0NodeB Local Commissioning
NodeB Local Commissioning
NodeB Local Commissioning
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Foreword
Understand the installation steps of the NodeB cabinet, boards,
modules and cables.
Describes the procedures for local commissioning and verifying the
NodeB after it is installed. The commissioning and verification
procedures ensure that the Nodeb operates as required
NodeB Local Commissioning
NodeB Local Commissioning
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
NodeB Overview
The 3900 series base stations are classified into macro base
stations and distributed base stations. These base stations are
used in different scenarios to meet operators' requirement for fast
network deployment with low cost.
Macro base stations:
Indoor: BTS3900, BTS3900L
The 3900 series base stations have a modular structure.
The basic modules of the 3900 series base stations are the Base
Band Unit (BBU), Radio Frequency Unit (RFU), and Remote Radio Unit
(RRU). To meet the requirements for radio network deployment, the
BBU and RFU/RRU are connected through a CPRI port that uses an
electrical or optical cable to transmit CPRI signals.
P-*
NodeB Local Commissioning
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Commissioning Resources
Before commissioning, you need to ensure that the required tools
are available, obtain the information about the base station to be
commissioned, and download the correct software for boards used in
the base station
Tools: PC, Multimeter, Power Meter, Site Master, Ethernet cable,
Serial port cable, Flat-head screwdriver, Light emitting diode
(LED)
NodeB Local Commissioning
Site Information
Before commissioning, you must obtain the following basic
information about the site Information on the networking and
related configuration of the base station, including the base
station type, transmission mode, networking mode, and cell
configuration.
Base station data configured on the base station controller.
Board Information
Before commissioning, you need to download the related board
software onto the PC. In the case that the commissioning is
performed by using the USB disk, you need to download the software
onto the USB disk in advance.
P-*
NodeB Local Commissioning
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
The NodeB hardware is installed and the cables are connected.
The NodeB has passed the hardware installation check before it is
powered on.
The NodeB is powered on, and the boards operate normally as
indicated by the LEDs on the boards.
The NodeB is installed. The system commissioning is completed, and
the system is operating properly.
Software Requirements
NodeB Local Commissioning
NodeB Local Commissioning
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Remote Commissioning Modes
Local LMT Commissioning
The upgrade of the NodeB software and configuration data can be
implemented on the LMT on the site. Then, you can check the status
and handle the alarms through LMT.
NodeB Local Commissioning
NodeB Local Commissioning
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
LMT Commissioning Scenarios
When transmission is unavailable, we can perform the on-site
commissioning of the NodeB on the LMT. You can upgrade the
software, download the data configuration file, and check the
running status of the NodeB on the NodeB LMT
NodeB Local Commissioning
NodeB Local Commissioning
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Local LMT Commissioning
The configuration file on the LMT
Check the running status of the NodeB
Do the software and configurations
need to be upgraded?
Local LMT Commissioning
Export the Commissioning Report
Checking External Environment Alarms
NodeB Local Commissioning
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Page*
Logging in to NodeB with NodeB local IP address
NodeB Local Commissioning
The default password for NodeB is “NodeB”.
Proxy function is used to log in to the NodeB through M2000 or
other proxy, M2000 server IP could be filled in Proxy server.
P-*
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Page*
NodeB Local Commissioning
The default password for NodeB is “NodeB”.
Proxy function is used to log in to the NodeB through M2000 or
other proxy, M2000 server IP could be filled in Proxy server.
P-*
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Page*
NodeB Local Commissioning
The default password for NodeB is “NodeB”.
Proxy function is used to log in to the NodeB through M2000 or
other proxy, M2000 server IP could be filled in Proxy server.
P-*
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Page*
NodeB Local Commissioning
The default password for NodeB is “NodeB”.
Proxy function is used to log in to the NodeB through M2000 or
other proxy, M2000 server IP could be filled in Proxy server.
P-*
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Page*
NodeB Local Commissioning
The default password for NodeB is “NodeB”.
Proxy function is used to log in to the NodeB through M2000 or
other proxy, M2000 server IP could be filled in Proxy server.
P-*
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Page*
NodeB Local Commissioning
The default password for NodeB is “NodeB”.
Proxy function is used to log in to the NodeB through M2000 or
other proxy, M2000 server IP could be filled in Proxy server.
