38
NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347 Mount Pleasant Road to Terry Road Design-Build Project Phase 2 Request for Qualifications Informational Meeting August 7, 2013 1

New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NEW YORK STATE DEPARTMENT OF TRANSPORTATION

NY Route 347

Mount Pleasant Road to Terry Road

Design-Build Project Phase 2

Request for Qualifications

Informational Meeting

August 7, 2013

1

Page 2: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2Agenda

Introductions and Opening RemarksProject Overview Quality Control & Quality AssuranceProcurementQuestions and Answers

2

Page 3: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

Peter RussellAttn: NY Route 347

Office of Contracts ManagementNew York State Department of Transportation

50 Wolf Road, 6th FloorAlbany, New York [email protected]

NY Route 347, Design-Build Phase 2Rules of Contact

3

Page 4: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Agenda

Introductions and Opening RemarksProject Overview

General LocationGoalsGeneral Scope of Work

NY Route 347 Vision Plan

Quality Control & Quality AssuranceProcurementQuestions and Answers

4

Page 5: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

August 8, 2013

NY Route 347 – Design-Build Phase 2 General Location

TOTAL FEIS PROJECT LIMIT

Design-Bid-Build Project (Completed)

Design-Build Phase 2 Project Location

Design-Build Phase 1 Project under construction

Page 6: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

Bike Path

NY Route 347, Design-Build Phase 2 General Location

6

End

Start

Page 7: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2Goals

Improve safety and mobility along the Route 347 Corridor;Efficient and Effective Project DeliveryMaintain corridor design continuity through the implementation of the NY Route347 Vision Plan

7

Page 8: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Goals Continued…

Improve safety and mobility along the NY Route 347 Corridor by:

Providing additional roadway lanes and improving traffic flow Implementing Intelligent Transportation System (ITS) technology (use of INFORM) Improving access to public transportation Providing enhancement to infrastructure for use by pedestriansCreating a shared-use path for bicyclists and pedestrians

8

Page 9: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Goals Continued…

Efficient and Effective Project Delivery by:Ensuring coordination with other construction projectsMinimizing disruption to existing trafficMinimizing temporary construction impacts to adjacent residents and businesses

Keep adjacent residents and businesses informedAddress general project related questions from publicForward project concept questions to NYSDOTForward questions from elected & public officials and the media to NYSDOT

Deliver Project Safely, On Schedule, On Budget, and Environmentally Compliant

9

Page 10: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

Implementation of the NY Route 347 Vision Plan by:Implementing traffic calming measuresImproving pedestrian and bicycle connectivity along the roadway and to bus transitMinimizing the removal of existing vegetation and providing extensive new plantingsPlanting native vegetation to support wildlifeTreating road runoff to improve water quality

NY Route 347, Design-Build Phase 2Goals Continued…

10

Page 11: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 General Scope of Work

Widening of NY Route 347 with additional travel lanes and shared-use path for pedestrians and bicyclistsPedestrian facility design and installationBus turnouts and enhanced bus stop design and installationExtensive landscape design and installation potentially including, but not limited to: vegetated screening, planted raised median, street trees, vegetated drainage featuresConcrete sound wall design and installationInstallation of street and pedestrian lighting

11

Page 12: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Typical Cross Section

12New Sound Wall(s)

or Low Screen at/near ROW Line

Page 13: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 General Scope of Work Continued…

Installation and integration of the INFORM systemTraffic signalsSigning & pavement markingsWork Zone Traffic ControlDrainage and Utilities

13

Page 14: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 General Scope of Work Continued…

Relocation and/or preservation of existing utilitiesInventory of existing utilities provided to DB TeamDB Team responsible for holding utility coordination meetingsDB Team to provide supporting documents for utility design, including: plans, Special Note of Utility Coordination & Table of ConflictsSpecial Note of Utility Coordination must include work description, proposed locations and time frames Table of Conflicts to include existing & proposed locations

14

Page 15: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 General Scope of Work Continued…

Relocation and/or preservation of existing utilities (continued)

Supporting documents are required for Utility & Municipal Agreements to be completed by RUERelocation of water main owned by Suffolk County Water will be required by DB teamLIPA to provide a cost estimate for their work to the RUE, once all supporting documents are provided by the DB Team. The RUE will complete the AgreementNYSDOT will not incur added costs for undergrounding aerial utilities

