Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 1
ExxonMobil Canada Canada East-Sable
OIMS
OIMS: System 10-2 Emergency Preparedness and Response
Comments:
This document may not be released in whole or in part without the express written permission of
ExxonMobil Canada Properties-Sable Project 1701 Hollis Street, Founders Square, Halifax, NS B3J 3M8
C8 Mar 2014 Annual Update
Kelly Thibbidao Barbara Welsh Keith Pike Hanna Janzen
C7 Oct 2012 Annual Update
Kelly Thibbidao Darren Crooks Kimberley Pearce Terry Hubele
C-6 March 2011 Move ESG Room
Dean Spence Darren Crooks Carolyn Harnett Terry Hubele
C5 10-22-10 Title Change – no change required to DCN
Dean Spence Darren Crooks Carolyn Harnett Terry Hubele
C4 6-23-2010 EOC Restructure
Dean Spence Darren Crooks Carolyn Harnett Terry Hubele
C3 11-15-08 Telelink Activation
Dean Spence Kevin Hughes Len Coughlan Terry Hubele
Rev. Date Reason for Issue
EMCE Emergency
Response
Preparedness Advisor
Onshore Ops. Supt. OIMS/EP&R/Trainin
g Coordinator
SHE/OIMS/Regulatory
Manager
Originated Approved Reviewed Endorsed
Professional Stamp/Seal (Where Applicable)
Title:
Sable Onshore Emergency
Response Reference
Document
Total Number
Pages:
102
Revision:
C8
Document Control Number: ZA-Z00-X-01-1002.03
Revision Key: A=Draft Issued for Comments, B=Issued for Internal Review/Signatures, C=Approved /Issued for Use
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 2
1.0 INTRODUCTION .............................................................................................................................. 6
1.1 Emergency Response Philosophy ...................................................................................................................................................... 7
1.2 Emergency Response Guiding Principles ......................................................................................................................................... 7
1.3 Purpose ............................................................................................................................................................................................... 8
1.4 Applicability ....................................................................................................................................................................................... 8
1.5 Accountability and Responsibility .................................................................................................................................................... 8 1.5.1 Onshore ........................................................................................................................................................................................ 8 1.5.2 Sable Offshore ER Reference Document ..................................................................................................................................... 8
1.6 Testing the Emergency Response Plan ............................................................................................................................................. 9
2.0 SABLE EMERGENCY RESPONSE ORGANIZATION .................................................................... 9
2.1 Field - Emergency Response Teams ................................................................................................................................................. 9
2.2 Incident Command Center (ICC) Mobilization .............................................................................................................................. 9
2.3 Founders Square Emergency Response Organization .................................................................................................................. 10
2.4 Mobilizing the Halifax EOC ........................................................................................................................................................... 10
Figure 1.00 – ExxonMobil Canada East - Emergency Support Group ................................................................................................... 11
Figure 2.00 - Sable Onshore Emergency Response Teams ....................................................................................................................... 11
Figure 3.00 Goldboro ICC Roles and Responsibilities ........................................................................................................................... 13
Figure 4.00 - Halifax EOC Roles and Responsibilities ............................................................................................................................. 14
Figure 5.00 - ESG Roles and Responsibilities ............................................................................................................................................ 14
2.5 Onshore Emergency Response Team Structure ............................................................................................................................ 15 2.5.1 On-Site Operations Chief (Goldboro Control Room Operator) ................................................................................................. 15 2.5.2 Identification of ERT Members ................................................................................................................................................. 15 2.5.3 Mobilization of the Onsite Emergency Response Team ............................................................................................................ 15
2.6 Onshore Unified Command Structure ........................................................................................................................................... 16
3.0 SEVERITY LEVELS OF EMERGENCY ..................................................................................... 17
3.1 Classification System ....................................................................................................................................................................... 17 3.1.1 Severity Level Zero (O) Emergency .......................................................................................................................................... 17 3.1.2 Severity Level One (1) Emergency ............................................................................................................................................ 17 3.1.3 Severity Level Two (2) Emergency ........................................................................................................................................... 17 3.1.4 Severity Level Three (3) Emergency ......................................................................................................................................... 17
Figure 6.00 - EMCE Incident Severity Level Matrix ............................................................................................................................... 18
4.0 COMMUNICATION AND NOTIFICATION .................................................................................. 19
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 3
4.1 Communications ............................................................................................................................................................................... 19
4.2 Notification / Communication Processes ........................................................................................................................................ 19
5.0 ICC FORMS AND CHECKLISTS ................................................................................................... 20
5.1 EMCE Sable Facilities ICC Forms and Checklists (detailed Information) ................................................................................ 20 5.1.1 Facility Status Sheet - Appendix 1 ............................................................................................................................................. 20 5.1.2 Incident Communications Checklist - Appendix 2 ..................................................................................................................... 20 5.1.3 First Arrival Instructions - Appendix 3 ...................................................................................................................................... 21 5.1.4 Telephone Call Sheet (example) - Appendix 4 .......................................................................................................................... 21 5.1.5 Timeout Sheet - Appendix 5 ...................................................................................................................................................... 21 5.1.6 Field Command Center Sign – In Log - Appendix 6 .................................................................................................................. 22 5.1.7 Field Command Center Action Log - Appendix 7 ..................................................................................................................... 22 5.1.8 Field Command Center Resources Log - Appendix 8 ................................................................................................................ 22 5.1.9 Field Command Center Log Sheet - Appendix 9 ....................................................................................................................... 22 5.1.10 Field Command Center Daily Team Assignment - Appendix 10 ............................................................................................... 22 5.1.11 Field Command Center General Meeting Log – ........................................................................................................................ 22 5.1.12 Goldboro and Point Tupper Control Room Emergency Response Checklist -Appendix 12 ...................................................... 23 5.1.13 Community and Local ER Contact Matrix – .............................................................................................................................. 23
6.0 POINT TUPPER LPG EMERGENCY RESPONSE PLAN (ONSITE) ............................................ 24
6.1 Purpose ............................................................................................................................................................................................. 24
6.2 Scope ................................................................................................................................................................................................. 24
6.3 Definitions ......................................................................................................................................................................................... 24
6.4 Application / Exceptions .................................................................................................................................................................. 25
6.5 Levels and Roles for Response ........................................................................................................................................................ 25
6.6 Method .............................................................................................................................................................................................. 27
6.7 Training Requirements .................................................................................................................................................................... 27
6.8 Training Material ............................................................................................................................................................................ 28
6.9 Resources .......................................................................................................................................................................................... 28
6.10 Attachments ...................................................................................................................................................................................... 28
6.11 References ......................................................................................................................................................................................... 28
ATTACHMENT "A": Emergency Plan for LPG ..................................................................................................................................... 29
7.0 POINT TUPPER LPG EMERGENCY RESPONSE PLAN (OFFSITE) .......................................... 35
7.1 Introduction ...................................................................................................................................................................................... 35
7.2 Sable Responsibilities ....................................................................................................................................................................... 35
7.3 Sable Owners Responsibilities ........................................................................................................................................................ 36
7.4 Sable Control Room Activities ........................................................................................................................................................ 37
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 4
7.5 Tank Car Incident ............................................................................................................................................................................ 37
Figure 7 - LPG EMERGENCY RESPONSE PROCEDURES FLOWCHART ..................................................................................... 38
Figure 8 - LPG EMERGENCY RESPONSE – TANK CAR LOG BOOK ............................................................................................. 39
Figure 9 - LPG EMERGENCY RESPONSE – CONTACT LIST ........................................................................................................... 40
Figure 10 - LPG EMERGENCY RESPONSE CORP. – ROLE DESCRIPTIONS ............................................................................... 41
8.0 SABLE ONSHORE AND NEARSHORE SPILL RESPONSE ........................................................ 44
8.1 Purpose ............................................................................................................................................................................................. 44
8.2 Description of the Pipeline and Their Contents ............................................................................................................................ 44
8.3 Near shore Section of the Subsea Production Gathering Pipeline ............................................................................................... 44
8.4 Overland Natural Gas Liquids Pipeline ......................................................................................................................................... 44
Table A – Pipeline Valve Locations ............................................................................................................................................................ 45
Table B - Properties of the Products Contained in the Pipelines Covered by this Plan (1) ................................................................... 46
Table C - Volumes of Natural Gas Liquids in Pipeline Sections .............................................................................................................. 47
Figure 11 - Map of Nearshore Section of the Subsea Production Gathering Pipeline ........................................................................... 48
9.0 ONSHORE TMR RADIOS .......................................................................................................... 50
9.1 Overview ........................................................................................................................................................................................... 50
9.1.1 Zones & Channels ........................................................................................................................................................................ 50 9.1.2 Switching Between ExxonMobil Zones and Emergency Talk Groups ...................................................................................... 50
9.2 Government Conditions for Use and Access of the Mutual Aid Talk Groups ............................................................................ 51
9.3 Mutual Aid Simplex Channels ........................................................................................................................................................ 52
Figure 13 - Talk Groups .............................................................................................................................................................................. 52
9.4 Functional Performance .................................................................................................................................................................. 53
Figure 14 - Buttons and Switches -XTS 3000 model 2 .............................................................................................................................. 53
Figure 15 -Buttons and Switches - Astro Spectra W4 .............................................................................................................................. 54
APPENDICES .............................................................................................................................................................................................. 55
Appendix 1 - Facility Status Sheet .............................................................................................................................................................. 55
Appendix 2 - Incident Communications Checklist .................................................................................................................................... 55
Appendix 3 - Emergency Operations Centre - First Arrival Instructions .............................................................................................. 55
Appendix 4 - Emergency Operations Center - Telephone Call Sheet ..................................................................................................... 55
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 5
Appendix 5 - Timeout Sheet ........................................................................................................................................................................ 55
Appendix 6 – Field Command Center - Incident Sign In Log .................................................................................................................. 55
Appendix 7 - Field Command Center - Incident Action Log ................................................................................................................... 55
Appendix 8 - Field Command Center - Incident Resource Log ............................................................................................................... 55
Appendix 9 - Field Command Center - Incident Log Sheet ..................................................................................................................... 55
Appendix 10 - Field Command Center - Daily Team Assignment ........................................................................................................... 55
Appendix 11- Field Command Center - General Meeting Log ................................................................................................................ 55
Appendix 12 - Goldboro Control Room Checklist .................................................................................................................................... 55
Appendix 13 - Point Tupper Checklist ....................................................................................................................................................... 55
Appendix 14 - Community and Local ER Contact Matrix....................................................................................................................... 55
Appendix 15 - Emergency Response Planning Maps (Emergency Planning Zones) .............................................................................. 55
Appendix 16 - Onshore ICC Checklists ..................................................................................................................................................... 55
Appendix 17 – Public Affairs Response to an Emergency ........................................................................................................................ 55
Appendix 18 – Family Response to an Emergency ................................................................................................................................... 55
Appendix 19 – Responder Pocket guide ..................................................................................................................................................... 55
Appendix 20 – Exhibit of ER Contact Card .............................................................................................................................................. 55
Appendix 21 - Onshore Flowcharts ............................................................................................................................................................ 55
Terrorism / Sabotage / Workplace Violence at Onshore Sable Facility .....................................................................................................
Hazardous Spill Onshore Sable Facility .................................................................................................................................................... 95
Gas Release Onshore Sable Facility ........................................................................................................................................................... 96
Medical Incident Onshore Sable Facility ................................................................................................................................................... 97
Severe Weather Onshore Sable Facility..................................................................................................................................................... 98
Liquid Spill Onshore/Near Shore Sable Facility ....................................................................................................................................... 99
Rail/Truck Incident Onshore Sable Facility ............................................................................................................................................ 100
Bomb Threat Onshore Sable Facility .............................................................................................................................................................
Hostage Taking at Onshore Sable Facility ....................................................................................................................................................
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 6
1.0 INTRODUCTION
This Emergency Response Reference Document has been developed by ExxonMobil Canada
Properties (EMCP) as the operator of the Sable Offshore Energy Project (SOEP) to describe the
guiding principles, objectives and structure that will be implemented in responding to an
emergency situation at Sable onshore facilities. This document details response structures that
can be implemented during emergency events. Supporting documentation like the Sable
Onshore Emergency Response Reference Document comprised of checklists, technical data /
information and resource contacts have been specifically developed for use by the
organizations emergency responders. The concept of this framework document and the
relationship with other response plans is presented in the diagram below.
Oil Spill
Response Plan Security Plan
Emergency Response
Response Philosophy
Guiding Principles
Accountabilities and Responsibilities
Organizational Structure
Site specific reference documents
Emergency Operations Centre (EOC) reference documents
Emergency Support Group (ESG) reference documents
Fra
mew
ork
P
lan
s S
up
po
rt
Emergency Response
Plan
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 7
1.1 Emergency Response Philosophy
ExxonMobil Canada East (EMCE) is committed to ensuring the safety of all people associated
with its Sable operations onshore. During an emergency, maintaining the safety of those
initially unaffected; ensuring the safety of those responding to the incident; and rescuing those
who may have been injured are the prime responsibilities of responders and those in command.
The EMCE - Sable Onshore Emergency Response Reference document aims to ensure the
safety of people, reduce the potential for environmental impacts and to reduce the potential for
loss or damage of physical assets.
All personnel involved in emergency response contribute to the development and improvement
of this and other emergency response documentation, and are trained to act in compliance with
this plan during any emergency situation.
This Sable Onshore Emergency Response reference document is available to all employees,
both onshore and offshore. This may include contractors that service the Sable production
facilities. Updates are redistributed both electronically and in a paper format.
1.2 Emergency Response Guiding Principles
Emergency Response capabilities have been and will continue to be tested regularly. The
results of exercises are incorporated into the appropriate resource material, which are
designed to improve performance. Goldboro has 2 dedicated emergency response rooms
in the Administration building (Control Room and ICC) to support emergency response
capabilities.
Emergency Response capability is an integral part of Sable's business and it is integrated
into the Business Planning Process.
Exercises, which can involve all of the Sable resources and appropriate external agencies,
are critical to ensuring preparedness for emergency response.
Appropriate training and exercises are conducted regularly to improve and maintain a
group of well-trained, competent individuals/teams.
Every employee, whether specifically assigned or not, has a responsibility to Emergency
Response as part of daily work and is expected to participate in both exercises and an
actual event.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 8
1.3 Purpose
This document:
describes the emergency response organizational structure;
details procedures, diagrams, flowcharts, and checklists to be followed for all reasonably
anticipated emergency response events.
To meet response objectives, the Sable Onshore Emergency Response Reference Document
defines individual roles and responsibilities, outlines training necessary to ensure competency
in emergency response, details communication hardware and processes, and provides checklists
and or flowcharts.
1.4 Applicability
This document applies to all Sable Onshore Facilities and Sable Contractors. This document
covers incidents at all Sable Onshore facilities, and the NGL pipeline. The ER Plan will be the
governing document for all activities for the life of the project and will be bridged with related
response plans to facilitate the maximum control of emergency situations.
1.5 Accountability and Responsibility
The Production Manager for ExxonMobil Canada has overall accountability for the Sable
emergency response capability.
1.5.1 Onshore
The EMCE SSHE Manager is responsible for emergency preparedness at all Sable
production facilities, various work sites, and maintaining competency of emergency
response teams.
The EMCE OIMS/Emergency Response Advisor is responsible for the technical
integrity of the emergency response system and execution of the activities described in
this document relating to participants.
