New Water Sources Projects New Water Sources Projects of the of the Metropolitan Waterworks and Metropolitan Waterworks and Sewerage System (MWSS) Sewerage System (MWSS) Mr. Ramon B. Alikpala Chairman, Board Of Trustees Metropolitan Waterworks and Sewerage System (MWSS)

New Water Sources Projects of the Metropolitan Waterworks and … · 2014. 11. 26. · Kaliwa Low Dam Kanan Dam. Development of Replacement Source for Irrigation: Angat Dam is a multi-purpose

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • New Water Sources ProjectsNew Water Sources Projectsof theof the

    Metropolitan Waterworks and Metropolitan Waterworks and Sewerage System (MWSS)Sewerage System (MWSS)

    Mr. Ramon B. AlikpalaChairman, Board Of Trustees

    Metropolitan Waterworks and Sewerage System (MWSS)

  • MWSS PrioritiesMWSS PrioritiesFor The Next Six (6) YearsFor The Next Six (6) Years

    Development of New Water Sources

    Development of Replacement Source for Irrigation

  • Development of New Water Sources:Development of New Water Sources:

    Angat Dam - the only present source of water supply forthe MWSS service area serving a total of 13 million

    population out of the total service population of 15

    million, or only 87% total service coverage.

    Angat Dam provides a supply volume of 4,000 million

    liters per day (4,000 mld) out of the present demand of

    4,395 mld, or a deficit of 395 mld.

    By 2015, the projected demand is expected to reach

    5,054 mld, thus requiring the development of

    supplementary sources of water to address the

    increasing demand.

  • Supply Supply –– Demand ProjectionDemand Projection

    YearSupply

    (mld)

    Demand

    (mld)

    Deficit(mld)

    Supply Source

    2009 4,000 Angat Dam = 4000mld

    2010 4,100 4,395 295 + Laguna Lake = 100mld

    2011 4,250 4,532 282 + Laguna Lake = 150mld

    2012 4,600 4,605 5+ Laguna Lake = 150mld

    + Sumag River = 200mld

    2015 4,600 5,054 454

    2020 4,600 5,680 1,080

    NOTE: Laguna Lake and NOTE: Laguna Lake and SumagSumag River will be implemented by the MWSS’ ConcessionairesRiver will be implemented by the MWSS’ Concessionaires

  • Development of New Water Sources:Development of New Water Sources:

    Based on the Supply-Demand Projection, potential new

    water sources were identified to fill the gap starting

    2015 (these are enumerated in the succeeding slides)

    MWSS will hire consultant:

    - to validate water demand study,

    - to undertake the necessary updating, comparativeevaluation and prioritization of the various new watersources identified, in order to come up with a new road map;

    - to prepare the first priority project biddable by 2012.

  • POTENTIAL NEW WATER SOURCES PROJECTSPOTENTIAL NEW WATER SOURCES PROJECTS

    Project DescriptionPotentialSupply Volume

    Project

    Cost(Estimate)

    Status/Remarks

    1) Kaliwa Low Dam Project

    Construction of a low dam

    (height=30m) and appurtenant

    structures such as conveyance

    tunnels/pipelines and treatment plant

    Location: Kaliwa River, Barangay

    Daraitan, Tanay, Rizal

    550 MLDUS$ 510 M

    (PhP 23 B)

    • Pre-Feasibility study of this

    Project was completed in

    2003.

    2) Laiban Dam Project

    Construction of a 113-meters high

    rockfill dam and other appurtenant

    structures such as conveyance

    tunnels/pipelines, treatment plant &

    reservoirs.

    Location: Kaliwa River, Brgy. Laiban,

    Tanay, Rizal

    1,900 MLDUS$ 1.45 B

    (PhP 65 B)

    • Feasibility Study and Detailed

    Design of this Project was

    completed & updated in 2007;

    • About 4,000 Affected Families

    in 8 barangays will be

    resettled;

    • New Environmental

    Compliance Certificate (ECC)

    is in process.

    MLD = million liters per day; US$1.00 = PhP45.00MLD = million liters per day; US$1.00 = PhP45.00

  • POTENTIAL NEW WATER SOURCES PROJECTSPOTENTIAL NEW WATER SOURCES PROJECTS

    Project DescriptionSupply Volume

    Project

    CostStatus/Remarks

    3) Kanan Dam Project

    Construction of a dam and a

    transbasin tunnel to the

    Laiban Dam reservoir

    Location: Kanan River

    General Nakar, Quezon

    3,270 MLDUS$ 1.30 B

    (PhP 60 B)

    • Pre-Feasibility study of

    this Project was

    completed in 2003.

