GOVERNMENT OF ODISHA WORKS DEPARTMENT
ODISHA STATE ROADS PROJECT
Construction Supervision of Berhampur-Taptapani Road (0/0 km to
41/228 km of SH 17) of Odisha State Roads Project
MONTHLY PROGRESS REPORT
LEA Associates South Asia Pvt. Ltd., New Delhi
August 2015
PACKAGE NO. : OSRP-CW-ICB-P03, Berhampur-Taptapani Road (0/0 km to 41/228 km of SH)
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 1 of 34
CONTENTS
CONTENTS..................................................................................................................................................... 1
CHAPTER 1. EXECUTIVE SUMMARY ...................................................................................... 3
1.1 PROJECT BACKGROUND................................................................................................................ 3
1.2 THE PROJECT .................................................................................................................................. 3
1.3 CONTRACT MANAGEMENT FRAME WORK .................................................................................. 4
1.4 PROJECT DETAILS .......................................................................................................................... 5
1.5 SALIENT FEATURES ........................................................................................................................ 5
1.6 MILESTONES .................................................................................................................................... 6
CHAPTER 2. PHYSICAL PERFORMANCE AND PROGRAMME OF WORK ............................ 7
2.1 ROAD WORK ..................................................................................................................................... 7
2.2 PROGRESS OF CD WORKS AND STRUCTURE .......................................................................... 10
2.3 SECTION WISE ACHIEVEMENT .................................................................................................... 11
2.4 ROUTINE MAINTENANCE .............................................................................................................. 13
2.5 PROGRAMME OF WORK ............................................................................................................... 13
2.6 FORECAST FOR NEXT MONTH .................................................................................................... 14
2.7 STATUS OF EXTENSION OF TIME ............................................................................................... 14
CHAPTER 3. FINANCIAL PERFORMANCE ............................................................................ 15
3.1 FINACIAL PROGRESS.................................................................................................................... 15
3.2 MONTH WISE FINANCIAL PROGRESS ........................................................................................ 15
3.3 MOBILIZATION ADVANCE ............................................................................................................. 17
3.4 STATEMENT OF IPC ...................................................................................................................... 18
CHAPTER 4. STATUS OF RISK .............................................................................................. 21
4.1 HANDING OVER OF SECTION ...................................................................................................... 21
4.2 STATUS OF UTILITY SHIFTING ..................................................................................................... 21
4.3 HINDRANCE LIST ........................................................................................................................... 22
4.4 ANY OTHER ISSUE ........................................................................................................................ 23
4.5 RISK INVOLVED .............................................................................................................................. 23
CHAPTER 5. ENVIRONMENTAL MONITORING AND SAFETY ............................................. 24
5.1 ENVIRONMENT MANAGEMENT PLAN ......................................................................................... 24
5.2 ROAD SAFETY ................................................................................................................................ 26
5.3 ENVIRONMENTAL CLEARENCES ................................................................................................. 26
CHAPTER 6. VARIATION AND CHANGES ............................................................................. 27
6.1 SUMMARY OF CHANGE ORDER .................................................................................................. 27
CHAPTER 7. QUALITY CONTROL AND QUALITY ASSURANCE ........................................ 28
7.1 TESTS CONDUCTED ...................................................................................................................... 28
CHAPTER 8. MOBILISATION .................................................................................................. 29
8.1 CONSULTANT’S TEAM................................................................................................................... 29
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 2 of 34
8.2 CONTRACTOR’S TEAM.................................................................................................................. 29
8.3 STATUS OF PLANT AND EQUIPMENT OF CONTRACTOR ......................................................... 30
CHAPTER 9. VISITS AND MEETINGS .................................................................................... 31
CHAPTER 10. IMPORTANT CORRESPONDENCE DURING THE MONTH ........................... 32
10.1 SUBMISSIONS AND APPROVALS ................................................................................................. 32
10.2 CORRESPONDENCES ................................................................................................................... 32
CHAPTER 11. WEATHER DURING THE MONTH ..................................................................... 34
Appendix 1 – Strip Chart of Highways
Appendix 2 – Pictorial Chart of Minor Bridges
Appendix 3 – Progress Chart of Structures
Appendix 4– List of GFC Drawings Issued
Appendix 5– PHOTOGRAPHS
Page 3 of 34
Chapter 1. Executive Summary
1.1 PROJECT BACKGROUND
The Odisha Works Department (OWD) has a medium to long-term comprehensive programme to
rehabilitate, upgrade and expand the road network throughout the state to improve accessibility,
connectivity and enhance the overall development. It is the pre-eminent state level road authority in
Odisha which deals with issues relating to Feasibility Study and preparation of Detailed Project
Report including the Route Selection, even for relatively low volume roads.
The Government of Odisha has secured a loan from International Bank for Reconstruction and
Development (The World Bank) towards the cost of Widening and Strengthening of existing
Berhampur to Taptapani Road Project (41.228 km).
Berhampur to Taptapani Road Project is part of 825 km of roads under Phase-I which aims at
promoting trade and regional integration between districts by improving transport communication. The
project road Berhampur to Taptapani is a part of the Phase-I road development, which was built
several years ago with two lane configuration and currently serves moderate level of traffic. The
project involves widening of the existing road which has an average carriageway width of 5.5 m to
6.8 m and 1.5m. Earthen shoulder on both sides, to a 7.0 m carriageway and 2.5m shoulders on
both sides in flat and rolling sections. The expected outcome of the project include reduced
transportation time of goods and better connectivity between districts along with improved safety
standards
1.2 THE PROJECT
This road is located in the south-eastern part of Odisha and takes off from NH-217 at 18th km near
Berhampur. The total length of the road is from Berhampur to Taptapani is 41.228 km. The terrain is
predominantly plain and villages are closely located from km 0/0 to 27/0. The stretch of road is
located in Ganjam district. This project stretch passes through Berhampur, Digapahandi and other
Villages/semi urban area. Principal River in the area is river Malabhanja, which crosses the project
road at 29/200 km near Digapahandi.
The location map of the project road is shown below in Figure 1-1;
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 4 of 34
Figure 1-1: Location Map
1.3 CONTRACT MANAGEMENT FRAME WORK
1.3.1 Employer
Mr. Om Prakash Patel, Chief Engineer, World Bank Projects, Odisha
on behalf of Works Department, Government of Odisha
1.3.2 Employer’ Representative
Er. A. K Dash Engineer, World Bank Projects, Odisha
onbehalf of Works Department, Government of Odisha
1.3.3 Engineer
Mr. Asheesh Suhaney Resident Engineer
Lea Associates South Asia Pvt Ltd
B1/E-27, Mohan Co Operative Industrial Estate Mathura Road, New Delhi-110 044
Site Office- Plot No.1002, Aurobindo Nager,1st Lane New Bus Stand, Berhampur, District –
Ganjam, Odisha , Pin – 760001
Email: [email protected]
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 5 of 34
1.3.4 Contractor
M/s RKD Construction Pvt.Ltd B-20, Chandaka Industrial Estate, Patia, Bhubaneswar
Project Manager –Mr.Sandeep Agarwal
Site Office –Near Mahughara Hill, Po.-Raijhola, PS- Berhampur Sadar, Dt.- Ganjam
1.4 PROJECT DETAILS
Contract Value :- Rs.96,87,51,258/-
Period of Construction :– 24 months
Date of Commencement of Work :– 24th January’ 2013
Scheduled Date of Completion :- 23rd January 2015
Revised Date of Completion:- 30.08.2015 (As per Grant of Provisional EOT)
Progress Achieved till August’ 2015 :- 54.778%
1.5 SALIENT FEATURES
1.5.1 Highways
Total Length of Project Corridor (SH 17) 41.23km
Type of Carriageway(Flexible 41.23km
Roadway Width Variable
Carriageway Width 7, 10 & 18 m
Bus Bays and Bus Shelter 26Nos
Toll Plaza 1Nos
Junctions 33Nos
1.5.2 Structures
Major Bridges Nil
Minor Bridges(repair/rehabilitation) 08Nos
Slab Culvert 06Nos
Box Culverts 28Nos
Hume Pipe Culvert 102Nos
1.5.3 Crust Details
Flexible Pavement
GSB 200 mm
WMM 250 mm
DBM 75mm& 50mm
BC 40 mm
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 6 of 34
1.6 MILESTONES
The project corridor has been divided into four sections for completion of work. Details of Sections are
furnished below.
Milestone -I:Total Length 9.928 Km
From Km 05/100to Km 9/800 and Km 36/000 to Km 41/228
Scheduled date of completion:- 10 (Ten) months from date of commencement i.e.
By 23.11.2013
Revised date of completion:-30.12.2014
Milestone -II : Total Length 10.200 Km
From Km 9/800 to Km 20/000
Scheduled date of completion:- 14 (Fourteen) months from date of commencement
i.e. By 23.03.2014
Revised date of completion:-30.08.2015(Provisional)
Milestone -III :Total Length 10.000 Km
From Km 26/000 to Km 36/000.
Scheduled date of completion:- 18 (Eighteen) months from date of
commencement i.e. By 23.07.2014
Revised date of completion:-30.08.2015(Provisional)
Milestone -IV :Total Length 11.100 Km
From Km 0/000 to Km 5/100. And Km 20/000 to Km 26/000.
Scheduled date of completion: -24 (Twenty-four) months from date of
commencement i.e. By 23.01.2015.
Revised date of completion:-30.08.2015(Provisional)
Page 7 of 34
Chapter 2. Physical Performance and Programme of Work
2.1 ROAD WORK
2.1.1 Linear Progress – Total Length- 41.228 km
Length in Km
Sl. No.