At the onshore facilities, the Onshore Superintendent is responsible for emergency
response, including execution of response efforts, maintaining competency of onshore
teams, approval for and review of emergency response exercises.
1.5.2 Sable Offshore ER Reference Document
The “Sable Offshore ER Reference Document” (ZA-A00-X-90-1002.01) defines the
Emergency Response structure at the Sable Offshore Facilities.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 9
1.6 Testing the Emergency Response Plan
The Sable Onshore Emergency Response Reference Document will be continually tested to
ensure it is current, comprehensive and effective. This is accomplished through regular drill
and simulation exercises.
The Sable Facility Emergency Drills and Exercises Procedure (ZA-Z00-X-01-1002.01)
supplies details for this process.
2.0 SABLE EMERGENCY RESPONSE ORGANIZATION
2.1 Field - Emergency Response Teams
The field Emergency Response organization deals with the immediate on-site incident and is
made up of a number of teams, each with their own specialized skills. This group has
responsibility for immediate action aimed at controlling and mitigating any emergency
situation. The team's primary purpose is to ensure the safety of personnel, protection of the
environment, and security of the installation.
2.2 Incident Command Center (ICC) Mobilization
The Incident Command Center (ICC) is located in the Goldboro Administration building.
During regular work hours, mobilization of the ICC Response Team will be normally initiated
through a facility muster alarm.
During off-hours (nights and weekends), mobilization of the ICC will be initiated by the
Goldboro Control Room Operator (Operations Chief). This identified person will follow a
checklist (appendix 12) during an emergency incident. Part of that list would include a
telephone call to the on call Operations Team Lead (OTL) or designate. The OTL in turn
would contact the ICC Team members if required via telephone and have them report to the
Goldboro facility. Responders will carry an operating cell phone at all times and will report to
the Goldboro Control Room or ICC Center at the Goldboro Gas Plant when activated.
Mobilization of the Halifax Emergency Operations Center (EOC) can be initiated by the
Control Room Operator or Operations Team Lead by contacting TELELINK in Newfoundland
at 1-709-748-4264.
Depending on the severity of the incident and the corporate support required (normally severity
2 or 3); the Operations Section Manager in the EOC will re-contact Telelink in Newfoundland
to activate the ESG (Emergency Support Group).
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 10
Core areas of expertise provided by the ICC Team are:
Incident Commander
On-Site Operation Chief (Control Room Operator or Lead Operator)
Operations Co-ordinator
Logistics Co-ordinator
Safety / Planning Co-ordinator
Event Recorder
2.3 Founders Square Emergency Response Organization
There are 2 separate emergency response teams for ExxonMobil Canada East Operations.
1. The Emergency Operations Center (EOC) supplies direct tactical response/support to the
Sable incident site Command Center or if required contractor facilities.
2. The Emergency Support Group (ESG) supports all EMCE owned/joint venture incident
Command Centers. (Sable, Hibernia, Terra Nova, Kometik, and NTL).
2.4 Mobilizing the Halifax EOC
The Responsible Person at the facility will assess the incident severity.
Severity 2 or 3 incidents support automatic mobilization of Halifax EOC Team.
(mobilization of Halifax EOC team may be initiated during an escalating severity 1
incident).
The Responsible Person calls 1-709-748-4264. (Telelink in Newfoundland) to mobilize
Halifax EOC Response Team.
Give the person at Telelink your name and role description.
Give person at Telelink a location, brief description and severity rating of the incident.
Ask for a full mobilization of the Halifax EOC Team and supply a call back number.
Once the local EOC has been mobilized, the normal method of communications will be
through the phone and fax lines.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 11
Figure 1.00 – ExxonMobil Canada East - Emergency Support Group
This diagram outlines the “ExxonMobil Canada East Emergency Support Group” (ESG) showing
communication links to EMCE Owned and Joint Venture companies.
Legal
Advisor
Spill
Response
EMO
Industrial
Hygiene
SH&E
Contractors
Consultant
Upstream
ExxonMobil
H. R.
Finance
Manager
Event
Recorder
SHE
Manager
Additional Support from Sub Teams to assist the
Emergency Support Group
ESG Leader
Drilling
Through EOC
Business
Impact
Security
HALIFAX - EMERGENCY
OPERATIONS CENTER
HIBERNIA - EMERGENCY
OPERATIONS CENTER
MCM - KOMETIK
DRILLING PROJECTS
CONSTRUCTION
PROJECTS
NEWFOUNDLAND
TRANSHIPMENT
TERMINAL
TERRA NOVA
EXPLORATION
PROJECTS
Technical
Advisor
Severity 2/3 Event - additional
support required from the ESG
Support from ESG
EMCE Owned and Joint
Venture Companies
Procurement
Through EOC
Public
Affairs
Deputy ESG
Leader
ESG
Facilitator
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 12
ESG Leader
Operations Section Manager
Operations /
Technical
Coordinator
Logistics
Coordinator
Safety
Coordinator
Human Resources
Coordinator
2 - Event
Recorders
Goldboro ICC - Incident
Commander
Goldboro - Control Room Operator
Point Tupper Frac Plant - Operator
Finance
Manager
SHE Manager
Technical
Advisor Public Affairs
Manager Deputy ESG
Leader
Operations
Coordinator
Logistics
Coordinator
Event
Recorder
Safety / Planning Coordinator
Emergency Support Group
Halifax Emergency
Operations Center
Goldboro Incident
Command Center (ICC)
2nd Technical Coordinator
As Required
Solid lines indicate
normal mode of
communication
between response
teams
Broken lines
indicate possible
communication links
during off -hours,
off site facilities, and
drilling functions
ESG Facilitator
Incident
Site
Field - On Scene Commander
Legal
Figure 2.00 - Sable Onshore Emergency Response Teams
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 13
Figure 3.00 Goldboro ICC Roles and Responsibilities
Role Major Responsibility ICC - Incident Commander Command and control of the ICC
Classification of the incident
Maintain a team focus
Support the incident site
ICC Operations
Co-ordinator Main point of contact to the incident site
Collection of data form the incident
Transfer data to the ICC team
ICC - Logistics Co-ordinator
As Required
Determine in field logistical support
Determine additional logistical support off site
Weather Forecasting
Determine transport / supplies to the incident
ICC - Safety / Planning
Co-ordinator
As Required
Help plan a response to the incident
Notification to external agencies
Identify additional SH&E issues
Develop strategy to reduce risk
ICC - Event Recorder Ensure set up of the facilities
Transfer incident information to information board
Maintain documents for record keeping
Field On Scene Commander
As Required
Ensure safety of personnel
Point of contact for ICC and Control Room
Field manager
Control of incident site
On-site Operation Chief Command and control of the incident site until the Incident Commander arrives
Classification of incident
Develop and implement the incident action plan
Notification
Notify OTL of incident
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 14
Figure 4.00 - Halifax EOC Roles and Responsibilities
Role Major Responsibility Operations Section
Manager Command and control of the EOC
Classification of the incident
Maintain a team focus
Support the incident site
Plan a response to the incident
Operations /
Technical Co-
ordinator
Main point of contact to the incident site
Collection of data form the incident
Transfer data to the EOC team
Mobilize switchboard and security
Activate contractor representatives
Human Resources
Co-ordinator Personnel tracking
Mobilize Family Telephone center
Mobilize Family Support Center
Track personnel movement during evacuation
Safety Co-ordinator Notification to external agencies
Identify and SH&E issues
Develop strategy to reduce risk
Logistics Co-
ordinator Determine in field logistical support
Determine any additional logistical support
Weather Forecasting
Determine transport / supplies to the incident
Event Recorder Ensure set up of the facilities
Transfer incident information to information board
Maintain documents for record keeping
Figure 5.00 - ESG Roles and Responsibilities
Role Major Responsibility ESG Leader Establish high level communication links
Assess business impact
Develop a business strategy
Ensure public affairs, technical and financial support
SHE Manager High level Safety Health and Environmental issues
Communications with ExxonMobil business unit
Develop high level strategy to reduce risk
Technical Advisor Technical support for the ESG
Identify Technical Resources
Business recovery plan
Finance Manager Finance resource for the incident
Compensation and claims strategy
Business Impact
Notify Security Regulatory Authorities
Public Affairs
Manager Asses the Public Affairs requirements
Mobilize the Media Response Teams
EMC Reputation impacts
Planning of press releases and news conference
Event Recorder Ensure set up of the facilities
Transfer incident information to information board
Maintain documents for record keeping
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 15
2.5 Onshore Emergency Response Team Structure
2.5.1 On-Site Operations Chief (Goldboro Control Room Operator)
The Operations Chief will be the first to respond to any Onshore Emergency Event and
is responsible for initial:
Command and control of the incident site.
Classification of incident.
Development and Implementation for initial incident action plan.
Notification of Onshore On-call Operations Team Lead (OTL).
Make other critical notifications.
Mobilize the Onshore Emergency Response Team if required.
2.5.2 Identification of ERT Members
The onsite ERT Team members are identified on the “ERT Members List” located at
each onshore facility adjacent to the personnel tracking rack.
2.5.3 Mobilization of the Onsite Emergency Response Team
During normal business hours, the Onshore ER Teams will assemble at muster stations
at both Goldboro and Point Tupper. During after hours, the Goldboro On-Site
Operations Chief will contact the OTL and determine if the Onshore ERT is to be called
out. Telephone call-out (if required) will be completed by the On-Site Operations Chief
or designate by direct call out method. Upon notification, the Onshore ER Team
members will report to their assigned facility and take direction from the Incident
Commander.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 16
2.6 Onshore Unified Command Structure
Overall Incident
Commander
EMO
On Scene Commander
(Typically Fire Rep.)
Sable Incident
CommanderEHS Response Org
Operation Safety Logistics
Sable
On Scene
Rep
EHS On
Scene
Rep
RCMP On
Scene
Rep
Other On
Scene
Rep
Other Response Org.
with On Scene
Representation
Communications of other On Scene Reps to
their own organizations
Communications of other On Scene Reps to
their own organizations
On Scene Response Structure
Sable ICC
UNIFIED COMMAND STRUCTURE
Normally the
Local Fire
Chief
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 17
3.0 SEVERITY LEVELS OF EMERGENCY
3.1 Classification System
The Sable Onshore Incident Commander, or Goldboro Control Room Operator will declare the
incident severity level in the field as outlined in the "ExxonMobil" Incident Severity
Assessment Level Matrix" (figure-6.00). The Sable EOC Operations Section Manager or ICC
Incident Commander may change the emergency severity level status once the facts related to
an emergency have been assessed.
3.1.1 Severity Level Zero (O) Emergency
Severity level Zero is an incident that is normally is very low risk and requires
notification to business units. A severity Level Zero may have the potential to escalate
into a more serious severity level.
3.1.2 Severity Level One (1) Emergency
A Severity Level One Emergency is an emergency where the public or the environment
is not at serious risk. The incident can be controlled by personnel on-site or readily
dispatched to the site. The incident is contained on-site. However, a Severity Level One
Emergency has the potential to escalate. The required Municipal, Provincial, and
Federal agencies must be alerted.
A Severity level One Emergency can also be declared for incidents that are not
immediately recognised as emergencies but because of the uncertainty of their
consequences can be declared Severity level One Emergency.
3.1.3 Severity Level Two (2) Emergency
A Severity level Two Emergency is any emergency that presents a definite risk to Sable
personnel, the public, or the environment. The emergency cannot be confined to a Sable
facility and external assistance is required. Extensive media contact is also required.
Sable’s assets or image may be compromised. Outside services Municipal, Provincial,
and Federal Government agencies must be alerted. This has the potential to develop
into a Severity level Three Emergency.
3.1.4 Severity Level Three (3) Emergency
A Severity level Three Emergency is an emergency where control of the situation has
been lost, presenting a definite hazard to Sable personnel, the public, or the
environment. A Severity level Three Emergency could evolve from a Severity level one
or Two Emergency. A Severity level Three Emergency can also include significant and
on-going environmental impacts. A Severity level Three Emergency also means that
there is immediate, multi-agency, Municipal, Provincial, and Federal Government
involvement.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 18
Figure 6.00 - EMCE Incident Severity Level Matrix
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 19
4.0 COMMUNICATION AND NOTIFICATION
4.1 Communications
All Sable facilities have a comprehensive suite of communication systems. These
may include Public Address, UHF and VHF radio, telephone (land and satellite),
and fax machines. An aeronautical radio system provides voice communication
between the facility, aircraft, vessel, and shore. A public address and emergency
alarm system is provided to alert personnel of emergency situations. A multi-
channel UHF trunked radio system is used as one of the primary means of routine
facility operation communications. The telephone system may use a satellite and /
or hard wire contact depending on the location. In areas onshore where UHF and
VHF radio signal strength may be decreased, cellphone boosters are utilized by our
ER personnel and they can also be supplied to local Emergency Services personnel
as required. Communication is a critical part of any emergency response. The
person in control of the incident may decide, under exceptional circumstances, to
use communications channels outside the normal protocols described in this section
(identified in section 9 - TMR Radio Procedure).
To be effective, an Emergency Response Plan requires an effective communication
system. Response personnel need to be appropriately informed during a serious
incident to enable emergency support. The EMCE emergency response team
Flowchart (figure 2.00) provides a framework for effective communication.
Communication links and the capture of pertinent information during an emergency
response event are critical to a successful response. The emergency response teams
use many tools to help in decision making. Some of these tools include Information
Boards, faxable information forms, log sheets, checklists, and maps or charts. Some
of these tools are identified in the following sections.
4.2 Notification / Communication Processes
During an emergency response, incident communication and notification processes
must be clear and simple to allow for proper transfer of information and decision
making within the response teams and community. This is accomplished through
proper checklists and communication links between the incident sites, response
teams, regulators, contractors, and the business unit. The Halifax EOC and
ExxonMobil Canada East - ESG team is responsible to support the onshore
facilities and teams with Public Affairs, Media, and Family Response.
Incident information must be obtained as soon as possible from the incident site and
transferred to the emergency response teams (ICC and EOC) to speed the support
process. The information from the incident site must be captured, documented, and
relayed to other support teams (ESG). In turn, from this information, quick
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 20
decisions can be made within the ER Teams on the best way to aid and support the
incident site. Sable has incorporated into their emergency response rooms many
response tools to aid in this communication transfer. These include telephones,
radios, faxes, checklists, and information boards.
5.0 ICC Forms and Checklists
Multiple ICC forms / checklists have been developed for use by our emergency
responders in the field, emergency response centers, and control room to obtain
information quickly, accurately and regularly from the incident site and relay this
data to support teams. Information whiteboards are used in all EMCE emergency
response rooms to collect and display incoming data and aid in the decision-making
processes.
This section outlines how EMCE Sable Facilities utilizes forms and checklists
during an emergency situation. A list of ICC forms is detailed in section 5.1 and
outlined within the plan appendices.
5.1 EMCE Sable Facilities ICC Forms and Checklists (detailed Information)
5.1.1 Facility Status Sheet - Appendix 1
The "Facility Status sheet" will be kept in all EMCE Sable facility
Control Rooms. In the event of an emergency (severity 2 or 3) this
form will be completed as soon as possible by the Goldboro Control
Room Operator or designate and faxed into the Halifax EOC (1-902-
490-8885). This form is generic and incorporates information for both
onshore and offshore facilities. The Goldboro Control Room Operator
or designate should complete only the sections pertinent to their
facility. During the incident and as the status of the facility changes,
this form can be updated by the Goldboro CR Operator or designate
and again faxed to the Halifax EOC. The information from this sheet
will be copied onto the information boards in the EOC.
