Shire OFWiluna
TENDER REGISTER Tender No.
RET abG +Brief description of goods or o
services required:
Particulars of the decision to
invite tenders: CEO .
Advertisement Details: Advertising Date(s): Newspaper(s):
Closing Date and Time:
Opening Date and Time:
Opened in the presence of: NAME: SIGNATURE
Tenderers Contact Name and Company Name: Address:
Shire of Wiluna - Submissions Made https://www.tenderlink.com/webapps/jadehttp.dll?WebTender&tend...
f5ܧ Pfe 9L ed users have made submissions to the tenders box for this tender. Their details, and details of the filesthey uploaded are shown below.
WILUNA-795047 - RFT 2017-06 - Supply of Plant with Operators for Flood Damage Repairs
Company Details Had Files Submitted [date - time uploaded]Copy
SE THEM Earthmoving Pty Ltd rft_2017-06_wiluna_--them__submission.pdf [08/02/2018 - 11:10 a.m.]130 Horwood RoadGERALDTON WA 6530AUSTRALIAContact : Katrina-Lee O'BrienPh : 0408856780ABN Number : 40137486116
The Joshua Johnson Family Trust [08/02/2018 -T/As Red Dust Holdings Pty Ltd rft_2017-06_road-flood_damage_-_final.pdf 1:59 p.m.]PO Box 2136
[08/02/2018 -Geraldton rft_2017-06-supply-of-plant_and-operators_for_.pdf 1:58 p.m.]GERALDTON WA 6531AUSTRALIAContact : Josh JohnsonPh : 08 99654891ABN Number : 82428834120
? Robbro WA Pty Ltd [08/02/2018 -P O Box 245 rft_2017-06-supply_of__plant_and__operators_for_.pdf 12:38 p.m.]GINGIN WA 6503AUSTRALIAContact : Michael RobertsPh : 08 9575.1129ABN Number : 51126381292
Quadrio Earthmoving Pty Ltd. . [08/02/2018 -
P.O. Box 2811 5.2.1_compliance-criteria.pdf10:41 a.m.]
GERALDTON WA 6531[08/02/2018 -AUSTRALIA a._organisational_experience_and_capacity.pdf 10:46 a.m.]Contact : Dianne Heinz
B Numbe 13152547950b._road-construction-experience_in_rural.pdf
0251
aÓ
[08/02/2018 -c.._key_personnel_and-overall-capacity.pdf 10:52 a.m.]
[08/02/2018 -d._extentand_condition-of__road.pdf10:54 a.m.]
[08/02/2018 -e_wiluna__flood_damage-schedule_--timeline.mpp 10:48 a.m.]
non- [08/02/2018 -
conforming__rft_2017-06_supply-of__plant-o_.pdf 11:02 a.m.]
[08/02/2018 -qem_-_insurances_-fleet.pdf 10:41 a.m.]
qem_-_insurances-- [08/02/2018 -
_workers_compensation_2018.pdf10:41 a.m.]
[08/02/2018 -qem_-_letter_of_reference_-_attie_swart_wml.pdf 10:49 a.m.]
[08/02/2018 -qem_-_letter_of_reference_--shire-of_murchison.pdf 10:49 a.m.]
[08/02/2018 -qem_-_letter_of_reference_--tony-chisholm.pdf 10:50 a.m.]
[08/02/2018 -qem_.-_public. and_products_liability.pdf 10:41 a.m.]
[08/02/2018 -qem_--safety-health___environment-policy.pdf 10:51 a.m.]
[08/02/2018 -qem_administration-resume---brenda_hipper.pdf 10:52 a.m.]
[08/02/2018 -qem__dozer-operator_-_aaron-merritt.pdf 10:52 a.m.]
[08/02/2018 -qem_dozer__operator_-_phil-mcintosh.pdf 10:52 a.m.]
. [08/02/2018 -qem_field-mechanic - lan-logan.pdf10:53 a.m.]
. [08/02/2018 -qem_field-mechanic_-_shane_winch-buist.pdf 10:53 a.m.]
1 of 9 o zn n, a - .
