SUMMARYof
PHYSICAL EXPLORATION WORKon the
SUNGOLD PROPERTYNTS 42 A/6
PORCUPINE MINING DIVISIONDISTRICT OF COCHRANE
ONTARIO
for
ECLIPSE MINING CORPORATION
Toronto, Ontario September 5, 1997
Nicholas WeirEclipse Mining Corporation
42A06NE01232.17801 CARMAN 010
l INTRODUCTION
This report, prepared for Eclipse Mining Corporation (Eclipse; Client No. 303205), presents a summary of physical exploration work carried out on the company's Sungold property in Carman and Langmuir Townships, southeast of Timmins, Ontario.
The purpose of the work program was to resample several of the existing pits and trenches on the property.
2 PROPERTY DESCRIPTION AND LOCATION
2.1 Location and Access
The Sungold property is located in the District of Cochrane, Province of Ontario (48 0 22' 05" North Latitude, 81 0 02' 50" West Longitude; NTS 42A/6; UTM Zone 17, 5357000 N, 496500 E).
The property is located 30 km southeast of downtown Timmins. Access to the property is good as an access road to the past-producing Langmuir nickel mine passes just to the south of the property.
2.2 Property Description
This property consists of 17 contiguous unpatented claim claims in Carman and Langmuir Townships, Porcupine Mining Division, Ontario. The individual claims are numbered as follows:
Claim No. Township Assessment
P 792475 Carman 3400P 792476 Carman 3400P 792477 Carman 3400P 792481 Langmuir 3400P 792482 Langmuir 3400P 792483 Langmuir 3400P 792484 Langmuir 3400P 947051 CarmanP 947054 CarmanP 947055 CarmanP 947056 CarmanP 947057 CarmanP 947058 CarmanP 947059 Carman Work performedP 987235 CarmanP 987236 CarmanP 987238 Carman
3 WORK PROGRAM
A program of sampling was carried out on the property between the 16th of August, 1997 and the 19* of August, 1997, inclusive. Fresh samples of bedrock material were obtained by drilling (Cobra rock drills) and blasting the surface exposures in the mineralized areas. A total of eight (8) mandays were spent working the property and a total of 21 samples were submitted for analysis. All work was performed on claim P 947059 in Carman Township.
The main target for mineralization on the property is gold associated with ironstones (iron formation) similar in nature to the nearby Carshaw and Malga deposits. The samples collected during this program were from ironstone unit(s) intercalated with mafic to intermediate volcanic (greenstone) country rocks. The ironstones contain magnetite and chlorite mesobands up to 5 cm wide that are separated by sugary white quartz, probably representing recrystallized chert. Sulphide minerals (pyrite, pyrrhotite and minor chalcopyrite) are found disseminated within the ironstones. Assay certificates for the submitted samples and location maps are appended to this report.
eclipse mining corporation
Rouyn - Noranda
Kirkland Lake
ECLIPSE "Sungold" property in northeastern Ontario
Property AreaMills and smelters
l\ M ining operations
PORCUPINE - NIGHT HAWK AREA(Timmins East)
48" 30' N
48" 25' N
81 0 20'W
6km
81* 10'W sro'w 80*50' W
Eclipse's Sungold claim group
P 987238
Interpreted trend of ironstones (from magnetics)
Area of trenching
P 947059
P 947058
Location of trench sampling area on claim P 947059
68179
6818068181
68182
6817668173
68172
6131756817468171
6818668187 l 68185
68184 68183
Trenchs6819168188
68189
Location of trench samples on claim P 947059
LANGMUIR TWP.
1500m
's Sungold claim group work applied to shaded claims
Swastika LaboratoriesA Division of TSL/Assayers Inc.
Assaying - Consulting - RepresentationEstablished 1928
Geochemical Analysis CertificateCompany: ECLIPSE MINING CORPProject: Lammer Attn: N. Weir
We hereby certify the following Geochemical Analysis of 20 Rock samples submitted AUG-18-97 by .