5.1.2 Incident Communications Checklist - Appendix 2
The "Incident Communications Checklist" form is used to obtain
pertinent ongoing information from the incident site. During an
incident, the Operations Co-ordinator (Halifax / Goldboro) will
contact the incident site (as outlined in figure 2.00) at intervals of
between 10 and 15 minutes and ask the questions itemised on the
checklist. The information gathered by the Operations Co-ordinator in
turn will be relayed to the Operations Section Manager / Incident
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 21
Commander. This form will also be faxed to other response teams
that require this information (ICC to EOC / EOC to ESG). From this
information, decisions can be made to support the incident site.
During the incident as the severity is lessened and the situation
stabilizes, call intervals to the incident site may be less frequent.
5.1.3 First Arrival Instructions - Appendix 3
The "1st Arrival Instructions" form is used by the EOC in Halifax and
the ICC On-site Operations Chief in Goldboro to gather the first
information from the incident scene. The first person arriving in the
ICC / EOC will contact the incident site, identify themselves to the
first activated responder, and proceed to ask the questions itemised on
this checklist. This information will be placed on information boards
and relayed to the ICC / EOC response team as they arrive in the
response room. These forms can then be faxed to the other response
teams (ICC to EOC, EOC to ESG). From this initial information,
decisions can be started to support the incident site.
5.1.4 Telephone Call Sheet (example) - Appendix 4
Each member of the EOC, ESG, and ICC has access to a "Telephone
Call Sheet". This sheet is used to capture information derived from
telephone conversations with the incident site, contractors and
regulators or from the business units. The information, if required,
can then be placed onto proper information boards by simply circling
the correct box at the bottom of the call sheet. The top sheet of this
form will be given to an Event Recorder. The call sheet originator
will keep one copy of the call sheet for their records.
After an Incident, the EMCE OIMS/EP&R Advisor will require all
the paperwork from the response rooms. This paperwork will be held
for one year in the event of an investigation or inquiry.
5.1.5 Timeout Sheet - Appendix 5
The purpose of the "Timeout Sheet" is to ensure the Leaders in the
Sable emergency response rooms (ESG, EOC, ICC) maintain focus
and control of their teams during the entire incident. As the
information is obtained from the incident (Incident Communications
Checklist), the leader of the team will assess the needs of the incident
site and formulate a plan to give support using this form. At intervals
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 22
of 10 to 15 minutes, the team leader will hold a timeout to direct,
inform, and focus the team.
5.1.6 Field Command Center Sign – In Log - Appendix 6
This Incident Sign in Log sheet will be used by the "On Scene
Commander" in the field to capture personnel entering or exiting
either an incident site or work area at the site. This form would be
used at an incident staging area where workers or equipment are
deployed.
5.1.7 Field Command Center Action Log - Appendix 7
This Incident Action Log sheet will be used by the "On Scene
Commander" in the field during meetings to detail actions to be
performed at the field incident site and by whom. This form would be
used at an incident staging area where workers or equipment are
deployed.
5.1.8 Field Command Center Resources Log - Appendix 8
This Incident Resources Log sheet will be used by the "On Scene
Commander" in the field to track resources that are required at the
incident site. These resources could include equipment, persons, or
teams. This form would be used at an incident staging area where
workers or equipment are deployed.
5.1.9 Field Command Center Log Sheet - Appendix 9
This Incident Log sheet will be used by the "On Scene Commander"
in the field to track events as they occur during the entire incident.
This form would be used at an incident staging area where workers or
equipment are deployed.
5.1.10 Field Command Center Daily Team Assignment - Appendix 10
This “Daily Team Assignment” sheet will used by the "On Scene
Commander" in the field to identify personnel working on teams in
the field at the incident site. This form would be used at an incident
staging area where workers or equipment are deployed.
5.1.11 Field Command Center General Meeting Log –
Appendix 11
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 23
This General Meeting Log sheet will be used by the "On Scene
Commander" in the field during regular meetings with personnel /
contractors to capture items discussed and personnel in attendance.
This form would be used at an incident staging area where workers or
equipment are deployed.
NOTE: Field information sheets should be contained in a binder and
placed in the Control Room for easy access when required for an
event.
5.1.12 Goldboro and Point Tupper Control Room Emergency Response
Checklist -Appendix 12
In the event of an incident at the Goldboro / Point Tupper facility
(severity 2 or 3) the Goldboro Control Room Operator or designate
would use this checklist as a guide for personnel safety, facility
management, notification, and ER Team mobilization.
5.1.13 Community and Local ER Contact Matrix –
Appendix 14
In the event of an incident at the Goldboro / Point Tupper facility
(severity 2 or 3) the Safety / Planning Co-ordinator (or designated
member of the ICC Team) can use this checklist as a guideline for
communication purposes.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 24
6.0 POINT TUPPER LPG EMERGENCY RESPONSE PLAN
(Onsite)
6.1 Purpose
This plan establishes an appropriate level of preparedness and response capability
for Liquefied Petroleum Gas related events.
6.2 Scope
The Plan provides emergency response capability for:
1. Transportation emergencies as required under the Transportation of
Dangerous Goods Act; and stationary tank (Environmental or E2) emergencies
as required under the Canadian Environmental Protection Act.
2. This plan applies to stationary tank incidents at the ExxonMobil Canada
Properties (ExxonMobil) operated Pt. Tupper Fractionation Plant.
3. Costs may apply for all services rendered during a response event.
Activities covered by the Plan:
Products: LPG
Container Types: Tank Cars (rail)
Tank Trucks
Stationary containers (fixed systems).
Activities Inclusions: Response to emergencies involving stationary containers, loading activities for truck and rail facilities.
Facilities Responded
For: Pt. Tupper Fractionation Plant
Levels of Response: Provision of initial information by market personnel or LPGERC (if activated).
Attendance by Market Responders.
Attendance by Market Responders with assistance from corporate resources
Activation of the LPGERC including attendance by an RMA and/or Response Team under the terms and conditions of the contractual agreement with the LPGERC (LPGERC members only)
6.3 Definitions
"LPG" is defined as liquefied petroleum gas.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 25
"LPGERC" is the Liquefied Petroleum Gas Emergency Response Corp., a wholly
owned subsidiary of the Propane Gas Association of Canada Inc.
"Responders" attend the scene and remediate. This may include ExxonMobil
Canada Properties employee(s) and/or contractor(s).
"MSDS" is defined as a Material Safety Data Sheet
"Response Team" is defined as a team acting for the LPGERC.
"RMA" is defined as a Remedial Measures Advisor acting for and supplied by
the LPGERC.
6.4 Application / Exceptions
See Scope for application.
There are no exceptions from the requirements of this standard.
6.5 Levels and Roles for Response
Level 1 Response – (site operations, local police or fire departments)
May handle the event without escalating the response to the next level under the
following circumstances:
There is no damage to the means of containment (tank or cylinder) or other
mechanical components (piping etc)
The means of containment is secure and not damaged.
Zero to minimal release of product through mechanical fittings.
The product can be managed using normal day-to-day processes with minimal
impact on public safety. These processes include, product transfer, flaring, physical
movement of containers and vehicles etc
On site responder is responsible to escalate response to Level 2 (if required) as
determined by their initial assessment.
Level 2 Response – (site operations, local police or fire departments, LPGERC)
May handle the event without escalating the response to the next level under the
following circumstances:
The means of containment is in contact with the ground surface or has been
impacted by an external object.
Zero to minimal release of product through mechanical fittings.
No significant structural damage on means of containment that impacts structural
integrity of means of containment.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 26
Team Leader is responsible to escalate response to Level 3 (if required) as
determined by their assessment of situation.
Responders from ExxonMobil Canada Properties may provide additional advice
via telephone and/or attend the scene along with the response team. This
applies to any event that may be responded to.
Level 3 Response – (LPGERC Response - local police or fire department,
EMCE Personnel support)
The LPGERC resources may be activated for any major event (as per the policies of
the LPGERC) at the discretion of ExxonMobil Canada employees or by first
responders and government authorities. The event will be handled on their behalf by
LPGERC.
The LPGERC can be activated by calling 1-800-265-0212 and indicating that a
large-scale event has occurred.
A Remedial Measures Advisor (RMA) will be dispatched to the scene by the
LPGERC.
The RMA may activate a team of specialists that will respond with additional
personnel and equipment if required.
The responder’s role is to assist the LPGERC responders as requested.
ExxonMobil Canada Properties prime contact (or designate) will advise the
appropriate senior company Representatives. The prime contact is the Onshore
Superintendent.
Bulk truck and cargo liner drivers are certified and trained as per provincial
regulatory requirements to operate these vehicles. They may transfer LPG to and
from tank trucks, cargo liners, filling plants and container refill centres and fill
containers on the premises of end-users through the trucks product transfer system.
Gas fitters may install, inspect, alter, purge, activate, repair, service or remove gas
equipment and accessories essential to its operation within the scope of their
provincial certification.
Contractors may provide services such as gas fitting, transportation, lifting, site
remediation in event of oil spill etc.
Manager is responsible to ensure that appropriate market business processes are
established and followed by market staff to comply with this standard. A copy of
this standard and the accompanying completed "Attachment "A": Plan Template -
Emergency Plan for LPG" must be posted at each market facility.
Designated Regulations & Operational Integrity Team members and Fleet
Team members monitor the response (either on site or remotely) to an LPG
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 27
Emergency and assist the market responders by providing incident management
advice and guidance.
ExxonMobil Canada Properties' prime contact(s) or designate to LPGERC:
Onshore Superintendent
Other regional and corporate resources are listed in Figure 9.0. Each Team may
provide various support functions depending on the scale of the event, location and
need.
6.6 Method
Initiation of Response
Responses may be initiated by two methods.
ExxonMobil Canada Properties customers or others
Customers will call LPGERC to activate a response. The number is available 24
hours/day for service. These events will generally be small scale in nature and
response resources will be escalated as appropriate.
First Responders and Government
In order to maintain a direct activation capability for employees, first responders
and government, the LPGERC may be contacted directly at 1- 800 - 265-0212. This
activation number appears on shipping documents. The activation will be initiated
in accordance with the LPGERC's terms and conditions of their plan participant’s
agreement.
Both activation processes may be completed in English or French.
Reporting - Regulatory and Internal
See Attachment “A”
6.7 Training Requirements
LPGERC is certified provincially to perform various tasks. Certification
regulations in each province will determine training required to fulfil
certification.
Additional internal technical training requirements based on job function must
be carried out and records maintained according to applicable legislation.
LPGERC courses "Fire Awareness", "Incident Command System/REACT",
"Gas Detection" and "Containers" can be used to supplement company resource
skills.
LPGERC response preparedness defines training requirements for LPGERC
responders. See LPGERC plan for details.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 28
6.8 Training Material
See section 6.7.
6.9 Resources
Resources that may be available to supplement the on-site or local response
capability in larger scale events including:
Halifax Emergency Support Group
Halifax Emergency Operations Centre
Goldboro Incident Command Centre
Goldboro/ Pt. Tupper On scene Commander
Third party resources: LPG Emergency Response Corp.
Regulatory authorities:
Transport Canada
Environment Canada
Nova Scotia Department of Environment and Labour
Nova Scotia Utilities and Review Board
6.10 Attachments
Attachment “A” Emergency Plan for LPG
6.11 References
The LPGERC plan forms a portion of ExxonMobil Canada Properties response
capability. See LPGERC plan documentation for preparedness and response
services. This is accessible from ExxonMobil Canada Properties and is not
maintained in hard copy at all locations.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 29
ATTACHMENT "A": Emergency Plan for LPG
EXXONMOBIL CANADA PROPERTIES' EMERGENCY RESPONSE PLAN FOR TRANSPORTATION AND
ENVIRONMENTAL (STATIONARY TANK) EMERGENCIES INVOLVING LPG IS MULTI-LAYERED,
WITH EACH LEVEL PROVIDING MORE COMPREHENSIVE RESOURCES AS THE SCALE OF THE
EVENT INCREASES.
The initial component of the emergency response plan will consist of establishing and
maintaining 24-hour emergency response capability utilizing internal staff and / or contractors.
These resources will generally respond to small-scale transportation and stationary container
events.
This document forms part of ExxonMobil Canada Properties' overall emergency response plan
for LPG related events.
Facility Contact Information:
Name Barbara Welsh Onshore Operations Superintendent Phone: (902) 387-3038
Fax: (902) 387-3018 Email Address: [email protected]
Facility/Plant Information - One plan must be completed for each location or facility.
Location/Site Name: Point Tupper Fractionation Plant
Address: 3940 Port Malcolm Road
City: Port Hawkesbury Province: Nova Scotia Postal Code: B9A 1Z5
Phone: (902) 625-6571
LPG Quantity Information
Total Plant Storage: 2158 Tonnes
Capacity of Largest LPG Tank: 158 Tonnes
Notes:
1 Gallon (US) = 0.00187 tonnes; 1 Gallon (UK, Canadian, Imperial) = 0.00224 tonnes; 1
yard = 0.9144 meters; 1 Litre = 0.000493 tonnes; Density of liquid propane at 25ºC =
0.493 kg/L
Storage capacity is to be calculated based on 80% of container capacity (legal maximum).
The National Emergency Response Guidebook (NARG) is used by fire fighters, police and other
emergency services personnel who may be the first to arrive at the scene of an incident. It is
primarily a guide to aid first responders in quickly identifying the generic hazards of the
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 30
materials involved in the incident and the protecting of themselves and the general public during
the initial response phase of the incident.
It references distances affected if a large-scale emergency were to occur.
Worst-case scenario: 800 - 1600 metres (NARG);
Alternate large-scale scenario: Up to 800 metres (NARG); Alternate controllable small-scale scenarios: Within confines of property. No evacuation necessary.
Potential Consequences in Case of Accident
Inventory Worst Probable Case
Scenario
Alternate Case Scenario
Distance to a thermal
radiation of 5 kW/m2
Distance to a thermal
radiation of 5 kW/m2
Distance to an
overpressure of 1 psig
(6.9 kPa)
Tonnes Litres US
Gallons
BLEVE 50.8 mm
(2 inch leak)
Wind 1.5 m/s Stability F
4.5 8,876 2,345 285 m 265 m 165 m
6.0 11,834 3,126 310 m 290 m 165 m
7.5 14,793 3,908 335 m 310 m 165 m
9.0 17,751 4,689 355 m 330 m 165 m
34.6 68,138 18,000 555 m 495 m 165 m
57.6 113,563 30,000 660 m 595 m 165 m
115.2 227,127 60,000 830 m 775 m 165 m
The fragments could theoretically reach 1.6 kilometres from the source.
PREVENTION
Installation:
The installation and operation of storage tanks and equipment complies with municipal zoning
bylaws, and applicable legislation. This legislation includes the Propane Storage and Handling
CSA B149 Code. This is a National Standard of Canada that is adopted into law in all provinces.
Certification and training:
All employees must be trained and certified as per provincial legislation to install, maintain and
operate LPG transfer facilities, trucks and end user systems. ExxonMobil Canada employees are
also required to meet internal training standards based on job function.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 31
Do employees meet the training requirements above?
