*For more information on any disruptions, click here.
WESTMEAD REDEVELOPMENT
KIDS RESEARCH
We have extended our construction hours for works on the new hospital building. This is for safety inspection and plant set-up only. Noise and truck movements will continue to be kept to a minimum, particularly in the early morning and early evening. We apologise for any disruption. Thank you for your patience as we continue work on the new hospital building.
A staged refurbishment to
the lifts in Westmead
Hospital is underway.
Current work in C/D block.
Increased truck movements at construction site entry plus
increasing road widening works on Hawkesbury Road,
including pedestrian/parking changes from June.
Ongoing work near the
endoscopy unit. There
will be intermittent
noisy work.
Ongoing works to linkway
thoroughfare for staged
switchover on 5 June 2019.
Intermittent
traffic
control in
place on
Research
Road.
Upgrades to the loading dock from April to
September 2019 will ensure a safer, more efficient
zone to service the adults’ hospital and cater for
the new Central Acute Services Building (CASB).
Internal and external E Block façade
investigation works for future CASB
linkbridge breakthroughs with traffic
controllers in place for pedestrians.
University Clinics one
-way loop exits onto
Hawkesbury Road
near WIMR from
Monday 3 June 2019.