7W-3336-RG1
Date: AUG-22-97
Sampl eNumber68171681726817368174681756817668177 Not Rec'd6817868179681806818168182681836818468185681866818768188681896819068191
AuPPB11811128821641
2194
545-
16816682811226
120341254510126236
2284167185
Au CheckPPB1097
----
---
1615-
.12720
-53
-
----
63-
Auoz/ton0.0340.0330.0240.0190.0640.016
-0.0050.0490.0820.0070.3510.0040.0010.0030.0080.0010.0070.0010.0020.005
Au Checkoz/ton0.032
----
---
0.047-
-0.371
-0.002
-
----
0.002-
Mil t iElementResul ts
tof o 1 1 ow
One assay ton portion used.
Certified by0-
pJL^Is
l Cameron Ave., P.O. Box 10, Swastika, Ontario POK l TO Telephone (705)642-3244 Fax (705)642-3300
OLT OD ^r iU-40 HO.UUO .-'.LI
Swastika LaboratoriesA Division of I 'ftL/Aroitycrii I nc.
AssayinK - Consulting - ItcprcKcntalion Geochemical Analysis Certificate 7W-3485-RCJ
Company: ECLIPSE MINING CORPORATION o**: SriP-04-97I'rojccl:Aim: N. Weir
We hereby certify ihc following Geochemical Analysis of l Rock samples submitted SEP-01-97 by .
Siunj)lc Au Au Check Au 2nd Au CheckNumber I'l'U FPU PPB PPB--"----"----' ' """"{569""" 1577 " ""1406 "137!"""
Olie assay ton portion used,
Certified by
Cameron Avc., P.O. Box 10, Swastika, Ontario POK ITO Telephone (705)642-3244 Fax (705)642-3300
ECLIPSE MINING CORPORATIONATTM:H.W*lr
PROJ . Laaner
SAMPLE:ftocx
7W-3336-KG1
1270 FEUSTER DRIVE. UNIT 3. HI3313SAUC* ONTAIIIO L4W 1M PHONE f: (90S) 6O2-8236 FAX *: (90S) 206-O313
I. C. A. P PLASMA SCANDigestion
REKMT No.
Pag* Ho.
HI* Ho.
Data
(XI Q.'
3AHFLE * ay M A* B
PP" PP* pp*Bl
ppi
O Cd Co Cr
pp* pp* pp*
Cu
pp*
f*
*
Mg
t
Mn Ho Ma Hi P Pb Sb 9c Sn Sr Tl V fpm pp- t ppo pp- ppi* PP* pp* PP* pp* pp* PPM
M9221l of l
AU28MA
AUC-29-1997
Y In Zr
PP* PP* PP*
68182 6 0. 59 i t 2O S 2. 2O 3 10 28 190}0.6O 0.52 2OO2 ^ 2 40.01 10 32 l t 10 58 36 13 * 10 * l 35
LOa:
CD
en1 .5 gm aa*ple U dlgc*tcd with 2 *1 of 3:1 HCL/HMO3 ^': 95 C for 90 Bin and diluted to 10 *l with DI M2O (Ills Method la partial for i*anf ox l da Material*
TSL/97SICMBD
Ministry ofNorthern Developmentand Mines
Declaration of Assessment Work Performed on Mining LandMining Act, Subsection 65(2) and 66(3), R.8.O. 1090
Transaction Number (office use)
Assessment .esearch Imaging
Personal Inlormalio Mining Act, the Infoi Questions about tl 933 Ramsey Lake l
42A06NE0123 2.17801 CARMAN 900Instructions:
- P lease type or print in ink.
and 66(3) of the Mining Act. Under section 8 of thejnt work and correspond with the mining land holder.of Northern Development and Mines, 6th Floor,
aim, use form 0240.
DUPLICATEV?