Yes No
Inspection of facility:
Is a regular facility inspection completed as required by company standard? (Regularity: daily )
Yes No
Do you dispose of all empty propane containers in a safe manner?
Yes No N/A
Are employees and/or anyone else who may be responsible for implementing this emergency
plan aware of their responsibilities and have the necessary skills/training?
Yes No
PREPAREDNESS
The primary component of the site emergency response plan will consist of establishing and
maintaining 24-hour emergency response capability utilizing staff and / or contractors. These
resources will generally respond to small-scale events. Does everyone at the site recognize the smell of LPG?
Yes No Is everyone at the site aware of the location of this plan and where to find the emergency
response phone numbers?
Yes No
Is everyone at the site aware of their responsibilities under this plan?
Yes No Does the location have a process in place to provide 24-hour emergency response capability?
Yes No
Does the site have a process in place to ensure that the after hours contact information is current?
Yes No The local fire department must be contacted annually and invited to visit the facility to review
emergency procedures. This must be documented in the regular safety committee meeting
minutes. Has this been completed within the last 12 months?
Yes No If No, date for completion: ________________
(mm/dd/yyyy)
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 32
Site Information: Attach a sketch of the site indicating the evacuation plan. The following information must be
shown:
All on-site buildings and plant storage tanks.
The location of the railway right-of-way; property line, fences; gates, adjacent roadways,
adjacent properties (c/w buildings and uses) and contact information for neighbours.
An orientation insignia indicating the direction “North”.
Equipment information:
ExxonMobil Canada Properties will respond using a wide variety of equipment depending upon
the severity of the event. Examples include gas detection equipment, service vehicles, etc.
Additional equipment may be obtained from LPGERC. For large-scale stationary and
transportation events resources may be supplemented by LPG Emergency Response Corp. teams
and equipment.
Has a process been established and followed to ensure that equipment is maintained and ready
for use should an event occur?
Yes No If No, date for completion:
(mm/dd/yyyy)
ExxonMobil Canada Properties Onshore Operations Superintendent is responsible to ensure that
the appropriate business processes are established and employees are compliant with this plan.
Responders may be employees or contractors
Number of ExxonMobil Canada employees / contractors in positions below at this location
Gas fitters: 0
Bulk drivers: 0
Plant/utility: 10
Others employees who may respond: 30
Contractor resources. Please list contractor name and capability
LPGERC______________________________________________________________________
______________________________________________________________________________
________________________________________________________________________
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 33
Response
THE EMERGENCY RESPONSE ACTIVATION AND NOTIFICATION PROCESS IS DRIVEN FROM THE
SITE LEVEL AND ESCALATES AS FOLLOWS:
The initial call is generally received directly at the location or the company office.
The location will respond with personnel and equipment to deal with small-scale
events and notify appropriate authorities.
1. Responders attend the scene and provide advice and assistance that may involve (but is
not limited to) such things as:
1. Escalating response to Level 2 or 3 (if required) as determined by their initial
assessment.
2. Providing technical and product advice in regard to the LPG involved;
3. Sourcing and procuring any equipment, personnel and materials needed to handle
the LPG involved;
4. Inspecting LPG systems to establish the presence of damage or leaks;
5. Making recommendations to officials at the emergency site (if applicable) on
actions to be taken with respect to the LPG and the container if damage or leaks are
found;
6. Securing valves and plugs;
7. Fixing minor leaks;
8. Coordinating the transfer, flaring, purging or other handling of LPG;
9. Coordinating emergency repairs of LPG systems;
The Role of ExxonMobil Canada Properties responders and appropriate resources is to assist the
LPGERC responders (if activated) as requested.
Emergency phone numbers as required:
Initial & Immediate Contact #'s (as applicable) Phone Number
Fire Department 911
Police 911
Environment Canada regional office 426-6200
Transport Canada 1-800-387-4999
Provincial gas regulatory authorities NSURB 424-4448
Internal Contact #'s (as applicable)
Safety Representative Clinton Cariou: 490-8998
Onshore Ops. Superintendent Barbara Welsh: 387-3038
Operations Superintendent M. David Acker 490-8741
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 34
Local Residents NuStar: 902-625-1711
NSP: 902-625-2323
New Page: 902-625-2460
Written Report requirements
Incident report and investigation (see Incident Management Manual)
Transport Canada (30 day Dangerous Occurrence Report)
Environment Canada (30 day Report)
Has a process been established and responsibilities assigned to facilitate initial and written
notification?
Yes No If No, date for completion: (mm/dd/yyyy)
Recovery
Following an environmental emergency, as soon as is reasonably possible, in co-operation with
local governments and other impacted stakeholders as required ExxonMobil Canada Properties
will develop a plan for the recovery of the site to a condition as safe and acceptable as reasonably
possible. ExxonMobil Canada Properties will be responsible for recovery of product and will
include in the planning: working with outside resources to support recovery; damage assessment
& communication to stakeholders; project planning to bring resources to bear at the right times;
organizing community resources to help those recovering
Recovery of actual product will be limited to non-existent when dealing with LPG’s.
Adequate ventilation of areas to ensure safe return to the vicinity will be carried out as
part of the Response phase of the incident.
Disposal of debris and equipment will be the responsibility of the site owner.
Onshore Operations Superintendent:
Signature ______________________Print ________________ Date _________
(mm/dd/yyyy)
ER Co-ordinator:
Signature ______________________ Print________________ Date _________
(mm/dd/yyyy)
Operations Superintendent:
Signature _____________________Print _________________ Date _________
(mm/dd/yyyy)
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 35
Point Tupper Fractionation Plant
7.0 POINT TUPPER LPG EMERGENCY RESPONSE PLAN
(Offsite)
7.1 Introduction
This document contains a description of procedures required by Sable and the Sable
owners in case of an emergency incident involving a tank car or tank truck
containing LPG product. Section 7.2 describes the responsibilities for Sable.
Section 7.3 describes the responsibilities for the Sable Owners and section 7.4
describes the activities which must be followed by the tank car which originated
from the Sable Point Tupper Fractionation Facility. A process flowchart included in
Figure 7 – LPG Emergency Response Procedures Flowchart provides a summary of
the activities required by the Sable Goldboro control room in case of an emergency
incident.
7.2 Sable Responsibilities
For purposes of Emergency Response assistance involving tank cars and tank trucks
containing LPG products. Sable is a member of the LPG Emergency Response
Corp. (LPGERC). As a member of LPGERC, Sable has obtained an Emergency
Response Assistance Plan (ERAP) number and Emergency Activation phone
number for emergency incidents in Canada. A short role description of the
LPGERC is provided in FIGURE 10 for information. The Sable ERAP and
activation phone number will be printed on all Sable Bills of Lading (BOLs). For
shipments to USA destinations, the Sable Owners 24 hour /day telephone number
(Goldboro control room: 1-877-374-0770) will also be printed on all butane or
mixed products tank cars or truck shipments originating out of the Sable Point
Tupper Fractionation Facility, the Emergency Activation phone number must be
called to activate Sable’s ERAP. The railway carrier, trucking carrier or members of
the public may call LPGERC directly in the event of an incident to activate Sable’s
Emergency Response Assistance Plan. Once Sable is notified of the incident, the
steps described in Figure 7 – Sable LPG Emergency response Procedures Flowchart
will be followed.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 36
The following emergency response information will be included on all Sable BOLs:
Shipping name: Special Commodity: Liquefied
Petroleum Gases Propane or Butane or Propane Mix product
Flammable gas: Class 2.1 UN1075
Sable 24 hr/day phone number (877) 374-0770
Sable E.R.A.P. registration no: ERP2-0010-116
LPG Emergency phone no – Canada 1-800-265-0212
Placards Flammable Gas 2 – 4 Placards
Applied per tank
7.3 Sable Owners Responsibilities
The Sable Owners will be responsible for the following:
The applicable Sable Owners(s) Emergency Response Assistance Plan
number(s) will be activated by Sable emergency response organization upon
identification of tanks car(s) by Sable.
Each Sable Owner must provide Sable with their Emergency Response
Assistance Plan number (see figure 9 - owner ERAP or LPGERC plan number)
as well as a 24 hour emergency activation phone number for the emergency
incidents in Canada.
Each Sable Owner must provide Sable with a 24 hour emergency activation
phone number for emergency incidents in USA.
Each Sable Owner must file MSDS information with their own Emergency
organization or Chemtrec for shipments into USA.
Each Sable Owner must provide a single 24 hour Owner company contact
number (see figure 9) where Sable can make a call in the event of a
transportation emergency incident involving LPG product.
As owners of the LPG products, each Sable Owner must include revenue for
LPG volume transported from Sable Point Tupper site when renewing PGAC
membership for the year 2000 and forward. This will allow Sable to maintain
minimal fees for annual Propane Gas Association of Canada Inc. (PGAC)
membership.
Each Sable Owner’s personnel will respond to transportation emergency
incidents as applicable.
In the event of an incident, each Sable Owner must make all notifications to the
Regulatory Agencies as required in the jurisdiction where the incident occurred.
Each Sable Owner should be registered with CANUTEC.
Each Sable Owner must have the response capacity to deal with cleanup of
environmental contamination due to a liquid spill. This is in addition to the
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 37
emergency response service provided through Emergency Response Assistance
Plan.
Sable Owners who are not shipping product out of Point Tupper Fractionation
facility are not required to follow the directives above. However such Sable
Owners must ensure that the appropriate documentation is submitted to Sable
detailing who the appropriate shipper is. It is also critical that such information
be kept up to date.
7.4 Sable Control Room Activities
The Sable Goldboro control room activities for an incident involving a tank car or
tank truck shipment originating from the Sable Point Tupper Fractionation Facility
are described in Figure 7 – LPG Emergency Response Procedures Flowchart.
Sable must maintain information current in this procedure and revise as necessary.
In particular contact personnel and phone numbers must be reviewed and be kept
current.
7.5 Tank Car Incident
Sable Point Tupper loading staff must fill in the LPG Emergency Response Tank
Car Log Sheet (Figure 8) for each tank car loaded daily. This information must be
transmitted to the Goldboro control room daily (via fax) for the immediate reference
in the event of an incident and call being received.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 38
Figure 7 - LPG EMERGENCY RESPONSE PROCEDURES FLOWCHART
Sable - offsite LPG Emergency Response Flow Chart (Tank Car or Truck)
An Incident occurs on an LPG Tank Car or Tank Truck in an off-sight location in Canada
Goldboro Control
Room is
immediately aware
of the incident
NO YES
Acquire Incident Information
Activate the Sable Emergency Response Assistance Plan
1. Call the LPGERP – 1-800-265-0212 and activate /
inform them of the incident.
2. Inform the Gas Plant Superintendent / Production
Supervisor of the incident.
3. Call the appropriate Sable Owner (as identified on
the Tank Car Log or Bill of Lading) and inform
them of the incident.
4. Supply technical data to all responders as required.
Goldboro Leadership to determine the need for additional
support for the incident (incident near site or injuries)
Activation of ICC / EOC
Public Affaire support
Company representation at incident site
Response / equipment support at incident site
Notify identified company of delivery interruption
Acquire Incident Information from person
calling into the Control Room.
Activate the Sable Emergency Response Assistance Plan
1. Call the LPGERP – 1-800-265-0212 and confirm
they have been activated (if not activate).
2. Inform the Gas Plant Superintendent / Production
Supervisor of the incident.
3. Call the appropriate Sable Owner (as identified on
the Tank Car Log or Bill of Lading) and confirm
they have been informed of the incident.
4. Supply technical data to all responders as required.
Goldboro Leadership to determine the need for additional
support for the incident (incident near site or injuries)
Activation of ICC / EOC
Public Affaire support
Company representation at incident site
Response / equipment support at incident site
Notify identified company of delivery interruption
An Incident occurs on an LPG Tank Car or Tank Truck in an off-sight location in the United States
Acquire Incident Information from person
calling into the Goldboro Control Room.
Activate the Sable Emergency Response Assistance Plan
1. For Sable Owner –Shell (as identified on the Tank
Car Log or Bill of Lading) call - CHEMTREX at –
1-800-424-9300 and confirm they have been
notified / activated.
2. For Sable Owner - Imperial Oil Ltd (as identified on
the Tank Car Log or Bill of Lading)
call - 1-619-339-2145 and confirm they have been
notified / activated.
3. Inform the Gas Plant Superintendent / Production
Supervisor of the incident.
4. Supply technical data to all responders as required.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 39
Figure 8 - LPG EMERGENCY RESPONSE – TANK CAR LOG BOOK
SABLE OFFSHORE ENERGY
POINT TUPPER FRACTIONATION FACILITY 3940 PORT MALCOLM ROAD
POINT TUPPER, NOVA SCOTIA
B0E 2V0
DATE: Tuesday, September 27, 2016
FAX TO: SABLE GOLDBORO CONTROL ROOM
1-902-387-3399
FROM: SABLE
SABLE LOADERS
SUBJECT: LPG EMERGENCY RESPONSE – TANK CAR LOG BOOK
SHIPPING DATE: October 9, 1999
Car
Initial
Car
Number
SOEI
Owner Product Loaded Destination
1 CGTX 000000 Propane Odorized City/Province
2 CGTX 111111 Propane Un-Odorized
3 CGTX 222222 Butane
4 CGTX 333333 C3C4 mix
5 CGTX 444444 NGL Mix
6
7
8
9
10
11
12
13
14
15
16
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 40
Figure 9 - LPG EMERGENCY RESPONSE – CONTACT LIST
SABLE OFFSHORE ENERGY
POINT TUPPER FRACTIONATION FACILITY 3940 PORT MALCOLM ROAD
POINT TUPPER, NOVA SCOTIA
B0E 2V0
CONTACT LIST PHONE NUMBER ERAP NUMBER ACTIVATION
PHONE NUMBERS
SABLE:
CONTROL ROOM:
Goldboro 1-877-374-0770 ERP2-0010-116 Can: 1-800-265-0212
LPGERC:
LPGERC ACTIVATION
PHONE NUMBER: 1-800-265-0212
SABLE OWNERS:
SHELL:
1-800-661-7378 ERAP: ERP2-0024
Can: 1-800-265-0212
USA: 1-800-424-9300
(CHEMTREC)
IMPERIAL OIL LTD:
24 hour number 1-866-232-9563 ERAP: 2-0012
Can: 1-519-339-2145
USA: 1-519-339-2145
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 41
Figure 10 - LPG EMERGENCY RESPONSE CORP. – ROLE DESCRIPTIONS
THE LPG EMERGENCY RESPONSE CORPORATION
Throughout Canada’s propane industry, safety is of paramount importance. However, incidents can happen, any time and any place. When they do, the LPG Emergency Response Corp. is there, 24 hours a day, 365 days a year. Highly trained personnel with state of the art emergency response capabilities are ready at all times to assist in handling an incident involving the storage or transportation or larger quantities of LPG (propane, butane or mixtures therefore). Any company that offers for transport or imports certain classes of dangerous goods (including LPG) must have a plan in place to handle emergencies. This is required by law and regulated by Transport Canada. Since 1987 the Propane Gas Association of Canada (PGAC) has made the services of its plan available to industry. Now called the LPG Emergency response Corp., this wholly owned subsidiary of PGAC is staffed with qualified and trained individuals employing state of the art equipment through which its services will be delivered. A call to the Plan’s 24 hour national emergency response telephone line at 800-265-0212 sets in motion the teams and equipment necessary to effectively and efficiently resolve any incident. This private plan is available for use by its member companies, transportation companies and government agencies or representatives. E.g. police, fire departments. THE PLAN IN ACTION In order to meet the highest standards for emergency response to LPG incidents involving storage containers or transportation by rail and road a team of highly trained specialists has been organized across Canada. This response capability involves Response Manager, Remedial Measures Advisors, Response Teams and a Home Base Coordinator. A phone call placed through the 24 hour activation telephone number starts the following:
Response Managers
Accept calls in English and French
Provide the initial consultation and advice
Activate Emergency response Assistance Plan if required
Notify appropriate local plan participants of emergency situation
Dispatch the appropriate Remedial Measures Advisors and Response Team to the
site
Remedial Measures Advisors
First to arrive at the scene within a maximum of 6 hours after being called out
Technical experts who provide expert advice and assistance in handling the incident
In some incidents, complete minor repairs
Response Teams
Provide hands on expertise within a maximum of 12 hours after being called out
Bring the necessary equipment and expertise to perform remedial procedures
Fully hands on emergency responders who, among other things, are experts in
transferring products and purging LPG containers
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 42
Home Base Coordinator
Performs the vital function of keeping all parties in constant communication
This function continues from the moment of the first call until the emergency has
been successfully handled
Training
All response personnel are extensively trained in the handling, storage and/or
transportation of LPG products and containers. Their “hands on” training includes
courses on product transferring, vapor and liquid flaring, container purging, and
bonding and grounding as well as WHMIS, TDG Certification, First Aid, CPR, H2S
Awareness and SCBA/PPE.
