New Water Sources ProjectsNew Water Sources Projectsof theof the
Metropolitan Waterworks and Metropolitan Waterworks and Sewerage System (MWSS)Sewerage System (MWSS)
Mr. Ramon B. AlikpalaChairman, Board Of Trustees
Metropolitan Waterworks and Sewerage System (MWSS)
MWSS PrioritiesMWSS PrioritiesFor The Next Six (6) YearsFor The Next Six (6) Years
Development of New Water Sources
Development of Replacement Source for Irrigation
Development of New Water Sources:Development of New Water Sources:
Angat Dam - the only present source of water supply forthe MWSS service area serving a total of 13 million
population out of the total service population of 15
million, or only 87% total service coverage.
Angat Dam provides a supply volume of 4,000 million
liters per day (4,000 mld) out of the present demand of
4,395 mld, or a deficit of 395 mld.
By 2015, the projected demand is expected to reach
5,054 mld, thus requiring the development of
supplementary sources of water to address the
increasing demand.
Supply Supply –– Demand ProjectionDemand Projection
YearSupply
(mld)
Demand
(mld)
Deficit(mld)
Supply Source
2009 4,000 Angat Dam = 4000mld
2010 4,100 4,395 295 + Laguna Lake = 100mld
2011 4,250 4,532 282 + Laguna Lake = 150mld
2012 4,600 4,605 5+ Laguna Lake = 150mld
+ Sumag River = 200mld
2015 4,600 5,054 454
2020 4,600 5,680 1,080
NOTE: Laguna Lake and NOTE: Laguna Lake and SumagSumag River will be implemented by the MWSS’ ConcessionairesRiver will be implemented by the MWSS’ Concessionaires
Development of New Water Sources:Development of New Water Sources:
Based on the Supply-Demand Projection, potential new
water sources were identified to fill the gap starting
2015 (these are enumerated in the succeeding slides)
MWSS will hire consultant:
- to validate water demand study,
- to undertake the necessary updating, comparativeevaluation and prioritization of the various new watersources identified, in order to come up with a new road map;
- to prepare the first priority project biddable by 2012.
POTENTIAL NEW WATER SOURCES PROJECTSPOTENTIAL NEW WATER SOURCES PROJECTS
Project DescriptionPotentialSupply Volume
Project
Cost(Estimate)
Status/Remarks
1) Kaliwa Low Dam Project
Construction of a low dam
(height=30m) and appurtenant
structures such as conveyance
tunnels/pipelines and treatment plant
Location: Kaliwa River, Barangay
Daraitan, Tanay, Rizal
550 MLDUS$ 510 M
(PhP 23 B)
• Pre-Feasibility study of this
Project was completed in
2003.
2) Laiban Dam Project
Construction of a 113-meters high
rockfill dam and other appurtenant
structures such as conveyance
tunnels/pipelines, treatment plant &
reservoirs.
Location: Kaliwa River, Brgy. Laiban,
Tanay, Rizal
1,900 MLDUS$ 1.45 B
(PhP 65 B)
• Feasibility Study and Detailed
Design of this Project was
completed & updated in 2007;
• About 4,000 Affected Families
in 8 barangays will be
resettled;
• New Environmental
Compliance Certificate (ECC)
is in process.
MLD = million liters per day; US$1.00 = PhP45.00MLD = million liters per day; US$1.00 = PhP45.00
POTENTIAL NEW WATER SOURCES PROJECTSPOTENTIAL NEW WATER SOURCES PROJECTS
Project DescriptionSupply Volume
Project
CostStatus/Remarks
3) Kanan Dam Project
Construction of a dam and a
transbasin tunnel to the
Laiban Dam reservoir
Location: Kanan River
General Nakar, Quezon
3,270 MLDUS$ 1.30 B
(PhP 60 B)
• Pre-Feasibility study of
this Project was
completed in 2003.
