GOVERNMENT OF ODISHA WORKS DEPARTMENT
ODISHA STATE ROADS PROJECT
Construction Supervision of Berhampur-Taptapani Road (0/0 km to
41/228 km of SH 17) of Odisha State Roads Project
MONTHLY PROGRESS REPORT
LEA Associates South Asia Pvt. Ltd., New Delhi
October 2015
PACKAGE NO. : OSRP-CW-ICB-P03, Berhampur-Taptapani Road (0/0 km to 41/228 km of SH)
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 1 of 35
CONTENTS
CONTENTS..................................................................................................................................................... 1
CHAPTER 1. EXECUTIVE SUMMARY ...................................................................................... 3
1.1 PROJECT BACKGROUND................................................................................................................ 3
1.2 THE PROJECT .................................................................................................................................. 3
1.3 CONTRACT MANAGEMENT FRAME WORK .................................................................................. 4
1.4 PROJECT DETAILS .......................................................................................................................... 5
1.5 SALIENT FEATURES ........................................................................................................................ 5
1.6 MILESTONES .................................................................................................................................... 6
CHAPTER 2. PHYSICAL PERFORMANCE AND PROGRAMME OF WORK ............................ 7
2.1 ROAD WORK ..................................................................................................................................... 7
2.2 PROGRESS OF CD WORKS AND STRUCTURE .......................................................................... 10
2.3 SECTION WISE ACHIEVEMENT .................................................................................................... 11
2.4 ROUTINE MAINTENANCE .............................................................................................................. 13
2.5 PROGRAMME OF WORK ............................................................................................................... 13
2.6 FORECAST FOR NEXT MONTH .................................................................................................... 14
2.7 STATUS OF EXTENSION OF TIME ............................................................................................... 14
CHAPTER 3. FINANCIAL PERFORMANCE ............................................................................ 15
3.1 FINACIAL PROGRESS.................................................................................................................... 15
3.2 MONTH WISE FINANCIAL PROGRESS ........................................................................................ 15
3.3 MOBILIZATION ADVANCE ............................................................................................................. 17
3.4 STATEMENT OF IPC ...................................................................................................................... 18
CHAPTER 4. STATUS OF RISK .............................................................................................. 21
4.1 HANDING OVER OF SECTION ...................................................................................................... 21
4.2 STATUS OF UTILITY SHIFTING ..................................................................................................... 21
4.3 HINDRANCE LIST ........................................................................................................................... 22
4.4 ANY OTHER ISSUE ........................................................................................................................ 23
4.5 RISK INVOLVED .............................................................................................................................. 23
CHAPTER 5. ENVIRONMENTAL MONITORING AND SAFETY ............................................. 24
5.1 ENVIRONMENT MANAGEMENT PLAN ......................................................................................... 24
5.2 ROAD SAFETY ................................................................................................................................ 26
5.3 ENVIRONMENTAL CLEARENCES ................................................................................................. 26
CHAPTER 6. VARIATION AND CHANGES ............................................................................. 27
6.1 SUMMARY OF CHANGE ORDER .................................................................................................. 27
CHAPTER 7. QUALITY CONTROL AND QUALITY ASSURANCE ........................................ 28
7.1 TESTS CONDUCTED ...................................................................................................................... 28
CHAPTER 8. MOBILISATION .................................................................................................. 29
8.1 CONSULTANT’S TEAM................................................................................................................... 29
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 2 of 35
8.2 CONTRACTOR’S TEAM.................................................................................................................. 29
8.3 STATUS OF PLANT AND EQUIPMENT OF CONTRACTOR ......................................................... 30
CHAPTER 9. VISITS AND MEETINGS .................................................................................... 31
CHAPTER 10. IMPORTANT CORRESPONDENCE DURING THE MONTH ........................... 32
10.1 SUBMISSIONS AND APPROVALS ................................................................................................. 32
10.2 CORRESPONDENCES ................................................................................................................... 32
CHAPTER 11. WEATHER DURING THE MONTH ..................................................................... 35
Appendix 1 – Strip Chart of Highways
Appendix 2 – Pictorial Chart of Minor Bridges
Appendix 3 – Progress Chart of Structures
Appendix 4– List of GFC Drawings Issued
Appendix 5– PHOTOGRAPHS
Appendix 6– MINUTES OF MEETING
Page 3 of 35
Chapter 1. Executive Summary
1.1 PROJECT BACKGROUND
The Odisha Works Department (OWD) has a medium to long-term comprehensive programme to
rehabilitate, upgrade and expand the road network throughout the state to improve accessibility,
connectivity and enhance the overall development. It is the pre-eminent state level road authority in
Odisha which deals with issues relating to Feasibility Study and preparation of Detailed Project
Report including the Route Selection, even for relatively low volume roads.
The Government of Odisha has secured a loan from International Bank for Reconstruction and
Development (The World Bank) towards the cost of Widening and Strengthening of existing
Berhampur to Taptapani Road Project (41.228 km).
Berhampur to Taptapani Road Project is part of 825 km of roads under Phase-I which aims at
promoting trade and regional integration between districts by improving transport communication. The
project road Berhampur to Taptapani is a part of the Phase-I road development, which was built
several years ago with two lane configuration and currently serves moderate level of traffic. The
project involves widening of the existing road which has an average carriageway width of 5.5 m to
6.8 m and 1.5m. Earthen shoulder on both sides, to a 7.0 m carriageway and 2.5m shoulders on
both sides in flat and rolling sections. The expected outcome of the project include reduced
transportation time of goods and better connectivity between districts along with improved safety
standards
1.2 THE PROJECT
This road is located in the south-eastern part of Odisha and takes off from NH-217 at 18th km near
Berhampur. The total length of the road is from Berhampur to Taptapani is 41.228 km. The terrain is
predominantly plain and villages are closely located from km 0/0 to 27/0. The stretch of road is
located in Ganjam district. This project stretch passes through Berhampur, Digapahandi and other
Villages/semi urban area. Principal River in the area is river Malabhanja, which crosses the project
road at 29/200 km near Digapahandi.
The location map of the project road is shown below in Figure 1-1;
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 4 of 35
Figure 1-1: Location Map
1.3 CONTRACT MANAGEMENT FRAME WORK
1.3.1 Employer
Mr. Om Prakash Patel, Chief Engineer, World Bank Projects, Odisha
on behalf of Works Department, Government of Odisha
1.3.2 Employer’ Representative
Er. A. K Dash Engineer, World Bank Projects, Odisha
on behalf of Works Department, Government of Odisha
1.3.3 Engineer
Mr.Asheesh Suhaney Resident Engineer
Lea Associates South Asia Pvt Ltd
B1/E-27, Mohan Co Operative Industrial Estate Mathura Road, New Delhi-110 044
Site Office- Plot No.1002, Aurobindo Nager,1st Lane New Bus Stand, Berhampur, District –
Ganjam, Odisha , Pin – 760001
Email: [email protected]
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 5 of 35
1.3.4 Contractor
M/s RKD Construction Pvt.Ltd B-20, ChandakaIndustrial Estate, Patia, Bhubaneswar
Project Manager –Mr.Sandeep Agarwal
Site Office –Near Mahughara Hill, Po.-Raijhola, PS- Berhampur Sadar, Dt.-Ganjam
1.4 PROJECT DETAILS
Contract Value :- Rs.96,87,51,258/-
Period of Construction :– 24 months
Date of Commencement of Work :– 24th January’ 2013
Scheduled Date of Completion :- 23rd January 2015
Revised Date of Completion:- 31.10.2015 (As per Grant of Provisional EOT)
Progress Achieved till October’ 2015 :- 57.113% (Approx.)
1.5 SALIENT FEATURES
1.5.1 Highways
Total Length of Project Corridor (SH 17) 41.23km
Type of Carriageway(Flexible 41.23km
Roadway Width Variable
Carriageway Width 7, 10 & 18 m
Bus Bays and Bus Shelter 26Nos
Toll Plaza 1Nos
Junctions 33Nos
1.5.2 Structures
Major Bridges Nil
Minor Bridges(repair/rehabilitation) 08Nos
Slab Culvert 06Nos
Box Culverts 28Nos
Hume Pipe Culvert 102Nos
1.5.3 Crust Details
Flexible Pavement
GSB 200 mm
WMM 250 mm
DBM 75mm& 50mm
BC 40 mm
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 6 of 35
1.6 MILESTONES
The project corridor has been divided into four sections for completion of work. Details of Sections are
furnished below.
Milestone –I:Total Length 9.928 Km
From Km 05/100to Km 9/800 and Km 36/000 to Km 41/228
Scheduled date of completion:- 10 (Ten) months from date of commencement i.e.
By 23.11.2013
Revised date of completion:-30.12.2014
Milestone –II : Total Length 10.200 Km
From Km 9/800 to Km 20/000
Scheduled date of completion:- 14 (Fourteen) months from date of commencement
i.e. By 23.03.2014
Revised date of completion:-31.10.2015(Provisional)
Milestone –III :Total Length 10.000 Km
From Km 26/000 to Km 36/000.
Scheduled date of completion:- 18 (Eighteen) months from date of
commencement i.e. By 23.07.2014
Revised date of completion:-31.10.2015(Provisional)
Milestone –IV :Total Length 11.100 Km
From Km 0/000 to Km 5/100. And Km 20/000 to Km 26/000.
Scheduled date of completion: -24 (Twenty-four) months from date of
commencement i.e. By 23.01.2015.
Revised date of completion:-31.10.2015(Provisional)
Page 7 of 35
Chapter 2. Physical Performance and Programme of Work
2.1 ROAD WORK
2.1.1 Linear Progress – Total Length- 41.228 km
Length in Km
Sl. No.
Description of Item
Length Executed through previous
contract
Length to be executed
under present contract
Progress Achieved Balance
length to be completed
Remark Upto Previous
month During the month
under report Cumulative
progress
1 Earthwork in
Embankment 12.095 29.133 23.713 0.822 24.535 4.598
2 Subgrade 8.940 32.288 26.158 0.652 26.810 5.478
3 GSB 8.025 33.203 26.923 0.792 27.715 5.488
4 WMM 8.025 33.203 26.858 0.672 27.530 5.673
5 DBM 8.025 33.203 26.668 0.645 27.313 5.890
6 BC 0.000 41.228 32.628 0.270 32.898 8.330
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 8 of 35
2.1.2 Progress in Quantities
Pie chart showing the weightage of major construction items is shown in Figure 2-1;
Figure 2-1: Weightage of Major Construction Items
Site Clearance, 0.35%
Earthwork, 8.75%GSB, 12.59%
WMM, 13.03%
DBM, 16.71%
BC, 13.78%
Culverts, 7.61%
Bridges, 5.94%
Road Safety & Amenities, 11.27%
Protective Work, 4.31%
Repair & Maintenance, 1.63%
EMM, 3.33%
Dayworks (Labour, Material & Equipment), 0.72%
Other, 21.25%
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 9 of 35
Progress in Quantities
Sl. No.
