NEW YORK STATE DEPARTMENT OF TRANSPORTATION

NY Route 347- Design Build Phase 2

Mount Pleasant Road to Terry Road

PIN 0054.22, contract D900014

Draft Request for Proposals

RFP Informational Meeting

December 19, 2013

Page 2: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Rules of Contact

Catherine TrainaAttn: NY Route 347 – Mt. Pleasant Rd. to

Terry Rd.Office of Contracts Management

New York State Department of Transportation50 Wolf Road, 6th Floor

Albany, New York [email protected]

2

Page 3: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Agenda

Project Overview Procurement Schedule Project Requirements Status of :

Adjacent Projects

ROW

Utilities General Contract Information RFP Content Quality Control & Quality Assurance Evaluation and Selection Additional Information and Submission Guidelines Questions and Answers

3

Page 4: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road General Location

TOTAL FEIS PROJECT LIMIT

Design-Bid-Build Project (Completed)

Design-Build Phase 2 Project Location

Design-Build Phase 1 Project under construction

4

Page 5: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

Bike

Path

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road General Location

5

EndStart

Page 6: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Anticipated Procurement Schedule

Activity Due Date

Draft RFP Info Meeting December 19, 2013

Final RFP to Shortlisted Firms January 2, 2014

Final Date for Requests for Changes to Proposer’s Organization and Personnel February 19, 2014

Final Date for receipt of Proposer Questions February 26, 2014

Final Addendum and/or Responses to Proposer Questions March 5, 2014

Proposal Due March 19, 2014

Selection of Best Value Mid April, 2014

Execution of Contract Late May, 2014

Notice to Proceed June, 2014

6

Page 7: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road General Scope of Work

Widening of NY Route 347 with additional travel lanes and shared-use path for pedestrians and bicyclists in a Manner that Maintains the Corridor Theme;

Pedestrian facility design and installation; Bus turnouts and enhanced bus stop design and

installation; Extensive landscape design and installation including,

but not limited to: vegetated screening, planted raised median, street trees, vegetated drainage features;

Invasive species removal as shown on the Indicative Plans

Concrete sound wall design and installation;

7

Page 8: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road General Scope of Work (Continued)

Relocation and/or preservation of existing utilities;

ITS Installation and integration with the existing INFORM system;

Traffic signals; Installation of street and pedestrian lighting. Signing & pavement markings; Work Zone Traffic Control; Drainage; GreenLITES Certification at Evergreen Level;

8

Page 9: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road General Scope of Work (Continued)

All Other Items of Work Necessary to Complete the Project Safely, On Schedule, and in Compliance with the Contract Documents including the NY Route 347 Aesthetic Design Guide.

9

Page 10: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Proposed Typical Cross Section

New Sound Wall(s) or Low Screen

at/near ROW Line

10

Page 11: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Proposed Typical Plan

11

Page 12: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Proposed Greenway Stop

12

Page 13: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

Think holistically about how the design and construction decisions will affect the final aesthetic design of the roadway.

Ensure the RFP requirements as it relates to the Aesthetic Design Guide are met throughout various stages of the project.

The Technical Solutions should reflect a collective design of related elements: Tree Inventory, anticipated vegetation removals, and proposed planting Aesthetic design of concrete materials ie. sound walls, retaining walls,

and median barrier Shared-use path alignment, Greenway Stop, and associated

transportation features ie. bio-swales, drainage basins, rain garden, etc Bus stop enhancements ie. decorative pavement, bus shelter, solar

lighting, bike racks

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Aesthetic Design

13

Page 14: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Status

Status of : Adjacent Projects ROW Utilities and Suffolk Co Water

14

Page 15: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Adjacent Projects

 PIN/Description: 0054.20 (D900012) – NY 347

Safety and Mobility Improvements from NY 111 to Mt. Pleasant Road

This is a Design-Build project with anticipated completion date of May 2015.

WZTC: Long term lane closures  Design Build team: Posillico Civil and

AECOM

15

Page 16: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Right-of-Way

The Department anticipates that all additional ROW it deems necessary for the Project will be acquired prior to the Notice to Proceed (June, 2014) in accordance with DB §107-22. No relocations are required as a result of this project.Should the Design-Builder identify any additional ROW needs for the project, it shall be acquired in accordance with DB §107-22.