FREQUENTLY ASKED QUESTIONS ABOUT THE LPG EMERGENCY
REPONSE ASSISTANCE PLAN What defines an LPG emergency?
Any incident in Canada which involves a potential or actual discharge of liquefied
petroleum gas (LPG including propane, butane and mixtures thereof) from a rail tank
car, tank truck, or large stationary storage tank (420 lbs or greater).
What does the LPG Emergency Response Corp. do? In the event of an emergency, specially trained personnel go to the incident site as
quickly as possible to provide technical advice and assistance to the emergency crews.
Their objective is to work toward the safe and effective resolution of the problem. When is the service available? This is a 24 hour, 7 days a week, year-round emergency response service capable of
responding in both English and French.
Who can activate the plan? Anyone may phone the emergency response line including police or fire officials, an
industry plant participant or the general public.
Who responds to the emergency calls?
A nation wide network of emergency responders (called Remedial Measures Advisors
and Response Teams) has been established. They are specially trained and skilled in
dealing with any type of situation involving LPG. What do these responders do?
Remedial Measures Advisors evaluate the need for specialized equipment or skills and
ensure a quick delivery of same to the incident site.
They also assist in damage assessment to the LPG containers involved in the incident,
use gas detection equipment to monitor the area surrounding the incident, and advise on
cordoning off the area or localized evacuation of nearby residents or workers.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 43
All response Teams have extensive knowledge and are fully trained to perform safe
product transfer, container purging and other emergency response procedures.
When the emergency has been success concluded, LPG Emergency response. Corporate
Team members will advise the local police and fire departments that if it is safe to stand
down the area.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 44
8.0 SABLE ONSHORE AND NEARSHORE SPILL
RESPONSE
8.1 Purpose
This section provides the user with quick reference information on Sable On-shore
and Near-shore Spill Response. The Sable Onshore and Near Shore Spill Response
Reference document is a controlled document in Sable Docs (# ZA-Z00-X-00-
1002.006) that will provide in depth Spill Response information and supporting
documentation to the ICC Team if a spill from the pipeline is reported. Specific
information will be required to plan and execute an effective spill response.
8.2 Description of the Pipeline and Their Contents
This plan applies to spills from:
The near shore section of the subsea production gathering pipeline
The overland natural gas liquids pipeline.
8.3 Near shore Section of the Subsea Production Gathering Pipeline
The subsea production-gathering pipeline transports both natural gas and natural gas
liquids from the offshore production site near Sable Island to the onshore gas plant
at Goldboro. It has an overall length of approximately 225 kilometres. However,
this plan applies only to the 5.75-km section of the pipeline nearest the gas plant.
This section includes a 3.5-km section of subsea pipeline, extending from the
entrance of Country Harbour to the point of landfall in Betty’s Cove and a 2.25-km
section of on land pipeline extending from the point7 of landfall to the gas plant
(Figure 11). This is a two-phase pipeline carrying both natural gas and natural gas
liquids. The pipeline is 660 mm in diameter, constructed of welded carbon steel,
with a wall thickness of 17.48 mm. The line allows a maximum flow rate of 18.3
million m3/day at a design pressure of 15.3 MPag and maximum operating pressure
of 11.7 MPag. This section of the pipeline is buried to a depth of from 1 to 4 meters
throughout its length.
The properties of the two-phase mixture contained in the pipeline are summarized
in Table B.
8.4 Overland Natural Gas Liquids Pipeline
This pipeline will transport natural gas liquids (NGL) from the gas plant near
Goldboro to the fractionation plant at Point Tupper, a distance of 61 kilometres
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 45
(Figure C). The line is composed of a single carbon steel pipe, 219 mm outside
diameter, 6.4 mm wall thickness. The pipeline is buried throughout its length to an
average depth of 1.0 m. Burial depth varies from 0.6 m in bedrock to 1.2 m in
agricultural land.
The pipeline carries 3318 cubic meters of NGL per day at operating pressures
between 4,137 to 6,895 KPag.
For reasons of safety and environmental protection, the sections of the pipeline
crossing the Salmon and Milford Haven Rivers and the Strait of Canso can be
isolated from the remainder of the pipeline by valves. In the event of a leak, this will
minimize the amount of spillage into these water bodies. This divides the pipeline
into six sections, and limits the size of the worst-case spills from each section, as
described in Table “A”. The locations of these emergency valves are listed below.
The composition and physical properties of the NGL are summarized in Table “B”.
Table A – Pipeline Valve Locations
Pipeline Valve Locations: Goldboro to Point Tupper
Valve Station Name Location KP Location
Salmon River Upstream Goldboro to Salmon River KP022+100
Salmon River Downstream Salmon River Crossing KP023+900
Milford Haven Upstream Salmon River to Milford Haven KP035+976
Milford Haven Downstream Milford Haven Crossing KP036+500
Strait of Canso – Mainland Bank Milford Haven to Strait of Canso KP057+650
Strait of Canso – Pt Tupper Bank Strait of Canso Crossing KP060
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 46
Table B - Properties of the Products Contained in the Pipelines Covered by this Plan (1)
Properties
Two- Phase
Mixture (2)
Natural Gas Liquids (3) Propane Butane Mix Butane
Appearance
Colourless liquefied gas
Colourless to dark liquid
Colourless liquefied gas
Colourless liquefied gas
Odour
odourless
Rotten egg odour if hydrogen
sulphide present
NE
mild
Boiling Point (˚ C)
NE (4)
NE
-42
-1
Upper Explosive Limit 46.0 7.8 9.5 9.5
Lower Explosive Limit 4.5 1.05 2.0 1.1
Vapour Pressure
452 KPA @ 21.1 ˚ C
<377 KPA @ 50.9 21 ˚ C
>1000 mm Hg @ 20 ˚ C
>1000 mm Hg @ 20 ˚ C
Density, Vapour (air = 1)
>1
>1
1.6
2.0
Density, Liquid
NA
NA
NA
NA
Solubility in Water
negligible
negligible
negligible
negligible
Specific Gravity (water = 1)
0.51 to 0.61 @ 21.1 ˚ C
0.5 to 0.7
0.5
0.6
Percent Volatile by Volume
100
100
100
100
Evaporation Rate
(Butyl Acetate = 1)
<1
>1
NE
NE
Viscosity
NE
<40 SUS @ 20˚ C
NA
NA
1. Based on Material Safety Data Sheets included here in MAP AND LISTS 4.2.2, 4.2.3, 4.2.4, 4.2.5, 4.2.6
2. Contents of the subsea production-gathering pipeline.
3. Contents of the overland natural gas pipeline.
4. NA = not applicable, NE = not established
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 47
Table C - Volumes of Natural Gas Liquids in Pipeline Sections
Pipeline
Section
Description of Section Length of
Section (km)
Volume
(cubic metres)
1
Goldboro to Salmon River
22 + 150m
758.9
1b
Salmon River Crossing
1.8
61.62
2
Salmon River to Milford Haven
13
445.4
2b
Milford Haven Crossing
0.4
13.7
3
Milford Haven to Strait of Canso
21
719.5
4
Strait of Canso Crossing
3
102
Total
61
2102
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 48
Figure 11 - Map of Nearshore Section of the Subsea Production Gathering Pipeline
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 49
Spill Occurs
Activate the Goldboro
ICC Team
Activate the Halifax
EOC and EMCE - ESG
Teams Through
TELELINK
1-709-748-4264
Goldboro Control Room Operator
Activates EMO
to maintain the
safety of the
community and
surrounding
areas For spill in
Fractionation Plant,
Tank Farm, and
Strait of Canso
Activate the Point
Tupper Marine
Services (PTMS)
902-625-1711
Supplies
direction /
support to EMO
/ Spill
Responders with
regards to
affected spill
area
Identified Responder mobilizes to the spill area, contacts EMCE On Scene
Commander, and initiates cleanup activities
EOC
Supports
the ICC
with spill
response
Activates site
On Scene
Commander to
set up command
post and
support cleanup
efforts
Spill Response is completed - repairs to pipeline initiated
ESG
Supports
the EOC
with spill
response
Houston ESG
Supports the
EMCE - ESG in
spill response
(NARRT)
For spill on land from
the pipeline
activate New-Alta Spill
Services to supply Spill
Response
1-800-567-7455
Oil Spills on Water
(Offshore Platforms,
26” line from
Thebaud, rivers,
wetlands, tributaries)
Activate Eastern
Canada Response
Corporation (ECRC)
1-613-930-9690 Contract Number is
E004-00033
Isolates the equipment and prepares for
spill cleanup and repairs to pipeline
Authorized individuals to activate ECRC are:
M. David Acker
Kevin Barker
Offshore Installation Manager
Barbara Welsh
Mike Flemming
Howard Sangster
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 50
9.0 ONSHORE TMR RADIOS
9.1 Overview
ExxonMobil Sable Onshore facilities utilize the TMR radios for the following:
1) Normal Communication - between Goldboro and Point Tupper and along
the pipeline ROW's.
2) Emergency Response - for inter-agency communications during co-
ordinated emergency scene response.
9.1.1 Zones & Channels
1) The TMR radios are typically operated in the Exxon Mobil Zone on
channel #1 during normal process operations.
2) During an emergency response that would require inter-agency
communications (e.g. EHS, EMO, RCMP, FIRE, etc.) the radios
would be operated on one of the Emergency Talk Groups (or channels)
identified in Figure “13”
9.1.2 Switching Between ExxonMobil Zones and Emergency Talk Groups
Power on Radio by
Turn Radio on by rotating volume button
Observe zone on LCD display. Typically should read
EXXONMOBIL CALL
1. Change from ExxonMobil Zone to an Emergency Talk Group
(Be sure to reference conditions in 9.2. This describes who, what and when an Emergency
Talk Group can be initiated)
Press and ZONE should appear on the display.
Press directly below ZONE on the display.
Press once and the emergency talk group that corresponds to the channel
Selector will appear. I.e. if channel 1 were selected, this would be Mutual Aid 1.
(See Figure 13 for emergency talk groups / channels)
HOME
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 51
2. Change from Emergency Talk Group back to the ExxonMobil Talk Group
Press and Hold and the ExxonMobil zone will re-appear
9.2 Government Conditions for Use and Access of the Mutual Aid Talk Groups
A PRO-ACTIVE APPROACH TO MANAGING THE SIX MUTUAL AID TALKGROUPS IS
REQUIRED TO PRESERVE PERFORMANCE AND INTEGRITY OF THE TMRS NETWORK. IF,
FOR EXAMPLE, USERS ACROSS THE PROVINCE LISTEN TO ACTIVE RESPONDERS
WORKING A SITUATION, THE REPEATERS WILL BE UNAVAILABLE FOR OTHER RADIO
COMMUNICATIONS. TO PREVENT THIS SITUATION, THE FOLLOWING SET OF GUIDELINES
SHOULD BE OBSERVED IN THE USE OF MUTUAL AID TALK GROUPS.
MUTUAL AID TALKGROUPS ARE DESIGNED FOR INTER-AGENCY COMMUNICATIONS
DURING A COORDINATED SCENE RESPONSE. THESE GUIDELINES APPLY TO ALL
GOVERNMENT AND NON-GOVERNMENT AGENCIES AUTHORIZED TO HAVE ACCESS TO
THE MUTUAL AID TALK GROUPS.
ALL EMERGENCY CALLS MUST BE INITIATED VIA THE 911 SYSTEM. 911 WILL DIRECT
THE CALLING PARTY TO AN INCIDENT COMMANDER OR DISPATCH OPERATOR.
SITUATIONS ARE MANAGED BY AN INCIDENT COMMANDER, WHO WILL DIRECT THE
USE OF THE MUTUAL AID TALKGROUPS AS NECESSARY TO ENSURE THE EFFECTIVE
RUNNING OF THE OPERATION. THE CONSOLE OPERATOR OF THE CUSTODIAL AGENCY
WILL ASSIGN A MUTUAL AID TALKGROUP TO THE INCIDENT COMMANDER.
The Custodial Agencies are:
· DNR for Mutual Aid 1 and 2;
· EHS for Mutual Aid 3 and 4; and
· RCMP for Mutual Aid 5 and 6.
RADIO USERS ARE TO SWITCH TO A MUTUAL AID TALKGROUP ONLY WHEN DIRECTED
TO DO SO BY A SUPERVISOR, DISPATCH CONSOLE OPERATOR OR INCIDENT
COMMANDER.
MUTUAL AID TALKGROUPS ARE NOT TO BE USED FOR UNAUTHORIZED PURPOSES SUCH
AS:
· Communication for a purpose other than direct scene response;
· Monitoring; and
· Hailing Communications Centers.
HOME
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 52
9.3 Mutual Aid Simplex Channels
MUTUAL AID SIMPLEX CHANNELS ARE PROGRAMMED INTO MOST TMRS PUBLIC
SAFETY RADIOS. BECAUSE THE IMPACT OF USE IS LOCALIZED TO A SMALL
GEOGRAPHIC FOOTPRINT, RADIO USERS CAN USE THESE CHANNELS WITHOUT THE SAME
LEVEL OF AUTHORIZATION AS IS REQUIRED FOR MUTUAL AID TALKGROUPS.
HOWEVER, THESE CHANNELS SHOULD NOT BE USED INDISCRIMINATELY.
Figure 13 - Talk Groups
Talk group
Name
Talk group
Number(s) Description of Talk group Usage
MUT AID 1 802505
Mutual Aid talk groups are designed for inter-agency communications during a coordinated scene response. Agencies are responsible to be aware of specific guidelines for the use of these talk groups.