Description Unit Total Quantity as
per BOQ Quantity executed
up to July ‘15 Quantity executed during August’15
Balance Quantity to be executed
Remark
1 Earthwork in Embankment Cum 48977.00 84009.694 380.000 0
2 Subgrade Cum 291101.00 166668.025 2820.378 121612.597
3 GSB Cum 90353.00 66680.567 1459.524 22212.909
4 WMM Cum 85568.00 59345.076 2025.795 24197.129
5 DBM Cum 22206.00 14749.820 670.492 6785.688
6 BC Cum 16182.00 11571.459 189.108 4421.433
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 10 of 35
2.2 PROGRESS OF CD WORKS AND STRUCTURE
Sl. No
Description of Structure Total Nos.
To be executed
Number Completed
under previous contract
Number to be executed
under present contract
Number completed Number
in progress
Remark Up to
previous month
During month under report
Balance remaining
to be completed
1 Minor Bridges/Rehabilitation/Widening of Bridges)
08 01 07 0 0 07 05
2 Slab Culvert 06 05 01 01 0 0 0
3 Box Culverts 28 19 09 03 01 05 03
4 Hume Pipe Culvert 102 75 27 11 03 13 06
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 11 of 35
2.3 SECTION WISE ACHIEVEMENT
A) Road Works
SH –17
Sl. No.
Items
Milestone – I, Total length:9.928 Km Milestone – II, Total length:10.200 Km Milestone – III, Total length:10.000 Km Milestone – IV, Total length:11.100 Km
FLEXIBLE : 9.928 Km FLEXIBLE : 10.200 Km FLEXIBLE : 10.000 Km FLEXIBLE : 11.100 Km
Sch. Date of Completion 23-Nov-13 Sch. Date of Completion 23-Mar-14 Sch. Date of Completion 23-July-14 Sch. Date of Completion 23-Jan-15
Completed In
Progress To be
taken up
Completed In
Progress To be
taken up
Completed In
Progress To be
taken up
Completed In Progress
To be taken up
Previous Present Previous Present Previous Present Previous Present
1 Embankment 5.685 4.243 0 0 5.190 4.557 0 0.453 0 10.000 0 0.000 1.220 5.735 0.050 4.095
2 Subgrade 2.955 6.973 0 0 5.120 4.627 0 0.453 0 10.000 0 0.000 0.865 5.210 0.350 4.675
3 GSB 2.820 7.108 0 0 4.850 4.897 0 0.453 0 10.000 0 0.000 0.355 5.710 0.055 5.035
4 WMM 2.820 7.108 0 0 4.850 4.773 0 0.577 0 10.000 0 0.000 0.355 5.650 0.000 5.040
5 DBM 2.820 7.108 0 0 4.850 4.665 0 0.685 0 10.000 0 0.000 0.355 5.540 0.000 5.205
6 BC 0.000 9.928 0 0 0.000 8.475 0 1.725 0 10.000 0 0.000 0.000 4.495 0.000 6.605
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 12 of 35
B) Structures
Sl. No.
Item
Milestone – I Milestone- II Milestone- III Milestone- IV
Completed In
Progress
To be taken
up
Completed In
Progress
To be taken
up
Completed In
Progress To be
taken up
Completed
In Progress
To be taken up
PREVIOUS PRESENT PREVIOUS PRESENT PREVIOUS PRESENT PREVIOUS PRESENT
1
Minor Bridge / Rehabilitation/Widening of Bridges
0 0 0 0 0 0 04 0 0 0 0 0 0 0 01 02
2 Slab Culvert 04 0 0 0 01 0 0 0 0 0 0 0 0 01 0 0
3 Box Culvert 06 0 0 0 05 0 0 0 08 02 0 0 0 02 03 02
4 HP Culvert 31 0 0 0 27 0 0 0 12 0 0 0 05 14 06 07
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 13 of 35
2.4 ROUTINE MAINTENANCE
After the handing over of the site and declaration of the Commencement date for execution of Civil
Works as 24th Dec. 2013, Contractor has to take up the maintenance work as per Sub-Clause 4.1 of
specific provisions Part-B of Conditions of Contract Vol.-II.
The Contractor has done pothole repair in stretches covered under MS-IV (Not handed over to them)
along with some stretches of MS-II & MS-III as well. Still a lot stretches are balance to be taken up by
the contractor for maintenance along with the construction work, as per their contractual obligation.
2.5 PROGRAMME OF WORK
Contractor’s existing work program has exhausted since it was made for the period ended by
31.12.2014& thus; that time has already elapsed. EOT analysis is under progress & Contractor shall
provide revised work program in accordance to the determined EOT.
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 14 of 35
2.6 FORECAST FOR NEXT MONTH
The contractor has not submitted any work programme for the next month. However after discussion
with the Project Manager following work programme has been made which is tentative.
FORECAST FOR AUGUST
Sl.
No. Description Unit
Quantity
remaining to
be executed
by end of
October
Quantity
planned to be
executed
during
November
Approximate
cost of work
(Rs in lakh)
Remarks
1 Earthwork in
Excavation Cum
40000 7500 5.25
2 Subgrade Cum 121612.597 7450 13.03
3 GSB Cum 22212.909 3711 50.10
4 WMM Cum 24197.129 4639 68.42
5 DBM Cum 6785.688 1230 89.78
6 BC Cum 4421.433 2382 193.12
7 Minor Bridge Number 2 2 15.6
Various
Components
8 Box Culvert Number 4 3 15.0
Various
Components
9 Hume Pipe culvert Number 13 8 15.0
2.7 STATUS OF EXTENSION OF TIME
The contractor had applied for EOT for Section II, III & IV up to 15th Dec’2015, 15th Nov’2015, &31st
March’2016 respectively. We have furnished our recommendation EOT for sections II, III upto 15th
Nov.’2015 and Section –IV upto 28th Feb’2016.
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 15 of 35
Chapter 3. Financial Performance
3.1 FINACIAL PROGRESS
Financial Progress achieved up to end of October’2015 is furnished below
1. Contract Price - 96,87,81,258 /-
2. Value of work done - 55,33,04,833 /- (Approx.- Invoice Not yet Submitted by Contractor)
3. Mobilisation Advance - 4,84,37,562 /-
4. Machineries Advance- 9,68,75,126 /-
5. Total (2+3+4) - 69,86,17,521 /-
6. Percentage of Financial Progress - 57.113% (Approx.)
3.2 MONTH WISE FINANCIAL PROGRESS
Month wise financial progress on work proper excluding Escalation and advances is furnished in
Table 3-1 below.
Table 3-1: Month wise Financial Progress
Sl.
No. Month
During the month Cumulative
Cost of work
executed
% wrt
Contract
price
Cumulative
Cost of work
% wrt
Contract
price
1 Mar-13 2,65,764 0.027 2,65,764 0.027
2 Apr-13 20,04,358 0.207 22,70,122 0.234
3 May-13 46,23,256 0.477 68,93,378 0.712
4 Jun-13 49,49,871 0.511 1,18,43,249 1.223
5 Jul-13 33,29,392 0.344 1,51,72,641 1.566
6 Aug-13 44,61,903 0.461 1,96,34,544 2.027
7 Sep-13 80,16,560 0.828 2,76,51,104 2.854
8 Oct-13 93,36,621 0.964 3,69,87,725 3.818
9 Nov-13 1,39,68,155 1.442 5,09,55,880 5.260
10 Dec-13 3,99,77,130 4.127 9,09,33,010 9.387
11 Jan-14 1,88,11,657 1.942 10,97,44,667 11.328
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 16 of 35
12 Feb-14 2,68,59,639 2.773 13,66,04,306 14.101
13 Mar-14 4,45,52,226 4.599 18,11,56,532 18.700
14 Apr-14 2,59,37,653 2.677 20,70,94,185 21.377
15 May-14 4,48,49,973 4.630 25,19,44,158 26.007
16 Jun-14 2,50,51,371 2.586 27,69,95,529 28.593
17 Jul-14 1,11,22,153 1.148 28,81,17,682 29.741
18 Aug-14 90,76,758 0.937 29,71,94,440 30.678
19 Sep-14 1,37,34,128 1.418 31,09,28,568 32.096
20 Oct-14 63,67,721 0.657 31,72,96,289 32.753
21 Nov-14 2,99,98,777 3.097 34,72,95,066 35.850
22 Dec-14 2,07,33,809 2.140 36,80,28,875 37.990
23 Jan-15 2,87,25,430 2.965 39,67,54,305 40.955
24 Feb-15 1,92,51,585 1.987 41,60,05,890 42.942
25 Mar-15 4,80,19,298 4.957 46,40,25,188 47.899
26 Apr-15 1,05,76,871 1.092 47,46,02,059 48.991
27 May-15 1,25,65,669 1.297 48,71,67,728 50.288
28 Jun-15 1,26,44,157 1.305 49,98,11,885 51.593
29 Jul-15 1,69,91,672 1.754 51,68,03,557 53.347
30 Aug-15 1,38,54,904 1.430 53,06,58,461 54.778
31 Sept-15
1,96,58,434 2.029 55,03,04,833 56.806
32 Oct-15 Not Submitted
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 17 of 35
3.3 MOBILIZATION ADVANCE
Net Amount Paid Cumulative
Amount Paid Remarks
1st Mobilisation Advance 4,84,37,562 /- 4,84,37,562 /-
1st Machineries Advance 1,22,43,248 /- 6,06,80,810 /-
2nd Machineries Advance 7,49,44,365 /- 13,56,25,175 /-
3rd Machineries Advance 96,87,513 /- 14,53,12,688 /-
Total : 14,53,12,688 /-
Amount of Advance recovered up to August’15 : 14,53,12,688 /-
Balance amount to be recovered : Nil
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 18 of 35
3.4 STATEMENT OF IPC
Sl.
No.
IPC
No. Month
Gross Amount of IPC (Rs. In millions)
Recoveries
Net
Amount
Paid
Cumulative
of Net
Amount
Paid
Cumulative
Gross
Amount Of
IPC
Remarks Value of
BOQ
Item
Value
of
Non
BOQ
Item
Escalation Secured
Advance
Gross
amount
1 1 Mar-13 48437562
0 0 48437562 8435401 40002161 40002161 48437562
Mobilization
advance
2 2 Apr-13 12243248
0 0 12243248 4776598 7466650 47468811 60680810
Machinery
advance
3 3 May-13 7002666
750533 0 7753199 1506521 6246678 53715489 68434009
4 4 Jun-13 74944365
0 0 74944365 702787 74241578 127957067 143378374
Machinery
advance
5 5 Jul-13 7123419
0
1607472
9 23198148 3395063 19803085 147760152 166576522
6 6 Aug-13 5508432
0 0 5508432 3594498 1913934 149674086 172084954
7 7 Sep-13 8016560
5109871 0 13126431 6692663 6433768 156107854 185211385
8 8 Oct-13 9336628
0
1052021
7 19856845 7006036 12850809 168958663 205068230
9 9 Nov-13 13943881
0 3459703 17403584 9174991 8228593 177187256 222471814
10 10 Dec-13 39162005
0 0 39162005 30592135 8569870 185757126 261633819
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 19 of 35
Sl.
No.
