    Services Tools and Equipment

    04 Global Clients

  • 3

    Anton completion focuses on integrated service

    A leading completion service provider locally in China

    Also an excellent partner with other IOSC globally

    Completion services and productions business in 17 countries

    9 international service bases and 300 members supporting field services

    1. Completion Product Line

  • 4

    1. Completion Product Line

    Business Scope

    IntegratedServices

    Stimulation

    Production Completion

    Cementing Completion

    SandControl

    Water Control

    Water Injection

  • 5

    Services Capacity

    Integrated completion design

    Full-set down-hole tools

    Surface equipment

    Professional service group

    Reservoir evaluation, engineering design, effectevaluation, simulation experimental.

    HTHP and Anti-corrosive completion tools, with 4manufacture base in China.

    11set Coiled tubing units and 100,000 HHPpumping capacity.

    7 Seiner experts and 60 engineers support globalfield operation, with 9 services bases globally.

    1. Completion Production Line

  • 6

    Contents

    01

    02

    03

    Completion Production Line

    Completion Technology

    Services Tools and Equipment

    04 Global Clients

  • 7

    2. Completion Technology

    Anton provide characteristic completion technology

    (1) Integrated completion solution

    Full-range wellbore completion design

    Complete surface and down-hole equipment

    Professional on-site technical services

    • Wellhead

    • Completion fluid

    • Production completion services

    • Stimulation/Cementing/Sand control completion services

    Integrated

  • 8

    2. Completion Technology

    (1) Integrated completion solutions

    Multi-lateral completion well

    Reduce well construction cost and operation time

    Key technologies of assess, isolation and re-entry.

    Multi-lateral

  • 9

    2. Completion Technology

    (2) Production completion technology

    HT/HP well or CO2/H2S gas well.

    Reliable safety valve systems, flow

    control systems, and packer

    systems secure a stable production.

    Complicated well

    C asing13 3/8"

    C ontrol line

    Flow coupling

    Tubing retrievable S S S V

    X P lug

    A R Landing nipple

    Flow coupling

    P erm anent P acker

    M illout E xtension

    X O

    P erforate P ipe

    Tubing H anger

    A F Landing nipple

    A nchor S eal N ipple

    S S D

    150℃

    Max. 15000psi

    Nickel

    base alloy

  • 10

    2. Completion Technology

    Using a permanent packer and PBRre-connection.

    Larger ID for higher pumping andproduction rates.

    One trip of completion system.

    Mono boreSSSVFlow Coupling Flow Coupling

    SISO anchor seal assembly

    Open Hole

    PBRLiner hanger with top packer

    Tieback seal assembly

    PBR

    Top isolation packer

    Tubing Hanger

    Landing Collar

    Float Collar

    Double Valve Float Shoe

    (2) Production completion technology

  • 11

    2. Completion Technology

    CO2 gas well or HTHP wells. Liner hanger & top packer system

    ensure cementing quality. High-pressure tie-back system

    provides reliable wellbore integration.

    Complicated well

    (3) Liner hanger technology

    150℃

    10000psi

    Tie back

  • 12

    2. Completion Technology

    Single trip multi-layers system for fracturing orcircle gravel packing.

    Unique dual seal system ensures independentoperation.

    Unique self-alignment Weight Down designcan easily locate the indication coupling.

    The large 3.88’’ inner production bore.

    Single trip Multi-layers

    (4) Multi-layers gravel pack technology

  • 13

    2. Completion Technology

    Automatic identification of oil and water production in isolation layers

    Control high water-cut Adjust the oil production contribution in

    multiple-layer reservoirs Integrate the sand control, water control

    with stimulation

    (5) Multi-layers AICD technology

    Multi-layersWater cut

  • 14

    2. Completion Technology

    Real-time monitoring of injection parameters

    Manage injection parameters according to monitoring data lively

    Reduce time and cost of work-over

    (6) Intelligent water injection technology

    Smart distributor

    Transmitter

  • 15

    Contents

    01

    02

    03

    Completion Production Line

    Completion Technology

    Services Tools and Equipment

    04 Global Clients

  • 16

    Liner hanger system Liner Hanger Series

    Casing Accessories• Cementing Stage Tool• Dart/Plug/Landing Collar• Float Collar/Shoe• Centralizer(rigid/bow)

    Expand Casing Packers• ECP/ACP Packer • Swell Packer

    • Conventional liner hanger• HongAT rotatable liner hanger • Retrievable liner hanger

    3. Services Tools and Equipment

    ApplicationsMain market: China, Iraq, Ethiopia, Central Asia, South America

  • 17

    HongAT rotatable liner hanger system

    3. Services Tools and Equipment

    Liner hanger system

    • Ideal for gas storage wells, severe corrosion

    gas wells, 3D wells and other hostile wells.

    • Can rotate liner while RIH or cementing job.

    • Work load up to 200tons.

    • 10000psi working pressure.

    • 180 Deg.C working temperature.

    • High performance raw material selected.