Description of Item
Length Executed through previous
contract
Length to be executed
under present contract
Progress Achieved Balance
length to be completed
Remark Upto Previous
month During the month
under report Cumulative
progress
1 Earthwork in
Embankment 12.095 29.133 23.063 0.330 23.393 5.740
2 Subgrade 8.940 32.288 25.808 0.220 26.028 6.260
3 GSB 8.025 33.203 26.273 0.595 26.868 6.335
4 WMM 8.025 33.203 26.273 0.530 26.803 6.400
5 DBM 8.025 33.203 25.993 0.435 26.428 6.775
6 BC 0.000 41.228 31.758 0.870 32.628 8.600
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 8 of 34
2.1.2 Progress in Quantities
Pie chart showing the weightage of major construction items is shown in Figure 2-1;
Figure 2-1: Weightage of Major Construction Items
Site Clearance, 0.35%
Earthwork, 8.75%GSB, 12.59%
WMM, 13.03%
DBM, 16.71%
BC, 13.78%
Culverts, 7.61%
Bridges, 5.94%
Road Safety & Amenities, 11.27%
Protective Work, 4.31%
Repair & Maintenance, 1.63%
EMM, 3.33%
Dayworks (Labour, Material & Equipment), 0.72%
Other, 21.25%
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 9 of 34
Progress in Quantities
Sl. No.
Description Unit Total Quantity as
per BOQ Quantity executed
up to July ‘15 Quantity executed during August’15
Balance Quantity to be executed
Remark
1 Earthwork in Embankment Cum 48977.00 83607.294 226.400 0
2 Subgrade Cum 291101.00 161827.025 1413.000 127860.975
3 GSB Cum 90353.00 64843.772 871.795 24637.433
4 WMM Cum 85568.00 57688.014 1368.062 26511.924
5 DBM Cum 22206.00 14339.324 228.096 7638.580
6 BC Cum 16182.00 11231.659 339.800 4610.541
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 10 of 34
2.2 PROGRESS OF CD WORKS AND STRUCTURE
Sl. No
Description of Structure Total Nos.
to be executed
Number Completed
under previous contract
Number to be executed
under present contract
Number completed Number
in progress
Remark Up to
previous month
During month under report
Balance remaining
to be completed
1 Minor Bridges/Rehabilitation/Widening of Bridges)
08 01 07 0 0 07 05
2 Slab Culvert 06 05 01 01 0 0 0
3 Box Culverts 28 19 09 02 01 06 02
4 Hume Pipe Culvert 102 75 27 06 02 19 09
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 11 of 34
2.3 SECTION WISE ACHIEVEMENT
A) Road Works
SH –17
Sl. No.
Items
Milestone – I, Total length:9.928 Km Milestone – II, Total length:10.200 Km Milestone – III, Total length:10.000 Km Milestone – IV, Total length:11.100 Km
FLEXIBLE : 9.928 Km FLEXIBLE : 10.200 Km FLEXIBLE : 10.000 Km FLEXIBLE : 11.100 Km
Sch. Date of Completion 23-Nov-13 Sch. Date of Completion 23-Mar-14 Sch. Date of Completion 23-July-14 Sch. Date of Completion 23-Jan-15
Completed In
Progress To be
taken up
Completed In
Progress To be
taken up
Completed In
Progress To be
taken up
Completed In Progress
To be taken up
Previous Present Previous Present Previous Present Previous Present
1 Embankment 5.685 4.243 0 0 5.190 3.930 0 1.080 0 10.000 0 0.000 1.220 5.220 0.000 4.660
2 Subgrade 2.955 6.973 0 0 5.120 4.000 0 1.080 0 10.000 0 0.000 0.865 5.055 0.000 5.180
3 GSB 2.820 7.108 0 0 4.850 4.205 0 1.145 0 10.000 0 0.000 0.355 5.555 0.000 5.190
4 WMM 2.820 7.108 0 0 4.850 4.205 0 1.145 0 10.000 0 0.000 0.355 5.490 0.000 5.255
5 DBM 2.820 7.108 0 0 4.850 4.045 0 1.305 0 10.000 0 0.000 0.355 5.275 5.470
6 BC 0.000 9.928 0 0 0.000 8.465 0 1.735 0 10.000 0 0.000 0.000 4.235 6.865
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 12 of 34
B) Structures
Sl. No.
Item
Milestone - I Milestone- II Milestone- III Milestone- IV
Completed In
Progress
To be taken
up
Completed In
Progress
To be taken
up
Completed In
Progress To be
taken up
Completed
In Progress
To be taken up
PREVIOUS PRESENT PREVIOUS PRESENT PREVIOUS PRESENT PREVIOUS PRESENT
1
Minor Bridge / Rehabilitation/Widening of Bridges
0 0 0 0 0 0 04 0 0 0 0 0 0 0 01 02
2 Slab Culvert 04 0 0 0 01 0 0 0 0 0 0 0 0 01 0 0
3 Box Culvert 06 0 0 0 05 0 0 0 08 02 0 0 0 01 02 04
4 HP Culvert 31 0 0 0 27 0 0 0 12 0 0 0 05 08 09 10
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 13 of 34
2.4 ROUTINE MAINTENANCE
After the handing over of the site and declaration of the Commencement date for execution of Civil
Works as 24th Dec. 2013, Contractor has to take up the maintenance work as per Sub-Clause 4.1 of
specific provisions Part-B of Conditions of Contract Vol.-II.
The Contractor has done pothole repair in stretches covered under MS-IV (Not handed over to them)
along with some stretches of MS-II & MS-III as well. Still a lot stretches are balance to be taken up by
the contractor for maintenance along with the construction work, as per their contractual obligation.
a. By the Contractor in this Month: NIL
2.5 PROGRAMME OF WORK
Contractor’s existing work program has exhausted since it was made for the period ended by
31.12.2014& thus; that time has already elapsed. EOT analysis is under progress & Contractor shall
provide revised work program in accordance to the determined EOT.
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 14 of 34
2.6 FORECAST FOR NEXT MONTH
The contractor has not submitted any work programme for the next month. However after discussion
with the Project Manager following work programme has been made which is tentative.
FORECAST FOR AUGUST
Sl.
No. Description Unit
Quantity
remaining to
be executed
by end of
August
Quantity
planned to be
executed
during
September
Approximate
cost of work
(Rs in lakh)
Remarks
1 Earthwork in
Excavation Cum
10000 2550 4.6
2 Subgrade Cum 127860 4520 8.0
3 GSB Cum 24537 2705 36.6
4 WMM Cum 26511 3345 49.4
5 DBM Cum 7638 1200 86.0
6 BC Cum 4610 630 52.0
7 Minor Bridge Number 2 2 20.0
Various
Components
8 Box Culvert Number 4 1 20.0
Various
Components
9 Hume Pipe culvert Number 13 3 20.0
2.7 STATUS OF EXTENSION OF TIME
The contractor had applied for EOT for Section II, III & IV up to 15th Dec’2015, 15th Nov’2015, &31st
March’2016 respectively. We are analysing the proposal & subsequently furnishing our
recommendation to Employer.
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 15 of 34
Chapter 3. Financial Performance
3.1 FINACIAL PROGRESS
Financial Progress achieved up to end of August’2015 is furnished below
1. Contract Price -96,87,81,258 /-
2. Value of work done - 53,06,58,461 /-
3. Mobilisation Advance - 4,84,37,562 /-
4. Machineries Advance- 9,68,75,126 /-
5. Total (2+3+4)- 67,59,71,149 /-
6. Percentage of Financial Progress - 54.778%
3.2 MONTH WISE FINANCIAL PROGRESS
Month wise financial progress on work proper excluding Escalation and advances is furnished in
Table 3-1 below.
Table 3-1: Month wise Financial Progress
Sl.
No. Month
During the month Cumulative
Cost of work
executed
% wrt
Contract
price
Cumulative
Cost of work
% wrt
Contract
price
1 Mar-13 2,65,764 0.027 2,65,764 0.027
2 Apr-13 20,04,358 0.207 22,70,122 0.234
3 May-13 46,23,256 0.477 68,93,378 0.712
4 Jun-13 49,49,871 0.511 1,18,43,249 1.223
5 Jul-13 33,29,392 0.344 1,51,72,641 1.566
6 Aug-13 44,61,903 0.461 1,96,34,544 2.027
7 Sep-13 80,16,560 0.828 2,76,51,104 2.854
8 Oct-13 93,36,621 0.964 3,69,87,725 3.818
9 Nov-13 1,39,68,155 1.442 5,09,55,880 5.260
10 Dec-13 3,99,77,130 4.127 9,09,33,010 9.387
11 Jan-14 1,88,11,657 1.942 10,97,44,667 11.328
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 16 of 34
12 Feb-14 2,68,59,639 2.773 13,66,04,306 14.101
13 Mar-14 4,45,52,226 4.599 18,11,56,532 18.700
14 Apr-14 2,59,37,653 2.677 20,70,94,185 21.377
15 May-14 4,48,49,973 4.630 25,19,44,158 26.007
16 Jun-14 2,50,51,371 2.586 27,69,95,529 28.593
17 Jul-14 1,11,22,153 1.148 28,81,17,682 29.741
18 Aug-14 90,76,758 0.937 29,71,94,440 30.678
19 Sep-14 1,37,34,128 1.418 31,09,28,568 32.096
20 Oct-14 63,67,721 0.657 31,72,96,289 32.753
21 Nov-14 2,99,98,777 3.097 34,72,95,066 35.850
22 Dec-14 2,07,33,809 2.140 36,80,28,875 37.990
23 Jan-15 2,87,25,430 2.965 39,67,54,305 40.955
24 Feb-15 1,92,51,585 1.987 41,60,05,890 42.942
25 Mar-15 4,80,19,298 4.957 46,40,25,188 47.899
26 Apr-15 1,05,76,871 1.092 47,46,02,059 48.991
27 May-15 1,25,65,669 1.297 48,71,67,728 50.288
28 Jun-15 1,26,44,157 1.305 49,98,11,885 51.593
29 Jul-15 1,69,91,672 1.754 51,68,03,557 53.347
30 Aug-15 1,38,54,904 1.430 53,06,58,461 54.778
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 17 of 34
3.3 MOBILIZATION ADVANCE
Net Amount Paid Cumulative
Amount Paid Remarks
1st Mobilisation Advance 4,84,37,562 /- 4,84,37,562 /-
1st Machineries Advance 1,22,43,248 /- 6,06,80,810 /-
2nd Machineries Advance 7,49,44,365 /- 13,56,25,175 /-
3rd Machineries Advance 96,87,513 /- 14,53,12,688 /-
Total : 14,53,12,688 /-
Amount of Advance recovered up to August’15 : 14,53,12,688 /-
Balance amount to be recovered : Nil
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 18 of 34
3.4 STATEMENT OF IPC
Sl.