MUT AID 2 802507
MUT AID 3 802509
MUT AID 4 802511
MUT AID 5 802513
MUT AID 6 802515
SIM ALL 1 866.0125 Simplex Mutual Aid frequencies are for localized scene response. SIM ALL 2 866.5125
SHUBIE 802003 Use SHUBIE to contact the Shubie Communications Centre. The operator will instruct you to move to GSS-DNR to communicate with the requested agency staff member.
GSS-DNR 802099
MFR-CB 800171 EHS talk groups provided to allow Regional medical first responders to communicate with EHS Dispatch and the First Response Communications Officer. These three talk groups should be used based on where the call is located: Cape Breton region, Central region or Northern region.
MFR-C 800169
MFR-N 800173
AMT AIR 802287 Talk group provided for direct communication with the EHS helicopter.
AMT SIMPLEX 867.0625 Simplex frequency provided for direct communication with the EHS helicopter.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 53
9.4 Functional Performance
Figure 14 - Buttons and Switches -XTS 3000 model 2
Description Function
1. 16-Position Select Knob Talk group/Channel Select 2. On/Off/Volume Knob On/Off/Volume 3. 3-Position Switch Unprogrammed 4. Top Side Button Display Light 5. Side Button 1 Unprogrammed 6. Side Button 2 Display Site 7. PTT Switch Push-To Talk
8. Top Button Unprogrammed 9. Concentric Switch Unprogrammed 10. Liquid Crystal Display
10
8
9
7
6
5
4
3
2
1
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 54
Figure 15 -Buttons and Switches - Astro Spectra W4
Description
Function
1. Dim Button Dim Display 2. H/L Button Horn/Lights 3. Home Button Home Mode 4. Blank Button Unprogrammed 5. Phone Button Respond to Call Alert 6. Scan Button Site/RSSI 7. Call Button Private Call 8. Select Button Call Alert Page 9. Down Arrow Button Zone Down 10. Up Arrow Button Zone Up 11. Dir Button Radio to Radio 12. Mon Button Monitor Button 13. On/Off/Vol Knob On/Off/Volume 14. Mode Knob Talkgroup/Channel Select
1
2
3
4
5
6
7 8
9
10
11
12 13 14
14 13
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 55
APPENDICES
Appendix 1 - Facility Status Sheet
Appendix 2 - Incident Communications Checklist
Appendix 3 - Emergency Operations Centre - First Arrival Instructions
Appendix 4 - Emergency Operations Center - Telephone Call Sheet
Appendix 5 - Timeout Sheet
Appendix 6 – Field Command Center - Incident Sign In Log
Appendix 7 - Field Command Center - Incident Action Log
Appendix 8 - Field Command Center - Incident Resource Log
Appendix 9 - Field Command Center - Incident Log Sheet
Appendix 10 - Field Command Center - Daily Team Assignment
Appendix 11- Field Command Center - General Meeting Log
Appendix 12 - Goldboro Control Room Checklist
Appendix 13 - Point Tupper Checklist
Appendix 14 - Community and Local ER Contact Matrix
Appendix 15 - Emergency Response Planning Maps (Emergency Planning Zones)
Appendix 16 - Onshore ICC Checklists
Appendix 17 – Public Affairs Response to an Emergency
Appendix 18 – Family Response to an Emergency
Appendix 19 – Responder Pocket guide
Appendix 20 – Exhibit of ER Contact Card
Appendix 21 - Onshore Flowcharts
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 56
Appendix 1 - Facility Status Sheet
Goldboro Point Tupper Thebaud Other: ___________
Fax form to Halifax EOC # 1-902-490-8885 Time: ___________
Production Online Offline N/A
ESD Yes NO N/A
Well Status Open Closed N/A
Depressurization Status Started Completed N/A
Main Power Generator Status On Off N/A
Emergency Generator Status On Off N/A
Fire System Status Online Offline N/A
Facility Operational Status -
Number of Persons Injured - Number of Persons Missing -
Outside Agencies Contacted -
Support Required -
Facility Drilling Status -
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 57
Appendix 2 - Incident Communications Checklist
From: _________________ Date: ___________ Time: __________
1 - What is the current facility status / situation?
2 - Is there a potential for escalation?
3 - What is the threat to personnel or facility?
4 - What is the facility focus?
5 - What assistance do you require?
6 - Can you supply any other information relating to the incident?
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 58
Appendix 3
Emergency Operations Center - 1ST ARRIVAL INSTRUCTIONS
1. Obtain the following copies of pertinent information from the Clip Board in the EOC
1. Current copy of the POB List
2. Latest weather report
3. Latest Vessel Position & Activity Report
2. Contact the Incident Scene to obtain information about the incident
3. Identify yourself to the Incident Commander / OIM at the Incident Scene.
(Ensure you let them know you are the first arrival at the EOC)
4. Prompt the Incident Commander / OIM for the information below:
Time of Incident ___________________________________________________________________
Current Facility Status_______________________________________________________________
Current Facility Focus_______________________________________________________________
Number of personnel injured __________________________________________________________
Number of personnel missing _________________________________________________________
Outside Agencies contacted __________________________________________________________
Support required ___________________________________________________________________
Any Other Information about Incident
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
5. During office hours, contact the switchboard (8900) to communicate Emergency Event in progress
6. Start recording event information on appropriate Boards.
7. Provide assistance if possible to incident scene.
8. Brief other EOC Members as they arrive.
Completed by (print): _________________________ Time (24hr)_______________
Thebaud - (902) 387-3201, Venture - (902) 387-3240, North Triumph - (902) 387-3245,
Goldboro - (902) 387-3076, Point Tupper - (902) 625-6570
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 59
Appendix 4 - Emergency Operations Center - Telephone Call Sheet
(Telephone should be answered in 2 rings)
Please Write Clearly
Role: ______________________ Date _________ Time ___________
To ________________________________________________________ Or
From ______________________________________________________
Remarks:
Circle box to transfer data to proper Information Boards
CALLS
LOG
POB
TRACKING
LOGISTICS
ACTION
PLAN
PLANT
STATUS
WEATHER
ONSHORE
RESOURCE
EVENT
LOG
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 60
Appendix 5 - Timeout Sheet
The Situation as I see it is:
Potential Escalation or Threat to Personnel and Platform is:
My Plan is: Delegated to:
1.
2.
3.
4.
5.
6.
My Focus is:
Feedback Information
Does everyone understand the Plan.
Is there any other information I need to know?
What support do we require from the ESG?
Timeout Over: Next Timeout:
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 61
Appendix 6 – Field Command Center Sign-In Log
Field Command Center - SIGN-IN LOG
Date Time
Location
Print Name Signature Time In Time Out
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 62
Appendix 7 – Field Command Center Action Log
Field Command Center - Action Log
Time Action By Whom Completed
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 63
Appendix 8 – Field Command Center Resource Log
Field Command Center Resources Log
Resources Time
Deployed
Resource
Location
ETA At
Site
Comments On
Site
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 64
Appendix 9 – Field Command Center Log Sheet
Field Command Center Log Sheet Incident On Scene Commander -
Time Event
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 65
Appendix 10 – Field Command Center Daily Team Assignment
On Scene Commander -
Team Lead Team Lead
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 66
Appendix 11 – Field Command Center General Meeting Log
On Scene Commander Time Date
Items Discussed:
Meeting Attendees Meeting Attendees
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 67
Appendix 12 - Goldboro Control Room Checklist
Goldboro CR Emergency Response Checklist
During Monday to Friday Day Shift
1. Muster facility personnel via Alarm, PA, or Radio Systems
2. Initiate facility operational procedures to isolate as required
3. Initiate critical contacts as required:
911 - Fire, RCMP, and Emergency Health Services
Telelink – Halifax EOC Team Activation - 1-709-748-4264
Offshore Facility 387-3201
Point Tupper 1-902-625-6571
Spectra Energy – 1-888-444-6677
Gas Marketing 430-4810
See Flowchart on Page 49 of Onshore ERP for Oil Spill Contact numbers
4. OTL or designate will be the Incident Commander in the Control Room and if required
will activate additional ICC Team members.
5. Complete the Facility Status Sheet and fax into the EOC in Halifax.
During Night Shift, Holidays, and Weekends
1. Complete items 1, 2, 3, and 5 as supplied in Monday to Friday Day Shift
2. Contact the OTL or designate and initiate ICC Mobilization
3. Prior to ICC mobilization, prepare to receive calls from the (EOC) Emergency
Operations Center (Operations Coordinator) to give incident updates.
4. If incident occurs at Point Tupper, maintain communication links (radio) open
between the Point Tupper Operator so incident information can be relayed to
the Incident Commander and EOC in Halifax if required.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 68
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 69
Appendix 14 - Community and Local ER Contact Matrix
Community and Local Emergency Response Contact Matrix
For ICC onshore and near-shore related incidents
This Matrix should be used only as a guide to supply appropriate response and mitigate impact on the local Community
and Businesses
Incident 911 Fire
Department
911
Ambulance
911
RCMP
PTMS /
NewAlta
/ ECRC
NuStar
Security
M&NEP Coast
Guard
Municipal
Contacts
(residential)
LPG
ERC
Duke
Energy
EMO
1. Structure Fire √ √ √
2. Gas Release on Site √ √ √
3. Pipeline Leak / Fire √ √ √ √ √ √ √ √
4. Pipeline Leak (water) √ √ √ √ √ √ √ √
5. Explosion on Site √ √ √ √
6. Explosion off Site √
7. Oil Spill on Site
(pipeline)
√ √ √ √ √ √ √
8. Oil Spill off Site (land) √ √ √ √ √ √
9. Oil Spill off Site
(water)
√ √ √ √ √ √ √
10. Rail or Truck Leak /
Fire / Explosion
√ √ √ √ √ √
11. Forest Fire √ √ √
12. Medical Emergency √ √
13. Rescue Emergency √ √ √
14. Helicopter Crash √ √ √ √
Contact Numbers
ECRC – 1-613-930-9695 NewAlta – 1-902-420-4002 PTMS – 1-902-635-1711
Nu Star – 1-902-625-1711 Duke Energy – 1-800-726-8383 LPGERC – 1-800-265-0212
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 70
Appendix 15 – Emergency Response Planning Maps (Emergency Planning Zone # 1)
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 71
(Emergency Planning Zone # 2)
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 72
(Emergency Planning Zone # 3)
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 73
(Emergency Planning Zone # 4)
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 74
(Emergency Planning Zone # 5)
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 75
Appendix 16 - Onshore ICC Checklists
ICC Incident Commander - Action Checklist
(Onsite Operations Chief – Until Relieved)
1. Upon notification from Goldboro Control Room Operator, assess the situation and determine if ICC team is to be
mobilized.
2. Mobilize ICC team, via Telelink if outside normal work hours.
3. If you are the first person to arrive at the ICC, activate the First Arrival Instructions, posted in the ICC.
4. If you are not the first person to arrive, promptly obtain a briefing of the incident.
5. Ensure communication lines are established and open with the incident scene.
6. Confirm classification of emergency - Level I, II or III.
7. Ensure all First Arrival Instructions have been carried out.
8. Brief each ICC Team Member as he/she arrives.
9. If a Team Member has not responded, reallocate ICC workload and arrange for a replacement to be called in.
10. Establish and maintain communications with EOC Operations Coordinator.
11. Establish and maintain ICC Team focus.
12. Receive a status update from ICC Operations Coordinator at the conclusion of each call to/from On-Scene Commander.
13. Hold appropriate Time-Outs to:
- Outline most current situation to ICC Members
- Obtain key information from ICC Members
- Maintain ICC focus
- Update Incident Focus Board/Action List (if required)
14. Ensure all notifications to external agencies have been made.
15. Based upon your understanding of the situation, consider ICC Team support options.
16. Assess need to mobilize second shift of ICC Members, if incident response protracted.
17. Maintain a detailed Individual Log and ensure ICC Members also maintain their Individual Logs.
Post Incident Actions - Incident Commander:
1. Determine and action any further support requirements.
2. Hold Incident Debrief.
3. Seek feedback from Incident Scene and outside agencies.
4. Close all communication loops.
5. Mobilize incident investigation procedures and resources.
6. Capture lessons learned.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 76
ICC Logistics Coordinator - Action Checklist
1. If you are the first person to arrive at the ICC, activate the First Arrival Instructions, posted in the ICC
2. If you are not the first person to arrive, promptly obtain a briefing of the incident.
3. Determine the logistical resources required to support incident response. Establish contact with these resources;
determine activation time and ETA of resources.
4. Log all calls on call sheets and update Logistics Status Board.
5. Obtain the latest weather details and forecast, update Weather Information Board.
6. Advise Weather Forecasting Centre of the requirement for additional forecasts.
7. If required, establish and maintain line of communication with other oil industry operators active in the region regarding
additional support resources available.
8. Ensure ICC Incident Commander and On-Scene Commander are kept fully briefed on status of support resources.
9. Display logistic information on ICC status board in timely manner.
10. Determine the food, transportation and accommodation needs for the incident response personnel and arrange for those
needs.
11. Ensure tracking of all transport units and resources (equipment and personnel).
12. Utilize call sheet for all outgoing and incoming calls, provide copy for Event Logger.
13. Maintain detailed individual log.
Post Incident Actions:
1. Determine and action any further support requirements from ICC Incident Commander
2. Close communications links if agreed by ICC Incident Commander.
3. Participate in incident debrief.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 77
ICC Operations Coordinator - Action Checklist
1. If you are the first person to arrive at the ICC, activate the First Arrival Instructions, posted in the ICC.
2. If you are not the first person to arrive, promptly obtain a briefing of the incident.
3. Review the information obtained from the First Arrival Instruction Responder, obtain clarification if required.
4. Assume communications with incident scene (or Goldboro control room operator) and obtain status report. Record
status update on call sheet and ensure information is transferred to Status Boards.
5. Maintain communications as single point contact with incident scene.
6. Ascertain Facility Status information from plant and display on appropriate Status Board.
7. Brief the ICC Incident Commander on the incident status to aid in picture compilation within the ICC.
8. Obtain information from incident scene as required by ICC Incident Commander or other ICC Members. Relay
information to appropriate person and ensure this information is transferred to the Status Boards.
9. Review ICC Event Board for accuracy/completeness and inform Event Logger of any discrepancies.
10. Review other Status Boards for accuracy based upon your understanding of the situation.
11. Utilize call sheet for all outgoing and incoming calls, provide copy for Event Logger.
12. Maintain detailed Individual Log.
Post Incident Actions:
1. Determine any further support requirements from Field and action same.
2. Confirm requirements by the Regulatory Authorities for start-up after incident.
3. Close communication link if agreed by ICC Incident Commander.
4. Participate in incident debrief.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 78
ICC Safety/Planning Coordinator - Action Checklist
1. If you are the first person to arrive at the ICC, activate the First Arrival Instructions, posted in the ICC.
2. If you are not the first person to arrive, promptly obtain a briefing of the incident.
3. Notify external agencies and communities as per ER matrix and Community and Local Emergency Response Contact
Matrix, log all calls and display on calls made board.
4. Identify safety and environmental requirements, prepare strategies and incorporate into Action Plan.
5. Identify the "what if" scenarios and potential for escalation, brief ICC Incident Commander.
6. Determine strategies in order to be proactive and reduce the consequences from identified hazards.
7. Ensure incident response activities are within regulatory guidelines. Identify any unsafe acts and correct, brief ICC
Incident Commander.
