OPERATIONAL ADVICE NOTICE OPERATIONAL ADVICE NOTICE (OAN) OAN 039/2020 PAGE 1 OF 10 OAN 039/2020 – ESSENTIAL NORTHSIDE TAXIWAY REPAIRS – TAXIWAYS JULIET-ECHO & ALPHA. OAN REF:‐ 039/2020 DATE OF ISSUE:‐ 31/03/20 EFFECTIVE DATE:‐ 06/04/20 MANUAL REFERENCE(S):‐ N/A EXPIRY DATE:‐ 09/04/20 PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF 1.0 SUMMARY 1.1 A three day programme of work to carry out essential asphalt pavement repairs on Taxiways Juliet‐Echo and Alpha. The work will be carried out using a combination of daytime and night‐time shifts. 2.0 PROGRAMME 2.1 Overall, the work will commence on Monday 6 th April and will be completed by the morning of Thursday 9 th April 2020. 2.2 The majority of the work on Taxiway Alpha will be carried out at night (23:00 – 06:00L) on the nights of Monday 6 th – Wednesday 8 th April, inclusive. N.B: Some minor aspects of work will be undertaken on Taxiway Alpha during daylight hours. 2.3 The entirety of the work on Taxiway Juliet‐Echo will be undertaken at night (23:00 – 06:00L), again, on the nights of Monday 6 th – Wednesday 8 th April, inclusive. 3.0 SCOPE & LOCATION OF WORKS 3.1 Overall, the programme of work will include the following tasks; Taxiway Alpha Temporary removal of 1 x taxiway centreline Aeronautical Ground Lighting (AGL) fitting. Asphalt pavement plane‐out and re‐surfacing. Reinstatement of painted ground markings disturbed by the works and 1 x AGL fitting.

OAN 039-2020 & ANNEXE ESSENTIAL NORTHSIDE TAXIWAY … · 2020-03-31 · o perational a dvice n otice operational advice notice (oan) oan 039/2020 page 1 of 10 oan 039/2020 – essential

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OAN 039-2020 & ANNEXE ESSENTIAL NORTHSIDE TAXIWAY … · 2020-03-31 · o perational a dvice n otice operational advice notice (oan) oan 039/2020 page 1 of 10 oan 039/2020 – essential

OPER

ATIO

NAL A

DVICE N

OTIC

E  

 

OPERATIONAL ADVICE NOTICE (OAN) 

 

 

   

OAN 039/2020  PAGE 1 OF 10   

 

OAN 039/2020 – ESSENTIAL NORTHSIDE TAXIWAY REPAIRS – TAXIWAYS JULIET-ECHO & ALPHA.

 

OAN REF:‐  039/2020  DATE OF ISSUE:‐  31/03/20  EFFECTIVE DATE:‐  06/04/20 

MANUAL REFERENCE(S):‐  N/A  EXPIRY DATE:‐  09/04/20 

 

PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF 

1.0  SUMMARY     1.1  A three day programme of work to carry out essential asphalt pavement repairs on Taxiways Juliet‐Echo 

and Alpha. The work will be carried out using a combination of daytime and night‐time shifts.    2.0  PROGRAMME     2.1  Overall, the work will commence on Monday 6th April and will be completed by the morning of Thursday 

9th April 2020.    2.2  The majority of the work on Taxiway Alpha will be carried out at night (23:00 – 06:00L) on the nights of 

Monday 6th – Wednesday 8th April, inclusive.      N.B: Some minor aspects of work will be undertaken on Taxiway Alpha during daylight hours.    2.3  The entirety of the work on Taxiway Juliet‐Echo will be undertaken at night (23:00 – 06:00L), again, on 

the nights of Monday 6th – Wednesday 8th April, inclusive.    3.0  SCOPE & LOCATION OF WORKS    3.1  Overall, the programme of work will include the following tasks;      Taxiway Alpha      Temporary removal of 1 x taxiway centreline Aeronautical Ground Lighting (AGL) fitting. 

Asphalt pavement plane‐out and re‐surfacing. 

Reinstatement of painted ground markings disturbed by the works and 1 x AGL fitting. 