No.
IPC
No. Month
Gross Amount of IPC (Rs. In millions)
Recoveries
Net
Amount
Paid
Cumulative
of Net
Amount
Paid
Cumulative
Gross
Amount Of
IPC
Remarks Value of
BOQ
Item
Value
of
Non
BOQ
Item
Escalation Secured
Advance
Gross
amount
1 1 Mar-13 48437562
0 0 48437562 8435401 40002161 40002161 48437562
Mobilization
advance
2 2 Apr-13 12243248
0 0 12243248 4776598 7466650 47468811 60680810
Machinery
advance
3 3 May-13 7002666
750533 0 7753199 1506521 6246678 53715489 68434009
4 4 Jun-13 74944365
0 0 74944365 702787 74241578 127957067 143378374
Machinery
advance
5 5 Jul-13 7123419
0
1607472
9 23198148 3395063 19803085 147760152 166576522
6 6 Aug-13 5508432
0 0 5508432 3594498 1913934 149674086 172084954
7 7 Sep-13 8016560
5109871 0 13126431 6692663 6433768 156107854 185211385
8 8 Oct-13 9336628
0
1052021
7 19856845 7006036 12850809 168958663 205068230
9 9 Nov-13 13943881
0 3459703 17403584 9174991 8228593 177187256 222471814
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 19 of 34
Sl.
No.
IPC
No. Month
Gross Amount of IPC (Rs. In millions)
Recoveries
Net
Amount
Paid
Cumulative
of Net
Amount
Paid
Cumulative
Gross
Amount Of
IPC
Remarks Value of
BOQ
Item
Value
of
Non
BOQ
Item
Escalation Secured
Advance
Gross
amount
10 10 Dec-13 39162005
0 0 39162005 30592135 8569870 185757126 261633819
11 11 0
10275997 8420182 18696179 4032180 14663999 200421125 280329998 Escalation
12 12 Jan-14 19651077
0 6943656 26594733 15056706 11538027 211959152 306924731
13 13 Feb-14 26859641
0 7257918 34117559 16536754 17580805 229539957 341042290
14 14 Mar-14 44552219
15615211
1346088
6 73628316 24233094 49395222 278935179 414670606
15 15 Apr-14 25937653
0 5899714 31837367 30193591 1643776 280578955 446507973
16 16 9687513
0 0 9687513 193750 9493763 290072718 456195486
Machinery
advance
17 17 May-14 44849973
0 6658299 51508272 26431068 25077204 315149922 507703758
18 18 Jul-14 25051371
0 4500138 29551509 17943214 11608295 326758217 537255267
19 19 0
20421882 0 20421882 3369611 17052271 343810488 557677149 Escalation
20 20 Jul-14 11122153
0 3525728 14647881 9851971 4795910 348606398 572325030
21 21 Aug-14 9076758
0 2473563 11550321 8757492 2792829 351399227 583875351
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 20 of 34
Sl.
No.
IPC
No. Month
Gross Amount of IPC (Rs. In millions)
Recoveries
Net
Amount
Paid
Cumulative
of Net
Amount
Paid
Cumulative
Gross
Amount Of
IPC
Remarks Value of
BOQ
Item
Value
of
Non
BOQ
Item
Escalation Secured
Advance
Gross
amount
22 22 Sep-14 13734128
0 2250701 15984829 10077018 5907811 357307038 599860180
23 23 Oct-14 6367721
0 1552807 7920528 4153880 3766648 361073686 607780708
24 24 Nov-14 29998777
5959148 5324783 41282708 18913732 22368976 383442662 649063416
25 25 Dec-14 20733830
10823504 4717441 36274775 16639519 19635256 403077918 685338191
26 26 Jan-15 28725430
0 6539902 35265332 17725132 17540200 420618118 720603523
27 27 Feb-15 19251585
0 2924828 22176413 9377878 12798535 433416653 742779936
28 28 Mar-15 48019298
21164508 5704141 74887947 24086699 50801248 484217901 817667883
29 29 Apr-15 10576871
0 1582825 12159696 4543029 7616667 491834568 829827579
30 30 May-15 12565669
0 2546525 15112194 6093153 9019041 500853609 844939773
31 31 Jun-15 12644157
0 2627553 15271710 6160288 9111422 509965031 860211483
32 32 Jul-15 16991672
0 2876988 19868660 7660582 12208078 522173109 880080143
33 33 Aug-15 13854904 5723118 2611111 22189133 7878758 14310375 536483484 902269276
`
Page 21 of 34
Chapter 4. Status of Risk
4.1 HANDING OVER OF SECTION
Handing over status of Sections is mentioned below
Section Name Scheduled date of Handing Over
Actual date of handing over
Encumbrances if any
Likely date of handing over /removal of
encumbrances
Milestone I 04.01.2013 04.01.2013 NIL NA
Milestone II 23.04.2013 09.08.2013 Encumbrances
not Totally removed
31.08.2015
Milestone III 23.06.2013 23.11.2013 Nil NA
Milestone IV 23.08.2013 (Not handed over)
Encumbrances not Totally removed
31.08.2015
4.2 STATUS OF UTILITY SHIFTING
Section Name Encumbrances Number existing
till last month
Number removed during
July’15
Balance remaining for removal
Milestone I
Tree cutting Completed Nil Nil
Shifting of Electric pole
Completed Nil Nil
Shifting of Telephone pole
Completed Nil Nil
Pipe line Completed Nil Nil
Milestone II
Tree cutting Completed Nil Nil
Shifting of Electric pole
Completed Nil Nil
Shifting of Telephone pole
Completed Nil Nil
Pipe line Completed Nil Nil
Milestone III
Tree cutting Completed Nil Nil
Shifting of Electric pole
Completed Nil Nil
Shifting of Telephone pole
Completed Nil Nil
Pipe line Completed Nil Nil
Milestone IV
Tree cutting Completed Nil Nil
Shifting of Electric pole
Nil
Km 0+00 to 3+000 (6 pole) &
Km 23+100 to 25+400 (30 pole)
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 22 of 34
Shifting of Telephone pole
Km 0+00 to 5+10 (04 pole) &
Km 23+100 to 25+00 (12 pole
Pipe line Km 0+00 to 3+00
(2.900 Km)
4.3 HINDRANCE LIST
HINDRANCE LIST
Chainage
Side Activity Length(m) Milestone Remark
From To
0+000 0+860 LHS Pipe line 860
MS-IV
1+130 1+170 LHS STR Gap, Pipe Line 40
1+290 1+330 LHS STR Gap, Pipe Line 40
1+780 2+330 LHS Pipe Line 550
2+450 2+540 LHS Pipe Line 90
2+610 2+640 LHS STR Gap, Pipe Line 30
2+730 2+750 LHS STR Gap, Pipe Line 20
2+920 3+110 LHS Pipe Line 190
13+470 13+580 LHS Land Problem 110 MS-II
0+000 0+960 RHS Pipe line 960
MS-IV
1+130 1+170 RHS STR Gap ,Pipe Line 40
1+290 1+330 RHS STR Gap, Pipe Line 40
1+760 2+150 RHS STR Gap, Pipe Line 390
2+320 2+350 RHS STR Gap, Pipe Line 30
2+480 3+000 RHS Pipe Line 520 MS-IV
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 23 of 34
4.4 ANY OTHER ISSUE
Bridge over Irrigation Canal @ 4+360 to be Commenced With due permission of
Concerned Department. For that, Work program from Contractor is awaited.
4.5 RISK INVOLVED
Due to delay in handing over sites, the work might be more delayed.
Page 24 of 34
Chapter 5. Environmental Monitoring and Safety
5.1 ENVIRONMENT MANAGEMENT PLAN
Sl.
No.
Environmental
Issue / Aspect Management Measures
1 Tree Cutting Work already Completed
2 Joint Field
Verification
NA
3 Location and
Installation of
Crushers, Hot
Mix Plants and
Batching Plants
The contractor has obtained ‘Consent to Establish’ for Concrete Batching
plant/ Hot Mix plant/ WMM plants from ‘OSPCB’ and concerned documents
submitted to Engineer’s Office. The Contractor has obtained ‘Consent to
Operate’ for HMP and Batching Plant of SH-53 camp but CTO for WMM
Plant have not been procured and its’ not being operated. CTO have been
obtained for Batching Plant and WMM Plant at Camp in SH-9 and it is in
working condition.
CAO ready Submitted
4 Construction
Camp(s) –
Selection, Design
and Layout
Submitted
5 Construction
Vehicles,
Equipment and
Machinery
Cl. 8.3 of Article 8 in this MPR
6 Identification,
Operation and
Rehabilitation of
Borrow Areas
Identified -17
In operation-2
Rehabilitation done -06
7 Identification,
Operation and
Rehabilitation of
Stone Quarry
Identified -01
In Operation -01
Rehabilitation not done yet
8 Identification, and
Operation of
Sand Quarry
Sand Quarry in operation owned by 3rd party : Mr.Sunil Nayak,Tahasil
Patapur Ch.25+000
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur -Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 25 of 34
Sl.
