100
MKAQ 1053 / SKAA 4813 Pavement Design & Construction/ Advanced Highway Engineering Dr. Haryati Yaacob

MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

MKAQ 1053 / SKAA 4813

Pavement Design & Construction/ Advanced Highway Engineering

Dr. Haryati Yaacob

Page 2: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Office Location

• M50- Room 02-34

– 07-5538666/ 019-7341405

[email protected]

[email protected]

Page 3: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

• Topic 1 – Flexible Pavement Design:

– AASHTO Method,

– Asphalt Institute Method,

– ATJ 5/85 (revised 2013)

• Topic 2 – Rigid Pavement Design

- Concrete pavement in Malaysia

- Concrete pavement elements

- Subgrade and sub-base design

- Shoulder options

- Design of rigid pavement

- AASHTO Method

- PCA Method

- Joints

- Steel design

• Topic 3 – Interlocking Block Pavement

Page 4: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Recommended Text

• Huang, Y.H., Pavement Analysis and Design,

Prentice Hall, 1993.

• Freddy L. Roberts et. Al., Hot Mix Asphalt

Materials, Mixture Design and Construction,

NAPA, 1996.

• Yoder & Witczak, Principles of Pavement

Design, Wiley Publications, 1975.

Page 5: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Flexible Pavement

• Structure

– Surface course

(waterproof, anti-skid)

– Base course

– Subbase course

– Subgrade

Page 6: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Pavement types

Page 7: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Type of Pavement & their Load

Distribution

Page 8: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Pavement Types & How They

Effect the Subgrade

Page 9: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Structural Design of Flexible

Pavements

Subgrade

Granular Subbase Layer

Granular Base Layer

Binder Layer

Surface Layer

Page 10: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Design Procedures

• AASHTO Method

• Asphalt Institute Method

• ATJ 5/85 (2013)

Page 11: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

AASHTO METHOD

Page 12: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

AASHO Road Test

• 1958 - 1960 near Ottawa, Illinois

• Soil uniform and representative of large

portion of US

• 4 large and 2 smaller loops

• Variables included

– pavement thickness

– load magnitude

– environmental effects

• Introduced concept of serviceability (PSR)

• Forms basis of AASHTO Method

Page 13: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

AASHO Road Test

Page 14: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Development of Design• AASHO Road Test

– Basis for most currently acceptable design methods

– Importance of traffic loads and repetition

• Design has been largely an empirical process

– Current AASHTO Procedure

• AASHTO is still a statistically based empirical

design method

– Original models revised and extended to make them

more widely applicable

Page 15: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

AASHTO Design Variables

• Time

• Traffic

• Reliability

• Materials

• Environment

• Serviceability

Page 16: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Time

• Performance Period

– Time from initial

construction to first

rehab

– Time between rehabs

• Analysis Period

– Time that any design

must cover

– Often equal to

performance period

Highway Analysis

Period

High Volume Urban 30 - 50

High-Volume Rural 20 - 50

Low-volume paved 15 - 25

Low-volume

aggregate surface

10 - 20

Page 17: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Traffic: Primary Design Input

• Complex Problem

– Traffic is composed of many vehicle types

• “Mixed” traffic

• Variable load magnitude

• Variable tire and axle configurations

• Variable tire inflation pressure

• Variable speeds

– Need to predict future growth, changes

– Estimate where traffic will travel

• Wheel wander

• Lane selection

Page 18: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Load Observations/Assumptions

• Different wheel loads and configurations produce different pavement response

• Larger, more concentrated loads = more stress/strain

• Repeated stress/strain can cause eventual failure

• Fewer applications of heavy loads can cause comparable damage to higher applications of lighter loads

• Load repetitions can be correlated to loss of serviceability

Page 19: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Mixed Traffic –Axle configuration