IPC
No. Month
Gross Amount of IPC (Rs. In millions)
Recoveries
Net
Amount
Paid
Cumulative
of Net
Amount
Paid
Cumulative
Gross
Amount Of
IPC
Remarks Value of
BOQ
Item
Value
of
Non
BOQ
Item
Escalation Secured
Advance
Gross
amount
11 11 0
10275997 8420182 18696179 4032180 14663999 200421125 280329998 Escalation
12 12 Jan-14 19651077
0 6943656 26594733 15056706 11538027 211959152 306924731
13 13 Feb-14 26859641
0 7257918 34117559 16536754 17580805 229539957 341042290
14 14 Mar-14 44552219
15615211
1346088
6 73628316 24233094 49395222 278935179 414670606
15 15 Apr-14 25937653
0 5899714 31837367 30193591 1643776 280578955 446507973
16 16 9687513
0 0 9687513 193750 9493763 290072718 456195486
Machinery
advance
17 17 May-14 44849973
0 6658299 51508272 26431068 25077204 315149922 507703758
18 18 Jul-14 25051371
0 4500138 29551509 17943214 11608295 326758217 537255267
19 19 0
20421882 0 20421882 3369611 17052271 343810488 557677149 Escalation
20 20 Jul-14 11122153
0 3525728 14647881 9851971 4795910 348606398 572325030
21 21 Aug-14 9076758
0 2473563 11550321 8757492 2792829 351399227 583875351
22 22 Sep-14 13734128
0 2250701 15984829 10077018 5907811 357307038 599860180
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03))
ODISHA WORKS DEPARTMENT
Page 20 of 35
Sl.
No.
IPC
No. Month
Gross Amount of IPC (Rs. In millions)
Recoveries
Net
Amount
Paid
Cumulative
of Net
Amount
Paid
Cumulative
Gross
Amount Of
IPC
Remarks Value of
BOQ
Item
Value
of
Non
BOQ
Item
Escalation Secured
Advance
Gross
amount
23 23 Oct-14 6367721
0 1552807 7920528 4153880 3766648 361073686 607780708
24 24 Nov-14 29998777
5959148 5324783 41282708 18913732 22368976 383442662 649063416
25 25 Dec-14 20733830
10823504 4717441 36274775 16639519 19635256 403077918 685338191
26 26 Jan-15 28725430
0 6539902 35265332 17725132 17540200 420618118 720603523
27 27 Feb-15 19251585
0 2924828 22176413 9377878 12798535 433416653 742779936
28 28 Mar-15 48019298
21164508 5704141 74887947 24086699 50801248 484217901 817667883
29 29 Apr-15 10576871
0 1582825 12159696 4543029 7616667 491834568 829827579
30 30 May-15 12565669
0 2546525 15112194 6093153 9019041 500853609 844939773
31 31 Jun-15 12644157
0 2627553 15271710 6160288 9111422 509965031 860211483
32 32 Jul-15 16991672
0 2876988 19868660 7660582 12208078 522173109 880080143
33 33 Aug-15 13842842 0 2611111 16453953 10409407 6044546 528217655 896534096
34 34 Sept-15 19658434 993901 3893016 24545351 9748891 14796460 543014115 921079447
35 35 Oct-15
Not
Submitted
Page 21 of 35
Chapter 4. Status of Risk
4.1 HANDING OVER OF SECTION
Handing over status of Sectionsis mentioned below
Section Name Scheduled date of Handing Over
Actual date of handing over
Encumbrances if any
Likely date of handing over /removal of
encumbrances
Milestone I 04.01.2013 04.01.2013 NIL NA
Milestone II 23.04.2013 09.08.2013 Exists over small
stretch
NA(Realignment Solution to be
Adopted)
Milestone III 23.06.2013 23.11.2013 Nil NA
Milestone IV 23.08.2013
01.10.2015
Exists over small stretch
30.10.2015
4.2 STATUS OF UTILITY SHIFTING
Section Name Encumbrances Number
existingtilllast month
Number removed during September’15
Balance remaining for removal
Milestone I
Tree cutting Completed Nil Nil
Shifting of Electric pole
Completed Nil Nil
Shifting of Telephone pole
Completed Nil Nil
Pipe line Completed Nil Nil
Milestone II
Tree cutting Completed Nil Nil
Shifting of Electric pole
Completed Nil Nil
Shifting of Telephone pole
Completed Nil Nil
Pipe line Completed Nil Nil
Milestone III
Tree cutting Completed Nil Nil
Shifting of Electric pole
Completed Nil Nil
Shifting of Telephone pole
Completed Nil Nil
Pipe line Completed Nil Nil
Milestone IV
Tree cutting Completed Nil Nil
Shifting of Electric pole
17 Km 23+100 to
25+400 (2 pole)
Shifting of Telephone pole
3
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 22 of 35
Pipe line Km 0+00 to 3+00
(2.900 Km)
4.3 HINDRANCE LIST
HINDRANCE LIST
Chainage
Side Activity Length(m) Milestone Remark
From To
0+000 3+000 RHS Water Supply pipe line to
be Shifted 3000
MS-IV
4+280 4+350 RHS
Land Problem , to be
resolved by providing Toe
Wall
70
4+510 4+818 RHS Lanjia: Structure to be
demolished 308
13+300 13+600 RHS
Narayanpur to be realigned
to accommodate the centre
line within the available
ROW saucer drain will not
be provided
300 MS-II
23+810 RHS Old Transformer to be
shifted 1 No MS-IV
24+320
RHS Electrical pole 1 No
MS-IV
24+600 RHS
House at Major Junction /
HC Case 1 No
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 23 of 35
4.4 ANY OTHER ISSUE
Bridge over Irrigation Canal @ 4+360 to be Commenced With due permission of
Concerned Department. For that, Work program from Contractor has been put up and
forwarded.
4.5 RISK INVOLVED
Due to delay in handing over sites, the work might be more delayed.
Page 24 of 35
Chapter 5. Environmental Monitoring and Safety
5.1 ENVIRONMENT MANAGEMENT PLAN
Sl.
No.
Environmental
Issue / Aspect Management Measures
1 Tree Cutting Work already Completed
2 Joint Field
Verification
NA
3 Location and
Installation of
Crushers, Hot
Mix Plants and
Batching Plants
The contractor has obtained ‘Consent to Establish’ for Concrete Batching
plant/ Hot Mix plant/ WMM plants from ‘OSPCB’ and concerned documents
submitted to Engineer’s Office. The Contractor has obtained ‘Consent to
Operate’ for HMP and Batching Plant of SH-53 camp but CTO for WMM
Plant have not been procured and its’ not being operated. CTO have been
obtained for Batching Plant and WMM Plant at Camp in SH-9 and it is in
working condition.
CAO ready Submitted
4 Construction
Camp(s) –
Selection, Design
and Layout
Submitted
5 Construction
Vehicles,
Equipment and
Machinery
Cl. 8.3 of Article 8 in this MPR
6 Identification,
Operation and
Rehabilitation of
Borrow Areas
Identified -17
In operation-2
Rehabilitation done -06
7 Identification,
Operation and
Rehabilitation of
Stone Quarry
Identified -01
In Operation -01
Rehabilitation not done yet
8 Identification, and
Operation of
Sand Quarry
Sand Quarry in operation owned by 3rd party : Mr. Sunil Nayak, Tahasil
Patapur Ch.25+000
9 Arrangement for Own Bore Wall (4Nos) 3nos at Kalua base camp and one at
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 25 of 35
Sl.
No.
Environmental
Issue / Aspect Management Measures
Construction
Water
Maulabhanja camp.
10 Clearing and
Grubbing
Not applicable.
11 Stripping,
Stacking and
Preservation of
Top Soil
Being done as per provisions of Contract
12 Labour Camp
Management
Provides all facility like living room Lighting, sanitary, Drinking water,
cooking gas etc.
13 Transportation of
Construction
Materials and
Haul Road
Management
Construction materials transported by contractor’s vehicles covered with
Tarpaulin sheets. Haul Roads are maintained time to time.
14 Worksite Safety
Management
Safety management being followed according to IRC-SP-55.
15 Accessibility Maintained time to time to ease road traffic movement.
16 Disruption to
Other Users of
Water
During construction water path is not disturbed and is being properly
channelized.
17 Labour
Requirements
Minimum requirements labour: 1. Provided to PPE at site 2. Drinking water,
3. First aid facility.
18 Pollution
Management
Being done as per provisions of Contract
19 Drainage and
Flood Control
Proper Drainage system is adopted.
20 Slope Protection
and Control of
Soil Erosion
Being done as per provisions of Contract
21 Waste
Management
Being done as per provisions of Contract
22 Chance Found Not applicable
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 26 of 35
Sl.
No.
Environmental
Issue / Aspect Management Measures
Archaeological
Property
23 Demobilisation
and
Decommissioning
Not applicable
5.2 ROAD SAFETY
Some measures are being taken up by Contractor on site, but recommended for hard barricading and
some more signage board during construction.
Traffic cones, handy signage, helmets, safety jackets are being used during construction activities.
5.3 ENVIRONMENTAL CLEARENCES
All the statuary Clearances have been secured.
Page 27 of 35
Chapter 6. Variation and Changes
6.1 SUMMARY OF CHANGE ORDER
Sl. No.
Change Order
No.
Description of Change
Item
Increase in cost
Saving in cost
Revised contract
Price
Percentage of increase/decre
ase on contract price
Cumulative % of increase/decrease of contract
price
NIL
Page 28 of 35
Chapter 7. Quality Control and Quality Assurance
7.1 TESTS CONDUCTED
Following tests both at site and at Laboratory have been conducted during the month to ensure
Quality control and Quality Assurance.
Sl.
No.
Description of Tests
conducted
Number of
Tests
conducted
No. Of NCR Remedial measure adopted
1 Embankment control
Tests 14 Nil
Any lacuna in Quality is notified in
RFIs & Remedial measures are
suggested through Verbal/Written
mode.
2 Tests in Sub grade 62 Nil
3 Tests in GSB 50 Nil
4 Tests in WMM 151 Nil
5 Tests in DBM 85 Nil
6 Tests in BC 24 Nil
7 Coarse aggregate for
Structures (Gradation) 29 Nil
8 Fine aggregate for
Structures (Gradation) 29 Nil
9 Cement 10 Nil
10 Cube Compression
Tests (28 days) 271 Nil
Page 29 of 35
Chapter 8. Mobilisation
8.1 CONSULTANT’S TEAM
The staff mobilization is being done in consultation with Employer as per the project requirement
considering the mobilization of the Contractor. The following table depicts the staff mobilization as on
date.
Sl. No Name Designation Joining
Date
1. Mr. Asheesh Suhaney Resident Engineer 23-Feb-15
2. Mr. Ravi Bhushan Rehalia
Quantity Surveyor 16-Mar-15
3. Mr. Ravi Prakash Dixit Highway Engineer 16-Mar-15
4. Mr. Sandeep Panda Material Engineer 01-Mar-15
5. Mr. Madhusudan Parida Asst. Highway Engineer-1 04-Mar-15
6. Mr. Suresh Ch. Nayak Asst. Highway Engineer-2 01-Sept-15
7. Mr. Abhay Kumar Dubey Asst. Bridge Engineer-2 22-June-15
8. Mr. K Sudipta Kumar Asst. Bridge Engineer-1 18-Aug-15
9. Mr. Sudhansu Rai Asst. Material-cum-Quality Engineer-1 16-July-15
10. Mr. Ashwani Kumar Asst. Surveyor-1 23-Feb-15
11. Mr.Maharshi Ku. Thakur Office Manager-cum-Accountant-1 01-Oct-15
12. Mrs.Gitarani Sethi Computer Operator-cum-Office Assistant-1 04-May-15
13. Mr.Hari. S. Brahma Office Attendant/Watchman-1 18-Mar-15
8.2 CONTRACTOR’S TEAM
The Contractor has to mobilize their manpower as per Contract.