No.
Environmental
Issue / Aspect Management Measures
9 Arrangement for
Construction
Water
Own Bore Wall (4Nos) 3nos at Kalua base camp and one at
Maulabhanja camp.
10 Clearing and
Grubbing
Not applicable.
11 Stripping,
Stacking and
Preservation of
Top Soil
Being done as per provisions of Contract
12 Labour Camp
Management
Provides all facility like living room Lighting, sanitary, Drinking water,
cooking gas etc.
13 Transportation of
Construction
Materials and
Haul Road
Management
Construction materials transported by contractor’s vehicles covered with
Tarpaulin sheets. Haul Roads are maintained time to time.
14 Worksite Safety
Management
Safety management being followed according to IRC-SP-55.
15 Accessibility Maintained time to time to ease road traffic movement.
16 Disruption to
Other Users of
Water
During construction water path is not disturbed and is being properly
channelized.
17 Labour
Requirements
Minimum requirements labour: 1. Provided to PPE at site 2. Drinking water,
3. First aid facility.
18 Pollution
Management
Being done as per provisions of Contract
19 Drainage and
Flood Control
Proper Drainage system is adopted.
20 Slope Protection
and Control of
Soil Erosion
Being done as per provisions of Contract
21 Waste
Management
Being done as per provisions of Contract
22 Chance Found Not applicable
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur -Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 26 of 34
Sl.
No.
Environmental
Issue / Aspect Management Measures
Archaeological
Property
23 Demobilisation
and
Decommissioning
Not applicable
5.2 ROAD SAFETY
Some measures are being taken up by Contractor on site, but recommended for hard barricading and
some more signage board during construction.
Traffic cones, handy signage, helmets, safety jackets are being used during construction activities.
5.3 ENVIRONMENTAL CLEARENCES
All the statuary Clearances have been secured.
Page 27 of 34
Chapter 6. Variation and Changes
6.1 SUMMARY OF CHANGE ORDER
Sl. No.
Change Order
No.
Description of Change
Item
Increase in cost
Saving in cost
Revised contract
Price
Percentage of increase/decre
ase on contract price
Cumulative % of increase/decrease of contract
price
NIL
Page 28 of 34
Chapter 7. Quality Control and Quality Assurance
7.1 TESTS CONDUCTED
Following tests both at site and at Laboratory have been conducted during the month to ensure
Quality control and Quality Assurance.
Sl.
No.
Description of Tests
conducted
Number of
Tests
conducted
No. Of NCR Remedial measure adopted
1 Embankment control
Tests 2
Any lacuna in Quality is notified in
RFIs & Remedial measures are
suggested through Verbal/Written
mode.
2 Tests in Sub grade 77
3 Tests in GSB 35
4 Tests in WMM 118
5 Tests in DBM 60
6 Tests in BC 71
7 Coarse aggregate for
Structures (Gradation) 30
8 Fine aggregate for
Structures (Gradation) 30
9 Cement 15
10 Cube Compression
Tests (28 days) 166
Page 29 of 34
Chapter 8. Mobilisation
8.1 CONSULTANT’S TEAM
The staff mobilization is being done in consultation with Employer as per the project requirement
considering the mobilization of the Contractor. The following table depicts the staff mobilization as on
date.
Sl. No Name Designation Joining Date
1. Mr. Asheesh Suhaney Resident Engineer 23-Feb-15
2. Mr. Ravi Bhushan Rehalia Quantity Surveyor 16-Mar-15
3. Mr. Ravi Prakash Dixit Highway Engineer 16-Mar-15
4. Mr. Sandeep Panda Material Engineer 01-Mar-15
5. Mr. Madhusudan Paria Asst. Highway Engineer-1 04-Mar-15
6. Mr. B.Thamizharasan Asst. Bridge Engineer-1 04-Mar-15
7. Mr. Abhay Kumar Dube Asst. Bridge Engineer-2 22-June-15
8. K Sudipta Kumar Asst. Bridge Engineer-1(Replacement – ABE-1) 18-Apr-15
9. Mr. Sudhansu Rai Asst. Material-cum-Quality Engineer-1 16-July-15
10. Mr. Ashwani Kumar Asst. Surveyor-1 23-Feb-15
11. Mr. SumanSarkar Office Manager-cum-Accountant-1 24-Mar-15
12. Mrs.GitaraniSethi Computer Operator-cum-Office Assistant-1 04-May-15
13. Mr. Hari. S. Brahma Office Attendant/Watchman-1 18-Mar-15
8.2 CONTRACTOR’S TEAM
The Contractor has to mobilize their manpower as per Contract.
Sl. No. Name Designation
1 Mr.Sandeep Agarwal
Project Manager
2 Mr.Ajit Nayak Highway Engineer
3 Mr. Mr.BrindjawharYadav Bridge Engineer
4 Mr Krushna Chandra Maharana Material Engineer
5 Mr Rashmi Ranjan Swain Quantity Surveyor(Not Approved)
6 Mr Lingaraj Mohapatra Equipment And Maintenance Engineer (Not Approved)
7 Mr Naren Kumar Dhala Samanta Environment And Safety Manager (Not Approved)
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 30 of 34
8.3 STATUS OF PLANT AND EQUIPMENT OF CONTRACTOR
Sl. No.
Description of Equipment/Plant Min. No. as
per Contract No.
Mobilized Remarks
1 Mechanical Bitumen Sensor Paver 1 1
2 Motor Grader 2 2
3 Hydraulic Excavator 2 2
4 Vibratory Roller 2 2
5 Pneumatic Tyre Roller 1 1
6 Transit Mixer 2 3
7 Front end Loader 2 2
8 Dozer 1 0
9 Tipper 25 14
10 Bitumen sprayer 1 1
11 Earth Compactor 2 2
12 Water tanker 3 2
13 Mechanical Paver 1 1
14 Concrete Pump 1 -
15 Concrete fixed from Paver 1 -
Plants
1 Hot Mix Plant (Batch Mix only) 1 1
2 Concrete Batch-mix Plant 1 1
3 Cone Crushing Unit 1 -
4 WMM Plant 1 1
The following survey equipment is available at site;
Sl. No. Name of the equipment Quantity (Nos.)
1 Total station 1
2 Auto level 4
Page 31 of 34
Chapter 9. Visits and Meetings
1. Monthly Progress Review Meeting was held on 04.08.2015 at the office of RE along with
Employer, Contractor & Consultant Representatives.
2. Site Visit of Mr. B.C. Tripathy , SE-PMU was held on 20.08.2015 along with representatives of
PH Dept. ,Electrical Department, EE Cum ER, Social Expert, LA Official , Contractor
Representatives & RE-CSC to sort out the issue of Hindrances at sections fall under MS-IV.
3. Project Review meeting, Chaired by Honorable Works Secretary, Government of Odisha, on
22nd Aug.’2015 at State Secretariat, Bhubneswar along with Employer, Contractor &
Consultant Representatives
Page 32 of 34
Chapter 10. Important Correspondence during the Month
10.1 SUBMISSIONS AND APPROVALS
Monthly Progress Report for July’ 2015 was submitted on 24th August’ 2015
Quarterly Progress Report for April’ to June’ 2015 was submitted on 31st August’ 2015
7nos of GFC drawing were issued to the contractor
10.2 CORRESPONDENCES
14 numbers of letters were received for the contractor and 20 numbers of letters were
issued to the contractor. Similarly 9 numbers of letters were received from OWD and
9 numbers have been replied to.