1. Recorded holder(s) (Attach a list if necessary)Nam6 ECLIPSE fAddress -
-TbRoK.ro
^MiMcs CORPORATION** rtriml*cr r? A *\^ c1 C- rOf |p r\r\MV- C-
OK! MSMST.5VS
Name
Address
Client Number3o3
Telephone Number
Fax Number
Client Number
Telephone Number
ZoSl - l S7o5*- 8563
Fax Number
2. Type of work performed: Check ( y ) and report on only ONE of the following groups for this declaration.
D Geotechnical: prospecting, surveys, r^a assays and work under section 18 (regs) l — '
^Physical: drilling, stripping, f— l Ron*, Nutation trenching and associated assays LJ- Rehabilitation
Work Type
T3RIUJI*?; , ELASTIC , SAMPLING
Dates Work A **x t ^ ^.^^ ~ 1 1\ " "™" •""" From . * D*\lfl l OoV To f M Performed rmm i^ rtvw, t^fy/ I U 1^1 VO Day 1 Month | Year Day
Global Positioning System Data (H available) Township/AreaCARMAN *
1 Month j Year
LArfSMOlRM or G-Plan Number
Office UseCommodity
Total S Value of J, . l/l/-^ Work Claimed *7 77^77
NTS Reference
Mining Division /JHT^-^--4^
Resident Geologist ^--^ District | j ;*-v^o
Please remember to: - obtain a work permit from the Ministry of Natural Resources as required;- provide proper notice to surface rights holders before starting work;- complete and attach a Statement of Costs, form 0212;- provide a map showing contiguous mining lands that are linked for assigning work;- include two copies of your technical report.
3. Person or companies who prepared the technical report (Attach a list if necessary)Name
Address
Name
Address
Name
Address
Telephone Number
Fax Number
Telephone Number
Fax Number
Telephone
Fax Numb*
4. Certification by Recorded Holder or Agent——— l ———————— i ———————————————————————————————— — —
'"HfcUblVtL)?rr * ' {QC7
" •"'••ffiCE 1 ^"'"'""" j
(Prim Name__________ ' do nsreby certifV tnat ' nave personal knowledge of the facts set
forth in this Declaration of Assessment Work having caused the work to be performed or witnessed the same during or after its completion and, to the best of my knowledge, the annexed report is true.
I
S; Ontario Ministry ofNorthern Developmentand Mines
Statement of Costs for Assessment Credit
Transaction Number (office us*)
ersonal Information collected on this form Is obtained under the authority of subsection 6(1) of the Assessment Work Regulation 6/98. Under -
action 8 of the Mining Act, the Information Is a public record. This Information will be used to review the assessment work and correspond with
ie mining land holder. Questions about this collection should be directed to the Chief Mining Recorder, Ministry of Northern Development and
lines, 6th Floor, 933 Ramsey Lake Road, Sudbury, Ontario, P3E 6B5. 2. 1780 lWork Type
Units of WorkDepending on the type of work, list the number of hours/days worked, metres of drilling, kilo metres of grid line, number of samples, etc.
Cost Per Unit of work
Total Cost
, S MEN
IZS/MAiJfrtt 2 So . o o
ANALYTICAL 1 SAMPLES
, RtffoRT 1 MArt
associated Costs (e.g. supplies, mobilization and demobilization).
MOB/DEMOB 3- S . c c
t C APS, WIRE ,
Z- 5 BoMfcARbiER 31*TS Be/HR , o o
CoBRA j Z) 7- 400. oo
Transportation Costs
fc^WTAC ,
SAMfKE475.00
Food and Lodging Costs
F ooP 103, Z7
Total Value of Assessment Work 4493.13
Calculations of Filing Discounts:
1. Work filed within two years of performance is claimed at lOO0/*) of the above Total Value of Assessment Work.
2. If work is flled after two years and up to five years after performance, it can only be claimed at SQiM) of the Total
Value of Assessment Work. If this situation applies to your claims, use the calculation below:
TOTAL VALUE OF ASSESSMENT WORK x 0.50 - Total S value of worked claimed.
Note:- Work older than 5 years is not eligible for credit.- A recorded holder may be required to verify expenditures claimed in this statement o
request for verification and/or correction/clarification. If verification and/or correction/cla ifOllpn J5M6T frri
Minister may reject all or part of the assessment work submitted. i 11— -r-
costs within 4R Ha of a (e)
Certification verifying costs:
SEP 1 1 193?
GEOSCIENCE ASSESSMENT OFFICE :curate, do hereby certify, that the amounts shov TT af6 as accurate as may
(please print luit name)
reasonably be determined and the costs were Incurred while conducting assessment work on the lands Indicated on
__ l am authorizedthe accompanying Declaration of Work form as 'pcyfleftA . f-^
(recorded holder/agent,
to make this certification.
was performed, at the tuiio worK was peiiuiinea. A map
m -st accompany this form. (l^fa
Mining Claim Number. Or If work was done on other eligible mining land, show in this column the location number indicated on the claim map.
eg
eg
eg
1 ,2
3
4
5
6
7
8
9
10
11
12
13
14
15
TB 7827
1234567
1234568
PS4705SP 792 47.5p 7*Z 474P 7324*77P 792 46 1P 792 46 iP 732483P73Z4S4
Number of Claim Units. For other mining land, list hectares.