Shire of Wiluna - Submissions Made https://www.tenderlink.com/webapps/jadehttp.dll?WebTender&tend...
[08/02/2018 -qem_grader_operator_-_keith-purcell.pdf 10:53 a.m.]
[08/02/2018 -qem_grader-resume_-_nicholas_jolliffe.pdf 10:53 a.m.]
[08/02/2018 -qem_leading-hand__resume--_ken__quadrio.pdf 10:54 a.m.]
[08/02/2018 -qem_ohs_2016_certificate.iso9001_2015.pdf 10:51 a.m.]
[08/02/2018 -qem_ohs_2016_certificate.pdf 10:51 a.m.]
[08/02/2018 -qem-plant-list.pdf 11:00 a.m.]
[08/02/2018 -qem_supervisor_resume -_craig_jupp.pdf 10:54 a.m.]
[08/02/2018 -qem_supervisor_resume_-_graeme_wenn.pdf 10:54 a.m.]
[08/02/2018 -quadrio-earthmoving_-_camp_.layout.pdf 10:51 a.m.]
[08/02/2018 -reference to dates value time_taken.pdf10:47 a.m.]
[08/02/2018 -rft_2017-06_supply-of-plant_and-operators_.for_.pdf 10:27 a.m.]
risk_assessment_i__qem__- [08/02/2018 -
organisational_chart__.pdf 10:42 a.m.]
[08/02/2018 -risk_assessment_i_qem_number-of-personnel.pdf 10:42 a.m.]
[08/02/2018 -risk__assessment_ii-asic__company__statement.pdf 10:43 a.m.]
risk_assessment_xii_qem_- [08/02/2018 -
_accountant_endorsement.pdf10:44 a.m.]
[08/02/2018 -risk_assessment_xii__qem-profit__loss_statement.pdf 10:46 a.m.]
[08/02/2018 -schedule_3.pdf 10:48 a.m.]
schedule 4.pdf [08/02/2018 -10:48 a.m.]
[08/02/2018 -schedule_5.pdf 10:48 a.m.]
[08/02/2018 -schedule_6.pdf 10:52 a.m.]
[08/02/2018 -schedule_7.pdf 10:58 a.m.]
Northern Goldfields Earthmoving 12pa4_companyprofile_v2.pdf [08/02/2018 - 10:35 a.m.]PO Box 117HERNE HILL WA 6056 nge-wilunatender-rtf_2017-06_parcel_1.pdf [08/02/2018 - 10:26 a.m.]AUSTRALIA nge-wilunatender-rtf_2017-06_parcel_3.pdf [08/02/2018 - 10:31 a.m.]Contact : Martha LinkePh : 04 2981 2988ABN Number : 46314139426
GOODWORK HOLDINGS PTY LTD zzz_v8-1._rft_2017-06_- [07/02/2018 - 8:19 a.m.]25 Wongawol Road_flood__gw_final.pdfWiluna
WILUNA WA 6646AUSTRALIAContact : Simon ThomasPh : 0899817157ABN Number : 29066339722
Broome Contracting t100_- [07/02/2018 - 6:38
tender-submission-broome_contracting-final.pdf p.m.]BROOME WA
AUSTRALIAContact : Chris WhelanPh : 0418804508ABN Number: 86073 062 503
Tender awarded by: DATE OF COUNCIL MEETING COUNCIL MINUTE NO.
Name of Successful Tenderer(s):
Amount of Successful Tender(s):
Copy of Advertisement: Statutory advertisement below.
The West Australian, Saturday, January 13, 2018
Part 5 COMPLETE AND RETURN THIS PART
5.3.2 Price Schedule
PRICE SCHEDULE – PARCEL BIDS
Which Works Parcel Do You Intend to Bid for?ParcelNo 1
ParcelNo 2
ParcelNo 3
Only One Works parcel (indicate which Parcel option via
a single tick)
More than One Works parcel as Lead Contractor
simultaneously (indicate which multiple Parcels via ticks)
PRICE SCHEDULE – GENERAL ITEMSContractors Name ………………………………………………………………….