         

Page 2: OAN 039-2020 & ANNEXE ESSENTIAL NORTHSIDE TAXIWAY … · 2020-03-31 · o perational a dvice n otice operational advice notice (oan) oan 039/2020 page 1 of 10 oan 039/2020 – essential

OPER

ATIO

NAL A

DVICE N

OTIC

E  

 

OPERATIONAL ADVICE NOTICE (OAN) 

 

 

   

OAN 039/2020  PAGE 2 OF 10   

 

  Taxiway Juliet‐Echo.      Carry out multiple asphalt pavement patch repairs from abeam Stand 7 to abeam Stand 15. 

Apply pavement joint sealant. 

Reinstate painted ground markings disturbed by the works.    4.0  OPERATIONAL IMPLICATIONS    4.1  Runway Operations    4.1.1  Whilst  the  night‐time  pavement  repair  work  is  ongoing  on  Taxiway  Alpha,  the  following  runway 

operational implications will apply;  

Aircraft will be required to backtrack Runway 05L‐23R, as directed by ATC. 

Link Bravo and Rapid Exit Taxiway (RET) Bravo‐Delta will be closed.      N.B: The required elements of daytime working on Taxiway Alpha will be coordinated to avoid any aircraft 

movements and the attendant requirement for runway backtracking.    4.2  Taxiway Restrictions    4.2.1  Whilst the night‐time pavement repair work is in progress on Taxiway Alpha, the taxiway will be closed 

at its junction with Taxiway Bravo.     4.2.2  Whilst the night‐time pavement repair work is in progress on Taxiway Juliet‐Echo, the taxiway will be 

closed from abeam Stand 7 to abeam Stand 15.     4.3  Aircraft Parking Stand Restrictions    4.3.1  The night‐time push back of aircraft from Stands 7, 9, 11 and 15 will not be possible whilst work is in 

progress on Taxiway Juliet‐Echo. Aircraft will be required to remain on stand until the completion of the pavement repair work the following morning. 

   5.0  LOW VISIBILITY OPERATIONS (LVO)    5.1  The work will have no impact on the airport’s ability to operate during periods of low visibility.    5.2  In the event of un‐forecast reduced visibility conditions (meeting the criteria for LVP Vis) prevailing whilst 

work is already underway, all work will be curtailed at the earliest opportunity.    6.0  FURTHER INFORMATION    6.1  For further information, please contact the Airfield Duty Manager on +44 0161 489 3331.       

Page 3: OAN 039-2020 & ANNEXE ESSENTIAL NORTHSIDE TAXIWAY … · 2020-03-31 · o perational a dvice n otice operational advice notice (oan) oan 039/2020 page 1 of 10 oan 039/2020 – essential

OPER

ATIO

NAL A

DVICE N

OTIC

E  

 

OPERATIONAL ADVICE NOTICE (OAN) 

 

 

   

OAN 039/2020  PAGE 3 OF 10   

 

7.0  ADDITIONAL DOCUMENTS      Drawing:  Yes  Annexe:  Yes 

Page 4: OAN 039-2020 & ANNEXE ESSENTIAL NORTHSIDE TAXIWAY … · 2020-03-31 · o perational a dvice n otice operational advice notice (oan) oan 039/2020 page 1 of 10 oan 039/2020 – essential

OPER

ATIO

NAL A

DVICE N

OTIC

E  

 

OPERATIONAL ADVICE NOTICE (OAN) 

 

 

   

OAN 039/2020  PAGE 4 OF 10   

 

  OAN 039/2020 ANNEXE                                                           A1  SAFETY MANAGEMENT AND CONTROL    ADM  

The Airfield Duty Manager (ADM) has overall responsibility for ensuring aerodrome safety aspects on a day‐to‐day basis. 

   MAGCD GT 

Project management of all pavement repairs rests with MAG Capital Delivery (MAGCD), with the work on site contracted to GallifordTry. 

   GT ADM ASCO  

Given  the  current  levels of extremely  infrequent aircraft movements, GallifordTry will be permitted  to carry  out  their  own  safety  oversight  to  include  direct  supervision  of  all  subcontractors.  This  will  be combined with regular safety oversight inspections by the on‐shift Airfield Operations team.  

   ADM  The ADM is to authorise the relevant P2W Airfield Operations Permits on the basis of this OAN.     ADM ESTM GT 

Prior to the works starting each day/night, the GT Site Agent is to dial in to the Airfield Operations Shift Brief conference call using the following details;  

Telephone Number: 0161 240 4600 

Attendee ID Code: 630032611#    ADM  Following the meeting, the ADM will brief the ATC Watch Manager and RFFS Station Manager; this to 

include the daily/nightly scope of works which will affect operations and emergency response.    ADM GT  

Milestone checks and communications will be made by the key persons throughout each working shift, as required. The time for formal wind‐up of works activities on each shift is to be agreed between the ADM and GallifordTry during the Airfield Operations Shift Brief. 

