Environmental
Pollution Incident on
Campus
Breach in
Environmental
Legislation
1
Non-Conformance Found
2
Identify materials/equipment/
affected area as appropriate
3
Segregate where practicable
4
Record details on Concept
Evolution: see attached
guidance
5
Analyse Non-Conformances
and report to fellow
Management for action
6
Take Corrective Action and
check to ensure specification/
legislation has been met.
7
Discuss non-conformance
trends at management
meetings
End
RESPONSIBILITY
Additional Comments/Related
Documents
ISSUE 2
PAGE 1 OF 1
DATE: July 2013
APPROVED BY: Simon Chubb
Environmental NC is something that
contravenes a system requirement, or
causes an adverse environmental impact
e.g. spillage, emission to air over allowed
limits, incorrect waste disposal etc.
1. Identify any affected area / environmental issue,
as appropriate
2. Identify any machinery/equipment that caused
accident or adverse environmental impact.
1. Segregate to avoid unintended use
2. Place materials in designated
quarantine areas where practical.
1. Ensure sufficient information is recorded to
clearly state fault, for ease of analysis.
2. Report all instances of NCs to Estates &
Facilities Management Team
1. Look for repetitive patterns in relation to
Environmental Issues
2. Undertake root cause analysis as required
3. Undertake cost / benefit analysis of proposed
corrective actions
1. Ensure relevant legislation authorities have
been informed as required.
2. Ensure staff are retrained as required.
3. Ensure process is updated where required.
4. Ensure equipment is repaired as required.
5. Remove supplier from list where necessary
Ensure suitable action is taken as per
corrective action process map OP 05 and
preventative action process map OP 06.
Failure EMS System
Element
ALL STAFF
Top Management
EMS Rep
ALL STAFF
EMS Rep
OP04 Environmental Non-Conformance
Recording ISO 14001 Items on
Concept Evolution
July 2013 Page 1 of 9
Concept Evolution is a web-based facilities management system used by the Estates & Facilities
Service of Anglia Ruskin University for a range of facilities management functions, including helpdesk
call logging, buildings compliance management, and minor works project management. During
2012/13 the task management functions of this system were adapted to enable recording and
tracking of ISO 14001 items, including incidents, suggestions, audit findings (non-conformances,
observations, improvement opportunities), and corrective actions.
The process for using Concept Evolution for recording ISO 14001 items is as follows.
1. Open a web browser and navigate to the online Concept Evolution system:
www.anglia.ac.uk/evolution
2. Open the Task Management module.
Recording ISO 14001 Items on
Concept Evolution
July 2013 Page 2 of 9
3. To record a new item, click on the ‘Advanced Helpdesk’ option.
4. Insert details of the ISO 14001 item in the following order:
i) Reporter – insert the reporter of the incident or suggestion, or name of the auditor or
auditing company.
ii) Contract – select ‘ENMA – Environmental Management’
iii) Category – this should complete automatically with ‘Environmental’ once the ‘ENMA –
Environmental Management’ contract is selected.
iv) Problem – select ‘Env communications / improvement / improvement opportunity /
incident / near miss /non-compliance / preventative action / observation / suggestion’
as appropriate.
v) Raised – insert the date the item occurred, and the ‘Due By’ date for non-compliances
referring to the agreed date for completion of corrective actions, and click the lock icon.
For all other items, leave the date field blank and click the lock icon.
vi) Building – select the building the item refers to, or insert ‘Off Site (NON-OFF)’ for non-
location specific items.
vii) Location – select the specific room or location if applicable, or leave blank.
viii) Req. ID – insert the clause number of ISO 14001 for non-compliances, observations and
other related items, or leave blank.
ix) Discipline – select the team or job role with responsibility for managing the item.
Recording ISO 14001 Items on
Concept Evolution
July 2013 Page 3 of 9
x) Description – insert a brief description of the ‘Env communications / improvement /
improvement opportunity / incident / near miss /non-compliance / preventative action /
observation / suggestion’ as appropriate.
xi) Fault Code – select the topic which most closely describes the item e.g. biodiversity,
communication, document control, legal compliance.
xii) Source – select ‘Audit Internal’ or ‘Audit External’ as appropriate for audit items, or
Email / Telephone for incidents or suggestions received.
Leave all other fields blank / unchanged.
Recording ISO 14001 Items on
Concept Evolution
July 2013 Page 4 of 9
5. To assign the item to a specific person with responsibility for follow-up, select the ‘Resources’
option from the left hand menu, scroll through the list of names, and select a person by double
clicking on their name.
6. Confirm the selection by clicking the ‘Save and close’ icon from the top menu bar.
Recording ISO 14001 Items on
Concept Evolution
July 2013 Page 5 of 9
7. Follow-up actions for items, such as root cause analyses, corrective action plans, verification,
and item closures can be recorded by selecting the ‘Events’ option from the left hand menu and
clicking the ‘create new entity’ icon on the top menu bar. Incidents and non-compliances must
have a root-cause analysis and corrective action plan recorded.
8. Record the following details for each follow-up action.
i) Event – select the type of follow-up action. Events linked to the environmental account
have codes beginning with ‘E’, e.g. E00: Root cause analysis.
ii) Date Due – insert the date when the follow-up action is due.
iii) Actioned – tick this box unless the follow-up action is scheduled for a future date. This
box can be ticked for the majority of actions.
iv) Date Actioned – insert the date when the follow-up action was completed. For most
actions this will be the same as the due date.
v) Comments – insert the details of the follow-up actions, recording any evidence
associated with verification of corrective actions.
Recording ISO 14001 Items on
Concept Evolution
July 2013 Page 6 of 9
9. Documents can be attached to items, for example records as evidence to verify that actions have
been completed, by selecting the ‘Documents’ option from the left hand menu and clicking the
‘create new entity’ icon on the top menu bar.
Recording ISO 14001 Items on
Concept Evolution
July 2013 Page 7 of 9
10. Record the following details for each document.
i) Document Ref – insert a unique number for each document related to a specific item.
ii) Title – insert the document title that will be displayed.
iii) Repository – select ‘Environmental Management’.
iv) Path – click the ‘Browse’ button, navigate to the document to be uploaded and select it.
11. Once an item has been verified as completed, the evidence for its completion must be recorded
in the ‘Events’ section as the following type of event: E03: Item closed (see paragraph 7 above).
Recording ISO 14001 Items on
Concept Evolution
July 2013 Page 8 of 9
12. Next select the ‘Resources’ option from the left hand menu and double-click the person to
whom the item was assigned.
13. Insert the date that the item was verified as completed in the ‘Date Finished’ box.