15

Page 16: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2“The Threads that Weave”

Concepts in the Vision Plan include:SustainabilitySmart Growth Context Sensitive SolutionsEnvironmental StewardshipWalkabilityLivabilityGreenLITES

16

Page 17: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 GreenLITES – Evergreen Certification

The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation infrastructure through the use of best practices that minimize impacts to the environment.NYSDOT implemented “GreenLITES” (Leadership In Transportation and Environmental Sustainability), a project rating program recognizing four levels of successfully attaining these goals in our projects.Route 347 will continue to implement as many of these best practices as possible achieving the highest level of certification…

…Evergreen.

17

Page 18: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Making NY Route 347 More “Bicycle & Pedestrian Friendly” & Multimodal

Improving Bicycle & Pedestrian FacilitiesConstructing a Shared-Use PathAdding SidewalksReducing Crossing DistancesExtending Crossing Times at CrosswalksCreating “Greenway Stops” along the proposed shared-use path

Enhancing Visibility & Motorist Cues at High Pedestrian Areas ie. Senior “Activity Centers”, Schools, etc

Improving Connections to Places of Interest, Community Centers, & TransitIdentifying DestinationsImproving Access to Community Centers & ParksEnhancing Bus Stops

18

Page 19: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2“Enhancing the Plan”

Recognizing Opportunities forImproving & Expanding Non-Motorized Transportation AlternativesImproving & Expanding Access to Mass Transit & Connections Conserving Energy Improving & Preserving Quality of Life, Aesthetics, & the EnvironmentStimulating the Economy

Developing a Corridor Theme“ Parks to Ports Greenway ”

Identifying & Highlighting Environmental AssetsGreenway Stops, Interpretive Signs, Info. Kiosks

Utilizing Traffic Calming FeaturesNarrowing Lane Widths on NY 347 and Side StreetsNarrowing Shoulders on NY 347 and Side StreetsVisually Narrowing by Adding Vertical Elements, i.e. Street Trees, Decorative Street Lighting, and Aesthetically Enhanced Raised Planted MediansConstructing a Buffer between Multi-Use Path and Shoulder

Reducing the Posted Speed

19

Page 20: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Typical Plan

20

Page 21: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Proposed Sound Walls or Vegetated Screening

Concrete Sound Wall DesignObjective to Provide Noise Abatement;

Must Maintain Proposed Wall’s : Location, Top Elevation, Length as shown in the 30% plans;Must Integrate a colored and decoratively surface patterned Sound Absorptive Material on Select Walls (No adhesive or mechanical fasteners may be used to attach the sound absorptive material to the concrete sound wall);

Design to Meet Conceptual Aesthetic Design Criteria as defined by the NY Route 347 Aesthetic Design Guide

Vegetated Screening Design Objective to Provide Visual Screening to the Road

May use a combination of preservation of existing vegetation, new planting and durable fence materials;

Design to Meet Conceptual Aesthetic Design Criteria as defined by the NY Route 347 Aesthetic Design Guide

Page 22: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Proposed Greenway Stop

22

Page 23: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Implementing the NY Route 347 Vision Plan

23

Page 24: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Implementing the NY Route 347 Vision Plan

24

Page 25: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Agenda

Introductions and Opening RemarksProject Overview Quality Control & Quality AssuranceProcurementQuestions and Answers

25

Page 26: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Quality Control (QC)

QC is Design-Builder’s Responsibility

Design-Builder shall appoint a QC Manager responsible for developing QC Plan for both Design and Construction

Design QC shall be by the Designer in accordance with the QC Plan

Construction Inspection shall be by an Independent Engineering Firm (Hired by the Design-Builder)

Materials Testing shall be by an Independent Testing Firm or Laboratory (Hired by the Design-Builder)

The Materials Testing Firm shall report to the Construction Inspection Firm

Offsite Plant Quality Control will be performed by the Design-Builder

26

Page 27: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347 – Design Build Quality Control (QC) Cont..

If the Design-Builder becomes aware of an apparent error, omission or ambiguity in any of the Contract Documents or of an apparent conflict, the Design-Builder shall notify the Department’s Project Manager in writing of any such error, omission, ambiguity or conflict.

