NOTABLE PROJECTS OF BOBBY G. SKAGGS 2006-2015 CITY OF OKLAHOMA CITY PRIMARY CONTROL NETWORK Job Title: Chief Surveyor Role: Conducted 400+ static GPS surveys; a combination of post processed with Trimble Business Center, most post processed through NGS’s OPUS. Analyzed, weighted and adjusted results for reporting. Since 2006, this has been a routine and ongoing process and since 2008 the process has been Trimble R8 and R10 GPS rovers operating on the WDS RTN Network. Role: Planned, managed, established QA\QC measures, developed a long range plan for perpetuation 2001-Present CITY OF OKLAHOMA CITY Untold miles of Right of Way Surveys Job Title: Chief Surveyor Role: Performed a wide variety of right of way surveys, for acquisition and 2007-Present OKLAHOMA RIVER HYDROGRAPHIC\BATHYMETRIC SURVEYS Employer: City of Oklahoma City Job Title: Chief Surveyor Role: Performed semiannual bathymetric surveys of the Oklahoma River on all three basins; 7.5 miles per survey. 2001-Present CITY OF OKLAHOMA CITY Too many Engineering\Topographic surveys to list. Job Title: Chief Surveyor Role: Administer and manage engineering, construction, and land surveys and a team of 2000-2001 Clour Engineering and self-employed, Priority Land Surveying-More than 80 ALTA surveys for cellular towers across Oklahoma, most of which required FAA 1A and 2C certifications. Job Title: Surveyor Role: Survey Manager 2000 OKLAHOMA TURNPIKE AUTHORITY-Kilpatrick Turnpike extension Employer: Duitt Constrction Job Title: Surveyor Role: Construction Staking, alignment, slope staking, base, sub-base, paving, drainage, etc. 1996-1999 Residential and Commercial Development- Employer: Design Engineers\The Benham Group

NOTABLE PROJECTS

Embed Size (px)

Citation preview

Page 1: NOTABLE PROJECTS

NOTABLE PROJECTSOF BOBBY G. SKAGGS

2006-2015 CITY OF OKLAHOMA CITY PRIMARY CONTROL NETWORKJob Title: Chief SurveyorRole: Conducted 400+ static GPS surveys; a combination of post processed with Trimble Business Center, most post processed through NGS’s OPUS. Analyzed, weighted and adjusted results for reporting. Since 2006, this has been a routine and ongoing process and since 2008 the process has been Trimble R8 and R10 GPS rovers operating on the WDS RTN Network.Role: Planned, managed, established QA\QC measures, developed a long range plan for perpetuation

2001-Present CITY OF OKLAHOMA CITY Untold miles of Right of Way SurveysJob Title: Chief SurveyorRole: Performed a wide variety of right of way surveys, for acquisition and

2007-Present OKLAHOMA RIVER HYDROGRAPHIC\BATHYMETRIC SURVEYS Employer: City of Oklahoma CityJob Title: Chief SurveyorRole: Performed semiannual bathymetric surveys of the Oklahoma River on all three basins; 7.5 miles per survey.

2001-Present CITY OF OKLAHOMA CITY Too many Engineering\Topographic surveys to list.Job Title: Chief SurveyorRole: Administer and manage engineering, construction, and land surveys and a team of

2000-2001 Clour Engineering and self-employed, Priority Land Surveying-More than 80 ALTA surveys for cellular towers across Oklahoma, most of which required FAA 1A and 2C certifications.Job Title: SurveyorRole: Survey Manager

2000 OKLAHOMA TURNPIKE AUTHORITY-Kilpatrick Turnpike extensionEmployer: Duitt ConstrctionJob Title: SurveyorRole: Construction Staking, alignment, slope staking, base, sub-base, paving, drainage, etc.

1996-1999 Residential and Commercial Development-Employer: Design Engineers\The Benham GroupJob Title: Construction Manager\Survey CoordinatorRole: Manage and Inspect, coordinate surveys for residential and commercial developments throughout the Oklahoma City metro area and across the state.

1996 CITY OF CLINTON, OK WATERLINE IMPROVEMENTS- 17 miles of 24” waterline, river and creek crossing, appurtenances.Employer: Glenn Briggs and AssociatesJob Title: Construction InspectorRole: Construction inspection of a cross country DIP waterline, including highway and railroad bores, creek and river crossings.

Page 2: NOTABLE PROJECTS

1995-1996 OKLAHOMA TURNPIKE AUTHORITY-Annual Facilities\Maintenance Inspection and Evaluation on the H.E. Baily and Kilpatrick turnpikes.Employer: Poe and AssociatesJob Title: Facilities\Construction InspectorRole: Inspect, evaluate and report condition of PCC and AC paving, joints, drainage structures, etc.

1996 WILL ROGERS WORLD AIRPORT-Annual Facilities\Maintenance Inspection and EvaluationEmployer: Poe and AssociatesJob Title: Facilities InspectorRole: Inspect, evaluate and report condition of runways and taxiways, concrete paving, joints, drainage structures, etc.