16 ha
12
2
l
l
l
l
l
l
l
l
Column TotalsX i
Value of work performed on this claim or other mining land.
S26, 825
0
S 8, 892
* 4439,13c-to
C*
6
O
O
*44S3, S
Value of work applied to (his claim.
N/A
S24,000
S 4,000
6
*4dO*4oo*4oo*4ooMoo^40o^4oo
s
*2fco6
Value of work assigned to other mining claims.
124,000
0
0
*25oo0
e
O
. 0
C)
0
o
*26oo
Lo- cxZl 1Bank. Value of work to be distributed at a future date.
92,825
0
14,892
*!6p.9,l3
o0
o
o
o0
Q
'
\
.
* 1493,13
hereby certify that the above work credits are eligible(PXnt Full Name) f
subsection 7 (1) of the Assessment Work Regulation 6/96 for assignment to contiguous claims or for application to
the claim where the work was done.
Signature of Recorded Holder or Agent Authorized in Writing
6. Instructions for cutting back credits that are not approved.
Some of the credits claimed in this declaration may be cut back. Please check ( ^ ) in the boxes below to show how
you wish to prioritize the deletion of credits:
fa 1. Credits are to be cut back from the Bank first, followed by option 2 or 3 or 4 as indicated.
O? 2. Credits are to be cut back starting with the claims listed last, working backwards; or
D 3. Credits are to be cut back equally over all claims listed in this declaration; or
D 4. Credits are to be cut back as prioritized on the attached appendix or as follows (describe):
p; p r m
Note: If you have not indicated how your credits are to be deleted, credits will be c it bach frorfV^ritffluiik fliJt,' followed by option number 2 if necessary.
For Office Use Only________^__^^__Received Stamp
(VI' 112/96)
Deemed Approved Date
Date Approved
Date Notification Sent
Total Value of Credit Approved
Approved for Recording by Mining Recorder (Signature)
Ministry ofNorthern Developmentand Mines
Ministers du Developpement du Nord et des Mines
November 18, 1997
ECLIPSE MINING CORPORATION 56 TEMPERANCE STREET SUITE 602TORONTO, ONTARIO M5H-3V5
OntarioGeoscience Assessment Office 933 Ramsey Lake Road 6th Floor Sudbury, Ontario P3E 6B5
Telephone: (888)415-9846 Fax: (705) 670-5863
Dear Sir or Madam:
Subject: Transaction Number(s):
Submission Number: 2 .17801
StatusW9760.00319 Deemed Approval
We have reviewed your Assessment Work submission with the above noted Transaction Number(s). The attached summary page(s) indicate the results of the review. WE RECOMMEND YOU READ THIS SUMMARY FOR THE DETAILS PERTAINING TO YOUR ASSESSMENT WORK.
If the status for a transaction is a 45 Day Notice, the summary will outline the reasons for the notice, and any steps you can take to remedy deficiencies. The 90-day deemed approval provision, subsection 6(7) of the Assessment Work Regulation, will no longer be in effect for assessment work which has received a 45 Day Notice.
Please note any revisions must be submitted in DUPLICATE to the Geoscience Assessment Office, by the response date on the summary.
If you have any questions regarding this correspondence, please contact Lucille Jerome by e-mail at [email protected] or by telephone at (705) 670-5858.
Yours sincerely,
ORIGINAL SIGNED BYBlair KiteSupervisor, Geoscience Assessment OfficeMining Lands Section
Correspondence ID: 11 573
Copy for: Assessment Library
Work Report Assessment Results
Submission Number: 2 .17801
Date Correspondence Sent: November 18, 1997 Assessor: Lucille Jerome
Transaction Number
W9760.00319
Section:10 Physical PTRNCH
First Claim Number
947059
Township(s) l Area(s)
CARMAN
Status
Deemed Approval
Approval Date
November 06, 1997
Correspondence to:
Resident Geologist South Porcupine, ON
Assessment Files Library Sudbury, ON
Recorded Holder(s) and/or Agent(s):
ECLIPSE MINING CORPORATION TORONTO, ONTARIO
Page: 1Correspondence ID: 11573
LEGENDCOOT TWMAP SYMHIGHWAY AND ROUTE Ne. OTHER ROADS TRAILS -SURVEYED LINES:
TOWNSHIPS. BASE L INES, ETC
Atriaf Cabltway Boundary
LOTS, MINING CLAIMS, PARCELS, ETC UNSURVEYED LINES
LOT LINESPARCEL BOUNDARYMINING CLAIMS ETC.
