GCRP – DS3 Update

11th February 2015Robbie Aherne

Page 2: GCRP – DS3 Update 11 th February 2015 Robbie Aherne

System Services Decision

• 60 €m• 7 Services

• 235 €m• 14 Services

Ancillary Services

Capacity Payments

Energy Payments

Ancillary Services / System Services

Capacity Payments

Energy Payments

Today Tomorrow2

Page 3: GCRP – DS3 Update 11 th February 2015 Robbie Aherne

System Services Decision

• Availability payment basis

Interim Regulated Tariff

2016/17

Regulated Tariff & Annual Auction

235 €M Cap in

2020/21

3

Page 4: GCRP – DS3 Update 11 th February 2015 Robbie Aherne

RoCoF Implementation Project

4

Generator Studies Project

TSO-DSO Implementation

Project

Alternative / Complementary Solutions Project

Plan A: Move to 1 Hz/s over 500ms Plan B: Stay at 0.5 Hz/s

1. Synch Comps / Rotating Stabiliser

2. Storage3. Flexible Plant4. Parking5. Non Synchronous Response

(DSM, HVDC, WFs)6. Operational Measures 7. AC Interconnection to GB

Can synchronous generators ride through a high RoCoF event?

Can DSOs protect against islanding using different

settings or measures

Page 5: GCRP – DS3 Update 11 th February 2015 Robbie Aherne

DS

3 P

rogr

amm

eO

pera

tiona

l P

olic

y R

evie

wC

ontr

ol C

entr

e

Not accepted. Improve.

Policy

Analysis, Policy, Tools.

Unforeseen Outcome

Policy Review

Period

Analysis, Policy, Tools.

Not accepted. Improve.

Policy

System Policy

• Cauteen Nodal Voltage Control Pilot Project with ESBN – progressing

• Ramping policy and tool development – progressing

• Primary and static reserve requirement study – progressing

• Automated approach to large scale dynamic studies using Plexos –complete *

• High SNSP Report – H1 2014 complete *

• High Wind Speed Shut Down report 2013 – complete *

• Glenree unity power factor study – complete *

Page 6: GCRP – DS3 Update 11 th February 2015 Robbie Aherne

WSAT & CCTC

WSAT• WSAT frequency assessment gone live in Dublin and Belfast

Control Centre Tools & Capability• Inertia and RoCoF constraints functionality included in RCUC on

15/11/2014

• Significant improvements in accuracy of short circuit tool – due to be complete by Q1 2015

Page 7: GCRP – DS3 Update 11 th February 2015 Robbie Aherne

Workstream Plans – Annual Review

Draft to DSOs

Draft to RAs

Draft to Advisory Council

Publication

Revised “Operational Capability Outlook”

Page 8: GCRP – DS3 Update 11 th February 2015 Robbie Aherne

2015 Focus Areas

• RoCoF Implementation Project

• System Services Detailed Design and Implementation Project

• Operational policy– Frequency regulation– Ramping– Voltage dip induced frequency dips– System high frequency mitigation etc.

• Control Centre Tools– Short circuit analysis tool – Increased WSAT functionality– EMS Integration Project

• Continued TSO-DSO co-operation