1991-1993 CITY OF ANADARKO WASTEWATER TREATMENT FACILITIES - A WWTF plant expansion; clarifiers, lift station, outfall line, headworks, etc.Employer: Poe and AssociatesJob Title: Construction InspectorRole: Coordinate construction, inspection, submittal review, concrete testing, process change orders

1992-1993 DEER CREEK RESERVOIR (later named WESS WATKINS RESERVOIR)Employer: Merco Consultants for Pottawattamie Development Authority.Job Title: Survey Party Chief, Engineering Technician, draftsmanRole: Topographic and boundary survey for an SCS funded1800 acre reservoir

1991-1993 CITY OF OKC DRAPER WATER LINE EXTENSION Job Title: Construction ManagerRole: Coordinate construction, inspection, submittal review, plant inspection of PSCCP, review and process change orders, conduct construction meetings.

1989-1990 CITY OF ARDMORE WASTEWATER TREATMENT FACILITIES AND LIFT STATION D- A WWTF plant expansion; clarifiers, lift station, outfall line, headworks, etc.Employer: Merco ConsultantsJob Title: Chief Inspector\Construction ManagerRole: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders

1989-1991 CITY OF MOORE WASTEWATER TREATMENT FACILITIES (two phases) - A WWTF plant expansion; clarifiers, RBC & structures, lift station, yard piping, headworks, etc.Employer: Merco ConsultantsJob Title: Chief Inspector\Project ManagerRole: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct construction meetings. set up file\record system to comply with Federally funded project (EPA)

1986-1990 MIDWEST CITY WASTEWATER TREATMENT FACILITIES(two phases) - A WWTF plant expansion; clarifiers, RBC & structures, lift station, yard piping, headworks, etc.Employer: Merco ConsultantsJob Title: Chief InspectorRole: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct construction meetings. set up file\record system to comply with Federally funded project (EPA)

Page 3: NOTABLE PROJECTS

1988-89 HUGO, OK WASTEWATER TREATMENT FACILITIES - A WWTF plant expansion; clarifiers, structures, lift station, yard piping, headworks, etc.Employer: Merco ConsultantsJob Title: Chief Inspector\Resident EngineerRole: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct construction meetings.

1987-1989 OKC MID-URBAN INTERCEPTOR (six phases – 7 miles of 48”-96” sanitary sewer lines, street and highway tunnels, with a 3 barrel inverted siphon across the North Canadian RiverEmployer: Merco ConsultantsJob Title: Chief Inspector\Resident EngineerRole: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, initiate Field Change Orders, conduct construction meetings, set up file\record system to comply with Federally funded project (EPA)

1987-88 DEL CITY, OK- A WWTF plant expansion; clarifiers, RBC & structures, lift station, yard piping, headworks, etc.Employer: Merco ConsultantsJob Title: Chief Inspector\Resident EngineerRole: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct construction meetings. set up file\record system to comply with Federally funded project (EPA)

1987-88 OKC Cow Creek WWTF- A WWTF plant facilities; clarifiers, Filters, Sequencing Batch Reactor (SBR), extended aeration & structures, lift station, yard piping, headworks, etc.Employer: Merco ConsultantsJob Title: Chief Inspector\Resident EngineerRole: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct construction meetings. set up file\record system to comply with Federally funded project (EPA)

1982-1984 Newcastle, Ok Water Treatment Facilities and waterline-(Two phases) clearwell, clarifiers, gravity filters, High Service pumps, Pipe gallery and control piping, yard piping, etc.Employer: Poe and AssociatesJob Title: Resident Construction InspectorRole: Resident Inspection, evaluate and report, concrete testing, hydrostatic testing, take-offs, monthly estimates, etc.

1982-1984 Norman, Ok Water Treatment Facilities-(Two phases) 6.5 MG reinforced concrete clearwell, clarifiers, gravity filters, High Service pumps, Pipe gallery and control piping, yard piping, etc.Employer: Poe and AssociatesJob Title: Resident Construction InspectorRole: Resident Inspection, evaluate and report, concrete testing, hydrostatic testing, take-offs, monthly estimates, etc.

1980-1982 Mustang Water Improvements-(Three phases) A one million gallon storage tank, booster pump station, 6 deep (500’-800’ Garber-Wellington) wells and 16+ miles of 6”-16” DIP water line, bores, etc.Job Title: Resident Construction InspectorRole: Resident Inspection, evaluate and report, concrete testing, hydrostatic testing, take-offs, monthly estimates, etc.

Page 4: NOTABLE PROJECTS

1980 CITY OF SULPHUR, OK Outfall S.S. and Inverted Siphon - A Sanitary Sewer Outfall Sewer line with an 3 barrel inverted siphon across a creek.Employer: Poe and AssociatesJob Title: Construction InspectorRole: Coordinate construction, inspection, submittal review; supervise inspectors, process change orders, conduct construction meetings. set up file\record system to comply with Federally funded project (EPA)

1979-1980 Tulsa International Airport-Taxiway\Runway construction, drainage, lighting, PCC reinforced and non reinforced paving, etc. Employer: Howard Needles, Tammen & BergondoffJob Title: Resident Construction InspectorRole: Resident Inspection, evaluate and report, monthly estimates, etc.