Sl. No. Name Designation
1 Mr. Sandeep Agarwal
Project Manager
2 Mr. Ajit Nayak Highway Engineer
3 Mr. Brindjawhar Yadav Bridge Engineer
4 Mr Krushna Chandra Maharana Material Engineer
5 Mr Rashmi Ranjan Swain Quantity Surveyor (Not Approved)
6 Mr Lingaraj Mohapatra Equipment And Maintenance Engineer (Not Approved)
7 Mr Naren Kumar DhalaSamanta Environment And Safety Manager (Not Approved)
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 30 of 35
8.3 STATUS OF PLANT AND EQUIPMENT OF CONTRACTOR
Sl. No.
Description of Equipment/Plant Min. No. as
per Contract No.
Mobilized Remarks
1 Mechanical Bitumen Sensor Paver 1 1
2 Motor Grader 2 2
3 Hydraulic Excavator 2 5
4 Vibratory Roller 2 2
5 Pneumatic Tyre Roller 1 1
6 Transit Mixer 2 3
7 Front end Loader 2 2
8 Dozer 1 0
9 Tipper 25 17
10 Bitumen sprayer 1 1
11 Earth Compactor 2 2
12 Water tanker 3 2
13 Mechanical Paver 1 1
14 Concrete Pump 1 -
15 Concrete fixed from Paver 1 -
Plants
1 Hot Mix Plant (Batch Mix only) 1 1
2 Concrete Batch-mix Plant 1 1
3 Cone Crushing Unit 1 -
4 WMM Plant 1 1
The following survey equipment is available at site;
Sl. No. Name of the equipment Quantity (Nos.)
1 Total station 1
2 Auto level 4
Page 31 of 35
Chapter 9. Visits and Meetings
1. Visit of World Bank Mission, along with CE-PMU, EE-PMU, ER, TL-CSC & other dignitaries on
6th October’2015. .
2. Meeting at PMU between World Bank Mission, CE-PMU, EE-PMU, TL-CSC and RE-CSC on
8th October.’2015 over various issues.
Page 32 of 35
Chapter 10. Important Correspondence during the Month
10.1 SUBMISSIONS AND APPROVALS
Monthly Progress Report for Sept’ 2015 was submitted on 12th Oct’ 2015
8 No’s of GFC drawing were issued to the contractor
10.2 CORRESPONDENCES
21 numbers of letters were received for the contractor and 24 numbers of letters were
issued to the contractor. Similarly 13 numbers of letters were received from OWD and
10 numbers have been replied to.
Following important correspondences made during the month are furnished below
Sl.
NO. DATE LETTER REFFERENCE NO. SUBJECT TO
1 01.10.2015 LASA/RE/P-03/RKD/-2015-
16/171
Deployment of Environment Expert on Work Exigency basis-Reg RKD
2 01.10.2015 LASA/RE/P-03/OWD/-2015-
16/172 Compliance Report Over Observation IPC No-32
OWD
3 01.10.2015 LASA/RE/P-03/RKD/-2015-
16/173
Source Approval of Sand for Highway work at Digapahandi RKD
4 04.10.2015 LASA/RE/P-03/OWD/-2015-
16/174
Compliance to the Observation under Aide memoire of World Banks May 15' Visit
OWD
5 05.10.2015 LASA/RE/P-03/RKD/-2015-
16/175 Issuance of GFC Drawing of Minor Bridge at Chainage 4+380-Reg
RKD
6 05.10.2015 LASA/RE/P-03/RKD/-2015-
16/176
Approval for Construction of Return Wall over Rock of Box Culvert at Ch. 25+106-Reg
RKD
7 07.10.2015 LASA/RE/P-03/OWD/-2015-
16/177
EWD:- Demanding a Hume pipe Culvert near at Ch.23+480 by Digapahandi people-Reg
OWD
8 07.10.2015 LASA/RE/P-03/RKD/-2015-
16/178 FWD:- Observation of IPC No-33
RKD
9 09.10.2015 LASA/RE/P-03/RKD/-2015-
16/179
Deletion of Two no. of Hume pipe Culverts at Ch. 32+466 & 34+463-Reg RKD
10 09.10.2015 LASA/RE/P-03/RKD/-2015-
16/180 Deletion of Two nos. of Cross road pipe Culverts at Ch. 29+511 & 32+518 -Reg
RKD
11 10.10.2015 LASA/RE/P-03/RKD/-2015-
16/181 Approval Revised Drawing of 2×2 Box Culvert with Utility at Ch. 23+255-Reg
RKD
12 10.10.2015 LASA/RE/P-03/OWD/-2015-
16/182 Compliance Report over Observation of IPC No-33
OWD
13 12.10.2015 LASA/RE/P-03/RKD/-2015-
16/183 Approval of Borrow Area No-18 Reg
RKD
14 12.10.2015 LASA/RE/P-03/RKD/-2015-
16/184
Three no' Utility Hume pipe Drawing at Ch. 24+600 (Chikiti Aska side & 24+550-Reg
RKD
15 12.10.2015 LASA/RE/P-03/OWD/-2015- Submission of MPR Month of OWD
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 33 of 35
16/185 September 2015
16 16.10.2015 LASA/RE/P-03/RKD/-2015-
16/186 Approval Revised Drawing of 2×3 skew Box Culvert at Ch. 23+822-Reg
RKD
17 16.10.2015 LASA/RE/P-03/RKD/-2015-
16/187
Variation Instruction: Approval to Change Request Sl. No. 1 to Sl No. 15-Reg
RKD
18 17.10.2015 LASA/RE/P-03/RKD/-2015-
16/188
Safety Issue:-Unprotected High Embankment Near Molabhanja Bridge from Km28+950 to 29+650-Reg
RKD
19 19.10.2015 LASA/RE/P-03/RKD/-2015-
16/189
Reiteration of Variation Instruction-Reg RKD
20 20.10.2015 LASA/RE/P-03/OWD/-2015-
16/190
FWD:-Observation of Hindrance in Section/ Milestone-IV-Reg OWD
21 21.10.2015 LASA/RE/P-03/OWD/-2015-
16/191 Reg:-Submission of Application for Interim Payment Certificate No-34
OWD
22 27.10.2015 LASA/RE/P-03/RKD/-2015-
16/192
Approval: Single Row Hume pipe Culvert Drawing at Ch.23+485-Reg RKD
23 27.10.2015 LASA/RE/P-03/RKD/-2015-
16/193
Source Approval:-Metal Beam Crash Barrier (Company-JBFS Engineering System PVT Ltd)
RKD
24 27.10.2015 LASA/RE/P-03/OWD(ER)/-
2015-16/194
Enquiry Report for the Complaint forward under complaint Handing System of OSRP, World Bank Project-Reg
OWD(ER)
25 27.10.2015 LASA/RE/P-03/RKD/-2015-
16/195
Re:-Submission of Drawing of Kerb-Reg RKD
26 28.10.2015 LASA/RE/P-03/RKD/-2015-
16/196
Progress Review Meeting on 28th October 2015 RKD
27 28.10.2015 LASA/RE/P-03/RKD/-2015-
16/197
Approval: Plan & X-Section drawings of T Junction Road at Ch.10+028 LHS & 10+075 RHS-Reg
RKD
28 28.10.2015 LASA/RE/P-03/RKD/-2015-
16/198
Approval : Major Junction Layout at Ch. 0+000- Reg RKD
29 29.10.2016 LASA/RE/P-03/RKD/-2015-
16/199
Approval: Drawing of Hume pipe Culvert in T- Junction Road at Ch. 10+028 LHS -Reg
RKD
30 29.10.2016 LASA/RE/P-03/RKD/-2015-
16/200
Re:-Slope Dressing, Lifting, surplus Soil
& Placing Additional Soil for Slope
Preparation at locations, executed by
Previous Contractor, M/S ARSS
Infrastructure Projects Ltd-Reg
RKD
31 30.10.2015 LASA/RE/P-03/OWD/-2015-
16/201
FWD: Excess Royalty Payment &
Receipt of Morram & Aggregate-Reg OWD
32 30.10.2015 LASA/RE/P-03/OWD/-2015-
16/202
Realignment Proposal between 13+300
to 13+600 (Nayayanpur) OWD
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State (Balance Work-Package OSRP-Bal-P03)
ODISHA WORKS DEPARTMENT
Page 34 of 35
33 30.10.2015 LASA/RE/P-03/RKD/-2015-
16/203
Revised Plan & Profile Drawing for
Digapahandi (Km.23+230 to 25+100)
Reg
RKD
34 31.10.2015 LASA/RE/P-03/RKD/-2015-
16/204
Re-Observation of Box Culvert Parapet
Drawing at Ch.18+028 & 18+115-Reg RKD
Page 35 of 35
Chapter 11. Weather during the Month
Sl.No. Date Minimum Temp °C
Maximum Temp °C
Min Humidity
Max Humidity
Rain Fall
(mm) Remarks
1 01.10.15 25.4 34.2 56% 6.0 Rainy
2 02.10.15 24.7 35.2 58% - Cloudy
3 03.10.15 25.3 34.7 55% 9.0 Rainy
4 04.10.15 24.7 35.0 55% - Sunny
5 05.10.15 25.2 34.6 54% 3.0 Cloudy
6 06.10.15 25.6 33.8 61% - Cloudy
7 07.1015 24.9 32.7 54% 3.5 Rainy
8 08.10.15 25.3 33.4 55% - Sunny
9 09.10.15 25.4 33.2 55% - Sunny
10 10.10.15 25.8 34.5 58% - Sunny
11 11.10.15 24.9 33.7 55% - Sunny
12 12.10.15 24.7 33.9 58% - Sunny
13 13.10.15 23.9 33.6 59% - Sunny
14 14.10.15 26.4 33.7 56% 4.5 Rainy
15 15.10.15 25.4 34.2 55% - Sunny
16 16.09.15 25.3 33.7 55% - Sunny
17 17.10.15 25.5 34.2 55% - Sunny
18 18.10.15 24.5 33.7 58% - Sunny
19 19.10.15 24.7 33.2 58% - Sunny
20 20.10.15 23.8 33.5 60% - Sunny
21 21.10.15 23.4 33.8 60% - Sunny
22 22.10.15 24.1 33.5 58% - Sunny
23 23.10.15 24.2 33.6 56% - Sunny
24 24.10.15 24.3 33.8 55% - Sunny
25 25.10.15 24.1 34.2 58% - Sunny
26 26.10.15 23.7 34.4 60% - Sunny
27 27.10.15 23.5 34.5 60% - Sunny
28 28.10.15 23.4 34.3 60% - Sunny
29 29.10.15 22.9 30.2 56% - Sunny
30 30.10.15 21.5 28.5 54% - Cloudy
31 31.10.15 21.5 33.7 50% 11.5 Rainy
Appendix 1
TAPTAPANIBC
DBM
WMM.
GSB
SUB.