16

Page 17: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Utility Coordination – Existing Utilities

In accordance with Part 4 – Utility Requirements, Design-Builder is responsible for: Appointing a single dedicated person responsible for

managing all utility coordination; Verifying utility facility locations; Identifying & resolving potential conflicts not yet

documented; Providing information on the need for any additional utility

easements; Coordinating with owner for utility relocation; Provide stakeout and final layout for utility relocations Protecting existing utilities; Cost to repair utility damage caused by Design-Builder; Informing the Department of all meetings/correspondence

with utility owners; Being Party to and signing the Three-Party Utility

Agreement.

17

Page 18: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Utility Coordination – Existing Utilities

Long Island Power Authority (LIPA) and Verizon (Aerial):– Approximately 62 poles carrying electric, telephone

and cable on both sides of NY 347 (to remain in service);

– Poles are owned by LIPA or Verizon- LIPA owns 36; Verizon owns 26. The current pole heights vary from approximately 35 feet to 45 feet;

– Service connections to businesses and homeowners originate from the pole line along NY 347 (to remain in service);

– There are third party attachments, including Cablevision and LI Fiber;

– There are 4 overhead transfer lines that feed to the communities to the north and south of NY 347.

18

Page 19: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Utility Coordination – Existing Utilities

National Grid Gas− There is an existing 8” steel main in the center

median of NY 347;− National Grid shall perform all work to relocate this

main out of the center median;− This relocation is anticipated to take 6 weeks;− There are steel gas mains located on the east side of

Terry Rd. – a 4” main south of NY 347, and a 6” main north of NY 347. If offsets are required due to pavement widening and/or drainage modifications, National Grid anticipates requiring approximately 2 weeks to complete this work once the site has been marked out and made available.

19

Page 20: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Utility Coordination – Existing Utilities

Verizon (Underground):− There is a seven (7) conduit - 4” PVC duct bank with a buried

copper cable along the existing south side of NY 347 from Mt Pleasant Road to Hidden Ponds Drive, with approximately 30” cover;

− There are 3 manholes associated with these conduits; these manholes are to be considered fixed objects which cannot be relocated;

− There is also an underground 15 conduit PVC duct bank (5 across and 3 deep) that runs along the east side of Terry Road that and crosses NY Route 347;

− Manholes associated with these conduits are located either side of NY Route 347; additional manholes exist within the project limits on Terry Road;

− Should complete relocation of duct bank and buried cable between manholes be required, Verizon will need at least 10 weeks to complete the work; Verizon shall be responsible for all relocation work;

− Verizon will require approximately 2 weeks to offset conduits and/or cable at each conflict location;

20

Page 21: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Utility Coordination – Existing Utilities

  Suffolk County Water

– There is a 12” water main on NY 347 in the vicinity of the center median from Mount Pleasant Road to Terry Road and beyond;

– These water mains shall be relocated to the south side of NY 347 by the Design-Builder;

– The Design Builder shall be responsible for all costs to design and reconstruct these mains as well as all service connections, hydrants and valves

– There is also a 12” water main that runs along the west side of Terry Road.

21

Page 22: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Contract Information

Lump Sum Design-Build Contract; Best Value Selection Process (50% Price, 50% Quality); Project Completion Date shall be the earlier of:

April 30, 2016; or The number of days past NTP proposed by the successful

Proposer on Form SCD (ITP Appendix D) There is one Interim Completion Milestone (Permanent

Transfer of all Traffic to Final Lane Configuration) There is a Payment Schedule provided in the RFP; $ 80,000.00 Stipend to Unsuccessful Proposers; Liquidated Damages may be imposed for not meeting

the Interim Completion Milestone date and the Project Completion date;

Escrow Submission of Bid Documents for Successful Proposer;

22

Page 23: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Contract Information

There is a Buy America Clause There is an Iran Divestment Clause There is a DBE Participation Goal 15% All Environmental permits and ROW by the Department

based on 30% design plans, including NYSDEC and USACE Fresh Water Wetlands Permits

The Design-Builder is responsible for complying with the requirements of Environmental permits obtained by the Department, including submission of final detailed plans to permitting agencies for review and approval