   GT ADM 

Upon  completion  of  each  working  shift,  GallifordTry,  as  the  principal  supervising  contractor  are  to conduct interim post‐works inspections, prior to Airfield Operations undertaking final inspections. 

   ADM ASCO 

All  post‐work  inspections  are  to  take place before  closed portions of  Taxiway Alpha or  Juliet‐Echo are returned to service. 

   ADM GT 

N.B. All post‐work inspections undertaken in hours of darkness are to be completed with the aid of mobile floodlighting towers. 

   ADM  

In support of  the above  inspection procedures, Airfield Operations are also  to conduct an additional ‘first‐light’ post‐works inspection of areas of night working. 

   A2  PROGRAMME, SCOPE & LOCATION OF WORKS    ALL  Overall programme and scope as listed within paragraphs 2.1 to 3.1. 

Page 5: OAN 039-2020 & ANNEXE ESSENTIAL NORTHSIDE TAXIWAY … · 2020-03-31 · o perational a dvice n otice operational advice notice (oan) oan 039/2020 page 1 of 10 oan 039/2020 – essential

OPER

ATIO

NAL A

DVICE N

OTIC

E  

 

OPERATIONAL ADVICE NOTICE (OAN) 

 

 

   

OAN 039/2020  PAGE 5 OF 10   

 

     Reinstatement  of  any  painted  ground markings  disturbed  by  the works will  be  the  responsibility  of 

GallifordTry.    ADM GT 

The required elements of daytime work on Taxiway Alpha are to be coordinated to avoid any aircraft movements, and therefore remove the requirement for aircraft runway backtracking manoeuvres. 

   A3  OPERATIONAL IMPLICATIONS    ADM ATC 

Overall, paragraphs 4.1 to 4.3.1 refer. 

     Due to the current exceptionally low frequency of aircraft movements and restricted airport operating 

hours, it is not envisaged that this work will cause any particular operational implications.    A4  LOW VISIBILITY AND ADVERSE WEATHER    ADM  Work will be permitted to take place down to the prescribed minima for LVP Vis (IRVR >599m). 

ADM  In the interest of keeping the works on programme, thereby making best use of available contractor 

resources, the ADM retains the discretion to facilitate the work should any forecast of low visibility only affect part of the shift. A delayed start or early finish may be possible. 

  ADM GT 

In the event of un‐forecast low visibility conditions (IRVR <599m) prevailing after work has begun, works are to be curtailed at the earliest opportunity. 

A5  KEY CONTACTS 

Responsibility  Name  Contact number 

Airfield Operations   ADM  0161 489 3331 

MA Asset Engineering  ESTM  07958 876 818 

MAG Project Manager   Chris Gee/ Claire McDermott 

07711 574 129/ 07711 574 236 

GT Site Agent   Mark Williams  07989 388 968 

GT Sub Agent  Mike Kenworthy  07701 972 002 

GT Logistics Manager  Steven Tutty  07989 388 914 

GT Works Manager  Lee Cansfield  07870 186 757 

Airfield Operations Planning  Shaun McAleer  07958 876 477 

ATC Operations  Andy McKnight  0161 209 2825 

A6  WORKS SITE ACCESS, MOBILISATION AND SECURITY ARRANGEMENTS    GT  

All works are located within the Critical Part; all external contractor traffic is to enter the airfield via West Gate. 

   

Page 6: OAN 039-2020 & ANNEXE ESSENTIAL NORTHSIDE TAXIWAY … · 2020-03-31 · o perational a dvice n otice operational advice notice (oan) oan 039/2020 page 1 of 10 oan 039/2020 – essential

OPER

ATIO

NAL A

DVICE N

OTIC

E  

 

OPERATIONAL ADVICE NOTICE (OAN) 

 

 

   

OAN 039/2020  PAGE 6 OF 10   

 

ADM GT  

All construction traffic must be checked for safe loading of materials / equipment and for FOD prior to entering the northside taxiway system. A similar check is also to be made prior to leaving the individual work areas. 