P-*
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Page*
Checking Software Version of NodeB
Checking the current software version of the boards and modules of
the NodeB by command LST VER
If The NodeB version doesn’t match, we need to upgrade the NodeB to
the right version
Upgrading the NodeB Software and Downloading the Data Configuration
File
NodeB Local Commissioning
P-*
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Page*
Upgrading the NodeB Software and Downloading the Data Configuration
File(Cont.)
Upgrade the NodeB
NodeB Local Commissioning
NodeB software
NodeB Program : Software.csp
Version file for each board of NodeB.
For NodeB software, Software is mandatory to upgrade, the BootROM
is optional. For some versions, the new software file is compatible
with old BootROM, and there is no new BootROM file in the new
version folder, so it’s no need to upgrade the BootROM. If there is
new BootROM file in the new version folder which means the new
software file is not compatible with old BootROM file, we must
upgrade the BootROM also.
P-*
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Upgrading the NodeB Software and Downloading the Data Configuration
File(Cont.)
Upgrade the NodeB BootROM
Confidential Information of Huawei. No Spreading Without
Permission
Click the Maintenance tab in the navigation tree.
Choose Software Management > Update BootROM. The Update BootROM
dialog box is displayed.Choose the directory where you store the
version file, then click “Next” to download the new BootROM from
laptop to NodeB.
If you click the “Activate BootROM”, the BootROM will be activated
automatically after downloading.
Activating the BootROM does not reset the NodeB.
After you log in to the NodeB LMT by online mode, the SFTPServer is
started up automatically. You’ll see in your windows tool bar. And
the setting is done by system. Double-click the icon to check the
detailed setting.
P-*
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Page*
Upgrading the NodeB Software and Downloading the Data Configuration
File(Cont.)
Upgrade the NodeB Software and Downloading Data Configuration
File
NodeB Local Commissioning
Confidential Information of Huawei. No Spreading Without
Permission
Click the Maintenance tab in the navigation tree.
Choose Software Management > Software Update. The Software
Update dialog box is displayed.
Select Upgrade NodeB Software in the dialog box. Click Next. The
Update NodeB Software dialog box is displayed.
Select Downloading the Data Configuration File, Download NodeB
Software Package, Download by Configuration, Effective Data
Configuration File, and Activate NodeB Software in sequence, and
set the directory for downloading the data configuration file and
NodeB software package.
“Backup Data Configuration File” is used in case the new version or
new configuration file is not working normally, we could downgrade
the version back with old data configuration file.
“Downloading the Data Configuration File” is used to download the
new configuration file to NodeB in case the old configuration file
is not working normally with new NodeB version.
“Download NodeB Software Package” is used to download the new NodeB
software file from laptop to NodeB.
“Download by Configuration” means only the new software of boards
which have been configured in NodeB will be downloaded to NodeB.
For example: If there is no UTRP board configured in NodeB now, the
new UTRP board software will not be downloaded. If you install UTRP
board with older version in this NodeB after NodeB upgrading, the
UTRP board can not get the new software version from new NodeB
software package. You have to upgrade the UTRP board software
version again.
Effective data configuration file will cause the NodeB reset, so is
Activate NodeB software. The NodeB will reset automatically after
either or both of there two options is clicked.
P-*
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Page*
Checking the Consistency Between Hardware Installation and Data
Configuration of NodeB
In the NodeB LMT window, click the Device Panel tab to check the
board configuration of the NodeB
Checking the operating status of the boards according to the board
color
NodeB Local Commissioning
Confidential Information of Huawei. No Spreading Without
Permission
The green color indicates that the board operates normally. The red
color indicates that the board is faulty, and an alarm related to
the board exists.
P-*
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Page*
Commissioning SNTP
Run the SET SNTPCLTPARA command to set the parameters of the SNTP
client
Run the LST SNTPCLTPARA command to check the parameters of the SNTP
client
NodeB Local Commissioning
P-*
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Page*
Commissioning SNTP
Run the LST LATESTSUCCDATE command to query the time of latest
successful synchronization of the SNTP client to the SNTP server,
and whether the synchronization is successful
If...
Then...
The synchronization fails
Check the following items: Whether the SNTP server is running .
Whether the IP address of the NodeB is correct. After the faults
are rectified, set the parameters again.
