October 12, 2007ERCOT Regional Planning Group Meeting
RPG-CREZ Task ForceStatus Report
Warren LasherSystem Assessment
2ERCOT Regional Planning Group Meeting
October 12, 2007
Work Accomplished
5 RPG-CREZ Meetings have been held (Aug. 31, Sept. 7, 14, 28, and Oct. 8)
The following issues have been addressed:− Issues List− Generic assumptions for 345-kV transmission
(modeling parameters and costs)− 765-kV transmission technology− HVDC transmission technology− Initial possibilities for CREZ collection lines
3ERCOT Regional Planning Group Meeting
October 12, 2007
Issues List
A list of issues has been developed and has been discussed at several RPG-CREZ meetings.
This list is available at the RPG-CREZ web-page
Now that the Interim Order has been issued, the Issues List will be reevaluated at the next RPG-CREZ meeting (10/19).
4ERCOT Regional Planning Group Meeting
October 12, 2007
345-kV Technology Generic Data
NOTE: IMPEDANCE BASED UPON 100MVA P.U / MILE
1 CKT.
2 CKT.
1 CKT.
2 CKT.
CONDUCTOR
STRUCTURE TYPE R JX B
RATE A
RATE B $M $M
MVA/$M
MVA/$M
2-1590 ACSR
DC LATTICE VERTICAL
2.92E-05
4.61E-04
9.17E-03 1,631 1,631 $1.4 $1.68 1,165 1,942
2-959 ACSS/TW
DC LATTICE VERTICAL
4.78E-05
4.83E-04
8.85E-03 1,969 1,969 $1.3 $1.56 1,515 2,524
2-1433 ACSS DC LATTICE3.00E-
054.70E-
049.02E-
03 2,988 2,988 $1.5 $1.80 1,992 3,320
R JX BRATE
ARATE
B Cost
600 Mva Auto2.50E-
041.90E-
02 0 600 600 $8 M
800 Mva Auto1.80E-
041.60E-
02 0 800 800 $9 M
RING BUS 6 - LINE TERMINALS = $15 M
BREAKER & 1/2 > 6 - LINE TERMINALS = $25 M
5ERCOT Regional Planning Group Meeting
October 12, 2007
765-kV and HVDC Technology
Vendors and stakeholders provided technical discussions of these technologies.
ETT Representatives presented a description of 765-kV transmission.
ABB and GE representatives described classic HVDC technology, “HVDC-Light” technology, and Variable Frequency Transformers.
6ERCOT Regional Planning Group Meeting
October 12, 2007
CREZ Connection Pathways
Preliminary discussions have been conducted regarding possible pathways for connecting CREZ areas to existing ERCOT transmission infrastructure.
Additional discussions will be held at future RPG-CREZ meetings.
7ERCOT Regional Planning Group Meeting
October 12, 2007
Project Timeline
1 2 3 4 5 6 7 8 9 10 11 12
Gridlines Represent 2-Week Periods
Gather Options for Connections in CREZ Areas
Stability Analysis
Evaluate Options for System Connections
Est
ab
lish
Ma
ilin
g L
ist
an
d S
et
Me
etin
g S
che
du
le
Modify Base Case for Higher Wind Scenarios
Incorporate Results of A/S Study
Review Results
Evaluate System Upgrade Options for Higher Wind Scenarios
ERCOT Review and Report