   ALL  Access/egress routes to the required individual work areas, including the need for any pre‐works airside 

mustering are to be agreed during the daily/nightly Airfield Operations Shift Briefs.     ADM GT 

GT personnel in possession of a valid ‘M’ (Manoeuvring Area) driver permit are responsible for providing supervision and escorts for their sub‐contracting teams at all times whilst airside. 

   A7  WORKS SITE DEMARCATION & DISCIPLINE    ADM GT 

The contractor  is  to maintain  cleanliness of  their daily/ nightly work area at all  times, ensuring  they remain free of FOD and that materials/ objects which may be vulnerable to the effects of strong winds and/ or jet blast are kept secure. 

   ADM GT 

All temporary floodlights employed during night works are to be directed away from Runway 05L‐23R, its applicable  approach  surface  and  active  taxiways.  Furthermore,  there must  be  no  light  spill  above  the horizontal plane. 

   ALL  Prior to any works parties leaving site, a check must be undertaken to ensure that any tools or equipment 

used during the shift can be accounted for and have not been left at or adjacent to any works areas.    ADM ESTM 

Portions of closed taxiway are to be demarked by extinguished taxiway centreline lighting and lit mobile barriers. 

   A8  EMERGENCY PLANNING & BUSINESS CONTINUITY    HoR RFFS 

The work has no impact on the use of RVPs. 

   RFFS ADM 

RFFS personnel should conduct regular field familiarisation exercises to ensure that crews are aware of the works activity locations and report immediately to the ADM, anything perceived as being untoward in terms of emergency response routing. 

   A9  MAG ASSET ENGINEERING SUPPLEMENTARY ACTIONS    ESTM  MAG  Asset  Engineering  will  be  required  to  extinguish  and  subsequently  re‐enable  AGL  leading 

to/through areas of work in progress as requested by the ADM.    A10  PROMULGATION OF INFORMATION    ADM  The ADM is to issue a NOTAM(s) promulgating; 

 

The night‐time closure of Taxiway Alpha, Link Bravo and RET Bravo‐Delta and the requirement for aircraft to backtrack Runway 05L‐23R, as directed by ATC. 

Page 7: OAN 039-2020 & ANNEXE ESSENTIAL NORTHSIDE TAXIWAY … · 2020-03-31 · o perational a dvice n otice operational advice notice (oan) oan 039/2020 page 1 of 10 oan 039/2020 – essential

OPER

ATIO

NAL A

DVICE N

OTIC

E  

 

OPERATIONAL ADVICE NOTICE (OAN) 

 

 

   

OAN 039/2020  PAGE 7 OF 10   

 

The night‐time closure of a portion of Link Juliet‐Echo between Stands 7 and 15.       

 

 

 

ORIGINATOR:‐   

(PRINT NAME) S.McAleer 

CONFIRMED & APPROVED BY:‐ 

(PRINT NAME) N.Biggar 

ROLE:‐  Airfield Technical Planner  ROLE:‐  Airfield Technical Manager 

SIGNATURE:‐     

SIGNATURE:‐     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 8: OAN 039-2020 & ANNEXE ESSENTIAL NORTHSIDE TAXIWAY … · 2020-03-31 · o perational a dvice n otice operational advice notice (oan) oan 039/2020 page 1 of 10 oan 039/2020 – essential

2

3

R

-

0

5

L

2

3

R

-

0

5

L

Alpha Patches

04/01 - 74m2

04/02 -14m2

04/03 - 59m2

Total = 147m2

- - - -

BAU Alpha Patches

BAU Patches

A13/03/20NG

M90 1AAManchester Airport Olympic House Manchester Airport Group (MAG)

M90 5XAManchester AirportPinfold LaneGalliford Try Aviation

BAU-04-02

For InformationMAG1006

1 of 1A3DNS

1. DO NOT SCALE THIS DRAWING. ALL DIMENSIONS MUST BECHECKED/VERIFIED ON SITE

2. ALL DIMENSIONS ARE IN METERS UNLESS STATED OTHERWISE

3. ALL LEVELS ARE IN METERS UNLESS STATED OTHERWISE

ONLY PATCH 04/03 TO BE REPAIRED. ALL OTHERS DEFERRED UFN.