Works Parcel No. 1 Units Qty Amount ($)Allow for all general items as follows:Mobilisation and demobilisation of all plant and
equipment to and from Wiluna
(Mob/Demob A)
Item 1
Mobilisation and Demobilisation of all plant and
equipment between roads within Works Parcel
(Mob/Demob B)
Item 1
Allow for all camp, accommodation and messing Item 1 Included in productive
plant ratesAllow for all insurances required under the contract Item 1 Included in productive
plant ratesAllow for compliance with all legislation, statutes, and
regulationsItem 1 Included in productive
plant ratesPrepare Traffic Management Plan Item 1
SUB-TOTAL GENERAL ITEMSWorks Parcel No.1
PRICE SCHEDULE – GENERAL ITEMSContractors Name …………………………………………………………………….
Works Parcel No. 2 Units Qty Amount ($)Allow for all general items as follows:
Mobilisation and demobilisation of all plant
and equipment to and from Wiluna
(Mob/Demob A)
Item 1
Mobilisation and Demobilisation of all plant
and equipment between roads within Works
Parcel
(Mob/Demob B)
Item 1
Allow for all camp, accommodation and
messing
Item 1 Included in productive
plant rates
Allow for all insurances required under the
contract
Item 1 Included in productive
plant rates
Allow for compliance with all legislation,
statutes, and regulations
Item 1 Included in productive
plant rates
Prepare Traffic Management Plan Item 1
SUB-TOTAL GENERAL ITEMSWorks Parcel No.2
Page 51 of 146
GOODWORK HOLDINGS PTY LTD
NIL
NIL
GOODWORK HOLDINGS PTY LTD
$ 1,200
$ 1,200
$ 11,000
$ 12,200
$ 14,000
$ 15,200
RFT2017-06 | GOODWORK HLDS Page 18 of 64
Part 5 COMPLETE AND RETURN THIS PART
PRICE SCHEDULE – GENERAL ITEMSContractors Name …………………………………………………………………….
Works Parcel No. 3 Units Qty Amount ($)Allow for all general items as follows:
Mobilisation and demobilisation of all plant
and equipment to and from Wiluna
(Mob/Demob A)
Item 1
Mobilisation and Demobilisation of all plant
and equipment between roads within Works
Parcel
(Mob/Demob B)
Item 1
Allow for all camp, accommodation and
messing
Item 1 Included in productive
plant rates
Allow for all insurances required under the
contract
Item 1 Included in productive
plant rates
Allow for compliance with all legislation,
statutes, and regulations
Item 1 Included in productive
plant rates
Prepare Traffic Management Plan Item 1
SUB-TOTAL GENERAL ITEMSWorks Parcel No.3
Page 52 of 146
NIL
$ 18,500
$ 1,200
GOODWORK HOLDINGS PTY LTD
$ 19,700
RFT2017-06 | GOODWORK HLDS Page 19 of 64
Part 5 COMPLETE AND RETURN THIS PART
PRICE SCHEDULE – PLANT HIRE ITEMSContractors Name …………………………………………………………………….Note: Items indicated in italics areprovisional only
No. of Plant itemsrequired per WorksParcel
Units Rate PerPlant item($/unit)
DOZERD8 or similar 1Productive operating hours HourStandby hours (inclement weather only) Hour
GRADER,140H or similar
Between 2 & 3
Productive operating hours HourStandby hours (inclement weather only) Hour
FRONT END LOADER2.0-3.0m3 Bucket (with IT Appendix)
1
Productive operating hours HourStandby hours (inclement weather only) Hour
FRONT END LOADER4.0-5.0m3 Bucket
1
Productive operating hours HourStandby hours (inclement weather only) Hour
45 TONNE EXCAVATOR
With rock breaker Appendix
1
Productive operating hours Hour
Standby hours (inclement weather only) Hour
35 TONNE EXCAVATOR
With rock breaker Appendix
1
Productive operating hours Hour
Standby hours (inclement weather only) Hour
VIBRATORY PADFOOT ROLLERMin 16t deadweight
Between 1 & 2
