National Smart Metering Programme

Consultation CER/11/191Information Session

23rd November 2011

Page 2: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Welcome

Cathy MannionDirector Electricity Networks & Retail

CER

Page 3: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Objective• CER/11/191: “Consultation on the Proposed National

Rollout of Electricity and Gas Smart Metering”

• Information Session Objective: To present the key sections of the consultation so that stakeholders will be better positioned to respond to the consultation.

• Consultation Period: 15th Nov 2011 – 13th Dec 2011

Page 4: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Agenda

• Section 2: Rollout Proposal & Rationale Paul O’Neill CER• Section 3: Programme Objectives Gary Martin CER• Section 4: Data Ownership, Display & Provision Gary Martin CER• Q&A• Section 5: End-to-end System Design & Functionality:

– Solution Overview & Gas Meter Functionality Michael Crowley BGN– Electricity Meter Functionality, HAN & WAN Neil McGuinness ESBN– Procurement Model Gary Martin CER

• Section 6: Implementation Approach & Timelines Gary Martin CER• Q&A• Wrap Up: Dermot Nolan CER

Page 5: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Phase 1 Overview – Participants & Key Deliverables

Customer Behaviour Trials Findings Reports Electricity: CER/11/080a

Gas: CER/11/180a

Technology Trials Findings Reports

Electricity: CER/11/080bDual Fuel : CER/11/180b

Cost-Benefit Analyses Reports

Electricity: CER/11/080c

Gas : CER/11/180c

Page 6: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Section 2 Rollout Proposal and Rationale

(Trial & CBA Results)

Paul O’NeillSmart Metering Programme Manager

CER

Page 7: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Objective of the Customer Behaviour Trials

“to ascertain the potential for smart meter technology to effect measurable change in consumer behaviour, which will result in thereduction of peak demand and overall energy use, when operated with appropriate DSM initiatives.”

Page 8: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Electricity TrialsExperimental Design

Tariff Bi-monthly detailed bill and

energy use statement

Monthly detailed bill and

energy use statement

Bi-monthly detailed bill

and Electricity Monitor

Bi-monthly detailed bill, energy use

statement plus Overall

Load Reduction

Tariff A 342 342 342 342 1,368

Tariff B 127 129 127 128 511

Tariff C 342 342 343 343 1,370

Tariff D 127 129 126 127 509

Weekend 100

Control Group 1,170

938 942 938 940 5,028

Page 9: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Gas Residential Trials Experimental Design

Page 10: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Time of Use (ToU) Tariffs

Tariff Night Day Peak T1 12 14 20 T2 11 13.5 26 T3 10 13 32 T4 9 12.5 38 T5 (W’end)* 10 14 38

Tariff Night Day Peak T6 14 15 22 T7 7.5 16 22.5

Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Electric Ireland SME Trial Time of Use Tariffs (cents per kWh, excluding VAT) ***

* Night rate applies all day Saturday & Sunday for T5** Current standard 24hr tariff rate is 14.1c per kWh excl. VAT

*** Bord Gáis Energy & ESBIE calculated the SME trial ToU tariffs for their participating customers based on the agreed methodology.

Page 11: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Detailed Bill (Residential)Appliance ToU Cost TableGraph of average usage

costs (by ToU)Text based messages:

– Personalised– Motivational– Historic & peer

comparisons– Hints & Tips

OLR Incentive (stimulus for subset of customers)

Billing - Residential

Page 12: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

In Home Display (IHD)

Page 13: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Electricity Residential CBT Findings

• The deployment of Time of Use tariffs and DSM stimuli are found to reduce overall electricity usage by 2.5% and peak usage by 8.8%

Overall Peak Usage

Day Usage

Night Usage

Overall Change -2.5%* -8.8%* -2.6%* 0.1%

* denotes results which are statistically significantly different from control group using a 90% confidence level.

