CASE STUDY MOTTRAM ROAD RETAINING WALL HYDE Masonry Retaining Wall Refurbishment Scheme CLIENT TAMESDIE MBC VALUE £657K CONTRACT NO. C910 Works included; removal of trees/saplings on or adjacent to the wall, removal of vegetation from bank/rock outcrop midway up the wall (inc Himalayan Balsam), jet washing to remove vegetation and detritus from wall and parapet face, cleaning out of gullies adjacent the wall, large areas of rake out and repoint of wall face, replacement of localised areas of missing masonry to the wall face, take up and dispose off-site for recycling existing copings, imported copings laid on mortar, increase parapet height to a minimum of 1.15m, localised lengths of parapet taken down to footway level and rebuilt, contractor design and installation of substantial soil nails. All associated traffic management and local PR activities. (NEC/ECC Option B)

MOTTRAM ROAD RETAINING WALL HYDE

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MOTTRAM ROAD RETAINING WALL HYDE

CASE STUDY

MOTTRAM ROAD RETAINING WALLHYDE

Masonry Retaining Wall Refurbishment Scheme

CLIENT

TAMESDIE MBCVALUE

£657KCONTRACT NO.

C910

Works included; removal of trees/saplings on or adjacent to the wall, removal ofvegetation from bank/rock outcrop midway up the wall (inc Himalayan Balsam),jet washing to remove vegetation and detritus from wall and parapet face,cleaning out of gullies adjacent the wall, large areas of rake out and repoint ofwall face, replacement of localised areas of missing masonry to the wall face,take up and dispose off-site for recycling existing copings, imported copings laidon mortar, increase parapet height to a minimum of 1.15m, localised lengths ofparapet taken down to footway level and rebuilt, contractor design andinstallation of substantial soil nails. All associated traffic management and localPR activities. (NEC/ECC Option B)

Page 2: MOTTRAM ROAD RETAINING WALL HYDE