1
*For more informaon on any disrupons, click here. WESTMEAD REDEVELOPMENT KIDS RESEARCH We have extended our construcon hours for works on the new hospital building. This is for safety inspecon and plant set-up only. Noise and truck movements will connue to be kept to a minimum, parcularly in the early morning and early evening. We apologise for any disrupon. Thank you for your paence as we connue work on the new hospital building. A staged refurbishment to the liſts in Westmead Hospital is underway. Current work in C/D block. Increased truck movements at construcon site entry plus increasing road widening works on Hawkesbury Road, including pedestrian/parking changes from June. Ongoing work near the endoscopy unit. There will be intermient noisy work. Ongoing works to linkway thoroughfare for staged switchover on 5 June 2019. Intermient traffic control in place on Research Road. Upgrades to the loading dock from April to September 2019 will ensure a safer, more efficient zone to service the adultshospital and cater for the new Central Acute Services Building (CASB). Internal and external E Block façade invesgaon works for future CASB linkbridge breakthroughs with traffic controllers in place for pedestrians. University Clinics one -way loop exits onto Hawkesbury Road near WIMR from Monday 3 June 2019.

NSW GOVERNMENT...2019/05/27  · investigation works for future AS linkbridge breakthroughs with traffic controllers in place for pedestrians. University linics one-way loop exits

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NSW GOVERNMENT...2019/05/27  · investigation works for future AS linkbridge breakthroughs with traffic controllers in place for pedestrians. University linics one-way loop exits

*For more information on any disruptions, click here.

WESTMEAD REDEVELOPMENT

KIDS RESEARCH

We have extended our construction hours for works on the new hospital building. This is for safety inspection and plant set-up only. Noise and truck movements will continue to be kept to a minimum, particularly in the early morning and early evening. We apologise for any disruption. Thank you for your patience as we continue work on the new hospital building.

A staged refurbishment to

the lifts in Westmead

Hospital is underway.

Current work in C/D block.

Increased truck movements at construction site entry plus

increasing road widening works on Hawkesbury Road,

including pedestrian/parking changes from June.

Ongoing work near the

endoscopy unit. There

will be intermittent

noisy work.

Ongoing works to linkway

thoroughfare for staged

switchover on 5 June 2019.

Intermittent

traffic

control in

place on

Research

Road.

Upgrades to the loading dock from April to

September 2019 will ensure a safer, more efficient

zone to service the adults’ hospital and cater for

the new Central Acute Services Building (CASB).

Internal and external E Block façade

investigation works for future CASB

linkbridge breakthroughs with traffic

controllers in place for pedestrians.

University Clinics one

-way loop exits onto

Hawkesbury Road

near WIMR from

Monday 3 June 2019.