EMB./EXC
0+
000
0+
100
0+
200
0+
213
0+
300
0+
369
0+
400
0+
500
0+
600
0+
700
0+
800
0+
847
0+
900
0+
975
1+
000
1+
100
1+
146
1+
200
1+
300
1+
310
1+
400
1+
500
1+
600
1+
700
1+
781
1+
800
1+
900
1+
925
2+
000
2+
100
2+
137
2+
200
2+
300
2+
332
2+
400
2+
500
2+
515
2+
600
2+
629
2+
700
2+
742
2+
800
2+
900
3+
000
3+
095
3+
100
3+
200
3+
259
3+
300
3+
382
3+
498
3+
600
3+
700
3+
800
3+
765
3+
900
3+
890
4+
000
4+
100
4+
115
4+
200
4+
300
4+
370
4+
400
4+
500
4+
600
4+
700
4+
800
4+
900
5+
000
EMB./EXC
SUB.
GSB
WMM.
DBM
BC
BC
DBM
WMM.
GSB
SUB.
EMB./EXC
5+
000
5+
100
5+
118
5+
200
5+
215
5+
300
5+
400
5+
500
5+
521
5+
600
5+
700
5+
761
5+
800
5+
900
6+
000
6+
069
6+
100
6+
200
6+
300
6+
400
6+
497
6+
500
6+
573
6+
600
6+
700
6+
800
6+
900
7+
000
7+
100
7+
200
7+
217
7+
300
7+
400
7+
500
7+
520
7+
600
7+
605
7+
700
7+
769
7+
800
7+
900
8+
000
8+
008
8+
100
8+
193
8+
200
8+
300
8+
363
8+
400
8+
500
8+
530
8+
600
8+
685
8+
700
8+
800
8+
900
9+
000
9+
100
9+
152
9+
200
9+
300
9+
400
9+
500
9+
538
9+
600
9+
700
9+
786
9+
800
9+
900
10+
000
EMB./EXC
SUB.
GSB
WMM.
DBM
BC
PQC
In Progress
In Progress
To be started
Completed
MN
B
RC
C B
OX
& U
TILI
TY
PIP
E &
UTI
LITY
PIP
E C
ULV
ERT
BO
X C
EL
L
RC
CB
OX
RC
C B
OX
GSB compltd
WMM.compltd
DBM compltd
BC compltd
PIP
E C
ULV
ERT
SUB. Compltd
RHS
LEGENDS:
EMB./EXC
compltd DLC
PIP
E &
UTI
LITY
PIP
E &
UTI
LITY
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
RC
C B
OX
LAYER CHART (SH-17) (FROM KM. 0+000 TO KM. 10+000)
BERHAMPUR
Chainage
LHS
LHS
RHS
Chainage
Structure
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
MB
RC
C B
OX
& U
TILI
TY
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
SL
AB
WIT
H
SL
AB
EX
T
PIP
E &
UTI
LITY
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
RC
C
BO
X
“Widening of Strengthening of Existing Carriage Way to 2 lane road from Berhampur to Taptapani (Km. 0/000 to 41/228 of SH-17)
(Balance work)- Package OSRP-Bal-P03)”
PIP
E
PIP
E
PIP
E
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E &
UTI
LITY
RC
C B
OX
MB
Appendix 1
BC
DBM
WMM.
GSB
SUB.
EMB./EXC
10
+0
00
10
+1
00
10
+2
00
10
+3
00
10
+4
00
10
+5
00
10
+6
00
10
+7
00
10
+8
00
10
+9
00
10
+9
33
11
+0
00
11
+1
00
11
+1
20
11
+2
00
11
+2
70
11
+3
00
11
+4
00
11
+5
00
11
+6
00
11
+7
00
11
+7
45
11
+8
00
11
+9
00
12
+0
00
12
+0
65
12
+1
00
12
+2
00
12
+3
00
12
+4
00
12
+4
07
12
+5
00
12
+6
00
12
+6
11
12
+7
00
12
+8
00
12
+9
00
12
+9
07
13
+0
00
13
+1
00
13
+1
32
13
+2
00
13
+3
00
13
+4
00
13
+4
70
13
+5
00
13
+6
00
13
+6
19
13
+7
00
13
+8
00
13
+8
09
13
+9
00
13
+9
16
14
+0
00
14
+1
00
14
+1
57
14
+2
00
14
+3
00
14
+4
00
14
+5
00
14
+5
31
14
+6
00
14
+7
00
14
+8
00
14
+8
77
14
+9
00
15
+0
00
EMB./EXC
SUB.
GSB
WMM.
DBM
BC
BC
DBM
WMM.
GSB
SUB.
EMB./EXC
15
00
01
5+
10
0
15
+1
85
15
+2
00
15
+3
00
15
+4
00
15
+4
40
15
+5
00
15
+6
00
15
+6
80
15
+7
00
15
+8
00
15
+8
97
15
+9
00
16
+0
00
16
+0
68
16
+1
00
16
+2
00
16
+3
00
16
+4
00
16
+4
17
16
+5
00
16
+5
21
16
+6
00
16
+7
00
16
+7
70
16
+8
00
16
+9
00
16
+9
70
17
+0
00
17
+1
00
17
+2
00
17
+3
00
17
+4
00
17
+5
00
17
+6
00
17
+6
66
17
+7
00
17
+8
00
17
+8
51
17
+9
00
18
+0
00
18
+0
28
18
+1
00
18
+1
15
18
+2
00
18
+3
00
18
+4
00
18
+4
80
18
+5
00
18
+6
00
18
+7
00
18
+8
00
18
+9
00
19
+0
00
19
+1
00
19
+1
92
19
+3
00
19
+3
82
19
+5
00
19
+5
30
19
+6
00
19
+7
00
19
+7
79
19
+8
00
19
+9
00
20
+0
00
EMB./EXC
SUB.
GSB
WMM.
DBM
BC PIP
E C
ULV
ERT
RC
C B
OX
PIP
E C
ULV
ERT
LAYER CHART (SH-17) (FROM KM. 10+000 TO KM. 20+000)
BERHAMPUR
LHS
TAPTAPANI
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
MN
B
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
EMB./EXC
complted
Chainage
Chainage
LHS
MN
B
PIP
E C
ULV
ERT
RC
C B
OX
WMM.compltd
LEGENDS:
MN
B
In Progress
To be startedGSB compltd BC compltd In Progress
PQCSUB. Compltd DBM compltdR
CC
BO
X W
ITH
UTI
LITY
RC
C B
OX
Structure
DLC Completed
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
MN
B
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
SLA
B E
XT
PIP
E W
ITH
UTI
LITY
“Widening of Strengthening of Existing Carriage Way to 2 lane road from Berhampur to Taptapani (Km. 0/000 to 41/228 of SH-17)
(Balance work)- Package OSRP-Bal-P03)”
PIP
E C
ULV
ERT
RC
C B
OX
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
ECU
LVER
YT
PIP
E C
ULV
ERT
MN
B
PIP
E C
ULV
ERT
Appendix 1
BC
DBM
WMM.
GSB
SUB.
EMB./EXC
20
+0
00
20
+1
00
20
+2
00
20
+3
00
20
+3
61
20
+4
00
20
+5
00
20
+6
14
20
+7
00
20
+8
00
20
+9
00
20
+9
35
21
+0
00
21
+0
05
21
+1
00
21
+2
00
21
+2
24
21
+3
00
21
+4
11
21
+5
00
21
+6
00
21
+7
00
21
+7
65
21
+8
00
21
+8
65
21
+9
00
22
+0
00
22
+1
00
22
+1
89
22
+2
00
22
+3
00
22
+4
00
22
+5
00
22
+5
82
22
+7
00
22
+7
61
22
+8
00
22
+9
00
22
+9
61
23
+0
00
23
+1
00
23
+1
47
23
+2
00
23
+2
25
23
+3
00
23
+4
00
23
+5
00
23
+6
00
23
+7
13
23
+8
00
23
+8
21
23
+9
00
24
+0
00
24
+1
00
24
+2
00
24
+3
00
24
+3
51
24
+4
00
24
+5
00
24
+6
00
24
+7
00
24
+8
00
24
+9
00
25
+0
00
EMB./EXC
SUB.
GSB
WMM.
DBM
BC
BC
DBM
WMM.
GSB
SUB.
EMB./EXC
25
+0
00
25
+1
00
25
+1
06
25
+2
00
25
+2
14
25
+3
00
25
+4
00
25
+5
00
25
+6
00
25
+7
00
25
+8
00
25
+8
61
25
+9
00
26
+0
00
26
+0
72
26
+1
00
26
+2
00
26
+3
00
26
+3
14
26
+4
00
26
+5
00
26
+6
00
26
+6
12
26
+7
00
26
+8
00
26
+9
00
27
+0
00
27
+0
26
27
+1
00
27
+2
00
27
+3
00
27
+4
00
27
+5
00
27
+6
00
27
+7
00
27
+7
43
27
+8
00
27
+9
00
28
+0
00
28
+0
08
28
+1
00
28
+2
00
28
+3
00
28
+4
00
28
+5
00
28
+5
47
28
+6
00
28
+7
00
28
+8
00
28
+9
00
28
+9
54
29
+0
00
29
+1
00
29
+2
00
29
+2
70
29
+3
00
29
+4
00
29
+5
00
29
+5
60
29
+6
00
29
+7
00
29
+8
00
29
+9
00
30
+0
00
EMB./EXC
SUB.
GSB
WMM.
DBM
BC
Chainage
BERHAMPUR
LHS
TAPTAPANI
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E W
ITH
UTI
LITY
PIP
E C
ULV
ERT
RC
C B
OX
WIT
H U
TILI
TY
PIP
E C
ULV
ERT
RC
C B
OX
PIP
E W
ITH
UT
ILIT
Y
PIP
ECU
LVER
T
RC
CB
OX
EMB./EXC
compltdWMM.compltd
LEGENDS:
RC
C B
OX
SLA
B E
XT
RC
C B
OX
PIP
E C
ULV
ERT
MN
B
MN
B
PIP
E
PIP
E C
ULV
ERT
MN
B
RC
CB
OX
Completed
PIP
ECU
LVER
T
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
Chainage
LHS
To be startedGSB compltd BC compltd In Progress
In Progress
RC
CB
OX
WIT
H U
TILI
TY
SUB. Compltd DBM compltd
Structure
PIP
E C
ULV
ERT
RC
C B
OX
PQC
PIP
E C
ULV
ERT
PIP
E W
ITH
UTI
LITY
“Widening of Strengthening of Existing Carriage Way to 2 lane road from Berhampur to Taptapani (Km. 0/000 to 41/228 of SH-17)
(Balance work)- Package OSRP-Bal-P03)”
LAYER CHART (SH-17) (FROM KM. 20+000 TO KM. 30+000)
DLC
PIP
E W
ITH
UTI
LITY
PIP
E C
ULV
ERT
Appendix 1
BC
DBM
WMM.
GSB
SUB.
