7
MPID 263 GCRP Constitution Modification David Cashman GCRP 11 th February 2015

MPID 263 GCRP Constitution Modification David Cashman GCRP 11 th February 2015

Embed Size (px)

Citation preview

Page 1: MPID 263 GCRP Constitution Modification David Cashman GCRP 11 th February 2015

MPID 263GCRP Constitution Modification

David Cashman

GCRP

11th February 2015

Page 2: MPID 263 GCRP Constitution Modification David Cashman GCRP 11 th February 2015

Current Membership

• a Chairman and 3 persons appointed by, and representing the TSO;• 1 person appointed by and representing ESB Power Generation; • 1 person appointed by & representing non- CCGT and non-Renewable Independent

Generators; • 1 person appointed by & representing Independent CCGT Generators;• 1 person appointed by & representing Independent Generators which shall exclude

Renewable Generators;• 1 person appointed by & representing Renewable Generators;• 1 person appointed by, & representing the Distribution System Operator;• 1 person appointed by & representing Demand Customers;• 1 person appointed by, & representing the Public Electricity Supplier;• 1 person appointed by, & representing Independent Electricity Suppliers;• 1 person appointed by, & representing the Commission;• 1 person appointed by, & representing the Transmission System Owner Licensee;• 1 person appointed by, & representing the Market Operator;• 1 person appointed by, & representing HVDC Interconnectors;

Page 3: MPID 263 GCRP Constitution Modification David Cashman GCRP 11 th February 2015

Changes to Current Membership• a Chairman and 3 persons appointed by, and representing the TSO;• 1 person appointed by and representing ESB Power Generation; • 1 person appointed by & representing non- CCGT and non-Renewable Independent

Thermal Generators; • 1 2 persons appointed by & representing Independent CCGT Generators;• 1 person appointed by & representing Independent Synchronous Renewable Generators;• 1 person appointed by & representing Non-Synchronous Renewable Generators;• 1 person appointed by, & representing Fast Acting Peaking Generators; • 1 person appointed by, & representing Pumped Storage Generators.• 1 person appointed by, and representing Emerging Technology Generators;• 2 persons appointed by Demand Side Units, and representing Demand Side Units;• 1 person appointed by & representing Demand Customers;• 1 person appointed by, & representing the Distribution System Operator;• 1 person appointed by, & representing the Public Electricity Supplier;• 1 person appointed by, & representing Independent Electricity Suppliers;• 1 person appointed by, & representing the Commission;• 1 person appointed by, & representing the Transmission System Asset Owner Licensee;• 1 person appointed by, & representing the Market Operator;• 1 person appointed by, and representing the Other TSO;• 1 person appointed by, & representing HVDC Interconnectors Owners;

Page 4: MPID 263 GCRP Constitution Modification David Cashman GCRP 11 th February 2015

Panel Voting on Proposals

• This section is suggested to clarify the process for voting on proposals prior to submission to the Commission

• High Level Proposal (including slight re-wording)– At the Chairman's discretion – a round table vote of panel members may be deemed necessary. – Each Member has the responsibility to vote in accordance with the views and interests of the

appointer. – The Chairman shall record all votes and abstentions from Members including any the views of the

Members made during the voting process for submission to the Commission. – The Chairman taking into account the views of the Panel and the results of the voting process, if

required, may determine that the Proposal:• Does not merit any further consideration;• Shall be submitted by the TSO to the Commission as a Grid Code modification for approval.

The modification application shall include the original Proposal and the views and considerations of the Grid Code Review Panel, including the results of the voting process; or

• Merits further consideration.

Page 5: MPID 263 GCRP Constitution Modification David Cashman GCRP 11 th February 2015

Additional Change

• Members Responsibilities & Protections: Section 11.3– Members have the responsibility to engage with the parties that comprise the Appointor. The

Member(s) shall use reasonable endeavours to engage with these parties.

Page 6: MPID 263 GCRP Constitution Modification David Cashman GCRP 11 th February 2015
Page 7: MPID 263 GCRP Constitution Modification David Cashman GCRP 11 th February 2015

Proposed Membership

• a Chairman and 3 persons appointed by, & representing the TSO;• 2 persons appointed by, & representing CCGT Generators;• 2 persons appointed by, & representing Thermal Generators; • 1 person appointed by, & representing Fast Acting Peaking Generators; • 1 person appointed by, & representing Synchronous Renewable Generators;• 1 person appointed by, & representing Pumped Storage Generators.• 2 persons appointed by, & representing Non-Synchronous Renewable Generators;• 1 person appointed by, & representing Emerging Technology Generators;• 1 person appointed by, & representing Demand Customers;• 2 persons appointed by, & representing Demand Side Units;• 1 person appointed by, & representing the Distribution System Operator;• 1 person appointed by, & representing the Public Electricity Supplier;• 1 person appointed by, & representing Independent Electricity Suppliers.• 1 person appointed by, & representing the Commission;• 1 person appointed by, & representing the Transmission Asset Owner Licensee;• 1 person appointed by, & representing the Market Operator;• 1 person appointed by, & representing the Other TSO;• 1 person appointed by, & representing Interconnector Owners;

In case you don’t like the coloured version this is the new membership on it’s own!