Page 14: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Electricity Residential CBT Findings by Stimuli

Usage

All Tariff Groups

and DSM Stimuli

Tariff Groups A-D by DSM Stimulus

Bi-monthly Bill and

energy use statement

(Stimulus 1)%

Monthly Bill and energy

use statement(Stimulus 2)

%

Bi-monthly Bill, energy

use statement and electricity

monitor(Stimulus 3)

%

Bi-monthly Bill, energy

use statement and OLR incentive

(Stimulus 4)%

Overall -2.5* -1.1 -2.7* -3.2* -2.9*Peak -8.8* -6.9* -8.4* -11.3* -8.3*

* denotes results statistically significantly different from control group using a 90% confidence level

Page 15: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Gas Residential CBT Findings

Bi-monthly bill and

energy usage statement

%

Monthly bill and

energy usage statement

%

Bi-monthly bill , energy

usage statement

and IHD device %

Bi-monthly bill, energy usage

statement, IHD device and

Variable tariff %

Overall -2.9* -2.2%* -2.8%* -2.9%* -3.6%*

* denotes results statistically significantly different from control group using a 90% confidence level.

Page 16: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Cost Benefit Analysis (CBA)

Page 17: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

National Rollout OptionsElectricity

• 12 Options - vary by billing baseline, billing scenario, communications technology & IHD inclusion.

Option Billing

baseline Billing

scenario Comm’s IHD Option 1 Bi-monthly Bi-monthly PLC-RF N Option 2 Bi-monthly Bi-monthly PLC-RF Y Option 3 Bi-monthly Monthly PLC-RF N Option 4 Bi-monthly Bi-monthly PLC-GPRS N Option 5 Bi-monthly Bi-monthly PLC-GPRS Y Option 6 Bi-monthly Monthly PLC-GPRS N Option 7 Bi-monthly Bi-monthly GPRS N Option 8 Bi-monthly Bi-monthly GPRS Y Option 9 Bi-monthly Monthly GPRS N Option 10 Monthly Monthly PLC-RF N Option 11 Monthly Monthly PLC-GPRS N Option 12 Monthly Monthly GPRS N

Page 18: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Total Electricity NPV (€m) by Option

Page 19: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Qualitative Benefits

• Smart Grid• Micro Generation• Electric Vehicles• Smart Home• Synergies with other Metering Requirements

(Gas / Water)

Page 20: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Total Gas NPV (€m) by Option

Energy saving scenario Meter roll-out

scenario Scenario code

Total incremental NPV (EUR)

Bimonthly ES Fast 1F 15,663,848 Bimonthly ES Phased 1S -1,612,759

Monthly ES Fast 2F 938,003 Monthly ES Phased 2S -13,870,616

Bimonthly ES + IHD Fast 3F 33,323,837 Bimonthly ES + IHD Phased 3S 12,101,010

Bimonthly ES + IHD + VT Fast 4F 59,879,967 Bimonthly ES + IHD + VT Phased 4S 33,991,380

Page 21: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Total Gas NPV (€m) by Option

Page 22: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Overall Trial FindingsOn the basis of the Customer Behaviour Trials and the Cost Benefit Analysis the CER is proposing to proceed with the rollout of electricity and gas smart meters.

Page 23: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Section 3 Programme Objectives

Section 4Data Ownership, Display & Provision

Gary MartinSmart Metering Programme Analyst

CER

Page 24: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Objectives (Section 3)1. Encourage Energy Efficiency2. Facilitate Peak Load Management3. Support Renewable and Micro Generation4. Enhance Competition and Improve

Consumer Experience5. Improve Network Services6. Review & Realise Synergies with Water

Metering

Page 25: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Data Ownership, Display & Provision (Section 4)

• Increase in available data results in key questions that need to be addressed, including:1. Granularity of data requirement2. Access to data for suppliers3. Access to data for consumers4. Billing content, frequency & tariffs5. Data required for prepayments6. In-Home data requirements7. Data ownership and security8. Vulnerable consumers