The synchronization is successful
P-*
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Checking the Status of a Cell
Run the DSP LOCELL command to check the status of all local and
logical cells of the NodeB.
If...
Then...
Rectify the faults according to the information.
No information prompting faults is displayed
End the task.
NodeB Local Commissioning
NodeB Local Commissioning
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Checking the Running Status of the NodeB(Cont.)
Measuring the RTWP
NodeB Local Commissioning
In the navigation tree of the Local Maintenance Terminal window,
click the Maintenance tab.
Choose Realtime Specific Monitoring > Board RTWP. The Board RTWP
dialog box is displayed, as shown in the figure.
Set the parameters in the dialog box.
Click OK. A window is displayed, showing the current monitoring
task in graph.
To stop this test task, use either of the following methods:
Method 1: Close the task monitoring window directly to stop all
monitoring tasks displayed in the window.
Method 2: Right-click the task on the monitoring task list and
choose Delete Task from the shortcut menu. The curve displayed for
the task is deleted together with the task.
NOTE:
One RF module can be configured with one to four carriers. The
system outputs the RTWP value of the corresponding carrier based on
the actual configuration.
One carrier may be configured with main and diversity RX.
P-*
NodeB Local Commissioning
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Checking the Running Status of the NodeB(Cont.)
Monitoring the Output Power of the NodeB
Page*
NodeB Local Commissioning
In the navigation tree of the Local Maintenance Terminal window,
click the Maintenance tab.
Choose Realtime Specific Monitoring > Output Power Monitoring.
The Output Power Monitoring dialog box is displayed, as shown in
the figure.
Set the parameters in the dialog box.
Click OK. A window is displayed, showing the current monitoring
task in graph.
To stop this test task, use either of the following methods:
Method 1: Close the task monitoring window directly to stop all
monitoring tasks displayed in the window.
Method 2: Right-click the task on the monitoring task list and
choose Delete Task from the shortcut menu. The curve displayed for
the task is deleted together with the task.
Result
The table monitoring items for the NodeB output power
measurement
P-*
NodeB Local Commissioning
Carrier Output Power(Channel No: X; Carrier No: Y; Unit:
0.1dBm)
Indicates the output power of Y carrier in X channel.
Channel Output Power(Channel No: X; Unit: 0.1dBm)
Indicates the typical output power in X channel corresponding to
the RF module.
Confidential Information of Huawei. No Spreading Without
Permission
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Page*
Handling NodeB Alarms
Clicking Alarm in the NodeB LMT window, and the Browse Alarm tab
page is displayed in the NodeB Alarm window
Clear the alarms related to the NodeB
If...
Then...
Clear the alarm based on the alarm online help.
An active alarm related to the NodeB cannot be cleared.
Record it in Data Sheet for NodeB Commissioning.
NodeB Local Commissioning
P-*
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Run the STR VSWRTEST command to check the NodeB VSWR
NodeB Local Commissioning
Context
An excessively large VSWR results in short transmission distance,
thus affecting the normal operation of the communication system.
The normal VSWR ranges from 1 to 1.8. The VSWR less than 1.5 is
preferred.
Postrequisites
Check that the antenna system is correctly installed based on the
checked VSWR.
Ensure the NodeB services are resumed.
CAUTION: During testing of the VSWR, the services of the NodeB are
interrupted. Therefore, you are advised to test the VSWR when the
service volume is light or after the NodeB services are
isolated.
P-*
NodeB Local Commissioning
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Setting the Maximum Output Power of RRU or RFU
Run LOC RRUTC set the maximum output power of the RRU or RFU
Page*
NodeB Local Commissioning
Run the DSP RRU command to query the cabinet/subrack/slot number,
TX channel number, and maximum output power of the RRU or
RFU.
Run the LOC RRUTC command to set the maximum output power of the
RRU or RFU.
Run the RST BRD command to reset the RRU or RFU.
Run the DSP TXBRANCH command to check that the maximum output power
of each RRU or RFU is set successfully.
P-*
NodeB Local Commissioning
Copyright © 2012 Huawei Technologies Co., Ltd. All rights
reserved.
Page*
Page*
Checking External Environment Alarms
Run the LST ALMPORT command to query the status of external alarm
ports
Check the external alarm settings according to the query
result
Check that the reported alarm is consistent with the configured
external alarm
NodeB Local Commissioning