• May be considered as
a next stage
development after the
Laiban Dam Project
MLD = million liters per dayMLD = million liters per day
US$1.00 = PhP45.00US$1.00 = PhP45.00
POTENTIAL NEW WATER SOURCES PROJECTSPOTENTIAL NEW WATER SOURCES PROJECTS
Project DescriptionSupply Volume
Project
CostStatus/Remarks
7 Rivers of Laguna 300 MLD+ N/A• Feasibility study
unavailable
Wawa River 50 MLDUS$ 100 M
(PhP 4.5 B)
• Feasibility study
completed in 2006
Laguna Lake 500 MLD N/A• Feasibility study
unavailable
MLD = million liters per dayMLD = million liters per day
US$1.00 = PhP45.00US$1.00 = PhP45.00
Project Location
13km transbasin tunnel
Laiban Dam
Angat Reservoir
ANGAT DAM
Kaliwa Low Dam
Kanan Dam
Development of Replacement SourceDevelopment of Replacement Sourcefor Irrigation:for Irrigation:
Angat Dam is a multi-purpose facility serving domestic
water supply, power supply and irrigation water.
MWSS’ present water allocation in the Angat Reservoir:
Original Allocation = 22.0 cms
Conditional Allocation from Irrigation water rights = 15.0 cms
Umiray-Angat Transbasin Tunnel = 9.0 cms
TOTAL = 46.0 cms
or 4,000 mld
cmscms = cubic meters per second= cubic meters per second
mldmld = million liters per day= million liters per day
Development of Replacement Source Development of Replacement Source for Irrigation:for Irrigation:
In 1988, the National Water Resources Board (NWRB)
granted a conditional allocation of 15 cubic meter per
second (15cms) to MWSS out of the unutilized
allocation of the National Irrigation Administration (NIA)
irrigation requirement;
MWSS is proposing to develop an alternative source to
replace/substitute the 15cms of NIA’s allocation from
Angat Reservoir.
cmscms = cubic meters per second= cubic meters per second
Alternative SourcesAlternative SourcesTo Replace The 15 CMS Conditional Allocation To Replace The 15 CMS Conditional Allocation
Project DescriptionPotential Supply Volume
Project
Cost(Estimate)
1) Apalit-Pampanga River
Construction of a diversion/intake structures
to utilize the irrigation return flows and the
normal flow available from the Pampanga
River
Location: Apalit, Pampanga
20 CMSUS$ 110 M
(PhP 5 B)
2) Pampanga River Diversion
Construction of a diversion/intake structures
to utilize the normal flow available from the
Bagabag River
Location: Calumpit, Bulacan
20 CMSUS$ 110 M
(PhP 5 B)
CMS = cubic meters per second , US$1.00 = PhP45.00CMS = cubic meters per second , US$1.00 = PhP45.00
Alternative SourcesAlternative SourcesTo Replace The 15 CMS Conditional Allocation To Replace The 15 CMS Conditional Allocation
Project DescriptionSupply Volume
Project
Cost
3) Candaba Water Resource Project
A 1,000 hectares water impounding
dam project at the Candaba Swamp
Location: Candaba, Pampanga
15 CMSUS$ 220 M
(PhP10 B)
4) Balintingon Multi-Purpose Dam Project
A multi-purpose high-head dam
project by NIA intended for power and
irrigation
Location: General Tinio, Nueva Ecija
17 CMSUS$ 440 M
(PhP20 B)
CMS = cubic meters per secondCMS = cubic meters per second
US$1.00 = PhP45.00US$1.00 = PhP45.00
Development of Replacement Source Development of Replacement Source for Irrigation:for Irrigation:
Technical Working Group (TWG) composed of MWSS, NIAand the Concessionaires (Maynilad and Manila Water) ispreparing a Memorandum of Understanding (MOU) for thejoint undertaking of the Project (re: 15 CMS Water SourceDevelopment Project);
The TWG will hire consultant:
- to evaluate the most viable and best alternativereplacement source;
- to prepare the selected source biddable by 2012.
CMS = cubic meters per secondCMS = cubic meters per second
THANK YOU…THANK YOU…