EMB./EXC
30
+0
00
30
+1
00
30
+2
00
30
+2
41
30
+3
00
30
+4
00
30
+5
00
30
+6
00
30
+6
37
30
+7
00
30
+8
00
30
+8
89
31
+0
00
31
+1
00
31
+2
00
31
+3
00
31
+4
00
31
+5
00
31
+6
00
31
+7
00
31
+8
00
31
+9
00
32
+0
00
32
+1
28
32
+2
00
32
+3
00
32
+4
00
32
+4
65
32
+5
00
32
+6
00
32
+7
00
32
+8
00
32
+9
00
33
+0
00
33
+1
00
33
+2
00
33
+3
00
33
+4
02
32
+5
00
32
+6
00
32
+7
00
32
+8
00
32
+9
00
33
+0
00
33
+1
00
33
+2
00
33
+3
00
33
+4
00
33
+4
76
34
+6
00
34
+7
00
34
+8
00
34
+9
00
33
+9
76
34
+0
69
34
+1
00
34
+2
00
34
+3
00
34
+4
00
34
+4
63
34
+5
00
34
+6
00
34
+6
70
34
+7
00
34
+8
13
34
+8
58
34
+9
00
35
+0
00
EMB./EXC
SUB.
GSB
WMM.
DBM
BC
BC
DBM
WMM.
GSB
SUB.
EMB./EXC
35
+0
00
35
+1
00
35
+2
00
35
+3
00
35
+3
78
35
+4
00
35
+5
00
35
+5
33
35
+6
00
35
+7
00
35
+8
00
35
+9
00
36
+0
00
36
+0
03
36
+1
00
36
+2
00
36
+2
38
36
+3
00
36
+3
58
36
+4
00
36
+5
00
36
+5
94
36
+6
00
36
+7
00
36
+7
58
36
+8
00
36
+9
00
36
+9
61
37
+0
00
37
+1
00
37
+1
64
37
+2
00
37
+3
00
37
+4
00
37
+5
00
37
+6
00
37
+6
19
37
+7
00
37
+8
00
37
+9
00
38
+0
00
38
+1
00
38
+1
57
38
+2
00
38
+3
00
38
+4
00
38
+4
83
38
+5
00
38
+6
00
38
+7
00
38
+7
46
38
+8
00
38
+9
00
39
+0
00
39
+0
02
39
+1
00
39
+1
18
39
+2
00
39
+3
00
39
+4
00
39
+5
00
39
+5
17
39
+6
00
39
+6
71
39
+7
00
39
+8
00
39
+9
00
40
+0
00
EMB./EXC
SUB.
GSB
WMM.
DBM
BC
Chainage
PIP
ECU
LVER
T
RC
C B
OX
RC
C B
OX
PIP
E W
ITH
UTI
LITY
PIP
ECU
LVER
T
PIP
ECU
LVER
T
PIP
E C
ULV
ERT
SLA
B E
XT
PIP
E W
ITH
UTI
LITY
PIP
ECU
LVER
T
PIP
ECU
LVER
T
PIP
E C
ULV
ERT
Chainage
LHS
PIP
ECU
LVER
T
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
To be startedGSB compltd BC compltd In Progress
LEGENDS: Structure
CompletedEMB./EXC
compltedWMM.compltd
DLC
SUB. Compltd DBM compltd PQC In Progress
PIP
ECU
LVER
T
PIP
E C
ULV
ERT
PIP
ECU
LVER
T
PIP
ECU
LVER
T
RC
CB
OX
RC
C B
OX
RC
CB
OX
PIP
E C
ULV
ERT
PIP
E W
ITH
UTI
LITY
RC
CB
OX
PIP
E W
ITH
UTI
LITY
“Widening of Strengthening of Existing Carriage Way to 2 lane road from Berhampur to Taptapani (Km. 0/000 to 41/228 of SH-17)
(Balance work)- Package OSRP-Bal-P03)”
LAYER CHART (SH-17) (FROM KM. 30+000 TO KM. 40+000)
BERHAMPUR
LHS
TAPTAPANI
No
t R
equ
ired
No
t R
equ
ired
PIP
EWIT
H U
TILI
TY
PIP
E C
ULV
ERT
PIP
E W
ITH
UTI
LITY
RC
C B
OX
Appendix 1
BC
DBM
WMM.
GSB
SUB.
EMB./EXC
40
+0
00
40
+0
90
40
+1
00
40
+2
00
40
+2
80
40
+3
00
40
+4
00
40
+4
37
40
+5
00
40
+5
50
40
+6
00
40
+7
00
40
+8
00
40
+9
00
41
+0
00
41
+1
00
41
+2
00
41
+2
28
EMB./EXC
SUB.
GSB
WMM.
DBM
BC
SUB. Complted DBM compltd PQC
GSB compltd BC compltd In Progress
In Progress
To be started
WMM.compltd
Chainage
RHS
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
Completed
LEGENDS:
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
PIP
E C
ULV
ERT
StructureEMB./EXC
compltd DLC
BERHAMPUR
LHS
“Widening of Strengthening of Existing Carriage Way to 2 lane road from Berhampur to Taptapani (Km. 0/000 to 41/228
of SH-17)
(Balance work)- Package OSRP-Bal-P03)”
LAYER CHART (SH-17) (FROM KM. 40+000 TO KM. 41+228)
TAPTAPANI
Appendix 2
RETURN RETURNWALL WALL
A2
IN PROPGRESS
COMPLETED Note- Not yet started
TAPTPANI
Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0
to Km. 41/0 of SH–17) Balance Work
Minor bridge at Ch.1+915
A1 P1
FOUNDATION
DIR
T W
ALL
STATUS AS ON -31.10.2015
DIR
T W
ALL
BERAHAMPUR
CAP CAP CAP
DECK SLAB DECK SLAB
Appendix 2
A2
CAP CAP
A2
IN PROGRESS
COMPLETED
TAPTPANIBERAHAMPUR
CRASH BARRIER
LHS
Dirt
Wall Cap
CRASH BARRIER CRASH BARRIER
Note : Not yet started
RHS
LEGENDS
A1 P1
Dirt
WallCap
FOUNDATION
Deck SlabDeck SlabDeck Slab
FOUNDATION
A1 P1
Wall
WallCAP Cap Cap CAP
Dirt
Dirt Deck Slab Deck Slab Deck Slab
Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0
of SH–17) Balance Work
CRASH BARRIER CRASH BARRIER CRASH BARRIER
Minor Bridge at Ch.4+370STATUS AS ON -31.10.2015
BERAHAMPUR TAPTPANI
Appendix 2
CRASH BARRIER
A2
CRASH BARRIER
A2
IN PROGRESS
1st Lift
BERAHAMPUR
Deck Slab
foundation
A1
2nd Lift 2nd Lift 2nd Lift 2nd Lift
1st Lift
Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km.
41/0 of SH–17) Balance Work
BERAHAMPUR TAPTPANI
2nd Lift
1st Lift
Minor bridge at Ch.11+270STATUS AS ON -31.10.2015
Dirt W
all
3rd Lift 3rd Lift
Deck Slab
3rd Lift
2nd Lift
1st Lift
3rd Lift
Note :Deck slab Casted.
LEGENDS
2nd Lift
COMPLETED
TAPTPANI
Dirt W
all
A1
1st Lift
1st Lift 1st Lift 1st Lift
Dirt W
all
CAP CAP
foundation
2nd Lift
3rd Lift3rd Lift 3rd Lift 3rd Lift
Dirt W
all
CAP CAP
Appendix 2
STATUS AS ON -31.10.2015
A2
Dirt
Dirt
CAP
A2
IN PROGRESS
COMPLETED
4th Lift4th Lift
FOUNDATION
3rd Lift
2nd Lift
1st Lift
4th Lift
3rd Lift
2nd Lift
1st Lift
4th Lift
3rd Lift
2nd Lift
1st Lift
3rd Lift
2nd Lift
1st Lift
3rd Lift
APPROACH SLABAPPROACH SLAB
Note : Deck Slab have been Casted.
BERAHAMPUR TAPTPANI
BERAHAMPUR TAPTPANI
RHS
LEGENDS
A1 P1
4th Lift
2nd Lift
1st Lift
4th Lift
3rd Lift
2nd Lift
1st Lift
Cap Cap
LHS
CRASH BARRIER CRASH BARRIER CRASH BARRIER
Deck Slab Deck Slab Deck Slab
Wall
WallCAP
1st Lift
FOUNDATION
A1 P1
1st Lift 1st Lift 1st Lift 1st Lift 1st Lift
WallCAP Cap Cap CAP
3rd Lift
2nd Lift 2nd Lift 2nd Lift 2nd Lift
4th Lift 4th Lift 4th Lift 4th Lift
3rd Lift
2nd Lift 2nd Lift
3rd Lift 3rd Lift 3rd Lift 3rd Lift
Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km.
41/0 of SH–17) Balance Work
CRASH BARRIER CRASH BARRIER CRASH BARRIER
Minor Bridge at Ch.11+745
Deck Slab Deck Slab
4th Lift 4th Lift
Dirt
APPROACH SLAB APPROACH SLAB
Dirt Deck Slab
Wall
Appendix 2
A2
A2
IN PROGRESS
COMPLETED
Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to
Km. 41/0 of SH–17) Balance Work
3rd Lift 3rd Lift 3rd Lift
2nd Lift 2nd Lift 2nd Lift
3rd Lift
2nd Lift
Deck Slab Deck Slab
Minor Bridge at Ch.15+185
STATUS AS ON -31.10.2015
TAPTPANIBERAHAMPUR
Crash Barier
1st Lift
Foundation
Note : Deck slab have been Casted.