The Design-Builder shall be responsible for all costs and/or delays associated with inconsistencies between the final plans and the approved permits, including any necessary re-permitting and/or redesign. modification

All Construction Related Permits (i.e., SPDES) by Design-Builder

23

Page 24: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Contract Information (Continued)

RFP Documents: Instructions to Proposers Part 1: D-B Agreement Part 2: General Provisions, Section DB 100, Part 3: Project Requirements (Scope of Work) Part 4: Utility Requirements Part 5: Special Provisions (Standard Specification Changes For DB

Use) Part 6: RFP Plans (Indicative Plans Only) Part 7: Engineering Data (NY Route 347 - Aesthetic Design Guide) Part 8: Special Specifications (New DB Specifications) Part 9: The Design Builder’s Proposal Part 10: Addenda (If Any)

Reference Documents: On Department’s web site (Not Part of the Contract Documents)

24

Page 25: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Quality Control (QC)

QC is Design-Builder’s Responsibility Design-Builder shall appoint a QC Manager

responsible for QC Plan for both Design and Construction

Design QC shall be by the Designer in accordance with the QC Plan

Construction Inspection shall be by an Independent Engineering Firm (Hired by the Design-Builder)

Materials Testing shall be by an Independent Testing Firm or Laboratory (Hired by the Design-Builder)

The Independent Testing Firm shall report to the Construction Inspection Firm

Offsite Plant Quality Control will be performed by the Department

25

Page 26: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Quality Assurance (QA)

Design and Construction QA is the Department’s Responsibility

The Department may perform QA on any of the Design-Builder’s activities

The Department will utilize an independent Consultant to perform QA of the Design-Builder’s Designs

Construction QA will be performed by Department staff

Offsite Plant Quality Assurance will be performed by the Department

26

Page 27: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road RFP Evaluation and Selection

Pass/Fail Evaluation Factors Legal – Financial – Administrative – DBE Compliance - Price Proposal

(Bond/Conformance)

Quality Evaluation Factors (50%) Key Personnel (28%) Management Approach (35%)

Overall Design-Build Team Organization (12%) Design Management Plan (5%) Construction Management Plan (8%) Quality Control Plan (10%)

Technical Solutions (27%) Design Approach (7%) Construction Approach (10%) CPM Schedule (10%)

Project Support (10%)

Price (50%)

Proposers must obtain a minimum

score of 60% of Quality Evaluation

factors

27

Page 28: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Additional Information – Submission Guidelines

All proposals must be self-contained.• Proposals should not have links to external

web sites.• Proposals should contain all information

needed for evaluation. Do not “assume the Department knows” your

firm and it’s experience/qualifications. Make sure the schedule you propose includes all

anticipated time associated with the final design, QC/QA review, production, and construction of project materials such as the concrete sound walls.

28

Page 29: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Additional Information – Submission Guidelines

Submit ALL Forms required. Do not alter any Form unless indicated on the

Form. Do not add any appendices or attachments to the

Forms. Do not include photographs or illustrations unless

specifically indicated. Do not submit

Form SA (Stipend Amendment) Form BDEA (Bid Document Escrow Agreement) PAB (Payment Bond (Labor and Material Bond)) PEB (Performance Bond (Faithful Performance Bond))

29

Page 30: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Additional Information – Submission Guidelines

Responses to Proposer Questions will be posted on the Department’s Project Web Site

Reference Documents are Posted on the Department’s Project Web Site:

https://www.dot.ny.gov/main/business-center/designbuildproject4

Reference Documents include: Design Report / FEIS “As Builts” Record Plans Regional Design Sheets Other Documents

30

Page 31: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Rules of Contact

Catherine TrainaAttn: NY Route 347 – Mt. Pleasant Rd. to

Terry Rd.Office of Contracts ManagementNew York State Department of

Transportation50 Wolf Road, 6th Floor

Albany, New York [email protected]

31

Page 32: NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347- Design Build Phase 2 Mount Pleasant Road to Terry Road PIN 0054.22, contract D900014 Draft Request

NY Route 347- Design Build Phase 2Mount Pleasant Road to Terry Road Questions and Answers

Questions ?