    • May be considered as

    a next stage

    development after the

    Laiban Dam Project

    MLD = million liters per dayMLD = million liters per day

    US$1.00 = PhP45.00US$1.00 = PhP45.00

  • POTENTIAL NEW WATER SOURCES PROJECTSPOTENTIAL NEW WATER SOURCES PROJECTS

    Project DescriptionSupply Volume

    Project

    CostStatus/Remarks

    7 Rivers of Laguna 300 MLD+ N/A• Feasibility study

    unavailable

    Wawa River 50 MLDUS$ 100 M

    (PhP 4.5 B)

    • Feasibility study

    completed in 2006

    Laguna Lake 500 MLD N/A• Feasibility study

    unavailable

    MLD = million liters per dayMLD = million liters per day

    US$1.00 = PhP45.00US$1.00 = PhP45.00

  • Project Location

    13km transbasin tunnel

    Laiban Dam

    Angat Reservoir

    ANGAT DAM

    Kaliwa Low Dam

    Kanan Dam

  • Development of Replacement SourceDevelopment of Replacement Sourcefor Irrigation:for Irrigation:

    Angat Dam is a multi-purpose facility serving domestic

    water supply, power supply and irrigation water.

    MWSS’ present water allocation in the Angat Reservoir:

    Original Allocation = 22.0 cms

    Conditional Allocation from Irrigation water rights = 15.0 cms

    Umiray-Angat Transbasin Tunnel = 9.0 cms

    TOTAL = 46.0 cms

    or 4,000 mld

    cmscms = cubic meters per second= cubic meters per second

    mldmld = million liters per day= million liters per day

  • Development of Replacement Source Development of Replacement Source for Irrigation:for Irrigation:

    In 1988, the National Water Resources Board (NWRB)

    granted a conditional allocation of 15 cubic meter per

    second (15cms) to MWSS out of the unutilized

    allocation of the National Irrigation Administration (NIA)

    irrigation requirement;

    MWSS is proposing to develop an alternative source to

    replace/substitute the 15cms of NIA’s allocation from

    Angat Reservoir.

    cmscms = cubic meters per second= cubic meters per second

  • Alternative SourcesAlternative SourcesTo Replace The 15 CMS Conditional Allocation To Replace The 15 CMS Conditional Allocation

    Project DescriptionPotential Supply Volume

    Project

    Cost(Estimate)

    1) Apalit-Pampanga River

    Construction of a diversion/intake structures

    to utilize the irrigation return flows and the

    normal flow available from the Pampanga

    River

    Location: Apalit, Pampanga

    20 CMSUS$ 110 M

    (PhP 5 B)

    2) Pampanga River Diversion

    Construction of a diversion/intake structures

    to utilize the normal flow available from the

    Bagabag River

    Location: Calumpit, Bulacan

    20 CMSUS$ 110 M

    (PhP 5 B)

    CMS = cubic meters per second , US$1.00 = PhP45.00CMS = cubic meters per second , US$1.00 = PhP45.00

  • Alternative SourcesAlternative SourcesTo Replace The 15 CMS Conditional Allocation To Replace The 15 CMS Conditional Allocation

    Project DescriptionSupply Volume

    Project

    Cost

    3) Candaba Water Resource Project

    A 1,000 hectares water impounding

    dam project at the Candaba Swamp

    Location: Candaba, Pampanga

    15 CMSUS$ 220 M

    (PhP10 B)

    4) Balintingon Multi-Purpose Dam Project

    A multi-purpose high-head dam

    project by NIA intended for power and

    irrigation

    Location: General Tinio, Nueva Ecija

    17 CMSUS$ 440 M

    (PhP20 B)

    CMS = cubic meters per secondCMS = cubic meters per second

    US$1.00 = PhP45.00US$1.00 = PhP45.00

  • Development of Replacement Source Development of Replacement Source for Irrigation:for Irrigation:

    Technical Working Group (TWG) composed of MWSS, NIAand the Concessionaires (Maynilad and Manila Water) ispreparing a Memorandum of Understanding (MOU) for thejoint undertaking of the Project (re: 15 CMS Water SourceDevelopment Project);

    The TWG will hire consultant:

    - to evaluate the most viable and best alternativereplacement source;

    - to prepare the selected source biddable by 2012.

    CMS = cubic meters per secondCMS = cubic meters per second

  • THANK YOU…THANK YOU…