Page 26: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

1. Granularity of Data Requirement Proposals

a. Overwhelming response in favour of half hourly intervals for electricity consumption data:• complements the settlement frequency in the electricity

wholesale market and will facilitate a full range of potential future innovative pricing options and consumption information provision options for electricity consumers.

b. Gas data granularity requirement not as clear:– Likely to be either half hourly to hourly intervals (IHD

refresh) – TBC during Design stage (Phase 2)

Page 27: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

2. Data Access for Suppliers -Proposals

a. Data portal: updated daily, push and/or pull access assuming this is technically and economically feasible – TBC

design stage ‘fair processing’ requirements of the Data Protection Acts.

Page 28: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

3. Data Access for Consumers -Proposals

a. Consumer owns their consumption data: access to it in a national harmonised format, free of charge may be via same data portal used by suppliers (TBC design stage)

b. Consumers will have the right to provide their detailed historical consumption data to other suppliers in order to get an alternative quote for their supply (design stage to explore)

c. Consumers can give permission to other third parties to access their detailed historical consumption data e.g. for energy management services (design stage to explore).

d. Consumers will receive cost and usage based consumption information via: in-home displays (IHD) and energy statements (with their bills).

Page 29: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

4. Billing Content, Frequency & Tariffs - Proposals

a. No monthly billing mandate - leave billing frequency to market CBT/CBA results. Potential future EU legislative developments in this area.

b. Mandate energy statement with bills: CBT/CBA results. minimum content requirements TBC in Design stage, taking into account

requirements from relevant EU and national legislation.

c. Mandate time of use tariffs for all electricity consumers on smart metering: Detailed proposals will be developed during the Design stage.

Page 30: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

5. Data Required for Prepayments -Proposals

a. The ‘thin prepayment’ solution will be facilitated by the smart metering functionality. Proof of concept trial.

Page 31: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

6. In-Home data requirements -Proposals

a. In-home displays (IHDs) will be provided to all energy consumersas part of the full rollout during their electricity smart meterinstallation.

b. The IHDs will cater for dual fuel consumers.c. Definition of the IHD’s minimum functionality will be determined

during the Design stage.d. The IHD device will be supported for two years after its

installation date (i.e. repairing or replacing faulty devices).e. Over time other devices in the home should be able to receive the

consumption data from the smart meter.

Page 32: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

7. Data ownership and security -Proposals

a. Full end-to-end security of smart metering systems is a paramount requirement (the Design stage of a full rollout would explore this further).

b. Data protection will be to the fore of smart metering systems design.

Page 33: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

8. Vulnerable consumers-Proposals

a. Specific considerations for vulnerable consumers should be integrated into the design of the smart metering systems and accompanying education and awareness programme at an early stage.

Page 34: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Q&A

Page 35: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Section 5 (Part 1)Smart Metering End-to-end Technology

Solution

Michael CrowleySmart Metering Project Manager

Bord Gáis Networks

Page 36: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

E

E = Electricity Meter, G = Gas Meter,Mic.Gen = Meter for Micro Gen.HAN = Home Area Network

G

Mic.Gen

Communications Network

Electricity Meter Data Storage and management

IHD

HAN

Data collection systems

Gas Meter Data Storage and management

Customer Portal

Existing Electricity

market system

Existing Gas market

system

Electricity Suppliers

Gas Shippers

ESBN

BGN

Solution Overview

Page 37: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Gas Meter Functionality (Section 5.2.2) - Proposals

Required gas meter output functionality:

1. Minimum half hourly profile volume usage data (actual interval to be confirmed during Design stage) and volume index reads (m³) with date and time stamp.