A1 P1
Crash Barier
Dirt w
all
Deck Slab
LEGENDS
4th Lift
1st Lift
A1 P1
RHS
4th Lift 4th Lift 4th Lift
LHS
BERAHAMPUR
Dirt w
allCAP CAP CAP
Dirt w
all
1st Lift 1st Lift
CAP CAP CAP
4th Lift 4th Lift 4th Lift
Dirt w
all
4th Lift
4th Lift
3rd Lift 3rd Lift
2nd Lift 2nd Lift 2nd Lift 2nd Lift 2nd Lift
TAPTPANI
4th Lift
3rd Lift
2nd Lift
1st Lift
Deck Slab
1st Lift
1st Lift
Foundation
3rd Lift 3rd Lift 3rd Lift
1st Lift 1st Lift1st Lift
Appendix 2
MINOR BRIDGE AT CH 15+680
STATUS AS ON -31.10.2015
P2 A2
LHS
P2 A2RHS
IN PROGRESS
COMPLETED
FOUNDATION
Final
3rd Lift
2nd Lift
1st Lift
Final
3rd Lift
2nd Lift
1st Lift
FOUNDATION
CAP CAP
APPROACH SLAB APPROACH SLAB
crash barrier
DIR
T W
ALL
DIR
T W
ALL
Final
3rd Lift
2nd Lift
1st Lift
Final
A1 P1 P3
3rd Lift 3rd Lift
2nd Lift 2nd Lift 2nd Lift 2nd Lift
3rd Lift
2nd Lift
1st Lift
CAP CAP CAP
3rd Lift
2nd Lift
1st Lift1st Lift 1st Lift 1st Lift 1st Lift
final Final
crash barrier
DECK SLAB DECK SLAB DECK SLAB DECK SLAB
2nd Lift
1st Lift 1st Lift
TAPTPANI
Final
3rd Lift
2nd Lift
Final Final final
3rd Lift 3rd Lift 3rd Lift
final
3rd Lift
2nd Lift 2nd Lift
APPROACH SLAB
DIR
T W
ALL
DIR
T W
ALL
CAP CAP CAP CAP
DECK SLAB DECK SLAB DECK SLAB DECK SLAB
TAPTPANI
CRASH BARRIERCRASH BARRIERCRASH BARRIER
Cap
Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of
SH–17) Balance Work
2nd Lift
1st Lift 1st Lift 1st Lift
BERAHAMPUR
BERAHAMPUR
Final Final final
3rd Lift 3rd Lift
A1 P1 P3
crash barrier crash barrier
CRASH BARRIER
APPROACH SLAB
Appendix 2
MINOR BRIDGE AT CH 17+851
P2 A2
LHS
P2 A2RHS
IN PROGRESS
COMPLETED
Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of
SH–17) Balance Work
FOUNDATION
A1 P1 P3
2nd Lift
1st Lift
3rd Lift 3rd Lift 3rd Lift 3rd Lift 3rd Lift 3rd Lift
Final Final Final final Final Finalfinal
3rd Lift
1st Lift 1st Lift 1st Lift 1st Lift 1st Lift 1st Lift
2nd Lift 2nd Lift 2nd Lift 2nd Lift 2nd Lift 2nd Lift
DIR
T W
ALL
APPROACH SLAB
CAP CAP CAP CAP CAP
APPROACH SLAB
DIR
T W
ALL
DECK SLAB DECK SLAB DECK SLAB DECK SLAB
BERAHAMPUR TAPTPANI
CRASH BARRIER CRASH BARRIER CRASH BARRIER CRASH BARRIER
FOUNDATION
A1 P1 P3
1st Lift 1st Lift 1st Lift 1st Lift 1st Lift 1st Lift
2nd Lift 2nd Lift 2nd Lift 2nd Lift 2nd Lift 2nd Lift2nd Lift
1st Lift
3rd Lift 3rd Lift 3rd Lift 3rd Lift 3rd Lift 3rd Lift
Final Final Final final Final Finalfinal
3rd Lift
APPROACH SLAB
DIR
T W
ALL
DECK SLAB DECK SLAB DECK SLAB DECK SLAB
BERAHAMPUR TAPTPANI
STATUS AS ON -31.10.2015
DIR
T W
ALL
APPROACH SLAB
CAP CAP CAP
CRASH BARRIER CRASH BARRIER CRASH BARRIER CRASH BARRIER
CAP Cap
Appendix 2
A2
CAP
A2
IN PROGRESS
COMPLETED Note : Deck Slab have been Casted.
Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of
SH–17) Balance Work
4th Lift
3rd Lift
2nd Lift
1st Lift
4th Lift
3rd Lift
2nd Lift
1st Lift
4th Lift
3rd Lift
2nd Lift
1st Lift
4th Lift
3rd Lift
2nd Lift
4th Lift
3rd Lift
2nd Lift
1st Lift
A1
BERAHAMPUR
1st Lift
LEGENDS
A1 P1RHS
FOUNDATION
4th Lift
3rd Lift
2nd Lift
1st Lift
4th Lift 4th Lift
1st Lift 1st Lift
Deck SlabDeck SlabDeck Slab
P1
2nd Lift 2nd Lift 2nd Lift 2nd Lift 2nd Lift
TAPTPANI
LHS
Dirt
3rd Lift 3rd Lift 3rd Lift 3rd Lift
APPROACH
SLAB
APPROACH
SLAB
Wall
Dirt
4th Lift 4th Lift 4th Lift
1st Lift 1st Lift 1st Lift1st Lift
CapCapCAP
3rd Lift
2nd Lift
3rd Lift
FOUNDATION
Wall
CRASH BARRIER CRASH BARRIER CRASH BARRIER
APPROACH
SLAB
4th Lift
Minor Bridge at Ch.21+765
STATUS AS ON -31.10.2015
BERAHAMPUR TAPTPANI
CRASH BARRIER CRASH BARRIER CRASH BARRIER
APPROACH
SLAB
Dirt Deck Slab Deck Slab Deck Slab
Dirt
Wall
WallCAP Cap Cap CAP
Appendix-3
1 HUME PIPE
LHS RHS LHS RHS LHS RHS LHS RHS 1st lift 2nd lift 3rd lift 1st lift 2nd lift 3rd lift LHS RHS
1 5+251 Single Row
2 6+069 Double Row
3 6+497 Single Row
4 6+573 Single Row
5 6+720 Single Row
6 7+000 Single Row
7 7+217 Single Row
8 7+520 Single Row
9 7+769 Double Row
10 8+193 Double Row
11 8+363 Single Row
12 8+685 Double Row
13 9+538 Double Row
14 36+238 Single Row
15 36+594 Single Row
16 36+758 Single Row
17 36+985 Single Row
18 37+164 Single Row
19 37+619 Single Row
20 38+157 Single Row
21 38+746 Double Row
22 39+002 Double Row
23 39+118 Double Row
24 39+671 Single Row
25 40+090 Single Row
26 40+280 Double Row
27 40+437 Single Row
28 40+550 Double Row
29 41+000 Single Row
30 41+191 Double Row
2 Box Culvert
LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS 1st lift 2nd lift 3rd lift LHS RHS
1 5+521 Box Culvert Done by ARSS
2 5+761 Box Culvert Done by ARSS
3 8+530 Box Culvert Done by ARSS
4 9+152 Box Culvert Done by ARSS
5 9+800 Box Culvert
6 39+517 Box Culvert
7 5+118 Slab Culvert Done by ARSS
8 7+605 Slab ext.
9 8+008 Slab ext.
10 38+483 Slab ext.
Completed Balance
Protection work RemarksPCC Raft PCC Return Wall Raft Side wall
SlabReturn wall
Done by ARSS
Done by ARSS
Done by ARSS
MILE STONE-1
Sl No Location DESCRIPTIONExcavation Sand filling
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Head wall(LHS) Head wall(RHS) AppronRemarks
Done by ARSS
Done by ARSS
Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of SH–17 (Balance Work)
Progress Chart of Structure as on 31st October ' 2015
MILE STONE-1
Sl No Location DESCRIPTIONExcavation Sand filling PCC Head wall Pipe laying
Appendix-3Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of SH–17 (Balance Work)
Progress Chart of Structure as on 31st October ' 2015
1 HUME PIPE
LHS RHS LHS RHS LHS RHS LHS RHS 1st lift 2nd lift 3rd lift 1st lift 2nd lift 3rd lift LHS RHS
1 10+500 Single Row
2 11+120 Double Row
3 11+270 Single Row
4 11+500 Double Row
5 11+735 Single Row
6 12+065 Double Row
7 12+407 Single Row
8 12+611 Single Row
9 12+907 Double Row
10 13+132 Single Row
11 13+619 Single Row
12 13+809 Double Row
13 13+916 Single Row
14 14+531 Single Row
15 14+877 Double Row
16 15+440 Single Row
17 15+897 Single Row
18 16+068 Single Row
19 16+417 Double Row
20 16+521 Single Row
21 16+770 Single Row
22 16+970 Single Row
23 17+666 Single Row
24 18+480 encase-600
25 18+612 Single Row
26 18+680 encase-600
27 19+200 Double Row
28 19+388 Single Row
29 19+799 Single Row
30 20+361 Single Row
31 20+935 Single Row
32 21+005 Single Row
33 21+224 Single Row
34 21+411 Single Row
2 Box Culvert /MINOR BRIDGE
Slab
LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS 1st lift 2nd lift 3rd lift LHS RHS
1 10+933 Box Culvert Done by ARSS
2 14+157 Box Culvert Done by ARSS
3 18+028 Box Culvert Done by ARSS
4 18+115 Box Culvert Done by ARSS
5 19+530 Box Culvert
6 13+470 Slab ext.
7 11+286 Minor Bridge
8 11+735 Minor Bridge
Approach slab & crash barrier
completed
9 15+185 Minor Bridge
Approach slab & crash barrier
completed
10 15+680 Minor Bridge
Approach slab & crash barrier
completed
11 17+851 Minor Bridge
Approach slab & crash barrier
completed
Completed Balance
Done by ARSS
Done by ARSS
Done by ARSS
Sl No Location DESCRIPTIONExcavation Sand filling PCC Raft PCC Return Wall
Done by ARSS
Done by ARSS
Done by ARSS
Raft Side wall Return wall
Protection work
Remarks
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Done by ARSS
Pipe laying Head wall(LHS) Head wall(RHS) AppronRemarks
MILE STONE-II
Sl No Location DESCRIPTIONExcavation Sand filling PCC Head wall
Appendix-3Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of SH–17 (Balance Work)
Progress Chart of Structure as on 31st October ' 2015
1 HUME PIPE
LHS RHS LHS RHS LHS RHS LHS RHS 1st lift 2nd lift 3rd lift 1st lift 2nd lift 3rd lift LHS RHS
1 26+072 Single Row
2 26+314 Double Row
3 27+743 Single Row
4 28+547 Single Row
5 28+920 Tripple rpw
6 30+637 Single Row
7 32+128 Single Row
8 32+465 Single Row NOT REQUIRED
9 33+402 Double Row
10 33+976 Single Row
11 34+069 Single Row
12 34+463 Single Row NOT REQUIRED
13 35+378 Single Row
14 35+533 Single Row
2 Box Culvert
Slab
LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS 1st lift 2nd lift 3rd lift LHS RHS
1 26+616 Box Culvert
2 27+026 Box Culvert
3 28+008 Box Culvert
4 29+562 Box Culvert
5 30+241 Box Culvert
6 30+854 Box Culvert
7 33+476 Box Culvert
8 34+670 Box Culvert
9 34+813 Box Culvert
10 34+858 Box Culvert
Completed Balance
PCC Return Wall Raft Side wall Return wall
Protection work
RemarksSl No Location DESCRIPTIONExcavation Sand filling PCC Raft
MILE STONE-III
Sl No Location DESCRIPTIONExcavation Sand filling PCC Head wall Pipe laying Head wall(LHS) Head wall(RHS) Appron
Remarks
Appendix-3Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of SH–17 (Balance Work)
Progress Chart of Structure as on 31st October ' 2015
1 HUME PIPE
LHS RHS LHS RHS LHS RHS LHS RHS 1st lift 2nd lift 3rd lift 1st lift 2nd lift 3rd lift LHS RHS
Utility 0+000 Single Row
Utility 0+194 Single Row
1 0+213 Double Row
2 0+369 Double Row
3 0+847 Double Row
4 0+975 Double Row
5 1+146 Double Row
6 1+310 Double Row
7 1+781 Double Row
8 2+332 Double Row
9 2+515 Double Row
10 2+629 Double Row
Utility 3+065 Single Row NA
11 3+095 Single Row
12 3+259 Single Row
13 3+498 Double Row
14 3+765 Double Row
15 3+890 Double Row
16 4+115 Double Row
17 20+614 Single Row
18 21+865 Double Row
19 22+189 Single Row
20 22+582 Double Row
21 22+761 Single Row
22 22+961 Single Row
23 23+147 Single Row
24 23+713 Single Row
25 24+351 Single Row
26 24+600 Single Row
27 24+600 Single Row
2 B0X CULVERT
Slab
LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS 1st lift 2nd lift 3rd lift LHS RHS
1 2+137 Box Culvert(2/3) Not Started
2 2+742 Box Culvert(3/3) Not Started
3 3+382 Box Culvert(2/3) TPT BAM tpt bam LHS Return wall not started
4 23+255 Box Culvert(2/2) RHS
5 23+821 Box Culvert(2/3)
6 25+106 Box Culvert(2/3)
7 25+861 Box Culvert(2/2)
8 25+214 NEW(slab)
1 1+925 Minor Bridge Not Started
2 4+370 Minor Bridge Not Started
3 21+731 Minor Bridge
Approach slab & crash barrier
completed
Completed Balance
MINOR BRIDGE
PCC Raft PCC Return Wall Raft Side wall Return wall
oska road
Sl No Location DESCRIPTIONExcavation Sand filling
Remarks
Protection work
NA NA NA
NA NA NA NA
MILE STONE- IV
Sl No Location DESCRIPTIONExcavation Sand filling PCC Head wall Pipe laying Head wall(LHS) Head wall(RHS) Appron
Remarks
Appendix 4
Sl.