  • 18

    Applications

    • Hydraulic set and release.

    • Retrieving by pulling directly.

    • Easily operating in directional and horizontal wells.

    • Sealing capacity:• Special polymer materials: Temperature 400 ℉, Pressure 5,000Psi

    • Metal polymer materials: Temperature 550℉, Pressure 3,000Psi

    • Special material: More than Temperature 662 ℉, Pressure 2,000Psi

    The successful applications are more than 60 wells in Venezuela and Ecuador.

    3. Services Tools and Equipment

    Thermal Retrievable Packer Liner hanger system

  • 19

    Packer system

    Flowing system• Sliding sleeve

    Safe valve system

    • Permanent/Retrievable• Cable production packer

    • Sub-surface safety valve• Flow sub• Hydraulic control pipe

    Integrate global resources for Customer.

    Production Completion Tools

    ApplicationsMain market: China, Iraq, Ethiopia, Central Asia, South America

    3. Services Tools and Equipment

  • 20

    AT-PP Premium Retrievable Packer

    • For HTHP gas wells.• Retrievable and hydraulic-set .• With performance of a permanent packer as a retrievable packer.• Retrieval by mechanical cut or shear release.• 10000psi WP.• 300 Deg.F WT.• 9Cr, 13Cr, 718 material selected.

    Production Completion Tools

    3. Services Tools and Equipment

  • 21

    Packer• Open Hole Packer• Bridge Plug Packer• Dissolve Bridge Plug

    Stimulation Completion Tools

    Frac-Sleeve• Open Hole Frac-sleeve • Cement Frac-sleeve• Full bore Frac-sleeve Other Fracturing Tools• Polymer ball/Dissolve ball• Isolation valve

    ApplicationsThe first China local company apply segment hydraulic fracturing technology.Over 800 wells have been applied in open-hole and casing bore.

    3. Services Tools and Equipment

  • 22

    AT-DFP Dissoluble Bridge Plug

    High-performance plug is rated to 10,000 psi for zonal

    isolation during wellbore stimulation with the most

    advanced dissolvable metal and rubber materials.

    3. Services Tools and Equipment

    • Materials dissolve time based on temperature and salinity.

    • Provides an entire wellbore ID for future operations upon

    complete dissolution.

    • Helps eliminate the risk and costs of conventional plug removal.

    • Special slim design for deformed casing in shale development

    Stimulation Completion Tools

  • 23

    Chemical Agent

    3. Services Tools and Equipment

    • Fracture liquid system

    • Acid liquid system

    • Nano stimulation liquid system

    Stimulation Completion Tools

    Block off material• Temporary plug material

    • Chemical plug material

    Proppant• Low/Middle/High density ceramsite

    • High strength ceramsite

  • 2424

    AICD (Autonomous Inflow Control

    Device)• Automatic identification of oil and water

    • Achieve a balanced production

    • Prevent early water breakthrough

    • Limit water area production

    ApplicationsTotally we have applied 36 wells in CNPC, Sinopec, and offshore CNOOC.

    Flow Control Product

    3. Services Tools and Equipment

  • 2525

    FCD (Flow Control Device)

    Steam Injection Valve

    We can provide a comprehensive solution to steam injection and production.• Uniform steam inject in segmented horizontal wells

    • Single directional inject channel

    • Automatic inflow control during production

    • Single string with steam injection and oil production in CSS or SGAD.

    Flow Control Product

    3. Services Tools and Equipment

  • 26

    Service Scope

    • Conventional gravel pack system

    • Single Trip Multi-layers gravel pack system

    Over 2,000 wells have been installed inglobal, widely used in China, Iraq andColombia.

    Applications

    • Gravel Packer

    • Pack off Housing

    • Closing Sleeve Assembly

    • Sand screen

    • Sump Packer

    STML GP system

    Gravel Pack

    3. Services Tools and Equipment

  • 2727

    Precise Punched Slots Screen (PPS)

    Precise Micropore Composite Screen (PMC)

    Water and sand control screen (AICD)

    Pre-Packed Screen (PPK)

    Sand Screen Product:

    More than 1,280,000 meters of global installed, main

    markets: Most oilfield in China, Canada, South America,

    Central Asia, Middle East and Africa regions.

    Applications

    Sand Screens

    3. Services Tools and Equipment

  • 2828

    PPS screensSpecial Lateral Slots

    • P u n c h e d s l o t s p a t e n t e dtechnology, three-dimensionalstructure design.

    • Embedded bridge slots, the rapidformation of sand bridge.

    • Lateral slots flow structure, avoidformation fluid directly erosion.

    Sand ScreensPPS

    Jacket

    End Ring

    Base pipe

    3. Services Tools and Equipment

  • 2929

    Services Capacity:

    100,000 HHP.

    47 Pump trucks.

    3 Liquid nitrogen pump trucks.

    9 Blander trucks.

    8 Instrument trucks.

    5 Pipe line integration trucks.

    More than 100 other trucks.

    3660 m³ liquid tanks.

