Upload
s2i3r3e2
View
1
Download
0
Embed Size (px)
DESCRIPTION
Multi Set de Comunicaciones MSC
Citation preview
056-011 MSC Link issue 2 - ADM
Multi Set Communications (MSC)The Multi Set Communications (MSC) link in use with DSE synchronising and load sharing modules performs many functions including load sharing and protection. This document shows the versatility of the MSC Link.
Synchronising
o First Set on the Bus determination (Virtual Key)o Security against bus sensing failure (Broken fuse)
Load Sharing
o Active (kW) o Reactive (kVAr)
Start/Stop on Load
o Starting sequenceo Run Priority o Balance engine hourso Control by 5560
Compatibility
o The load demand scheme uses the 5510s MSC link.
o The MSC Link is compatible across the range of MSC enabled controllers via MSC selection in 5000 series For instance a 5510 controller can be used in a load demand scheme with a 550 controller.
o Priority based upon engine hours is only available on 5510 controllers V6.0 and above.
For details of Run priority and balance engine hours, see DSE Part
Multi Set Communications (MSC)
link in use with DSE synchronising and load sharing modules performs many and protection. This document shows the versatility of the MSC Link.
ing First Set on the Bus determination (Virtual Key) Security against bus sensing failure (Broken fuse)
Start/Stop on Load Demand Starting sequence
Balance engine hours
The load demand scheme uses the 5510s MSC
The MSC Link is compatible across the range of MSC enabled controllers via MSC selection in 5000 series For instance a 5510 controller can be used in a load demand scheme with a 550 controller. Priority based upon engine hours is only available on 5510 controllers V6.0 and
For details of Run priority and balance engine hours, see DSE Part Number 056-013 Load Demand Scheme
Multi Set Communications (MSC) Link link in use with DSE synchronising and load sharing modules performs many
and protection. This document shows the versatility of the MSC Link.
MSC enabled controllers via MSC selection in 5000 series software. For instance a 5510 controller can be used in a load demand
Priority based upon engine hours is only available on 5510 controllers V6.0 and
013 Load Demand Scheme
056-011 MSC Link issue 2 - ADM