Truck Wheel Loads

Tractor

Single Axle, Single Tires

Trailer

Single Axle, Dual Tires

Tandem Axle, Dual Tires

• Legal axle weight: 18-20 kip

• Tire pressure: 80 – 120 psi

• More axles can carry more

weight, but spread out the

damaging effect

Page 20: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

ESALs

• Equivalent Single Axle Loads

• Used for highway pavements to convert mixed traffic to a number of standard axles for design

• Defined as:– Total # of applications of a standard axle (generally

18,000 lb single) required to produce the same damage or loss of serviceability as a number of applications of one or more different axle loads and/or configurations over life of pavement

Page 21: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

21

ESAL Calculation

ESALi = Current Traffic x Growth Factor x 365 x ESAL Factor

m

i

itotal ESALESAL1

Page 22: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Growth Rates• Large errors can result in ESAL calc’s from poor

estimates of future traffic

• Best estimates are obtained by forecasting

vehicle types separately

• Forecasting techniques include

– Historical trends (regression)

– Engineering judgment

– Compound interest equation

– Straight line projections

Page 23: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

23

Predict Future

• How fast will traffic grow?

• What is the design level of traffic?

• Examine historical trends

– Develop best estimate of future growth

rate

• Apply growth factor to current volume

g

gFactorGrowth

n 1)1(

Page 24: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a
Page 25: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Lane and Directional Distributions

• Typical Assumptions

– Directional distribution = 50%

– Lane Distribution-Typically design for

‘heaviest’ loaded lane

# Lanes/Direction %Traffic In Design Lane

1 100

2 80-100

3 60-80

4 or more 50-75

Page 26: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Conversion of mix traffic to ESALs

Page 27: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Reliability• Definitions

– Reliability = 1 – P[Failure]

– “The reliability of a pavement design-performance process is the probability that a pavement section designed using the process will perform satisfactorily over the traffic and environmental conditions for the design period.”

• 1993 AASHTO Guide

Page 28: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Reliability

Recommended Reliability

Functional Class Urban Rural

Interstate/Freeway 85-99.9 80-99.9

Principle Arterials 80-99 75-95

Collectors 80-95 75-95

Local 50-80 50-80

Page 29: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Variability

• Need design standard deviation

– Account for variability of all input variables

• Recommended values

– S0 = 0.45 (flexible)

– S0 = 0.35 (rigid)

Page 30: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Serviceability – ability of a pavement to

serve the type of traffic

Page 31: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

PSI

• 0 – 5

• 0 = Impassible

• 5 = Perfect

PCRDSVPSI 01.0)(38.1)1log(91.103.5 2

(Flexible Pavement)

(Rigid Pavement)

PCSVPSI 09.0)1log(80.141.5

Page 32: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Materials

• Need to characterize stiffness

– E, Mr

• Account for seasonal variability

• Determine structural coefficients

Page 33: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Environment

• Need to consider freeze/thaw and swelling

of soils

– AASHTO has an established procedure

– We will not go through the procedure

Page 34: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Seasonal Effects on Unbound Layers

10

100

10001

-Feb

3-M

ar

2-A

pr

2-M

ay

1-J

un

1-J

ul

31

-Ju

l

30

-Au

g

29

-Sep

29

-Oct

28

-No

v

28

-Dec

Date

Ela

stic

Mo

dulu

s, M

Pa

Page 35: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Seasonal Effects on HMAC

Cell 1 - Mn/ROAD (1993-1996)

100

1000

10000

100000

0 30 60 90 120 150 180 210 240 270 300 330 360

Day of Year

Mo

du

lus,

MP

a

Page 36: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

AASHTO Design Values

• Select average values for everything but

not subgrade

• Compute relative stiffness of subgrade for

design

Page 37: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Effective Subgrade Modulus/ Effective

Roadbed Soil Resilient Modulus, Mreff

Definition: an equivalent modulus that would result in the same damage if

seasonal modulus values were actually used

Page 38: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Finding Mreff

• Find seasonal modulus every month

– Non destructive deflection testing

Page 39: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a
Page 40: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Finding Mreff