    Single well Max. 40,000 m³ liquid and 1,600 m³ proppant pumping record.

    Max. pump rate 22m³ /min, Max. pump pressure up to 98Mpa.

    Pump services equipment

    3. Services Tools and Equipment

  • 3030

    Services Capacity:

    11 Coiled tubing service teams.

    Size from 1 ¼” – 2 3/8”.

    Max. operation depth record5712m.

    Provides a coiled tubing drivepacker fracturing.

    Coiled tubing equipment

    3. Services Tools and Equipment

  • 31

    Tianjin base: Screen and Completion tools

    Qingdao base:Gravel packing tools

    Dongying base: Gravel packing and chemical material

    Suining base:Proppant

    Manufacturing Base

    3. Services Tools and Equipment

  • 32

    • API SPEC 5CT

    • API Q1

    • API 11D1

    • API 14A

    • ISO 9001:2008 IDT

    • ISO 14001:2004 IDT

    • OHSAS 18001:2007 IDT

    Qualification certificate

    3. Services Tools and Equipment

  • 33

    Contents

    01

    02

    03

    Completion Production Line

    Completion Technology

    Services Tools and Equipment

    04 Global Clients

  • 34

    4. Clients

    http://www.google.ca/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=xCuMUS0Rkzj3UM&tbnid=9I3PXFr1B09naM:&ved=0CAUQjRw&url=http://www.cmi.com.co/i/p/imp.asp?n=77536&ei=VdNBUvfINoi1iwL9qoGABA&psig=AFQjCNEE0IPfHxzW4Ir136AEFroi7mqPbg&ust=1380132045328109http://www.google.ca/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=Bprd-mXT7TJSgM&tbnid=i-Eg949_2KX9zM:&ved=0CAUQjRw&url=http://3blmedia.com/News/CSR/CITGO-Honored-2013-ILTA-Safety-Excellence-Award&ei=ldNBUr31LuHqiQKRk4HoDw&psig=AFQjCNGvgvf26Cnuf8YcBsd3x0ilDcYcfg&ust=1380132113563965http://www.google.ca/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=Ry9NaZ1HUxjFGM&tbnid=mdOjjQ-_gLS0VM:&ved=0CAUQjRw&url=http://www.bjchp.gov.cn/publish/portal0/tab6000/info116566.htm&ei=xNRBUqyEPaatiQL41oDQBA&psig=AFQjCNH2YsWI-TW50iRcUTaK7qxEqEQh9Q&ust=1380132417279842http://www.google.ca/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=vt52NVrYq3M4QM&tbnid=7WqUdBPsK_JAAM:&ved=0CAUQjRw&url=http://www.chinafrontier.cn/cn/clients-cn.html&ei=NtVBUtTDO4TFiwKewYDAAg&psig=AFQjCNHcIO6MXDb7JbOF_OyrXrfHQ3LwTg&ust=1380132528536418http://www.google.ca/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=112iSENQ0VzmGM&tbnid=zQ0nlozVrHPLPM:&ved=0CAUQjRw&url=http://big5.ce.cn/gate/big5/intl.ce.cn/zhuanti/data/sinopec/index.shtml&ei=g9VBUqTAAYTcigKGz4GYDQ&psig=AFQjCNHrd739JplNOKSbJNYZ6ddfXfj75A&ust=1380132604317073http://www.google.ca/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=VKCPDizJiCN-RM&tbnid=VXEBHDAMQhQndM:&ved=0CAUQjRw&url=http://de.wikipedia.org/wiki/Datei:CITIC_Group_logo.svg&ei=Q9dBUtywFsnniAKEwoGQDg&psig=AFQjCNHkxqX7kDi1Mfj1uYGgW2Z_wnp9bg&ust=1380133041550176http://www.google.ca/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=hNm2DvyY1DIbfM&tbnid=hNlECHvXyxdxEM:&ved=0CAUQjRw&url=http://www.codimet.com/INICIO/Nuestros-clientes.php&ei=JtNBUobAL-H0iwK35IHwCw&psig=AFQjCNEidaHMgwV6oLz256poamPouOd-SA&ust=1380132000597489

  • www.antonoil.com

    Helping others succeed…

    THANKS!

    幻灯片编号 1幻灯片编号 2幻灯片编号 3幻灯片编号 4幻灯片编号 5幻灯片编号 6幻灯片编号 7幻灯片编号 8幻灯片编号 9幻灯片编号 10幻灯片编号 11幻灯片编号 12幻灯片编号 13幻灯片编号 14幻灯片编号 15幻灯片编号 16幻灯片编号 17幻灯片编号 18幻灯片编号 19幻灯片编号 20幻灯片编号 21幻灯片编号 22幻灯片编号 23幻灯片编号 24幻灯片编号 25幻灯片编号 26幻灯片编号 27幻灯片编号 28幻灯片编号 29幻灯片编号 30幻灯片编号 31幻灯片编号 32幻灯片编号 33幻灯片编号 34幻灯片编号 35