Following important correspondences made during the month are furnished below
Sl. NO. DATE LETTER REFFERENCE
NO. SUBJECT TO
1 04.08.2015 LASA/RE/P-03/RKD/-2015-16/114
Progress Review Meeting on 4th August’15 RKD
2 4.08.2015
LASA/RE/P-03/OWD(ER)/-2015-16/115
Forward-Contractors Requisition about seeking permission of use Excavator to clearance the Hindrance in Lanjhia Village at (Ch.4+450 to 4+900) Reg
OWD(ER)
3 05.08.2015 LASA/RE/P-03/OWD/-2015-16/116
Regarding-Compliance Report over Observation of IPC No-31 OWD
4 07.08.2015 LASA/RE/P-03/RKD/-2015-16/117
FWD-ER-Letter-Observation over construction of Retaining Walls at ch. 2+000 & 17+600 to 17+780 Reg
RKD
5 07.08.2015 LASA/RE/P-03/RKD/-2015-16/118
Approval Single Row Hume Pipe Culvert across Cross Road at 32+600 LHS Reg RKD
6 08.08.2015 LASA/RE/P-03/RKD/-2015-16/119
Approval :-Bathing Ghat side Toe wall drawing of Ch. 34+745 -Reg RKD
7 08.08.2015 LASA/RE/P-03/RKD/-2015-16/120
Approval:-Box Drain Section & Profile drawing Between 34+069 to 34+670 LHS RKD
8 10.08.2015 LASA/RE/P-03/RKD/-2015-16/121
FWD:- Letter from PMU to Collector &District Magistrate Chatrapur ,Ganjam towards Request for Extension of Lease of Stone Quarry-Reg
RKD
9 10.08.2015 LASA/RE/P-03/OWD/-2015-16/122
Re-Invoice for Mobilization Advance-Reg OWD
10 11.08.2015 LASA/RE/P-03/RKD/-2015-16/123
Transition Zone plan, Profile and Cross Section Drawing Adjacent to the section from 23+230 to 25+100 Reg
RKD
11 11.08.2015 LASA/RE/P-03/RKD/-2015-16/124
Minutes of Progress Review Meeting -04.08.2015 RKD
12 12.08.2015 LASA/RE/P-03/RKD/-2015-16/125
Reply(2): -Drawing & Profile of T Junction @
Ch.32+560 RHS and 32+600LHS Reg RKD
13 12.08.2015 LASA/RE/P-03/OWD/-2015-16/126
Regarding EOT for MS-II, Ms-III and Ms-IV OWD
14 12.08.2015 LASA/RE/P-03/OWD/-2015-16/127
Regarding Submission application for Interim payment certificate No-32 OWD
15 17.08.2015 LASA/RE/P-03/RKD/-2015-16/128
FWD:- Letter From PMU towards Handing over Hindrance free site for (Section -IV)-Reg RKD
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 33 of 34
16 17.08.2015 LASA/RE/P-03/RKD/-2015-16/129
Approval Drawing of T Junction Road of
Ch.29+511 RHS-Reg RKD
17 18.08.2015 LASA/RE/P-03/RKD/-2015-16/130
Approval:- Drawing of T-Junction Road of Ch.19+785 RHS & 20+852 LHS-Reg RKD
18 18.08.2015 LASA/RE/P-03/RKD/-2015-16/131
Approval Drawing of T-Junction Road of Ch.34+943 RHS-Reg RKD
19 19.08.2015 LASA/RE/P-03/RKD/-2015-16/132
Approval:- Single Row Hume Pipe Culvert across Cross Road at 24+351-Reg RKD
20 19.08.2015 LASA/RE/P-03/RKD/-2015-16/133
Approved-: Raised Payment Markers (RPMS) Location for Ms-III -Reg RKD
21 21.08.2015 LASA/RE/P-03/RKD/-2015-16/134
Reg:-Box Culvert Drawing at Ch.23+821-Reg RKD
22 20.08.2015 LASA/TL-BBSR/2015/021
CV of Asst. Bridge Engineer for P-03 OWD
23 24.08.2015 LASA/RE/P-03/RKD/-2015-16/135
FWD- Letter From PMU towards Handing over Hindrance free site for (Section -IV) & follow up action on joint Visit Dt-20.08.2015-Reg-Reg
RKD
24 24.08.2015 LASA/RE/P-03/OWD/-2015-16/136
Monthly Progress Report for the month of July-2015 OWD
25 25.08.2015 LASA/RE/P-03/RKD/-2015-16/137
FWD:- Letter EE (R & B Division) Letter to Sub Collector, Ganjam for Deployment of Executive Magistrate and Police Personel in Connection with eviction of encroachment of Road from Berhampur-Taptapani under World Bank Project -Reg
RKD
26 27.08.2015 LASA/RE/P-03/RKD/-2015-16/138
Requirement of 1 No of JCB and 1 No of Tipper for dismantling of Berhampur-Taptapani Road at Digapahandi on 28.08.2015
RKD
27 27.08.2015 LASA/RE/P-03/RKD/-2015-16/139
Deployment of 1 No JCB to trace out the existing PHED water supply line from 1/0 to 3/0 (LHS) of Berhampur -Taptapani Road (SH-17)
RKD
28 27.08.2015 LASA/RE/P-03/OWD/-2015-16/140
Reg:-Replacement for the position of Assistant Bridge Engineer. OWD
29 28.08.2015 LASA/TL-BBSR/2015/022
Minutes of Meeting held on 22.08.2015(P-03) OWD
30 31.08.2015 LASA/RE/P-03/OWD/-2015-16/141
Submission of Quarterly Progress Report (QPR) for the month from April' to June' 2015 -Reg OWD
Page 34 of 34
Chapter 11. Weather during the Month
Sl.No. Date Minimum Temp °C
Maximum Temp °C
Min Humidity
Max Humidity
Rain Fall
(mm) Remarks
1 01.08.15 28.2 36.8 60% - Sunny
2 02.08.15 27.6 37.2 63% - Sunny
3 03.08.15 27.9 36.9 62% - Sunny
4 04.08.15 28.1 37.5 59% 2.0 Rainy
5 05.08.15 28.4 36.8 63% - Sunny
6 06.08.15 27.9 37.8 48% - Sunny
7 07.08.15 28.4 36.9 50% - Sunny
8 08.08.15 28.3 36.6 63% - Sunny
9 09.08.15 28.0 36.8 58% - Sunny
10 10.08.15 28.4 36.5 55% - Cloudy
11 11.08.15 28.6 36.0 50% 23.0 Rainy
12 12.08.15 26.0 34.0 52% 24.5 Rainy
13 13.08.15 25.5 35.7 55% - Sunny
14 14.08.15 28.7 35.9 58% - Cloudy
15 15.08.15 28.0 34.5 56% 19.5 Rainy
16 16.08.15 24.7 33.7 55% - Sunny
17 17.08.15 25.5 30.8 54% 14.5 Rainy
18 18.08.15 25.4 33.8 59% 5.0 Rainy
19 19.08.15 26.3 30.0 59.5% 26.0 Rainy
20 20.08.15 25.4 34.3 60% - Sunny
21 21.08.15 25.3 34.3 50% 5.0 Sunny
22 22.08.15 25.4 33.4 55% 13.0 Cloudy
23 23.08.15 25.8 34.6 60% 11.25 Rainy
24 24.08.15 24.8 29.2 60% - Sunny
25 25.08.15 23.9 27.5 60% - Sunny
26 26.08.15 23.5 28.4 55% 17.5 Rainy
27 27.08.15 23.4 29.4 60% 5.0 Rainy
28 28.08.15 24.2 30.7 58% - Sunny
29 29.08.15 25.4 27.9 62% 3.5 Rainy
30 30.08.15 23.8 28.4 55% 1.0 Cloudy
31 31.08.15 24.1 29.2 54% - Cloudy
0+
00
0
0+
10
0
0+
20
0
0+
30
0
0+
40
0
0+
50
0
0+
60
0
0+
70
0
0+
80
0
0+
90
0
1+
00
0
1+
10
0
1+
20
0
1+
30
0
1+
40
0
1+
50
0
1+
60
0
1+
70
0
1+
80
0
1+
90
0
2+
00
0
2+
10
0
2+
20
0
2+
30
0
2+
40
0
2+
50
0
2+
60
0
2+
70
0
2+
80
0
2+
90
0
3+
00
0
3+
10
0
3+
20
0
3+
30
0
3+
40
0
3+
50
0
3+
60
0
3+
70
0
3+
80
0
3+
90
0
4+
00
0
4+
10
0
4+
20
0
4+
30
0
4+
40
0
4+
50
0
4+
60
0
4+
70
0
4+
80
0
4+
90
0
5+
00
0
5+
00
0
5+
10
0
5+
20
0
5+
30
0
5+
40
0
5+
50
0
5+
60
0
5+
70
0
5+
80
0
5+
90
0
6+
00
0
6+
10
0
6+
20
0
6+
30
0
6+
40
0
6+
50
0
6+
60
0
6+
70
0
6+
80
0
6+
90
0
7+
00
0
7+
10
0
7+
20
0
7+
30
0
7+
40
0
7+
50
0
7+
60
0
7+
70
0
7+
80
0
7+
90
0
8+
00
0
8+
10
0
8+
20
0
8+
30
0
8+
40
0
8+
50
0
8+
60
0
8+
70
0
8+
80
0
8+
90
0
9+
00
0
9+
10
0
9+
20
0
9+
30
0
9+
40
0
9+
50
0
9+
60
0
9+
70
0
9+
80
0
9+
90
0
10
+0
00
Clearing & Grubbing completed GSB 1st (Drainage Layer) completed
Embankment completed GSB Top Completed
Sub-grade completed WMM Top Completed
L.A Problem DBM Top Completed
OGL BC Top Completed
NGL
Note: Stretches affected by hindrances are not shown.
Chainage
RH
S M
ain
Ca
rria
gew
ay
Appendix-1
LH
S M
ain
Ca
rria
gew
ay
Chainage
RH
S M
ain
Ca
rria
gew
ay
LH
S M
ain
Ca
rria
gew
ay
Berhampur to Taptapani Road Project (Package -P03)
Strip Chart Showing the Status of Working Area from Km. 0+000 to Km. 10+000 (as on August' 2015)
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
Roadway Excavation
OGL
Clearing and Grubbing
NGL
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
Roadway Excavation
OGL
Roadway Excavation
OGL
Clearing and Grubbing
NGL
BC
DBM
WMM
GSB
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
Clearing and Grubbing
NGL
Roadway Excavation
OGL
Clearing and Grubbing
NGL
Subgrade
Embankment Filling
10+
000
10+
100
10+
200
10+
300
10+
400
10+
500
10+
600
10+
700
10+
800
10+
900
11+
000
11+
100
11+
200
11+
300
11+
400
11+
500
11+
600
11+
700
11+
800
11+
900
12+
000
12+
100
12+
200
12+
300
12+
400
12+
500
12+
600
12+
700
12+
800
12+
900
13+
000
13+
100
13+
200
13+
300
13+
400
13+
500
13+
600
13+
700
13+
800
13+
900
14+
000
14+
100
14+
200
14+
300
14+
400
14+
500
14+
600
14+
700
14+
800
14+
900
15+
000
15+
000
15+
100
15+
200
15+
300
15+
400
15+
500
15+
600
15+
700
15+
800
15+
900
16+
000
16+
100
16+
200
16+
300
16+
400
16+
500
16+
600
16+
700
16+
800
16+
900
17+
000
17+
100
17+
200
17+
300
17+
400
17+
500
17+
600
17+
700
17+
800
17+
900
18+
000
18+
100
18+
200
18+
300
18+
400
18+
500
18+
600
18+
700
18+
800
18+
900
19+
000
19+
100
19+
200
19+
300
19+
400
19+
500
19+
600
19+
700
19+
800
19+
900
20+
000
Clearing & Grubbing completed GSB 1st (Drainage Layer) completed
Embankment completed GSB Top Completed
Sub-grade completed WMM Top Completed
L.A Problem DBM Top Completed
OGL BC Top Completed
NGL
Note: Stretches affected by hindrances are not shown.