AutoCAD SHX Text
Ant
AutoCAD SHX Text
Ant
AutoCAD SHX Text
HS
AutoCAD SHX Text
FH
AutoCAD SHX Text
FH
AutoCAD SHX Text
FH
AutoCAD SHX Text
FH
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
Guard Light
AutoCAD SHX Text
Guard Light
AutoCAD SHX Text
Guard Light
AutoCAD SHX Text
Guard Light
AutoCAD SHX Text
FH
AutoCAD SHX Text
HS
AutoCAD SHX Text
Sign
AutoCAD SHX Text
Sign
AutoCAD SHX Text
Sign
AutoCAD SHX Text
Sign
AutoCAD SHX Text
Sign
AutoCAD SHX Text
Sign
AutoCAD SHX Text
Sign
AutoCAD SHX Text
FH
AutoCAD SHX Text
Sign
AutoCAD SHX Text
HS
AutoCAD SHX Text
Sign
AutoCAD SHX Text
Sign
AutoCAD SHX Text
FH
AutoCAD SHX Text
FH
AutoCAD SHX Text
FH
AutoCAD SHX Text
FH
AutoCAD SHX Text
FH
AutoCAD SHX Text
04/01
AutoCAD SHX Text
04/02
AutoCAD SHX Text
04/03
AutoCAD SHX Text
DESCRIPTION:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
REV:
AutoCAD SHX Text
BY:
AutoCAD SHX Text
Notes:
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
SHEET SIZE:
AutoCAD SHX Text
STATUS:
AutoCAD SHX Text
DRAWING NO:
AutoCAD SHX Text
CLIENT:
AutoCAD SHX Text
CONTRACTOR:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
SHEET NO:
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
PROJECT NAME:
Page 9: OAN 039-2020 & ANNEXE ESSENTIAL NORTHSIDE TAXIWAY … · 2020-03-31 · o perational a dvice n otice operational advice notice (oan) oan 039/2020 page 1 of 10 oan 039/2020 – essential

1

5

1

5

1

1

1

1

9

9

7

4

3

4

3

44L

44L

1

3

3

.

2

m

²

3

6

.

2

m

²

300 Dia Core

Juliet Echo Patches

04/04 - 47m2

04/05 - 50m2

04/06 - 19.6m2

04/07 -131m2

04/08 - 24m2

04/09 - 44m2

04/10 - 44m2

04/11 - 15m2

Total = 374.6m2

- - - -

BAU Juliet Echo Patches

BAU Patches

A13/03/20NG

M90 1AAManchester Airport Olympic House Manchester Airport Group (MAG)