Productive operating hours HourStandby hours (inclement weather only) Hour
VIBRATORY ROLLER SMOOTHDRUM ROLLERMin 16t deadweight
1
Productive operating hours Hour
Standby hours (inclement weather only) Hour
GRID ROLLER 12t-16t static rollerweight (excluding tractor)
1
Productive operating hours Hour
Standby hours (inclement weather only) Hour
MULTI-TYRED ROLLERMin 16t deadweight 1Productive operating hours Hour
Standby hours (inclement weather only) Hour
Page 53 of 146
210.00
60.00
172.00
160.00 55.00
3
1
55.00
2
0
1
1
1
180.00
35.00
185.00
130.00
45.00
55.00
128.00
45.00
125.00
45.00
1
1
GOODWORK HOLDINGS PTY LTD
RFT2017-06 | GOODWORK HLDS Page 20 of 64
Part 5 COMPLETE AND RETURN THIS PART
PRICE SCHEDULE – PLANT HIRE ITEMSContractors Name……………………………………………………………………….Note: Items indicated in italics areprovisional only
No. of Plant itemsrequired per WorksParcel
Units Rate PerPlant item($/unit)
WATER CARTMin 25 kL
Between 3 & 4
Productive operating hours HourStandby hours Hour
ROAD TRAIN WATER CART
Min 50 kL
Between 1 & 2
Productive operating hours Hour
Standby hours Hour
SIDE – TIPPER Single (18m3) Between 2 & 4Productive operating hours HourStandby hours Hour
ROADTRAIN SIDE - TIPPERDouble (36m3)
Between 3 & 4
Productive operating hours HourStandby hours Hour
ROADTRAIN SIDE - TIPPERTriple (54m3)
Between 2 & 4
Productive operating hours HourStandby hours Hour
MACHINERY FLOAT 1Rate per hour whilst used mobilising
between work sections (Mob/Demob C)Hour
WATER SUPPLY EQUIPMENT ATEACH WATER SOURCE SITE-including standalone standpipe with
150mm transfer pump, 3-phase
submersible bore pump including power
generators as required
Between 1 & 3 atany time per worksection
Rate per site for all equipment including
maintenance and re-fuellingDay
Standby rate per site (when not
pumping)Day
Dam liner (if required) Per
liner
TRAFFIC MANAGEMENTSupply of all traffic control personnel,
signs, materials & equipment etc.
Under roadworks HourLABOUR ONLY RATE- applicable
only when prior approval of Supers Site
Supervisor is gained
Hour
Page 54 of 146
155.0050.00
1
195.00
50.00
4
155.00
50.00
4
195.00
55.00
2
215.00
55.00
170.00
500.00
100.00
2000.00
68.00
60.00
3-4
GOODWORK HOLDINGS PTY LTD
RFT2017-06 | GOODWORK HLDS Page 21 of 64
Part 5 COMPLETE AND RETURN THIS PART
PRICE SCHEDULE – PLANT HIRE ITEMS
Contractors Name……………………………………………………………………….
ADDITIONAL NON-SPECIFIEDITEMS BEING OFFERED
No. of Plant itemsrequired per WorksParcel
Units Rate PerPlant item($/unit)
ITEM………………………………………………Productive operating hours HourStandby hours HourMobilisation and demob for single item Item
ITEM………………………………………………Productive operating hours HourStandby hours HourMobilisation and demob for single item Item
ITEM………………………………………………Productive operating hours HourStandby hours HourMobilisation and demob for single item Item
ITEM………………………………………………Productive operating hours HourStandby hours HourMobilisation and demob for single item Item
ITEM………………………………………………Productive operating hours HourStandby hours HourMobilisation and demob for single item Item
ITEM………………………………………………Productive operating hours HourStandby hours HourMobilisation and demob for single item Item
Page 55 of 146
130.00
20.00
100.00
MINI EXCAVATOR 1.8T 1
125.00
20.00100.00
D6R DOZER 1
170.00
40.00500.00
EX 65 DOZER 1
170.0040.00
500.00
2
120.00
10.00
100.00
FLAT TOP TRAILERS
HIAB TRUCK
2
150.00
10.00
100.00
SKID STEER LOADER 2
GOODWORK HOLDINGS PTY LTD
RFT2017-06 | GOODWORK HLDS Page 22 of 64