2. Other data that will be required to support meter equipment servicing;a. Open/closed valve statusb. Meter serial number or other identifierc. Alarm/Event codesd. Battery warning flag/codee. Valve usage counterf. Excess flow warning

Page 38: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Gas Meter Functionality (Section 5.2.2) - Proposals

Gas meter input functionality:1. Remote disconnection instruction (valve closure)2. Remote reconnection enablement instruction (health and safety

validation checks required to allow consumer to self re-connect / open valve)

3. Calorific Value where required (can be used by in-home ancillary equipment or IHD for the conversion of volume output data from the meter into energy values - kWh)

4. Clock synchronization (for the gas meter and comm’s modules)5. Tariff settings

a. Block (volume related) tariff settings (can be used by IHD if required for advanced tariff and payment systems)b. Seasonal or time of use (ToU) tariff settings (can be used by IHD if required

for advanced tariff and payment systems)

Page 39: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Gas Meter Functionality (Section 5.2.2) - Proposals

Gas meter input functionality cont…

6. Firmware upgrades (to meter and communications modules)7. Tariff prices (can be used by in-home ancillary equipment or IHD if

required for advanced tariff and payment systems)8. Encryption key changes for secure data communication9. Potential requirements for prepayment functionality on the meter

will be determined during the Design stage.10. Life of meter typically 15-20 years (with possibility of one battery

replacement if necessary)11. Ability to store data on meter for agreed period of time (to be

finalised during the Design stage)

Page 40: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Gas Meter Functionality (Section 5.2.2) - Proposals

Optional gas meter output functionality for further consideration:1. Volume usage data to support remote reading and provision of data

to ancillary devices in the home, to be provided at defined frequencies (e.g. half hourly, hourly, 4 hourly, Daily);a. Temperature sensor readings (gas temperature at meter point) b. Temperature compensated volume index readings (m³)

2. The gas meter may also be required to provide energy usage interval data (in kWh) for the IHD depending on the final detailed design.

Optional gas meter input functionality for further consideration:1. Signal strength indicator (on LCD display) for low power radio

link between gas meter and electricity meter/communications hub.

Page 41: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Section 5 (Part 2)Smart Metering End-to-end Technology

Solution

Neil McGuinness Smart Metering Project Manager

ESB Networks

Page 42: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Proposed Smart Meter Functionality – Energy

Measurement Proposals Half-hourly profile data Facilitate a minimum of three types of tariffs: energy

import, energy export and network. Minimum of twelve rate registers. Import and export measurement Watt-less energy measurement

Page 43: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Proposed Smart Meter Functionality Condition Monitoring Proposals

Power outages recordable on the meter Tamper alerts recordable on the meter Meter events / error messages Voltage outside limits recorded Voltage / Power quality monitoring

available as required

Page 44: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Proposed Smart Meter Functionality Operations Proposals

Remotely operable embedded switch for de/re-energisation

Trip settings to enable load limiting and MIC enforcement

Single controllable physical circuit for legacy loads such as night storage heating.

Sensors to enable switch reclosing

Page 45: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Proposed Smart Meter Functionality meter technical

Proposals Firmware upgradeable Strong Encryption and secure mechanisms for joining the smart

metering network Ability to store data on meter for agreed period of time Life of meter typically 15-20 years The communications module, which will provide the WAN and

HAN capability, will be incorporated in the electricity meter. Potential requirements for prepayment functionality on the

meter will be determined during the Design stage.

Page 46: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Home Area Network (Section 5.2.5) – Proposals

Utility HAN:• The electricity meter will act as a hub for the gas meter, via

the utility HAN, thereby facilitating a single communications infrastructure to support both electricity and gas smart metering

• The utility HAN should also accommodate if required a second electricity meter installed to measure actual output of embedded micro generator.

• The CER will continue to work with the Department of the Environment, Heritage and Local Government to review any potential synergies that may exist between the required energy smart metering infrastructure and water metering.

Page 47: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Home Area Network (Section 5.2.5) – Proposals

Non-Utility HAN:• The functionality should enable secure communications between

the smart meter and in home devices i.e. any authenticated device in the home and not just the in-home display.

• Due the immaturity of the associated technologies and evolving business requirements further evaluation of secure communications functionality will be required during the design stage.