M90 5XAManchester AirportPinfold LaneGalliford Try Aviation

BAU-04-01

For InformationMAG1006

1 of 1A3scale

1. DO NOT SCALE THIS DRAWING. ALL DIMENSIONS MUST BECHECKED/VERIFIED ON SITE

2. ALL DIMENSIONS ARE IN METERS UNLESS STATED OTHERWISE

3. ALL LEVELS ARE IN METERS UNLESS STATED OTHERWISE

AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
Ca Pr
AutoCAD SHX Text
RP
AutoCAD SHX Text
Sign
AutoCAD SHX Text
Sign
AutoCAD SHX Text
Sign
AutoCAD SHX Text
TRP 07
AutoCAD SHX Text
TRP 11
AutoCAD SHX Text
DP20
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
GU
AutoCAD SHX Text
72.532
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
GU
AutoCAD SHX Text
72.532
AutoCAD SHX Text
GU
AutoCAD SHX Text
72.549
AutoCAD SHX Text
BL
AutoCAD SHX Text
GU
AutoCAD SHX Text
72.485
AutoCAD SHX Text
BL
AutoCAD SHX Text
CL 72.409
AutoCAD SHX Text
72.398
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.532
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.560
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.606
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.608
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.609
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.620
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.551
AutoCAD SHX Text
HS
AutoCAD SHX Text
BL
AutoCAD SHX Text
72.860
AutoCAD SHX Text
72.829
AutoCAD SHX Text
72.777
AutoCAD SHX Text
72.715
AutoCAD SHX Text
72.660
AutoCAD SHX Text
72.613
AutoCAD SHX Text
72.568
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.808
AutoCAD SHX Text
Concrete
AutoCAD SHX Text
72.550
AutoCAD SHX Text
72.550
AutoCAD SHX Text
72.562
AutoCAD SHX Text
72.588
AutoCAD SHX Text
72.615
AutoCAD SHX Text
72.632
AutoCAD SHX Text
72.649
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.680
AutoCAD SHX Text
72.687
AutoCAD SHX Text
72.686
AutoCAD SHX Text
72.699
AutoCAD SHX Text
72.732
AutoCAD SHX Text
72.743
AutoCAD SHX Text
72.750
AutoCAD SHX Text
72.766
AutoCAD SHX Text
72.784
AutoCAD SHX Text
72.794
AutoCAD SHX Text
72.816
AutoCAD SHX Text
72.814
AutoCAD SHX Text
72.824
AutoCAD SHX Text
72.843
AutoCAD SHX Text
72.851
AutoCAD SHX Text
72.840
AutoCAD SHX Text
72.839
AutoCAD SHX Text
72.828
AutoCAD SHX Text
72.791
AutoCAD SHX Text
72.799
AutoCAD SHX Text
72.776
AutoCAD SHX Text
72.766
AutoCAD SHX Text
72.756
AutoCAD SHX Text
72.732
AutoCAD SHX Text
72.724
AutoCAD SHX Text
72.711
AutoCAD SHX Text
72.681
AutoCAD SHX Text
72.670
AutoCAD SHX Text
72.858
AutoCAD SHX Text
72.803
AutoCAD SHX Text
72.751
AutoCAD SHX Text
72.698
AutoCAD SHX Text
72.644
AutoCAD SHX Text
72.593
AutoCAD SHX Text
72.528
AutoCAD SHX Text
BL
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.807
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.902
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.743
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.746
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.752
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.667
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.630
AutoCAD SHX Text
72.580
AutoCAD SHX Text
72.577
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.489
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.482
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.472
AutoCAD SHX Text
72.562
AutoCAD SHX Text
72.557
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.607
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.587
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.722
AutoCAD SHX Text
Concrete
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.542
AutoCAD SHX Text
72.564
AutoCAD SHX Text
72.614
AutoCAD SHX Text
72.662
AutoCAD SHX Text
72.718
AutoCAD SHX Text
72.773
AutoCAD SHX Text
72.826
AutoCAD SHX Text
72.860
AutoCAD SHX Text
72.596
AutoCAD SHX Text
72.645
AutoCAD SHX Text
72.697
AutoCAD SHX Text
72.748
AutoCAD SHX Text
72.794
AutoCAD SHX Text
72.854
AutoCAD SHX Text
72.670
AutoCAD SHX Text
72.659
AutoCAD SHX Text
72.640
AutoCAD SHX Text
72.645
AutoCAD SHX Text
72.608
AutoCAD SHX Text
72.609
AutoCAD SHX Text
72.593
AutoCAD SHX Text
