1 © Nokia Siemens Networks ERTMS Integration Experiences Peter Olasz Customer Solution Management ERTMS in Central and Eastern Europe 27 May 2010, Warszawa

NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

Embed Size (px)

Citation preview

Page 1: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

1 © Nokia Siemens Networks

ERTMS Integration ExperiencesPeter Olasz

Customer Solution Management

ERTMS in Central and Eastern Europe27 May 2010, Warszawa

Page 2: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

2 © Nokia Siemens Networks

Agenda

• Tasks for the GSM-R vendor• Spanish example

– Optimization phase– QoS phase– ETCS-L2 integration tests

• Outlook on other cases• Conclusions

Page 3: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

3 © Nokia Siemens Networks

Agenda

• Tasks for the GSM-R vendor• Spanish example

– Optimization phase– QoS phase– ETCS-L2 integration tests

• Outlook on other cases• Conclusions

Page 4: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

4 © Nokia Siemens Networks Public and Corporate Solutions / GSM-Railway / March 2009

Handheld, shunting terminals

Infrastructure GSM-R: Radio, Core, Data portfolio

Core

IN

BTS

BTS

BSC

bs240_241

bs240_241

End-to-end tested GSM-R Solution for Railways

Tested and proven Solutions in 25 Railway NetworksDispatcher Equipment CAB Radios

Page 5: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

5 © Nokia Siemens Networks

GSM-R as bearer service for ETCS L2

GSM-R

• Ensure that EVC can reach RBC, i.e. compliance with FFFIS Euroradio

• Ensure the required GSM-R Quality of Service, i.e. compliance with Subset-093

• ... and build a network designed for this

MSCRBC

cab

EVC

Page 6: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

6 © Nokia Siemens Networks

Agenda

• Tasks for the GSM-R vendor• Spanish example

– Optimization phase– QoS phase– ETCS-L2 integration tests

• Outlook on other cases• Conclusions

Page 7: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

7 © Nokia Siemens Networks

GSM-R HSL Radio design principles

BTS1 BTS2 BTS3

BTS1 BTS2 BTS3

BTS1ABTS1B

BTS2A BTS3ABTS2B BTS3B

Madrid-Sevilla• single radio layer

HSL ETCS L2 lines• double radio layer for highest

availability• -85 dBm/-70 dBm tunnels

Zaragoza-Huesca• overlapped radio layer• ETCS L1

Page 8: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

8 © Nokia Siemens Networks

Overview (graphical)

HSL Madrid Lleida (450km)

RBC Ansaldo

HSL Lleida – Barcelona(150km)

RBC Thales

In both lines:EVC: Siemens

CabRadios: Siemens

Trains:Siemens S-103, 350 km/h

Lleida

Madrid

Barcelona

Page 9: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

9 © Nokia Siemens Networks

Overview (textual), HSL Madrid-Barcelona• Some data about the GSM-R network:

– Double radio layer, double core

• Types of measurements performed– Optimization and Qos tests– Real ETCS-L2 tests

▪ Real Cab radios supplied by Siemens

Layer "A"

BTS 1A BTS .. BTS 4A

BSC ATRAU AMSC-AZaragoza

BSC B Layer "B"TRAU BMSC-BAtocha

BTS 1B BTS… BTS 4B

Page 10: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

10 © Nokia Siemens Networks

Agenda

• Tasks for the GSM-R vendor• Spanish example

– Optimization phase– QoS phase– ETCS-L2 integration tests

• Outlook on other cases• Conclusions

Page 11: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

11 © Nokia Siemens Networks

Tools for the optimization and QoS phase

Test System with ComTalk application Abis, A, ISDN protocol analyzer (K1205)

Spectrum analyzer

Triorail TEMS

TSMU Scanner

Page 12: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

12 © Nokia Siemens Networks

Optimization phase

What to measure• Coverage level• Quality of the signal• Interference• Handover Parameters, always checked in both directions

How to do it• Campaign of 2-3 weeks, different types of trains (160 km/h, 200 km/h, 300 km/h…)• Separated / joint / „degraded” measurement of layers• After each day, results are obtained & changes proposed in some parameters. Following day

effects of changes are checked• Parameters usually changed:

– Tilts– HO parameters– Power reduction– Frequencies– Priorities…

What to deliver• Graphical representation of the signal level and quality• Parameter - Tables with Nº of succesful HO’s, HO recreation time, HO break time…

Page 13: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

13 © Nokia Siemens Networks

Agenda

• Tasks for the GSM-R vendor• Spanish example

– Optimization phase– QoS phase– ETCS-L2 integration tests

• Outlook on other cases• Conclusions

Page 14: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

14 © Nokia Siemens Networks

Quality of Service (QoS) for ETCS

ERTMS/GSM-R Quality of Service Requirements for ETCS are defined in Subset-093

• Connection Establishment Delay (CED)• Connection Establishment Error Ratio (CER)• Network Registration Delay (NRD)• Transfer Delay (TD)• Transmission Interference Rate (TIR)• Connection Loss Rate (CLR)

The corresponding tests are defined in ERTMS/GSM-R Quality of Service Test Specification (O-2475)

Page 15: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

15 © Nokia Siemens Networks

Agenda

• Tasks for the GSM-R vendor• Spanish example

– Optimization phase– QoS phase– ETCS-L2 integration tests

• Outlook on other cases• Conclusions

Page 16: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

16 © Nokia Siemens Networks

Real ETCS-L2 tests

• CabRadio supplied by Siemens• Different GSM-R data modems used

• FWK (MT1, version 2.14)• Sagem (GPRM1)

• RBC from Ansaldo, EVC from Siemens (Madrid-Zaragoza)• Close cooperation between NSN, Ansaldo and Siemens

with the supervision of Adif• Problems fixed:

• Interworking between the RBC and the EVC• Data Losses• RBC Handovers

Page 17: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

17 © Nokia Siemens Networks

Agenda

• Tasks for the GSM-R vendor• Spanish example

– Optimization phase– QoS phase– ETCS-L2 integration tests

• Outlook on other cases• Conclusions

Page 18: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

Public and Corporate Solutions / GSM-Railway / March 2009

European High Speed lines overview by 2025

Page 19: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

19 © Nokia Siemens Networks

International experience

• Netherlands– ETCS L2 up and running on HSLs

• Belgium– Inter-PLMN HO with Netherlands

• Switzerland– Overall network redundancy design concept

• Italy– Running ETCS w/o backup system successfully

• Spain– High availability of the “Double” radio & core network

• China– Extreme fast network rollout

Page 20: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

20 © Nokia Siemens Networks

Agenda

• Tasks for the GSM-R vendor• Spanish example

– Optimization phase– QoS phase– ETCS-L2 integration tests

• Outlook on other cases• Conclusions

Page 21: NSN ERTMS integration experiences v02 - plkold.evo.plplkold.evo.pl/.../19_sesja_2_referat_12_-_NOKIA_SIEMENS_NETWOR… · 1 ©Nokia Siemens Networks ERTMS Integration Experiences

21 © Nokia Siemens Networks

Setting up common „task force”

Setting up a small group of people participating on real ETCS-L2 measurements to share information: • Configuration of the network: HW, FW… NSN, signalling

vendors…• Problems / solutions found• Generating and maintaining a report describing the situation of each project

Not to re-invent the wheel in every project...