No.Description of Drawing
Date & Letter No. of
Submission by Contractor
Date & Letter No. of
Approval by CSC
Status of
ApprovalGFC Drawing No. Remarks
1GFC Drawing of Minor Bridge at
Chainage 4+380
RKD/Ber-Tap./WBP/722/2015-
16,Dt.04.08.2015
LASA/RE/P-03/RKD/-
2015-16/175,
Dt.05.10.2015
Approved OSRP/P03BAL/GFC/STR
2
Revised Drawing of 2×2 Box
Culvert with Utility at Ch.
23+255
RKD/Ber-Tap./WBP/790/2015-
16,Dt.03.10.2015
LASA/RE/P-03/RKD/-
2015-16/181,
Dt.10.10.2015
Approved DRG NO. 43OSRP/P03BAL/GFC/STR
3Revised Drawing of 2×3 skew
Box Culvert at Ch. 23+822
RKD/Ber-Tap./WBP/788/2015-
16,Dt.01.10.2015
LASA/RE/P-
03/RKD/2015-16/186,
Dt.16.10.2015
Approved OSRP/P03/BAL/GFC/STR
4Single Row Hume pipe Culvert
Drawing at Ch.23+485
RKD/Ber-Tap./WBP/791/2015-
16,Dt.03.10.2015
LASA/RE/P-
03/RKD/2015-16/192,
Dt.27.10.2015
Approved OSRP/P03/CEG/SH-17/SRHPC
5
Plan & X-Section drawings of T
Junction Road at Ch.10+028
LHS & 10+075 RHS
RKD/Ber-Tap./WBP/785/2015-
16,Dt.30.09.2015
LASA/RE/P-
03/RKD/2015-16/197,
Dt.28.10.2015
Approved OSRP/P03BAL/GFC/STR
6Major Junction Layout at Ch.
0+000
RKD/Ber-Tap./WBP/795/2015-
16,Dt.05.10.2015
LASA/RE/P-
03/RKD/2015-16/198,
Dt.28.10.2015
Approved OSRP/CEG/SH-17/MJ/0/000
7
Drawing of Hume pipe Culvert
in T- Junction Road at Ch.
10+028 LHS
RKD/Ber-Tap./WBP/786/2015-
16,Dt.30.09.2015
LASA/RE/P-
03/RKD/2015-16/199,
Dt.29.10.2015
Approved OSRP/CEG/CDJN
8
Revised Plan & Profile Drawing
for Digapahandi (Km.23+230 to
25+100)
RKD/Ber-Tap./WBP/782/2015-
16,Dt.30.09.2015
LASA/RE/P-
03/RKD/2015-16/203,
Dt.30.10.2015
Approved
Widening & Strengthening of existing carriageway to 2-lane road from Berhampur to Taptapani (Km. 0/0 to Km. 41/0 of SH–17 (Balance Work)
LIST OF GFC DRAWING ISSUED Package No. P03
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State Roads Project
ODISHA WORKS DEPARTMENT
APPENDIX-5
1
Box Culvert Return Wall at Ch. 3+380 2nd lift Concrete in Progress
Saucer Drain at Ch. 4+880 to 4+910 LHS Concrete in Progress
Monthly Progress Report October 2015 Construction Supervision of Widening & Strengthening of Berhampur – Taptapani Road (0/0 km to 41/0 km of SH 17) of Odisha State Roads Project
ODISHA WORKS DEPARTMENT
APPENDIX-5
2
WMM 1st layer at Ch 23+300 to Ch.23+400 LHS
DBM Laying at Ch 18+035 to Ch.18+110 RHS
Enclosure of L.N. LASA/RE/P-03/RKD/2015-16/215 ; Dated: 4th Nov.’2015
Pag
e1
MINUTES OF MEETING
Subject:Progress Review Meeting(P-03).
Venue: Contractor’s Base Camp
Date: Wednesday, 28th Oct.’ 2015 Time: 4.30PM
Attendees:
EE Cum ER (Employer), RE- LASA (CSC) & PM-RKD (Contractor) along with Colleagues
Detailed Attendance Sheet being enclosed.
S.N. Discussion Action to be taken
By Date
1.0 RE commences the proceeding of the meeting
2.0 PROGRESS
2.1
2.2
2.3
2.4
2.5
Bridge Widening over Irrigation canal (4+360):
Irrigation department Conveyed about the
stoppage of Canal flow for 20 days after 15th
Dec.’2015 & Contractor ensured to complete the
work upto cap level within that duration.
Earthen Shoulder and Turfing:
Ongoing at MS-II
Reference pillars and chainage pillars:
ME will Confirm the No. of pillars which have
been casted.
Bus Lay Bye:
PM submitted the drawings .LASA to approve.
ER raised the matter to increase to capacity e.g.
Manpower/ Machineries etc. so as to expedite the
structural progress & meet the deadline for
competition precisely, in the line of Visit of
World Bank Mission on06.10.205 & asked to
submit the work program. PM assured to do so.
PM
Contr. Hwy Team(Execution)/
CSC Hwy Team (Monitor)
ME-LASA
RE-LASA
PM
15.12.2015
29.10.2015
02.11.2015
02.11.2015
Enclosure of L.N. LASA/RE/P-03/RKD/2015-16/215 ; Dated: 4th Nov.’2015
Pag
e2
2.6
2.7
2.8
2.9
3.0
ER asked about submission of as built drawings
of MS-III. PM assured to do so.
The locations of MBCB, RPM & Sign Boards
shall be finalizing by LASA in coordination with
Contractor & will be conveyed.
Revised plan for Village Narayanpur (13+300-
13+600) to accommodate carriage way within
Constraints will be finalized by LASA &
recommended to PMU for further approval.
PM said that they will commence the work from
Km. 0 to 3 after PHE clearance.
Rehabilitation proposal for existing minor bridge
at Km. 11+745 will be Put up by Contractor.
PM
HE-LAS
PM
RE-LASA
PM
10.11.2015
02.11.2015
30.10.2015
30.10.2015
3.0 HINDERENCES
3.1
3.2
3.3
3.4
PHE pipeline shifting:
ER conveyed that of work between Km 0+0 to
3+0 LHSis completed & at RHS is under
progress and shall be completed.
ER confirmed again that the Encasing of affected
PH Pipes at Km 0+195 & Km. 1+800 shall be
done by PH Department themselves.
Electrical utility shifting :
ER conveyed that is under progress & Shall be
Completed as per following Schedule:
Km 0+000 to 3+000 : Completed
Digapahandi : 1 Week
To solve LA issue of Narayanpur Village (Km
13+300 to 13+600):As per point 2.8 Above
.Section 4+480 to 4+900:
ER told that Dismantling of Structure will be
done in a week.
ER
ER
RE-LASA
ER
01.11.2015
04.11.205
30.10.2015
04.11.2015
Enclosure of L.N. LASA/RE/P-03/RKD/2015-16/215 ; Dated: 4th Nov.’2015
Pag
e3
3.5
3.6
3.7
PM raised the Matter of nonpayment to Villagers
at Km. 3+600 LHS and thus it amounts to
Hindrance. ER noted and assured to resolve in a
week.
PM raised the Matter of a land belong to Temple
Trust that is affecting the work from Km 4+280
to 4+370 RHS. It was agreed by all to resolve the
issue in similar fashion as that of Gokarnpur
issue. Eventually PM was asked to put up
proposal for Toe Wall thereby. ER confirmed the
ROW is 9 Mt. there
Impeding House at 24+600 Junction: ER told
that since the matter is sub judicious, a suitable
decision will be taken soon & conveyed.
ER
PM
ER
04.11.2015
10.11.2015
Soon
4.0 QUALITY
4.1
4.2
4.3
Rectification of Bituminous top of the tenure of
Previous Contractor (ARSS): HE-LASA shall
put up a report over contractor’s submission.
Surface Regularity tests to be precisely done.
ME-CSC will Ensure.
Two shuttering plates to be fixed by at least three
nuts & bolts together. CSC team to be ensured.
HE-LASA
Contractor/Consultant(ME)
Contractor/Consultant
29.10.2015
5.0 ENVIRONMENT AND SAFETY
5.1
5.2
5.3
Installation of Sign Boards, safety ribbons,
cones, flags and other safety measures shall be
deployed at work zone and HE (CSC) will ensure
the same.
The disposal of excavated soil to be done
precisely & Scrapped bitumen to be removed out
of site & to be disposed at appropriate location
following stipulated procedure to check the
contamination and report to be prepared in
proper format with photographs.
Unused borrow areas to be closed as per norms
and report to be prepared in proper format with
photographs.
Contractor’s Safety Team/HE
(LASA)
PM/Environment
Expert(Contractor)/ME(LASA)
Environment
Expert(Contractor)/ ME(CSC)
15.11.2015
Enclosure of L.N. LASA/RE/P-03/RKD/2015-16/215 ; Dated: 4th Nov.’2015
Pag
e4
6.0 MISCELLANEOUS
6.1
6.2
6.3
6.4
6.5
6.6
6.7
Old ARSS works on Side Slopes & removal of
their surplus Material: Contractor was asked to
submit quantity by using cross section method
for precise computation.
PM was reminded of Changing rooms at
Kansamari/Dharampur Bathing Ghats. In a
mutual consensus with ER; RE asked to submit
proposal by using relevant day work provisions,
if any.
RE again asked PM to submit the application of
their Key Professional who had been given
Provisional approval so as to confirm them, if
found satisfactory. PM Assured.
RE once again asked to deploy competent
Quantity Surveyor in confirmation to CA. PM
assured to mobilize within 15 days.
PM pointed about the discrepancy in Contract for
Ch. 17+350-17+450. This section comes under
TCS-9 (Earthen Shoulder) whereas it is also
listed under schedule of Saucer Drain. RE asked
PM to submit a proposal & suitable decision was
assured w.r.t site condition.
It was agreed to verify all Saucer drain
Chainages & reconcile & them as per site
suitability.
It was decided that no bump will be provided at
main carriageway.
PM/RE
PM
PM
PM
PM/RE
LASA/RKD
29-09-2015
30.10.2015
30.10.2015
15.11.2015
30.10.2015
7.0
The Meeting was over by 7.00 PM.