72.587
AutoCAD SHX Text
72.582
AutoCAD SHX Text
72.572
AutoCAD SHX Text
72.522
AutoCAD SHX Text
72.543
AutoCAD SHX Text
72.512
AutoCAD SHX Text
72.559
AutoCAD SHX Text
72.392
AutoCAD SHX Text
04/05
AutoCAD SHX Text
04/04
AutoCAD SHX Text
04/08
AutoCAD SHX Text
04/07
AutoCAD SHX Text
04/06
AutoCAD SHX Text
04/09
AutoCAD SHX Text
04/10
AutoCAD SHX Text
04/11
AutoCAD SHX Text
RP
AutoCAD SHX Text
TRP 44
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.686
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
72.827
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.532
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.560
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.606
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.608
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.609
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.860
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.891
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.620
AutoCAD SHX Text
72.860
AutoCAD SHX Text
72.829
AutoCAD SHX Text
BL
AutoCAD SHX Text
Conc
AutoCAD SHX Text
BL
AutoCAD SHX Text
72.550
AutoCAD SHX Text
72.550
AutoCAD SHX Text
72.562
AutoCAD SHX Text
72.588
AutoCAD SHX Text
72.615
AutoCAD SHX Text
72.632
AutoCAD SHX Text
72.649
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.680
AutoCAD SHX Text
72.687
AutoCAD SHX Text
72.686
AutoCAD SHX Text
72.699
AutoCAD SHX Text
72.732
AutoCAD SHX Text
72.743
AutoCAD SHX Text
72.750
AutoCAD SHX Text
72.766
AutoCAD SHX Text
72.784
AutoCAD SHX Text
72.794
AutoCAD SHX Text
72.816
AutoCAD SHX Text
72.814
AutoCAD SHX Text
72.824
AutoCAD SHX Text
72.843
AutoCAD SHX Text
72.861
AutoCAD SHX Text
72.879
AutoCAD SHX Text
72.892
AutoCAD SHX Text
72.899
AutoCAD SHX Text
72.907
AutoCAD SHX Text
72.896
AutoCAD SHX Text
72.905
AutoCAD SHX Text
72.915
AutoCAD SHX Text
72.924
AutoCAD SHX Text
72.925
AutoCAD SHX Text
72.906
AutoCAD SHX Text
72.929
AutoCAD SHX Text
72.915
AutoCAD SHX Text
Conc
AutoCAD SHX Text
72.884
AutoCAD SHX Text
72.904
AutoCAD SHX Text
72.877
AutoCAD SHX Text
72.880
AutoCAD SHX Text
72.851
AutoCAD SHX Text
72.840
AutoCAD SHX Text
72.839
AutoCAD SHX Text
72.828
AutoCAD SHX Text
72.791
AutoCAD SHX Text
72.799
AutoCAD SHX Text
72.776
AutoCAD SHX Text
72.766
AutoCAD SHX Text
72.756
AutoCAD SHX Text
72.732
AutoCAD SHX Text
72.724
AutoCAD SHX Text
72.711
AutoCAD SHX Text
72.681
AutoCAD SHX Text
72.670
AutoCAD SHX Text
72.882
AutoCAD SHX Text
72.858
AutoCAD SHX Text
72.580
AutoCAD SHX Text
72.577
AutoCAD SHX Text
CL 72.489
AutoCAD SHX Text
72.562
AutoCAD SHX Text
72.557
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.607
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 72.587
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
72.836
AutoCAD SHX Text
72.826
AutoCAD SHX Text
72.860
AutoCAD SHX Text
72.854
AutoCAD SHX Text
72.880
AutoCAD SHX Text
Tarmac
AutoCAD SHX Text
Tarmac
AutoCAD SHX Text
RP
AutoCAD SHX Text
RP
AutoCAD SHX Text
RP
AutoCAD SHX Text
RP
AutoCAD SHX Text
RP
AutoCAD SHX Text
9
AutoCAD SHX Text
9A
AutoCAD SHX Text
15R
AutoCAD SHX Text
B737 A321 CRJ7/9/K
AutoCAD SHX Text
A318 A319 A320
AutoCAD SHX Text
E145 E190-E195 F100
AutoCAD SHX Text
E170-E175 F50
AutoCAD SHX Text
AT45 AT72
AutoCAD SHX Text
146 DH4
AutoCAD SHX Text
STAND 11 PRE-POSITION ONLY
AutoCAD SHX Text
STD 9 FORWARD HOLD
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
Tarmac
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
DESCRIPTION:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
REV:
AutoCAD SHX Text
BY:
AutoCAD SHX Text
Notes:
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
SHEET SIZE:
AutoCAD SHX Text
STATUS:
AutoCAD SHX Text
DRAWING NO:
AutoCAD SHX Text
CLIENT:
AutoCAD SHX Text
CONTRACTOR:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
SHEET NO:
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
PROJECT NAME:
Page 10: OAN 039-2020 & ANNEXE ESSENTIAL NORTHSIDE TAXIWAY … · 2020-03-31 · o perational a dvice n otice operational advice notice (oan) oan 039/2020 page 1 of 10 oan 039/2020 – essential