• Cost information is part of the requirements for display of data in home. However, how exactly price information is provided to the in home devices (i.e. via the smart metering infrastructure or via another method e.g. IP based) will be examined further as part of the Design stage of a full rollout.

• A “watching brief” will be kept on developments in ‘Smart Home’ and ‘Smart Grid’ technologies areas for ‘future proofing’ req’s.

Page 48: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Wide Area Network (Section 5.2.3) – Proposals

• WAN will facilitate (Design stage will elaborate req’s):– two-way communication with the backend smart metering

infrastructure.– the collection of both on-demand (real time) and cyclical data

from the meter e.g. daily interval reads.– remote operation of the meter to de-energise and re-energise the

customer (subject to safety arrangements).– remote re-configuration and upgrades of meter.

• All viable wide area network (WAN) solutions will be considered - guiding principle will be to ensure that the most cost effective communications solution is put in place through a public procurement process.

Page 49: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Section 5 (Part 3)Smart Metering End-to-end Technology

Solution

Gary MartinSmart Metering Programme Analyst

CER

Page 50: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Procurement Model(Section 5.3) – Proposals

• Ultimately the guiding principle will be to ensure that the most cost effective end-to-end national smart metering solution is put in place through a public procurement process.

i. Proposed model for procuring smart metersii. Proposed model for procurement and management of

the wide area network (WAN) and back-end IT systems (including meter data management system (MDMS) and Web portal)

iii. Proposed model for procurement and management of the in-home display (IHD)

Page 51: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Smart Meter Procurement Model(Section 5.3) – Proposals

• ESB Networks will be responsible for procuring electricity smart meters with a communications module (for wide area network and home area network) that meet the agreed functionality requirements and will be responsible for installation and ongoing maintenance of these meters.

• Bord Gáis Networks will be responsible for procuring gas smart meters with a communications module (for home area network) that meets the agreed functionality requirements and will be responsible for installation (in coordination with ESB Networks) and ongoing maintenance of these meters.

• The CER will approve the functional requirements and the procurement strategy.

Page 52: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

WAN / Back-end IT Procurement Model (Section 5.3) – Proposals

• These will be procured as separate or combined lots and on an ownership or service provision basis.

• ESB Networks will own the contracts for the WAN and electricity back-end IT systems and will be responsible for their procurement.

• Bord Gáis Networks will own the contract for the gas back-end IT systems and will be responsible for their procurement.

• The CER will approve the procurement strategy.

Page 53: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

IHD Procurement Model (Section 5.3) – Proposals

• The IHDs will be procured on an ownership or service provision basis.

• The CER will approve the minimum functional requirements.

• Regarding responsibility for procurement, installation and maintenance of IHDs either:

1. ESB Networks will be responsible for procurement for all consumers. In which case the CER will approve the procurement strategy.

2. Electricity suppliers will be responsible for procurement for their customers.

Page 54: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Section 6Implementation Approach & Timelines

Gary MartinSmart Metering Programme Analyst

CER

Page 55: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Programme Governance

• The CER will be responsible for the overall governance of the programme.

• The CER will continue to oversee the development of the Smart Metering Project. It will coordinate Industry inputs, keep all stakeholders informed and up-to-date, and will also manage and coordinate any implementation programme.

• The CER will issue details of the proposed Programme Governance structure in early Q1 2012 and publish a detailed Programme Plan shortly thereafter.

Page 56: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

High Level Implementation Timelines

• Phase 1: Discovery, Exploration and Business Case Development (Q1 2012)• Phase 2: Planning, Requirement Definition, Procurement and Selection (≤2yrs)• Phase 3: Detailed design, System testing and Pre-Deployment roll out (≤2yrs)• Phase 4: Deployment Phase (2-4yrs)

Page 57: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**

Q&A

Page 58: National Smart Metering Programme - CRU · 2019. 1. 24. · T6 14 15 22 T7 7.5 16 22.5 Electric Ireland Residential Trial Time of Use Tariffs (cents per kWh, excluding VAT)**