RH
S M
ain
Carria
gew
ay
Berhampur to Taptapani Road Project (Package -P03)
Strip Chart Showing the Status of Working Area from Km. 10+000 to Km. 20+000 (as on August' 2015)
Chainage
Appendix-1
LH
S M
ain
Carria
gew
ay
Chainage
RH
S M
ain
Carria
gew
ay
LH
S M
ain
Carria
gew
ay
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
Roadway Excavation
OGL
Clearing and Grubbing
NGL
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
Roadway Excavation
OGL
Clearing and Grubbing
NGL
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
Roadway Excavation
OGL
Clearing and Grubbing
NGL
Roadway Excavation
OGL
Clearing and Grubbing
NGL
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
20+
000
20+
100
20+
200
20+
300
20+
400
20+
500
20+
600
20+
700
20+
800
20+
900
21+
000
21+
100
21+
200
21+
300
21+
400
21+
500
21+
600
21+
700
21+
800
21+
900
22+
000
22+
100
22+
200
22+
300
22+
400
22+
500
22+
600
22+
700
22+
800
22+
900
23+
000
23+
100
23+
200
23+
300
23+
400
23+
500
23+
600
23+
700
23+
800
23+
900
24+
000
24+
100
24+
200
24+
300
24+
400
24+
500
24+
600
24+
700
24+
800
24+
900
25+
000
Bridge
25+
000
25+
100
25+
200
25+
300
25+
400
25+
500
25+
600
25+
700
25+
800
25+
900
26+
000
26+
100
26+
200
26+
300
26+
400
26+
500
26+
600
26+
700
26+
800
26+
900
27+
000
27+
100
27+
200
27+
300
27+
400
27+
500
27+
600
27+
700
27+
800
27+
900
28+
000
28+
100
28+
200
28+
300
28+
400
28+
500
28+
600
28+
700
28+
800
28+
900
29+
000
29+
100
29+
200
29+
300
29+
400
29+
500
29+
600
29+
700
29+
800
29+
900
30+
000
Clearing & Grubbing completed GSB 1st (Drainage Layer) completed
Embankment completed GSB Top Completed
Sub-grade completed WMM Top Completed
L.A Problem DBM Top Completed
OGL BC Top Completed
NGL
Note: Stretches affected by hindrances are not shown.
Appendix-1
Berhampur to Taptapani Road Project (Package -P03)
Strip Chart Showing the Status of Working Area from Km. 20+000 to Km. 30+000 (as on August' 2015)
RH
S M
ain
Carria
gew
ay
LH
S M
ain
Carria
gew
ay
Chainage
RH
S M
ain
Carria
gew
ay
LH
S M
ain
Carria
gew
ay
Chainage
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
Roadway Excavation
OGL
Clearing and Grubbing
NGL
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
Roadway Excavation
OGL
Roadway Excavation
OGL
Clearing and Grubbing
NGL
BC
DBM
WMM
GSB
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
Clearing and Grubbing
NGL
Roadway Excavation
OGL
Clearing and Grubbing
NGL
Subgrade
Embankment Filling
30+
000
30+
100
30+
200
30+
300
30+
400
30+
500
30+
600
30+
700
30+
800
30+
900
31+
000
31+
100
31+
200
31+
300
31+
400
31+
500
31+
600
31+
700
31+
800
31+
900
32+
000
32+
100
32+
200
32+
300
32+
400
32+
500
32+
600
32+
700
32+
800
32+
900
33+
000
33+
100
33+
200
33+
300
33+
400
33+
500
33+
600
33+
700
33+
800
33+
900
34+
000
34+
100
34+
200
34+
300
34+
400
34+
500
34+
600
34+
700
34+
800
34+
900
35+
000
35+
000
35+
100
35+
200
35+
300
35+
400
35+
500
35+
600
35+
700
35+
800
35+
900
36+
000
36+
100
36+
200
36+
300
36+
400
36+
500
36+
600
36+
700
36+
800
36+
900
37+
000
37+
100
37+
200
37+
300
37+
400
37+
500
37+
600
37+
700
37+
800
37+
900
38+
000
38+
100
38+
200
38+
300
38+
400
38+
500
38+
600
38+
700
38+
800
38+
900
39+
000
39+
100
39+
200
39+
300
39+
400
39+
500
39+
600
39+
700
39+
800
39+
900
40+
000
Clearing & Grubbing completed GSB 1st (Drainage Layer) completed
Embankment completed GSB Top Completed
Sub-grade completed WMM Top Completed
L.A Problem DBM Top Completed
OGL BC Top Completed
NGL
Note: Stretches affected by hindrances are not shown.
Chainage
Appendix-1
Berhampur to Taptapani Road Project (Package -P03)
Strip Chart Showing the Status of Working Area from Km. 30+000 to Km. 40+000 (as on August' 2015)
RH
S M
ain
Carria
gew
ay
LH
S M
ain
Carria
gew
ay
Chainage
RH
S M
ain
Carria
gew
ay
LH
S M
ain
Carria
gew
ay
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
Roadway Excavation
OGL
Clearing and Grubbing
NGL
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
Roadway Excavation
OGL
Roadway Excavation
OGL
Clearing and Grubbing
NGL
BC
DBM
WMM
GSB
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
Clearing and Grubbing
NGL
Roadway Excavation
OGL
Clearing and Grubbing
NGL
Subgrade
Embankment Filling
40+
000
40+
100
40+
200
40+
300
40+
400
40+
500
40+
600
40+
700
40+
800
40+
900
41+
000
41+
100
41+
200
41+
228
Clearing & Grubbing completed GSB 1st (Drainage Layer) completed
Embankment completed GSB Top Completed
Sub-grade completed WMM Top Completed
L.A Problem DBM Top Completed
OGL BC Top Completed
NGL
Note: Stretches affected by hindrances are not shown.
Appendix-1
Berhampur to Taptapani Road Project (Package -P03)
Strip Chart Showing the Status of Working Area from Km. 40+000 to Km. 41+000 (as on August' 2015)
Chainage
LH
S M
ain
Carria
gew
ay
RH
S M
ain
Carria
gew
ay
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
Roadway Excavation
OGL
Clearing and Grubbing
NGL
Roadway Excavation
OGL
Clearing and Grubbing
NGL
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
Note: Stretches affected by hindrances are not shown.
Berhampur to Taptapani Road Project (Package -P03)
Strip Chart Showing the Status of Working Area from Km. 40+000 to Km. 41+000 (as on August' 2015)
Chainage
LH
S M
ain
Carria
gew
ay
RH
S M
ain
Carria
gew
ay
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
Roadway Excavation
OGL
Clearing and Grubbing
NGL
Roadway Excavation
OGL
Clearing and Grubbing
NGL
BC
DBM
WMM
GSB
Subgrade
Embankment Filling
Appendix-1
Berhampur to Taptapani Road Project (Package -P03)
Strip Chart Showing the Status of Working Area from Km. 40+000 to Km. 41+000 (as on August' 2015)
BAM
BAM
MINOR BRIDGE NO 15+185 RHS
TPT BAM
A2 P2 P1 A1
MINOR BRIDGE NO 11+745 LHS
TPT
A2 P2 P1 A1
MINOR BRIDGE NO 11+745 RHS
TPT BAM
A2 P1 A1
MINOR BRIDGE NO 15+185 LHS
BAM
Appendix 2
A1
Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of SH–17 (Balance Work)
Pictorial Chart of Minor Bridge
A2 P1
TPT
RFI NO.6843 ON DT.14/04/2015
RFI.NO.9191 09/07/2015 RFI NO.9189 09/07/15
RFI .NO949627/07/2015
RFI NO.949627/07/2015
RFI. NO.949627/07/2015
RFI NO 937417/07/15 RFI NO.9372 18/07/15
RFI.NO. 9606 ON Dt 03/08/2015RFI .NO 960603/08/2015
RFI.NO.9606 03/08/2015
RFI . NO.7375 ON Dt.01/05/2015
RFI NO 10065 DT .22/08/2015
RFI NO 3264 14/08/14
RFI NO.2863
RFI NO.6688 DT.08/04/2015 RFI NO.6688 DT.08/04/2015
RFI NO.2360 DT. 16/05/2014
RFI .NO. 7347 DT. 30/04/2015 RFI .NO.6614 DT.04/04/2015
RFI NO.7050 21/04/15
RFI .NO.72692704/2015
RFI .NO. 6919 17/04/2015
RFI.NO.7209 25/04/2015