8. Implement Security Plan for incident facilities.
9. Utilize call sheet for all outgoing and incoming calls; provide copy to Event Logger.
10. Maintain detailed individual log.
Post Incident Actions:
1. Determine and action any further support requirements from ICC Incident Commander.
2. Close communications links if agreed by ICC Incident Commander.
3. Participate in incident debrief.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 79
ICC Event Recorder - Action Checklist
1. If you are the first person to arrive at the ICC, activate the First Arrival Instructions, posted in the ICC.
2. If you are not the first person to arrive, promptly obtain a briefing of the incident.
3. Ensure all Status Boards are established and available, transfer any information already received onto the boards.
4. Verify ICC clocks are correct.
5. Identify critical information required to be captured and display immediately.
6. Display information in a clear, logical fashion.
7. Ensure ICC members transfer information promptly.
8. Provide copy of Event Log to ICC Incident Commander and fax copy to EOC Operations Section Manager. Time stamp
each copy to identify chronological accuracy.
9. Ensure written copies of information on white boards are kept for record purposes.
10. Ensure individual ICC member call sheets are being transferred quickly.
11. Utilize "Time-out" sessions to reinforce information transfer, if necessary.
12. Do NOT allow yourself to get overwhelmed by quantity of information flow - GET HELP IMMEDIATELY, inform
ICC Incident Commander if additional resources are required.
Post Incident Actions:
1. Determine and action any further support requirements from ICC Incident Commander.
2. Close communications links if agreed by ICC Incident Commander.
3. Participate in incident debrief.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 80
ExxonMobil On-Scene Commander / Representative - Action Checklist
1. Upon notification of incident, proceed safely to emergency site.
2. Ensure Command Center is set up at the Incident Site.
3. Approach from upwind/uphill/upstream; select safe and functional Incident Command Post and Staging Area.
4. Ensure all on-site personnel are accounted for and utilize supplied ICC forms to track information and personnel.
5. Confirm location and severity of incident.
6. Establish and maintain single point communications with ICC Operations Coordinator, determine Incident Severity
Level and share with Command Post.
7. Identify and establish hot, warm and cold zones.
8. Determine status of facility/pipeline and report status to ICC (control measures may include ESD, depressure, pull
permits etc.)
9. Isolate hazard area and deny entry, establish barriers/roadblocks as required.
10. Ensure critical notifications are made prior to mobilization of ICC.
11. Liaise with ICC to assess/agree Incident Action Plan.
12. Implement Incident Action Plan.
13. Continually re-assess situation with respect to safety of personnel.
14. Evaluate need for additional resources and request these through ICC.
15. Complete required forms for long term incident.
16. Ensure personnel at incident site are restricted to only those directly involved in response operations.
17. Maintain control of all on-site operations.
18. As appropriate, give all-clear signal to on-site staff when safe to do so and agreed with ICC.
Incident Severity Level: _____
Communicated to Command Post?
(Check):
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 81
Appendix 17 - Public Affairs
PUBLIC AFFAIRS / MEDIA RESPONSE
Detailed information on Public Affairs during an incident can be found in the "ExxonMobil Canada
Crisis Communication Management System". This system documents how Public Affairs and
support teams will operate during initial Call-Out and during the provision of Public Affairs support
services from the following locations:
1. Emergency Operations Center, 6th floor, Founder's Square
2. Public Affairs Emergency Response Center, 6th Floor, Founder's Square
This "Crisis Communication Management System" will support ExxonMobil Canada in effectively
responding to, and addressing the needs of media and external stakeholders.
The "Crisis Communication Management System" will be used internally as a means to support
EMCP Halifax overall response operations and will provide procedures, communication message
protocols/tools and decision-making processes during the mobilization and operation of the Public
Affairs activities.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 82
Appendix 18 - Family Response
FAMILY RESPONSE
Detailed information on Family Response during an incident can be found in the "ExxonMobil
Canada Human Resources/Family Support Plan". This plan documents how Human Resources and
the Family Support Team will operate during initial Call-Out and during the provision of HR/Family
Support Services from the following locations:
1. Local Emergency Operations Center (EOC), 6th Floor, Founder's Square
2. Family Support Telephone Center, Imperial Oil CSSC Call Centre
3. Family Support Center, Offsite Location
This "Family Support Plan" will support ExxonMobil Canada in effectively responding to, and
addressing the needs of, family members awaiting news of ExxonMobil Canada workers located
onshore or offshore during emergency response operations.
The "Family Support Plan" will be used internally as a means to support EMCP Halifax overall
response operations and will provide procedures and decision-making processes during the
mobilization and operation of the Human Resources/Family Support Telephone Center and/or
Family Support Center.
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 83
Appendix 19 – Responder Pocket Guide
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 84
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 85
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 86
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 87
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 88
Appendix 20 – Exhibit of Contact Cards
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 89
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 90
Appendix 21 - Flowcharts
Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number ZA-Z00-X-01-1002.03 91
Forest Fire Onshore Sable Facility
S I N ICC
NO
YES
CCR CONFIRM
FOREST FIRE
LOCATION
CCR
CCR SOUND
MUSTER
ALARM
ALL
PERSONNEL
TO PROCEED
TO MUSTER
STATION
DETERMINE THE
MAGNITUDE AND
DIRECTION OF FIRE
DEPRESSURE
PLANT
KEEP
MONITORING
THE FIRE
MAKE CRITICIAL
NOTIFICATION CONTACT OTL
GOLDBORO CR TO
TAKE CHARGE AS
ON –SITE
OPERATIONS
CHIEF
OTL AND ICC
MOBILIZED TO
GOLDBORO
GOLDBORO TO
REMAIN OSC
UNTIL LOCAL ICC
IS ESTABLISHED
STANDBY AND
TAKE
DIRECTION
FROM ICC OR
ON-SITE
OPERATIONS
CHIEF
ON-SCENE
COMMANDER IS LOCAL ICC
MOBILIZATION
REQUIRED
INCIDENT TO BE
HANDLED BY
OSC OR ICC
IS HALIFAX EOC
REQUIRED
MOBILIZE
HALIFAX
EOC
THROUGH
TELELINK
OSC & ICC
TEAM TO
DEVELOP
ACTION PLAN
IS THERE A NEED
TO SHUTDOWN
AND DEPRESSURE
FACILITITY
START AN ACTION PLAN FOR
EVACUATION OF PERSONNELL
AND COMPLETE SHUTDOWN OF
FACILITY
HAVE A CONTACT LINE OPEN
WITH FIRE DEPARTMENT
(TMR)
IS PLANT
DEPRESSURING
CONTINUE
BLOWDOWN
TRACE CAUSE AND TAKE
APPROPRIATE ACTION
HALIFAX EOC TO
SUPPORT
INCIDENT SCENE
YES NO
YES
YES NO
NO
YES NO
ExxonMobil Canada Use Only Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number: ZA-Z00-X-01-1002.03 Page 92 of 102
Pipeline Incident Onshore Sable Facility
S I N ICC
NO
CCR CONFIRM
PIPELINE
INCIDENT
LOCATION
CCR
CCR SOUND
MUSTER
ALARM
ALL
PERSONNEL
TO PROCEED
TO MUSTER
STATION
DETERMINE THE MAGNITUDE
AND LOCATION OF PIEPLINE
INCIDENT
DEPRESSURE
PLANT
KEEP
MONITORING
THE PIPELINE
PRESSURE
MAKE CRITICIAL
NOTIFICATION CONTACT OTL
GOLDBORO CR TO
TAKE CHARGE AS
ON –SITE
OPERATIONS
CHIEF
OTL AND ICC
MOBILIZED TO
GOLDBORO
GOLDBORO TO
REMAIN OSC
UNTIL LOCAL ICC
IS ESTABLISHED
STANDBY AND
TAKE
DIRECTION
FROM ICC OR
ON-SITE
OPERATIONS
CHIEF
ON-SCENE
COMMANDER
IS LOCAL ICC
MOBILIZATION
REQUIRED
INCIDENT TO BE
HANDLED BY
OSC OR ICC
IS HALIFAX EOC
REQUIRED
MOBILIZE
HALIFAX
EOC
THROUGH
TELELINK
OSC & ICC
TEAM TO
DEVELOP
ACTION PLAN
IS THERE A NEED
TO SHUTDOWN
AND DEPRESSURE
FACILITITY
START AN ACTION PLAN FOR
EVACUATION OF PERSONNELL
AND COMPLETE SHUTDOWN OF
FACILITY
HAVE A CONTACT LINE OPEN
WITH FIRE DEPARTMENT
(TMR)
IS PLANT
DEPRESSURING
CONTINUE
BLOWDOWN
TRACE CAUSE AND TAKE
APPROPRIATE ACTION
HALIFAX EOC TO
SUPPORT
INCIDENT SCENE
YES
NO
NO
NO
NO
YES
YES
YES
ExxonMobil Canada Use Only Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number: ZA-Z00-X-01-1002.03 Page 93 of 102
Terrorism / Sabotage / Workplace Violence at Onshore Sable Facility
CCR CONFIRMS ACT OF TERRORISM, CRIMINAL ACT,
WORKPLACE VIOLENCE, THEFT, ILLIGAL WEAPONS /
DRUGS, SABOTAGE
CCR
SHUTDOWN &
ISOLATE PROCESS
PLANT IF REQUIRED
IS
BLOWDOWN REQUIRED
DEPRESSURE
PLANT
MONITOR
INCIDENT FOR
ESCALATION
GOLDBORO CR TO TAKE CHARGE AS ON-
SITE OPERATIONS
CHIEF
CONTACT OTL
IS LOCAL ICC
MOBILIZATION
REQUIRED
OTL AND ICC
MOBILIZED TO
GOLDBORO
GOLDBORO TO
REMAIN OSC UNTIL LOCAL ICC IS ESTABLISHED
IS HALIFAX
EOC
REQUIRED
INCIDENT TO BE
HANDLED BY OSOC
or ICC
IS PLANT
DEPRESSURING
CONTINUE
BLOWDOWN
TRACE CAUSE AND TAKE
APPROPRIATE ACTION
CCR SOUND
MUSTER
ALARM
ALL PERSONNEL
TO PROCEED
TO MUSTER
STATION
S I N ICC
YES
NO
YES NO
NO YES
NO
MOBILIZE
HALIFAX EOC THROUGH
STRATO
YES
DEVELOP
ACTION PLAN
ARE THERE
MISSING
PERSONNEL
IS IT SAFE
TO LOCATE
MISSING
PERSONNEL
YES
NO
STAND BY AND TAKE DIRECTION FROM
ICC OR POLICE DEPARTMENT
GOLDBORO ICC
AND LOCAL
AUTHORITIES
(RCMP) TO
DEVELOP ACTION
PLAN
ON SCENE COMMANDER WILL LIAISE
WITH LOCAL POLICE WHO WILL BE
IN CHARGE OF INCIDENT SITE
MOBILIZE RCMP AND
MAKE CRITICAL
NOTIFICATIONS
ExxonMobil Canada Use Only Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number: ZA-Z00-X-01-1002.03 Page 94 of 102
Fire & Explosion Onshore Sable Facility
S I N ICC
YES
YES
NO
YES NO NO YES
YES
NO
YES
YES
MONITOR
PERSON
CONDITION
USE AS
RESOURCE
EVACUATE
STANDBY AND
TAKE
DIRECTION
FROM ICC OR
ON-SITE
OPERATIONS
CHIEF
CCR CONFIRM
FIRE EXPLOSION
LOCATION
CCR
CCR SOUND
MUSTER
ALARM
ALL
PERSONNEL
TO PROCEED
TO MUSTER
STATION
ARE THERE
MISSING
PERSONNEL
LOCATE MISSING PERSON
SHUTDOWN
& ISOLATE
PROCESS
PLANT
DEPRESSURE
PLANT
MONITOR
INCIDENT FOR
ESCALUATION
IS PLANT
DEPRESSURIZING
CONTINUE
BLOWDOWN
TRACE CAUSE AND TAKE
APPROPRIATE ACTION
MAKE CRITICIAL
NOTIFICATION
CONTACT OTL
GOLDBORO CR TO
TAKE CHARGE AS
ON-SITE
OPERATIONS
CHIEF
OSC & ICC TEAM TO
DEVELOPE ACTION
PLAN
ON-SCENE
COMMANDER
IS
BLOWDOWN
REQUIRED
IS LOCAL ICC
MOBILIZATION
REQUIRED