Construction Manual Weekly Programme FM-CON-010 (01) KW

SHORT TERM PROGRAMME 05/04/2020

S S M T W T F S S M T W T F S S M T W T F S RESOURCES

START END

04

/04

/20

20

05

/04

/20

20

06

/04

/20

20

07

/04

/20

20

08

/04

/20

20

09

/04

/20

20

10

/04

/20

20

11

/04

/20

20

12

/04

/20

20

13

/04

/20

20

14

/04

/20

20

15

/04

/20

20

16

/04

/20

20

17

/04

/20

20

18

/04

/20

20

19

/04

/20

20

20

/04

/20

20

21

/04

/20

20

22

/04

/20

20

23

/04

/20

20

24

/04

/20

20

25

/04

/20

20

SUB-CONTRACTOR

Alpha Taxiway ## ## ## ## ## ## ## ## ## ## ## ## ## ##

1 Remove Centreline AGL Luminaire & Install Blanking Plate (Patch 04-0 06/04/2020 06/04/2020 1 0% ## ## ## ## ## ## ## ## ## ## ## ## ## ATG To be carried out on DAYS as agreed with ADM / Airfield O

2 Remove Centreline AGL & Fill Void with PyraPatch (Patch 04-03) 06/04/2020 06/04/2020 1 0% ## ## ## ## ## ## ## ## ## ## ## ## ## ATG / GT-ADT

3 Plane Out & Surface (Patch 04-03 - 59m²) 06/04/2020 06/04/2020 1 0% ## ## ## ## ## ## ## ## ## ## ## ## ## Tarmac

4 Reinstate Yellow Centreline (8.0 lm - Patch 04-03) 06/04/2020 06/04/2020 1 0% ## ## ## ## ## ## ## ## ## ## ## ## ## GT-ADT

5 Reinstate Centreline AGL (Patch 04-03) 07/04/2020 07/04/2020 1 0% ## ## ## ## ## ## ## ## ## ## ## ## ## ATG . GT-ADT

6 Remove Centreline AGL Blanking Plate & Re-Install Luminaire (Patch 08/04/2020 08/04/2020 1 0% ## ## ## ## ## ## ## ## ## ## ## ## ## ATG To be carried out on DAYS as agreed with ADM / Airfield O

7 Maxi-Crete Around Centreline AGL (Patch 04-03) 08/04/2020 08/04/2020 1 0% ## ## ## ## ## ## ## ## ## ## ## ## ## GT-ADT

## ## ## ## ## ## ## ## ## ## ## ## ## ##

Juliet Echo Taxiway ## ## ## ## ## ## ## ## ## ## ## ## ## ##

8 Plane Out & Surface (4No Patches 04-04, 05, 06 & 08 - 141m²) 06/04/2020 06/04/2020 1 0% ## ## ## ## ## ## ## ## ## ## ## ## ## Tarmac

9 Plane Out & Surface (4No Patches 04-07, 09, 10 & 11 - 234m²) 07/04/2020 07/04/2020 1 0% ## ## ## ## ## ## ## ## ## ## ## ## ## Tarmac

10 Remove Redundant AGL (Patch 04-07) 07/04/2020 07/04/2020 1 0% ## ## ## ## ## ## ## ## ## ## ## ## ## GT-ADT

11 Reinstate Yellow Centreline (1.0 lm - Patch 04-05) 07/04/2020 07/04/2020 1 0% ## ## ## ## ## ## ## ## ## ## ## ## ## GT-ADT

12 Reinstate Yellow Stand Designator (Patch 04-06) 08/04/2020 08/04/2020 1 0% ## ## ## ## ## ## ## ## ## ## ## ## ## GT-ADT

13 Reinstate Yellow Centreline (3.0 lm - Patch 04-10) 07/04/2020 07/04/2020 1 0% ## ## ## ## ## ## ## ## ## ## ## ## ## GT-ADT

14 N2 Sealant to Asphalt / Concrete Joints 08/04/2020 08/04/2020 1 0% ## ## ## ## ## ## ## ## ## ## ## ## ## GT-ADT

## ## ## ## ## ## ## ## ## ## ## ## ## ##

## ## ## ## ## ## ## ## ## ## ## ## ## ##

## ## ## ## ## ## ## ## ## ## ## ## ## ##

## ## ## ## ## ## ## ## ## ## ## ## ## ##

## ## ## ## ## ## ## ## ## ## ## ## ## ##

## ## ## ## ## ## ## ## ## ## ## ## ## ##

## ## ## ## ## ## ## ## ## ## ## ## ## ##

## ## ## ## ## ## ## ## ## ## ## ## ## ##

INFORMATION REQUIRED QA / ENVIRONMENT

ACTION BY ACTION BY

SETTING OUT REQUIREMENTS DESIGN CONSIDERATIONS

ACTION BY ACTION BY

SAFETY/COSHH GENERAL CONSIDERATION

ACTION BY ACTION BY

DRAWN BY DATE COPIES TO CHECKED BY: SITE MANAGER

N/A N/A

ITEM No. D

UR

AT

ION

CO

MP

LE

TIO

N

COMMENTS, MATERIALS, COMMERCIAL ETC

WEEK COMMENCING

CONTRACT TITLE: CONTRACT NO: MAG1006 (Task 12) REVISION No.

Mark williams (Site Agent) 31/03/2020

ADDITIONAL COMMENTS:

MAG (BAU) - Alpha / Juliet Echo Maintenance

DESCRITPTION

03

Send improvement via your local Quality Manager UNCONTROLLED WHEN PRINTED Page 1 of 1