RFI .NO.8368 05/06/2015
RFI.NO.6975 19/04/2015
RFI.NO.7283 28/04/2015
RFI NO.8308 04/06/2015
RFI NO.7759 ON DT.15/05/2015
RFI NO.7845 18/05/15
RFI .NO.828503/06/2015
RFI NO.9244 RFI NO 9242
RFI NO.6845 ON DT.14/04/2015
RFI NO.7046 21/04/15
RFI .NO.721525/04/2015
RFI .NO. 6917 17/04/2015
RFI.NO.7101 22/04/2015
RFI .NO.9135 05/07/2015
RFI.NO.6973 19/04/2015
RFI.NO.7622 10/05/2015
RFI NO.8532 11/06/2015
RFI NO.7624 ON DT.10/05/2015
RFI NO.7731 14/05/15
RFI .NO.792020/05/2015
RFI NO 2719 14/06/2014
RFI NO.2737 18/06/2014
RFI .NO325812/08/14
RFI NO 2405 25/05/201
RFI NO 2535 30/05/2014
RFI .NO.3357 28/08/2014
RFI NO 2694 11/06/2014
RFI NO 2737 18/06/2014
RFI NO. 3258 12/08/2014
RFI NO3260 RFI NO 2865
RFI NO.5970 .05/03/2015 RFI NO.5970 05/*03/2015
RFI NO.2494 DT. 27/05/2014
RFI NO.9282 DT .14/07/2015
RFI NO 2719 14/06/2014
RFI NO .2737 18/06/2014
RFI NO. 3243 09/08/2014
RFI NO 2405 25/05/2014
RFI NO 2535 30/05/2014
RFI NO 3278 14/08/2014
RFI NO 2694 11/06/2014
RFI NO 2737 18/06/2014
RFI NO 3243 09/08/2014
RFI NO.2426 DT.23/05/2014
RFI NO 4164 26/11/14
RFI 3355 25/08/14
RFI NO.6300 DT 22/03/2015
RFI .NO.6333 DT 24/03/2015
RFI NO.2343 DT.15/05/2014
Appendix 2
Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of SH–17 (Balance Work)
Pictorial Chart of Minor Bridge
MINOR BRIDGE NO 17+851 RHS
BAM
MINOR BRIDGE NO 17+851 LHS
TPT
A1P1P2P3A2
A1P1P2
A1P1
A1
BAM
BAM
TPT
TPT
P3 P2
A2 P3 P2 P1
A2
MINOR BRIDGE NO 15+680 LHS
MINOR BRIDGE NO 15+680 RHS
TPT BAM
P3A2
RFI NO6513
RFI .NO.900830/06/2015
RFI.NO.900830/06/2015
RFI.NO.900830/06/2015
RFI NO.5590 ON DT.13/02/2015
RFI NO .10127 .DT.26/08/2015
RFI 6513 01/04/15
RFI.NO 900830/06/2015
RFI.NO.6142 16/03/2015
RFI.NO.6201 19/03/2015
RFI NO.6331 24/03/2015
RFI.NO.6161 17/03/2015
RFI No . 640127./03/2015
RFI NO 7156 24/04/2015
RFI NO.6186 18/03/2015
RFI No. 6457 30/03/2015
RFI NO 7167 24/04/2015
RFI NO.6395 26/03/2015
RFI NO. 651501.04.15
RFI NO 7196 25/04/2015
RFI NO7518 06/05/15
RFI.NO 7520 06/05/15
RFI NO.7522 06/05/15
RFI.NO.6383 25/03/2015
RFI NO .6371 25/03/2015
RFI NO . 6473 30/03/2015
RFI 7333
RFI .NO.803024/05/2015
RFI.NO.803024/05/2015
RFI.NO.803024/05/2015
RFI 7333
RFI.NO 803024/05/2015
RFI NO.3507 26/09/2014
RFI NO 6646 06/04/2015
RFI NO.6780 11/04/2015
RFI NO.6126 14/03/2015
RFI NO.6379 25/03/2015
RFI NO 7095 22/04/2015
RFI NO.6122 14/03/2015
RFI NO.6343 24/03/2015
RFI NO 7092 22/04/2015
RFI NO.6078 12/03/2015
RFI NO.6256 21/03/2015
RFI NO 7026 20/04/2015
RFI 7333 29/04/15
RFI7333 29/04/15
RFI 7343 30/04/15
RFI NO.3500 25/09/2014
RFI.NO.4690 28/12/2014
RFI NO 6740 10.042015
RFI 6829 13/04/2015
RFI .NO.896728/06/2015
RFI.NO.896728/06/2015
RFI.NO.896728/06/2015
RFI NO. 6007 DT .07/03/2015
RFI NO .10365 DT. 03/09/2015
RFI 6847 14/04/15
RFI.NO 896728/06/2015
RFI 6483 31/03/14
RFI NO.6558 02/04/2015
RFI 6644 06/04/15
RFI NO.6479 31/03/15
RFI 6612 04/04/15
RFI 6981 19/04/15
RFI NO 6320 23/03/2015
RFI 6608 04/04/15
RFI 6962 18/04/15
RFI NO.6318 DT23/03/2015
RFI 6554 02/04/15
RFI 6965 18/04/15
RFI NO 8404 DT 07/06/15
RFI 8406 D.07/06/15
RFI 8408 D 07/06/15
RFI NO .628822/03/2015
RFI NO 6371 25/03/2015
RFI 6736 10/04/2015
RFI 6913
RFI .NO.900830/06/2015
RFI.NO.900830/06/2015
RFI.NO.900830/06/2015
RFI NO .5820 DT .24/02/2015
RFI 6911
RFI.NO 900830/06/2015
RFI 6507 01/04/15
RFI 6646 06/04/15
RFI 6780 11/04/15
RFI 6511 01/04/15
RFI 6664 07/04/15
RFI 772514/05/15
RFI NO.6248 21/03/2015
RFI 6662 07/04/15
RFI 7162 24/04/15
RFI NO. 6252 21/03/2015
RFI 6716 09/04/15
RFI 7029 20/04/15
RFI NO.6237 20/03/2015
RFI NO .6375 25/03/2015
RFI 6740 10/04/15
RFI NO.6312 DT.23/03/2015
RFI NO. 6239 ON DT.20/03/2015
RFI NO.3453 DT. 16/09/2014
RFI NO 5387 DT .03/02/2015
RFI 20/02/2015
RFI NO.3413 ON DT.08/09/2014 RFI NO.3461 DT.18/09/2014
RFI NO. 6239 ON DT.20/03/2015
RFI 7853 18/05/15 RFI 7851 18/05/15 RFI 7849 18/05/15
RFI NO.3453 DT. 16/09/2014
RFI NO.8896 DT .25/06/2015
RFI NO .10365 DT. 03/09/2015
Appendix 2
Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of SH–17 (Balance Work)
Pictorial Chart of Minor Bridge
TPT BAM
TPT BAM
A1P1P2
A1P1
A1
TPT
TPT
P1P2A2
MINOR BRIDGE NO 21+760 RHS
MINOR BRIDGE NO 4+180 LHS
MINOR BRIDGE NO 21+760LHS
A2
MINOR BRIDGE NO 4+180 RHS
P2A2
BAM
BAM
RFI NO 9569 DT 31/07/2015 RFI NO. 9569 31/07/2015 RFI NO 9569 31/07/2015
RFI NO 9384 DT 19/07/2015 RFI NO .9384 19/07/2015 RFI NO.9384 19/07/2015
EEEEEEEEEEEEEEEEE
WWWWWOWORKWWW
ee
RFI NO 7001 DT 19/04/2015
RFI NO 6999 19/04/2015
RFI NO.8837 24/06/2015 RFI NO8837 24/06/2015
RFI NO 7292 DT 28/04/2015
RFI NO 9335
RFI NO. 7568 07/05/2015
RFI NO. 7776 15/05/2015
RFI NO.8484 09/06/2015
RFI NO.7592 08/05/2015
RFI NO 825702/06/2015
RFI NO.8513 10/06/2015
RFI NO.7592 08/05/2015
RFI NO.8257 02/06/2015
RFI NO.8513 10/06/2015
RFI NO.7568 07/05/2015
RFI NO.7776 15/05/2015
RFI NO.8484 09/06/2015
RFI NO 8609 13/06/2015 RFI NO 8609 13/06/2015
RFI NO. 7616 20/04/2015
RFI NO.7538 06/05/2015
RFI NO 7600 08/05/2015
RFI NO 8324 04/06/2015
RFI NO. 7512 DT.05/05/2015
RFI NO.7751 14/05/2015
RFI NO 8274 03/06/2015
RFI NO 751205/05/2015
RFI NO.7751 14/05/2015
RFI NO 8274 03/06/2015
RFI NO.7427 02/05/2015
RFI NO 7600 08/05/2015
RFI NO. 8252 02/06/2015
RFI NO 8614 13/06/2015
RFI NO8614 13/06/2015
RFI NO 8842 24/06/15
RFI NO.8842 24/06/2015RFI NO.9335
Appendix 2
Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of SH–17 (Balance Work)
Pictorial Chart of Minor Bridge
A2 P2 P1 A1
TPT BAM
TPT BAM
A1P1P2A2
MINOR BRIDGE NO 1+690 LHS
MINOR BRIDGE NO 1+690 RHS
ee
ee
Appendix-3
1 HUME PIPE
LHS RHS LHS RHS LHS RHS LHS RHS 1st lift 2nd lift 3rd lift 1st lift 2nd lift 3rd lift LHS RHS
1 5+251 Single Row
2 6+069 Double Row
3 6+497 Single Row
4 6+573 Single Row
5 6+720 Single Row
6 7+000 Single Row
7 7+217 Single Row
8 7+520 Single Row
9 7+769 Double Row
10 8+193 Double Row
11 8+363 Single Row
12 8+685 Double Row
13 9+538 Double Row
14 36+238 Single Row
15 36+594 Single Row
16 36+758 Single Row
17 36+985 Single Row
18 37+164 Single Row
19 37+619 Single Row
20 38+157 Single Row
21 38+746 Double Row
22 39+002 Double Row
23 39+118 Double Row
24 39+671 Single Row
25 40+090 Single Row
26 40+280 Double Row
27 40+437 Single Row
28 40+550 Double Row
29 41+000 Single Row
30 41+191 Double Row
2 Box Culvert
LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS 1st lift 2nd lift 3rd lift LHS RHS
1 5+521 Box Culvert Done by ARSS
2 5+761 Box Culvert Done by ARSS
3 8+530 Box Culvert Done by ARSS
4 9+152 Box Culvert Done by ARSS
5 9+800 Box Culvert
6 39+517 Box Culvert
7 5+118 Slab Culvert Done by ARSS
8 7+605 Slab ext.