IS HALIFAX
EOC
REQUIRED
INCIDENT TO BE
HANDLED BY OSC
OR ICC
OTL AND ICC
MOBILIZED
TO
GOLDBORO
GOLDBORO TO
REMAIN OSC
UNTIL LOCAL ICC
IS ESTABLISHED
MOBILIZE
HALIFAX EOC
THROUGH
TELELINK
IS IT SAFE TO
LOCATE
MISSING
PERSON
No Yes
YES NO
ExxonMobil Canada Use Only Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number: ZA-Z00-X-01-1002.03 Page 95 of 102
Hazardous Spill Onshore Sable Facility
S I N ICC
YES
NO
YES NO
YES
NO
YES
YES
CCR CONFIRM
HAZARDOUS
SPILL
LOCATION
CCR
CCR SOUND
MUSTER
ALARM
ALL
PERSONNEL
TO PROCEED
TO MUSTER
STATION
ARE THERE
MISSING
PERSONNEL
LOCATE MISSING PERSON
SHUTDOWN
PROCESS
PLANT IF
REQUIRED
DEPRESSURE
PLANT
MONITOR
INCIDENT FOR
ESCALUATION
IS PLANT
DEPRESSURIZING
CONTINUE
BLOWDOWN
TRACE CAUSE AND TAKE
APPROPRIATE ACTION
INITIATE OR
DELEGATE
CRITIAL
NOTIFICATION
CONTACT OTL
GOLDBORO CR
TO TAKE
CHARGE AS
ON-SITE
OPERATIONS
CHIEF
INCIDENT
COMMAND & ICC
TEAM DEVELOP
ACTION PLAN
MONITOR
PERSONEL
CONDITION
USE AS
RESOURCE
EVACUATE
STANDBY AND
TAKE
DIRECTION
FROM ICC OR
ON-SITE
OPERATIONS
CHIEF
ON-SCENE
COMMANDER
DEVELOP
CLEANUP PLAN
AND COMMENCE
CLEAN UP
DEVELOPE
CLEANUP PLAN
AND COMMENCE
CLEAN UP
IS IT SAFE TO
LOCATE
MISSING
PERSONNEL
IS
BLOWDOWN
REQUIRED
IS ICC
MOBILIZATION
REQUIRED
OTL AND
ICC
MOBILIZED
TO
GOLDBORO
GOLDBORO TO
REMAIN OSC
UNTIL LOCAL ICC
IS ESTABLISHED
IS HALIFAX
EOC
REQUIRED
INCIDENT TO
BE HANDLED
BY OSC OR ICC
MOBILIZE
HALIFAX EOC
THROUGH
TELELINK
YES NO
NO YES
ExxonMobil Canada Use Only Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number: ZA-Z00-X-01-1002.03 Page 96 of 102
Gas Release Onshore Sable Facility
S I N ICC
NO YES
NO
NO YES
YES NO
YES
NO
YES
CCR CONFIRM
GAS RELEASE
LOCATION
CCR
CCR SOUND
MUSTER
ALARM
ALL
PERSONNEL
TO PROCEED
TO MUSTER
STATION
ARE THERE
MISSING
PERSONNEL
LOCATE MISSING PERSON
SHUTDOWN
& ISLOATE
PROCESS
PLANT
DEPRESSURE
PLANT
MONITOR
INCIDENT FOR
ESCALUATION
IS PLANT
DEPRESSURIZING
CONTINUE
BLOWDOWN TRACE CAUSE AND TAKE
APPROPRIATE ACTION
MAKE CRITICIAL
NOTIFICATION CONTACT OTL
GOLDBORO CR TO
TAKE CHARGE AS
ON –SITE
OPERATIONS
CHIEF OTL AND ICC
MOBILIZED TO
GOLDBORO
GOLDBORO TO
REMAIN OSC
UNTIL LOCAL ICC
IS ESTABLISHED
MONITOR
PERSONEL
CONDITION
USE AS
RESOURCE
EVACUATE
STANDBY AND
TAKE
DIRECTION
FROM ICC OR
ON-SITE
OPERATIONS
CHIEF
ON-SCENE
COMMANDER
IS IT SAFE
TO LOCATE
MISSING
PERSONNEL
IS LOCAL ICC
MOBILIZATION
REQUIRED
INCIDENT TO BE
HANDLED BY
OSC OR ICC IS HALIFAX EOC
REQUIRED
MOBILIZE
HALIFAX
EOC
THROUGH
TELELINK
OSC & ICC TEAM TO DEVELOP
ACTION PLAN
IS
BLOWDOWN
REQUIRED
YES NO YES NO
ExxonMobil Canada Use Only Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number: ZA-Z00-X-01-1002.03 Page 97 of 102
Medical Incident Onshore Sable Facility
S I N ICC
NO
NO
NO YES
YES
YES
CCR CONFIRM
INJURED PERSON’S
IDENTITY & SEVERITY
OF INJURY
CCR OPERATOR
CCR SOUND
MUSTER
ALARM
ALL
PERSONNEL
TO PROCEED
TO MUSTER
STATION
ARE THERE
MISSING
PERSONNEL
LOCATE MISSING PERSON
INITIATE EMERGENCY
SHUTDOWN PROCEDURE IF
REQUIRED
MAKE CRITICIAL
NOTIFICATION CONTACT OTL
GOLDBORO
CCR TO TAKE
CHARGE AS ON-
SITE
OPERATIONS
CHIEF
OSC & ICC TEAM
DEVELOPE ACTION
PLAN
MONITOR
PERSONEL
CONDITION
USE AS
RESOURCE
STANDBY AND
TAKE
DIRECTION
FROM ICC OR
ON-SITE
OPERATIONS
CHIEF
ON-SCENE
COMMANDER
HAVE OUTSIDE
OPERATOR REPORT TO
INJURED PERSON IF
SAFE TO DO SO
ENSURE ADEQUATE FIRST AID
IS PROVIDED TO INJURED
PERSON
ENSURE ADEQUATE FIRST AID
IS SUPPLIED TO INJURED
PERSON
COMPLETE INCIDENT REPORT &
ARRRANGE FOR D&A TESTING
TRANSPORT INJURED PERSON TO
HOSPITAL BY AMBULANCE OR
VEHICLE
IF EMCE EMPLOYEE, HAVE OTL
OR EMCE REPRESENTATIVE
ACCOMPANY OR MEET INJURED
PERSON AT HOSPITAL
IF CONTRACTOR, HAVE
CONTRACTOR REPRESTATIVE
MEET INJURED PERSON AT
HOSPITAL AND HAVE EMCE
PERSON ACCOMPANY EN ROUTE
TO HOSPITAL
COMPLETE INCIDENT
REPORT AND
ARRANGE FOR D&A
TESTING
OTL
CONTRACTOR
REPRESENTATIVE IF
REQUIRED
DOES INJURED
PERSON NEED TO
BE TRANSPORTED
TO HOSPITAL
IS IT SAFE
TO LOCATE
MISSING
PERSONNEL
IS ICC
MOBILIZATION
REQUIRED
OTL AND
ICC
MOBILIZED
TO
GOLDBORO
GOLDBORO TO
REMAIN OSOC
UNTIL LOCAL
ICC IS
ESTABLISHED
IS HALIFAX
EOC
REQUIRED
INCIDENT TO
BE HANDLED
BY OSC OR
ICC
MOBILIZE
HALIFAX EOC
THROUGH
TELELINK
911 AMBULANCE
YES NO
Yes
No Yes
Yes
No
ExxonMobil Canada Use Only Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number: ZA-Z00-X-01-1002.03 Page 98 of 102
Severe Weather Onshore Sable Facility
S I N ICC
NO YES
NO
NO
YES NO
YES
YES
NO
YES
CCR CONFIRM
SEVERE WEATHER
CONDITIONS
CCR
CCR SOUND
MUSTER
ALARM
ALL
PERSONNEL
TO PROCEED
TO MUSTER
STATION
ARE THERE
MISSING
PERSONNEL
LOCATE MISSING PERSON
SHUTDOWN &
ISLOATE PROCESS
PLANT IF
REQUIRED
DEPRESSURE
PLANT
MONITOR
INCIDENT FOR
ESCALUATION
IS PLANT
DEPRESSURIZING
CONTINUE
BLOWDOWN TRACE CAUSE AND TAKE
APPROPRIATE ACTION
MAKE CRITICIAL
NOTIFICATION CONTACT OTL
GOLDBORO CR TO
TAKE CHARGE AS
ON –SITE
OPERATIONS
CHIEF OTL AND ICC
MOBILIZED TO
GOLDBORO
GOLDBORO TO
REMAIN OSC
UNTIL LOCAL ICC
IS ESTABLISHED
MONITOR
PERSONEL
CONDITION
USE AS
RESOURCE
EVACUATE
STANDBY AND
TAKE
DIRECTION
FROM ICC OR
ON-SITE
OPERATIONS
CHIEF
ON-SCENE
COMMANDER
IS IT SAFE
TO LOCATE
MISSING
PERSONNEL
IS LOCAL ICC
MOBILIZATION
REQUIRED
INCIDENT TO BE
HANDLED BY
OSC OR ICC
IS HALIFAX EOC
REQUIRED
MOBILIZE
HALIFAX
EOC
THROUGH
TELELINK
OSC & ICC
TEAM TO
DEVELOP
ACTION
PLAN
IS
BLOWDOWN
REQUIRED
DEVELOP ACTION
PLAN
HALIFAX EOC TO
SUPPORT
INCIDENT SCENE
START AN ACTION PLAN
FOR EVACUATION OF
PERSONNELL AND
COMPLETE SHUTDOWN OF
FACILITY
YES NO YES NO
ExxonMobil Canada Use Only Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number: ZA-Z00-X-01-1002.03 Page 99 of 102
Liquid Spill Onshore/Near Shore Sable Facility
S I N ICC
NO YES
NO
NO
YES NO
YES YES
NO
YES
CCR CONFIRM
LIQUIDS SPILL
LOCATION
CCR
CCR SOUND
EMERGENCY
ALARM
ALL
PERSONNEL
TO PROCEED
TO MUSTER
STATION
ARE THERE
MISSING
PERSONNEL
LOCATE MISSING PERSON
SHUTDOWN
& ISLOATE
PROCESS
PLANT
DEPRESSURE
PLANT
MONITOR
INCIDENT FOR
ESCALUATION
IS PLANT
DEPRESSURIZING
CONTINUE
BLOWDOWN
TRACE CAUSE AND TAKE
APPROPRIATE ACTION
MAKE CRITICIAL
NOTIFICATION CONTACT OTL
GOLDBORO CR TO
TAKE CHARGE AS
ON –SITE
OPERATIONS
CHIEF OTL AND ICC
MOBILIZED TO
GOLDBORO
GOLDBORO TO
REMAIN OSOC
UNTIL LOCAL ICC
IS ESTABLISHED
MONITOR
PERSONEL
CONDITION
USE AS
RESOURCE
EVACUATE
STANDBY AND
TAKE
DIRECTION
FROM ICC OR
ON-SITE
OPERATIONS
CHIEF
ON-SCENE
COMMANDER
IS IT SAFE
TO LOCATE
MISSING
PERSONNEL
IS LOCAL ICC
MOBILIZATION
REQUIRED
INCIDENT TO BE
HANDLED BY
OSOC OR ICC IS HALIFAX EOC
REQUIRED OSOC &
ICC TEAM
TO
DEVELOP
ACTION
PLAN
MOBILIZE HALIFAX EOC
THROUGH TELELINK
IS
BLOWDOWN
REQUIRED
PUT IN PLACE
ACTION PLAN
PUT IN PLACE
ACTION PLAN
HALIFAX EOC TO
SUPPORT INCIDENT
SCENE
YES
YES
NO
NO
YES
ExxonMobil Canada Use Only Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number: ZA-Z00-X-01-1002.03 Page 100 of 102
Rail/Truck Incident Onshore Sable Facility
S I N ICC
NO YES
NO
NO
YES
YES
NO
YES
CCR CONFIRM
RAIL/TRUCK
INCIDENT
LOCATION
CCR
CCR SOUND
MUSTER
ALARM
ALL
PERSONNEL
TO PROCEED
TO MUSTER
STATION
ARE THERE
MISSING
PERSONNEL
LOCATE MISSING PERSON
PERFORM
APPROPRIATE
EMERGENCY SHUT
DOWN PROCEDURES
ISLOATE AND
DEPRESSURE FACILITY MONITOR
INCIDENT FOR
ESCALUATION
DETERMINE
MAGNITUDE OF
INCIDENT
MAKE CRITICIAL
NOTIFICATION CONTACT OTL
GOLDBORO CR TO
TAKE CHARGE AS
ON –SITE
OPERATIONS
CHIEF OTL AND ICC
MOBILIZED TO
GOLDBORO
GOLDBORO TO
REMAIN OSC
UNTIL LOCAL ICC
IS ESTABLISHED
MONITOR
PERSONEL
CONDITION
USE AS
RESOURCE
STANDBY AND
TAKE
DIRECTION
FROM ICC OR
ON-SITE
OPERATIONS
CHIEF
ON-SCENE
COMMANDER
IS IT SAFE
TO LOCATE
MISSING
PERSONNEL
IS LOCAL ICC
MOBILIZATION
REQUIRED
INCIDENT TO BE
HANDLED BY
OSC OR ICC IS HALIFAX EOC
REQUIRED
MOBILIZE
HALIFAX
EOC
THROUGH
TELELINK
OSC & ICC
TEAM TO
DEVELOP
ACTION
PLAN
IS
BLOWDOWN
REQUIRED
SECURE INCIDENT
SCENE AND DENY
ENTRY
ACTIVATE LPG EMERGENCY
RESPONSE PLAN
SECURE INCIDENT
SCENE AND DENY
ENTRY
HALIFAX EOC TO
SUPPORT
INCIDENT SCENE
YES NO
NO YES
ExxonMobil Canada Use Only Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number: ZA-Z00-X-01-1002.03 Page 101 of 102
Bomb Threat Onshore Sable Facility
CCR CONFIRM
BOMB THREAT
CCR
ACTIVATE
TELEPHONE CALL
TRACE OPTION BY
PRESSING STAR 57
GOLDBORO CR TO
TAKE CHARGE AS ON-
SITE OPERATIONS
CHIEF
CONTACT OTL
IS LOCAL ICC
MOBILIZATION
REQUIRED OTL AND ICC
MOBILIZED TO
GOLDBORO OR
FIELD BASED
COMMAND
GOLDBORO TO
REMAIN OSC
UNTIL LOCAL ICC
IS ESTABLISHED
IS HALIFAX
EOC
REQUIRED
INCIDENT TO BE
HANDLED BY OSC
OR ICC
CCR SOUND
MUSTER
ALARM
ALL PERSONNEL
TO PROCEED
TO MUSTER
STATION
S I N ICC
NO YES
NO
ARE THERE
MISSING
PERSONNEL
IS IT SAFE
TO LOCATE
MISSING
PERSONNEL
LOCATE MISSING PERSON
YES
- MONITOR
PERSONNEL
CONDITION
- USE AS
RESOURCE
NO
YES
STANDBY AND
TAKE
DIRECTION
FROM ICC OR
ON-SITE
OPERATIONS
CHIEF
NO
MOBILIZE
HALIFAX EOC
THROUGH
TELELINK
DOES THAT
THREAT
CONTAIN 2 +
PTI's
INITIATE ABANDON
PLANT AND EVACUATE
FACILITY
MONITOR
INCIDENT FOR
ESCALATION
YES
YES NO
CONDUCT A
GENERAL SEARCH
OF THE FACILITY IS PLANT
DEPRESSURIZING
TRACE CAUSE AND TAKE
APPROPRIATE ACTION CONTINUE
BLOWDOWN
DEVELOP ACTION
PLAN
YES NO
POSITIVE TARGET IDENTIFIERS (PTI's)
1. Time the bomb is to detonate.
2. The target to be destroyed - this is
identifying a "who".
3. The bomb's construction, shape or
description - telling you what to look for and
what it is made of.
4. The bomb's location.
MOBILIZE RCMP
AND MAKE
CRITICAL
NOTIFICATIONS
GOLDBORO
ICC AND
LOCAL
AUTHORITIES
TO DEVELOP
ACTION PLAN
ON SCENE COMMANDER WILL
LIAISE WITH LOCAL POLICE
WHO WILL BE IN CHARGE OF
INCIDENT SITE
ExxonMobil Canada Use Only Sable Onshore Emergency Response Reference Document
Mar 2014 Document Control Number: ZA-Z00-X-01-1002.03 Page 102 of 102
Hostage Taking at Onshore Sable Facility
CCR CONFIRMS
HOSTAGE TAKING
CCR
MOBILIZE RCMP AND MAKE CRITICAL
NOTIFICATION
SHUTDOWN &
ISOLATE PROCESS
PLANT IF REQUIRED
IS
BLOWDOWN REQUIRED
DEPRESSURE PLANT
MONITOR INCIDENT FOR
ESCALATION
GOLDBORO CR TO TAKE CHARGE AS ON-
SITE OPERATIONS
CHIEF
CONTACT OTL
IS LOCAL ICC MOBILIZATION REQUIRED
OTL AND ICC MOBILIZED TO GOLDBORO
GOLDBORO TO REMAIN OSC
UNTIL LOCAL ICC
IS ESTABLISHED
IS HALIFAX EOC REQUIRED
INCIDENT TO BE HANDLED BY OSC
OR ICC
IS PLANT DEPRESSURING
CONTINUE BLOWDOWN
TRACE CAUSE AND TAKE APPROPRIATE ACTION
CCR SOUND
Muster ALARM
ALL PERSONNEL
TO PROCEED TO MUSTER STATION
S I N ICC
YES NO
YES NO
NO YES
NO
MOBILIZE HALIFAX EOC
THROUGH TELELINK
YES
DEVELOP ACTION PLAN
ARE THERE MISSING PERSONNEL
IS IT SAFE
TO LOCATE
MISSING PERSONNEL
YES
NO
STAND BY AND TAKE DIRECTION
FROM ICC OR POLICE
DEPARTMENT
GOLDBORO
ICC AND
LOCAL
AUTHORITIES
TO DEVELOP
ACTION PLAN
ON SCENE COMMANDER WILL
LIAISE WITH LOCAL POLICE
WHO WILL BE IN CHARGE OF
INCIDENT SITE