RAILWAY *|*O RIGHT OF WAV UTILlTY-LIWfS NON-PCRENNIAL STREAM f LOODING OR FLOODING RIGHTS SUBDIVISION OR COMPOSITE PLAJU
MOOSEISLAND
(AtL IN COOY1213297
NIGHT HAWK LAKE i
MO 60"*"li|Nl213298
12135401213293
(16 UNITS)— -— -J_ *
RESERVATIONSORIGINAL SHORELINEMARSH OR MUSKEGMINESTRAVERSE MONUMENT
Omit* lint rivtr• l**' ••Itl*l4
CR6w ISL
QNEST ISLANDPi tor, Strom. Canol
DISPOSITION OF CROWN LANDSGULL ISLAND
TYPE OF DOCUMENTP
228859UNITS) PATENT. SURFACE ft MINING RIGHTS
" .SURFACE RIGHTS ONLY........ __ .....J..... 9" . MINING RIGHTS ONLY... _ ................-. O
LEASE, SURFACE 81 MINING RIGHTS" .SURFACE RIGHTS ONLY........ ..——— ......— H" .MINING RIGHTS ONLY.............. _ .......—— B
LICENCE OF OCCUPATION . __ — —— .—— .... .....— TORDER-IN-COUNC1L ....... ............................— OCRESERVATION __CANCELLED __ ........ _ ....... ..................... 9SAND ft GRAVEL ......................................... 0
Spot Elevation(lot! i lixtiom) -30O.O
Fwnct.Htdgt, Woll
Tow* r ai 9
Transmission Lin*Ftaturt Outlinefilum, l l
• •c.)
Utility Pol** Wherfveock, Pi*r
Araa
or Swamp Matt Mine Htad FrawB Outcrop i
(15. UNITS)1213279 (16 UNITS) NOTE: MININQ NIGHTS IN PARCELS PATENTED PRIOR TO MAY O.
1*13. ViSTED IN ORIGINAL PATENTEE BY THE PUBLIC LAMOB ACT. R.S.O. 1970. CHAP 3BO. SEC. S3. SUBSEC 1.
AREAS WITHDRAWN FROM DISPOSITION
2^860 * (16
M.R.O. - MINING RIGHTS ONLY
S.R.O. - SURFACE RIGHTS ONLY
M.+ S. - MINING AND SURFACE RIGHTS
Otpvrlption t)rd*r No. DM* Olvotition Fil*
1223406 (15 UNITS)
SCALE 1:20 000
GRID ZONE: 17
,. (l6 UNITS)/
K -""T ' ' " T -
L.-Jl___'-^L- —
* \...-^^t^-^y"t,'•'i! l *-
-r^^-. 224444
DATE OF ISSUENOV 181997
•^-SKr^r*?*..^
l M7243 \
C A R MA N(15 UNITS)
—h—-^TOWNSHIP
CARMANM. N. R. ADMINISTRATIVE DISTRICT
TIMMINSMINING DIVISION
PORCUPINELAND TITLES/ REGISTRY DIVISION
COCHRANE
1224441 12^4442
4403UNITS ) l.v^-^'C"THE INFORMATION THAT
APPEARS ON THIS MAP HAS BEEN COMPILED FROM VARIOUS SOURCES, AND ACCURACY IS NOT GUARANTEED. THOSE WISHING TO STAKE MIN ING CLAIMS SHOULD CON SULT WITH THE MINING RECORDER, MINISTRY OF NORTHERN DEVELOP- *, MENT AND MINES, FOR AD DITIONAL INFORMATION ON THE STATUS OF THE LANDS SHOWN HEREON.
^.•W?Sr^ft^- l (5 UNITS)
Ministry of L*ndNatural ManagementResources Iranch
ORIGINALCOMPILATION JULY 1984 G-4000LANGMUIR WP.
O O (N