9 8+008 Slab ext.
10 38+483 Slab ext.
Completed Balance
Head wall(LHS) Head wall(RHS) AppronRemarks
Done by ARSS
Done by ARSS
Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of SH–17 (Balance Work)
Progress Chart of Structure as on 31st Aug ' 2015
MILE STONE-1
Sl No Location DESCRIPTIONExcavation Sand filling PCC Head wall Pipe laying
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
MILE STONE-1
Sl No Location DESCRIPTIONExcavation Sand filling
Protection work RemarksPCC Raft PCC Return Wall Raft Side wall
SlabReturn wall
Appendix-3Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of SH–17 (Balance Work)
Progress Chart of Structure as on 31st Aug ' 2015
1 HUME PIPE
LHS RHS LHS RHS LHS RHS LHS RHS 1st lift 2nd lift 3rd lift 1st lift 2nd lift 3rd lift LHS RHS
1 10+500 Single Row
2 11+120 Double Row
3 11+270 Single Row
4 11+500 Double Row
5 11+735 Single Row
6 12+065 Double Row
7 12+407 Single Row
8 12+611 Single Row
9 12+907 Double Row
10 13+132 Single Row
11 13+619 Single Row
12 13+809 Double Row
13 13+916 Single Row
14 14+531 Single Row
15 14+877 Double Row
16 15+440 Single Row
17 15+897 Single Row
18 16+068 Single Row
19 16+417 Double Row
20 16+521 Single Row
21 16+770 Single Row
22 16+970 Single Row
23 17+666 Single Row
24 18+480 encase-600
25 18+612 Single Row
26 18+680 encase-600
27 19+200 Double Row
28 19+388 Single Row
29 19+799 Single Row
30 20+361 Single Row
31 20+935 Single Row
32 21+005 Single Row
33 21+224 Single Row
34 21+411 Single Row
2 Box Culvert /MINOR BRIDGE
Slab
LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS 1st lift 2nd lift 3rd lift LHS RHS
1 10+933 Box Culvert Done by ARSS
2 14+157 Box Culvert Done by ARSS
3 18+028 Box Culvert Done by ARSS
4 18+115 Box Culvert Done by ARSS
5 19+530 Box Culvert
6 13+470 Slab ext.
7 11+286 Minor Bridge
8 11+735 Minor Bridge
9 15+185 Minor Bridge
10 15+680 Minor Bridge
11 17+851 Minor Bridge
Completed Balance
Pipe laying Head wall(LHS) Head wall(RHS) AppronRemarks
MILE STONE-II
Sl No Location DESCRIPTIONExcavation Sand filling PCC Head wall
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Sl No Location DESCRIPTIONExcavation Sand filling PCC Raft PCC Return Wall
Done by ARSS
Done by ARSS
Done by ARSS
Raft Side wall Return wall
Protection work
Remarks
Done by ARSS
Done by ARSS
Done by ARSS
Appendix-3Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of SH–17 (Balance Work)
Progress Chart of Structure as on 31st Aug ' 2015
1 HUME PIPE
LHS RHS LHS RHS LHS RHS LHS RHS 1st lift 2nd lift 3rd lift 1st lift 2nd lift 3rd lift LHS RHS
1 26+072 Single Row
2 26+314 Double Row
3 27+743 Single Row
4 28+547 Single Row
5 28+920 Tripple rpw
6 30+637 Single Row
7 32+128 Single Row
8 32+465 Single Row NOT REQUIRED
9 33+402 Double Row
10 33+976 Single Row
11 34+069 Single Row
12 34+463 Single Row NOT REQUIRED
13 35+378 Single Row
14 35+533 Single Row
2 Box Culvert
Slab
LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS 1st lift 2nd lift 3rd lift LHS RHS
1 26+616 Box Culvert
2 27+026 Box Culvert
3 28+008 Box Culvert
4 29+562 Box Culvert
5 30+241 Box Culvert
6 30+854 Box Culvert
7 33+476 Box Culvert
8 34+670 Box Culvert
9 34+813 Box Culvert
10 34+858 Box Culvert
Completed Balance
AppronRemarks
MILE STONE-III
Sl No Location DESCRIPTIONExcavation Sand filling PCC Head wall Pipe laying Head wall(LHS) Head wall(RHS)
PCC Return Wall Raft Side wall Return wall
Protection work
RemarksSl No Location DESCRIPTIONExcavation Sand filling PCC Raft
Appendix-3Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of SH–17 (Balance Work)
Progress Chart of Structure as on 31st Aug ' 2015
1 HUME PIPE
LHS RHS LHS RHS LHS RHS LHS RHS 1st lift 2nd lift 3rd lift 1st lift 2nd lift 3rd lift LHS RHS
Utility 0+000 Single Row
Utility 0+194 Single Row
1 0+213 Double Row
2 0+369 Double Row
3 0+847 Double Row
4 0+975 Double Row
5 1+146 Double Row
6 1+310 Double Row
7 1+781 Double Row
8 2+332 Double Row
9 2+515 Double Row
10 2+629 Double Row
Utility 3+065 Single Row NA
11 3+095 Single Row
12 3+259 Single Row
13 3+498 Double Row
14 3+765 Double Row
15 3+890 Double Row
16 4+115 Double Row
17 20+614 Single Row
18 21+865 Double Row
19 22+189 Single Row
20 22+582 Double Row
21 22+761 Single Row
22 22+961 Single Row
23 23+147 Single Row
24 23+713 Single Row
25 24+351 Single Row
26 24+600 Single Row
27 24+600 Single Row
2 B0X CULVERT
Slab
LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS 1st lift 2nd lift 3rd lift LHS RHS
1 2+137 Box Culvert(2/3) Not Started
2 2+742 Box Culvert(3/3) Not Started
3 3+382 Box Culvert(2/3) LHS
4 23+255 Box Culvert(2/2) Not Started
5 23+821 Box Culvert(2/3) Not Started
6 25+106 Box Culvert(2/3)
7 25+861 Box Culvert(2/2)
8 25+214 NEW(slab)
1 1+925 Minor Bridge Not Started
2 4+370 Minor Bridge Not Started
3 21+731 Minor Bridge
Completed Balance
MILE STONE- IV
Sl No Location DESCRIPTIONExcavation Sand filling PCC Head wall Pipe laying Head wall(LHS) Head wall(RHS) Appron
Remarks
NA NA NA NA
NA NA NA
IN THIS MONTH
IN THIS MONTH
IN THIS MONTH
oska road
Sl No Location DESCRIPTIONExcavation Sand filling
Remarks
Protection work
MINOR BRIDGE
PCC Raft PCC Return Wall Raft Side wall Return wall
Appendix 4
Sl.
No.Description of Drawing
Date & Letter No. of
Submission by Contractor
Date & Letter No. of
Approval by CSC
Status of
ApprovalGFC Drawing No. Remarks
1
Single Row Hume Pipe Culvert
across Cross Road at 32+600
LHS
RKD/Ber-Tap./WBP/700/2014-
15,Dt.21.07.2015
LASA/RE/P-
03/RKD/2015-16/118,
Dt.07.08.2015
Approved DRG NO. OSRP/P03/GFC/STR
2Bathing Ghat side Toe wall
drawing of Ch. 34+745
RKD/Ber-Tap./WBP/715/2014-
15,Dt.28.07.2015
LASA/RE/P-
03/RKD/2015-16/119,
Dt.08.08.2015
Approved DREG NO-23 OSRP/P03 BAL/GFC/STR
3
Box Drain Section & Profile
Drawing Between 34+069 to
34+670 LHS
RKD/Ber-Tap./WBP/712/2014-
15,Dt.27.07.2015
LASA/RE/P-
03/RKD/2015-16/120,
Dt.08.08.2015
Approved DRG NO. OSRP/P03/BOX DRAIN/1
4Drawing of T Junction road of
Ch.29+511 RHS
RKD/Ber-Tap./WBP/704/2014-
15,Dt.22.07.2015
LASA/RE/P-
03/RKD/2015-16/129,
Dt.17.08.2015
Approved DREG NO- OSRP/P03 TYP-T-JUN 29511
5Drawing of T-Junction Road of
Ch.19+785 RHS & 20+852 LHS
RKD/Ber-Tap./WBP/711/2014-
15,Dt.25.07.2015
LASA/RE/P-
03/RKD/2015-16/130,
Dt.18.08.2015
Approved DREG NO-03 OSRP/P03/TYP-T JUN 19+785
6Drawing of T Junction road of
Ch.34+943 RHS
RKD/Ber-Tap./WBP/720/2014-
15,Dt.03.08.2015
LASA/RE/P-
03/RKD/2015-16/131,
Dt.18.08.2015
Approved DREG NO-03 OSRP/P03/TYP-T JUN 34943
7Single Rpw Hume pipe culvert
across Cross Road at 24+351
RKD/Ber-Tap./WBP/724/2014-
15,Dt.05.08.2015
LASA/RE/P-
03/RKD/2015-16/132,
Dt.19.08.2015
Approved DRG NO. 40 OSRP/P03 BAL/GFC/STR
Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of SH–17 (Balance Work)
LIST OF GFC DRAWING ISSUED Package No. P03
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State Roads Project
ODISHA WORKS DEPARTMENT
APPENDIX-5
1
Retaining Wall at Ch. 2+052 to Ch. 2+070 RHS Concrete in Progress
Box Drain at Ch. 34+070 to Ch.34+100 LHS
Monthly Progress Report August 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State Roads Project
ODISHA WORKS DEPARTMENT
APPENDIX-5
2
BC Laying at Ch 22+700 to Ch.23+080 LHS
WMM Top layer Field density checking at Ch 23+100 to Ch.23+230 LHS