27

Page 28: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Quality Assurance (QA)

Design and Construction QA is Department’s ResponsibilityThe Department may perform QA on any of the Design-Builder’s activities, including Offsite Plant QA The Department may utilize an independent Consultant to perform QA of the Design-Builder’s DesignsThe Construction QAE will be Department staff.

28

Page 29: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Agenda

Introductions and Opening RemarksProject Overview Quality Control & Quality AssuranceProcurement

ScheduleContract InformationSOQ Evaluation and SelectionAdditional Information and Website

Questions and Answers

29

Page 30: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Procurement Schedule

Activity Due DateFinal RFQ Released August 21, 2013

Final Date for receipt of Proposer’s questions September 9, 2013

Issue Date for Final Addendum to the RFQ and/or answers to Proposer’s questions September 16, 2013

SOQ Due Date October 2, 2013

Shortlisted DB Teams Announced October 23, 2013

Draft RFP Issued November 6, 2013

Draft RFP Info Meeting November 20, 2013

Final RFP to Shortlisted Firms December 11, 2013

Proposals Due February 12, 2014

Selection of Best Value Mid March, 2014

Execute Contract Early April, 2014

Notice to Proceed Mid April, 2014

30

Page 31: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Contract Information

Lump Sum Design-Build Contract

Two Step Design-Build Procurement Process

Project Schedule

Total Duration 21 Months

There will be a Payment Schedule provided in the RFP

Stipend Under Consideration by NYSDOT

Liquidated Damages may be imposed for missed milestones and final completion

ROW by NYSDOT

D/B Team to prepare SPDES Storm Water Pollution Prevention Plan (SWPPP) and an acceptable Notice Of Intent (NOI) consistent with NYSDEC and NYSDOT procedures.

NYSDOT will obtain the NYSDEC Fresh Water Wetlands permit based on the conceptual 30% plans.

31

Page 32: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 SPDES General Permit

D/B Team to prepare SPDES Storm Water Pollution Prevention Plan (SWPPP) consistent with NYSDEC and NYSDOT procedures.D/B Team shall design drainage system to treat Storm Water Quality and Quantity as per NYSDEC and NYSDOT guidance documents.D/B Team to prepare an acceptable Notice of Intent (NOI) for NYSDOT signature/submission to NYSDEC.The DR/FEIS drainage information can be used as a design “starting point” but shall not be used to calculate final design flow volumes and storm water treatment practices.

32

Page 33: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 NYSDEC/ USACE Fresh Water Wetlands Permits

NYSDOT will obtain the permits based on the conceptual 30% plans prepared by the Department. The permits may include conditions requiring the submission of final detailed plans after preparation by the D/B team.If the final plans are not consistent with the DEC permit conditions, the D/B team shall submit the plans to NYSDOT/ NYSDEC for review. NYSDOT/NYSDEC reserves the right to reject any plans that are inconsistent with the approved permits.

33

Page 34: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 SOQ Evaluation and Selection

Pass/Fail Evaluation FactorsLegal FinancialBacklog Capacity Proposal responsivenessVendor Responsibility

Quality Evaluation FactorsOrganization and Key Personnel (30%)Experience of the Firms (25%)Project Understanding (25%)Past Performance (20%)

34

Page 35: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Additional Information

Responses to Proposer Questions will be posted on the Department Website

Final Addendum to the RFQ will be issued by Wednesday, September 16, 2013

Additional Reference Information to be Posted on Website:Final Design Report / Final EIS / Final Section 4(F) Evaluation

Contract D261357 Design Drawings (Adjacent Contract)

As-Built Drawings NY 347

Route 347 Revaluation 23CFR771.129 – Review & Appendixes (Including NY 347 Vision Plan)

There will be a Buy America Clause

There will be a DBE Participation Goal

35

Page 36: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Project Website

https://www.dot.ny.gov/main/business-center/designbuildproject4

36

Page 37: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

Peter RussellAttn: NY Route 347

Office of Contracts ManagementNew York State Department of Transportation

50 Wolf Road, 6th FloorAlbany, New York [email protected]

NY Route 347, Design-Build Phase 2 Project Contact

37

Page 38: New York State Department of Transportation · 13/05/2008  · The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation

NY Route 347, Design-Build Phase 2 Questions and Answers

Questions??

38