• Find relative damage, uf for each season

Uses AASHTO Damage Equation

mf = 1.18x108MR-2.32

• Determine weighted average uf

• Find Mreff corresponding to uf

Page 41: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Structural Number

SN = a1D1 + a2m2D2 + … + anmnDn

Page 42: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Structural Coefficients

• ai = measure of relative ability of a unit

thickness of a given material to function as

a structural component of the pavement

Page 43: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Asphalt Concrete Structural Coefficient , a1

Page 44: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Granular Base Layer Coefficient (untreated) , a2

a2= 0.249 (log E2) -0.977

Page 45: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Granular Subbase Layer Coefficient , a3

a3-= 0.227 ( log E3)- 0.839

Page 46: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Drainage Coefficient, mi

• Depends on quality of drainage and

availability of moisture

Quality Water < 1% 1 -5 % 5 - 25% > 25%

Removed

Excellent 2 hours 1.40 - 1.35 1.35 - 1.30 1.30 - 1.20 1.20

Good 1 day 1.35 - 1.25 1.25 - 1.15 1.15 - 1.00 1.00

Fair 1 week 1.25 - 1.15 1.15 - 1.05 1.05 - 0.80 0.80

Poor 1 month 1.15 - 1.05 1.05 - 0.80 0.80 - 0.60 0.60

Very Poor Never Drain 1.05 - 0.95 0.95 - 0.75 0.75 - 0.40 0.40

mi Values for Modifying Structural Layer Coefficients

(Untreated Base and Subbase Materials)

% Time pavement structure is exposed to

moisture levels approaching saturation95%

Page 47: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Design Equation

• Based on road test

• Determines number of ESALs before DPSI

is reached

07.8log32.2

1

10944.0

5.12.4log

20.01log36.9log

19.5

018

D

RR M

SN

PSI

SNSZW

Page 48: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a
Page 49: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Design Procedure

• Determine SN required above each layer

• Find thickness to satisfy SN above each

layer

Page 50: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a
Page 51: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

AASHTO Layer Thickness Determination

Subbase E3 a3 m3

Base E2 a2 m2

Surface E1 a1

SN3 SN2 SN1

D1

D2D3

Roadbed Soil

SN= a1D1 + a2D2m2 + a3D3m3

D1≥ SN1/a1

D2 ≥( SN2- a1D1)/ a2m2

D3 ≥ (SN3- a1D1-a2D2m2)/a3m3

Page 52: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Minimum Thickness - AASHTO

ESAL, 1000 AC Base

< 50 1 4

50 – 150 2 4

150-500 2.5 4

500 – 2,000 3 6

2,000 – 7,000 3.5 6

> 7,000 4 6

Page 53: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Design example

• Calculate D1, D2 and D3. Given:

– E1= 400,000psi; E2= 30, 000psi; E3= 11,000

– a1= 0.42; a2=0.14; a3= 0.08

– m2=m3=1.2

– Mreff = 5,700 psi

– w18= 18.6 x 106

– R = 95%

– So= 0.35

– ΔPSI = 2.1

Page 54: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Asphalt Institute Method

Mechanistic-Empirical Design

Page 55: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Design Criteria

• Mechanics of materials coupled with

observed performance

Number of Loads Until Failure

Str

ess o

r S

train

Page 56: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Performance Equations

• Fatigue

– 11% AC

– VTM 5%

– 20% Cracking at AASHO Road Test

• Rutting

– ½” Rut

– Need to have good materials, compaction

854.0

291.3

*1

0796.0

EN

t

f

477.4

9 110365.1

v

rN

Page 57: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Traffic Analysis

• Use ESALs for detailed analysis

• Same process as AASHTO

– SN = 5

– pt = 2.5

Page 58: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Simplified procedure for

determining Design ESAL

Page 59: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Materials

• Resilient modulus and Poisson’s ratio

• Poisson’s Ratio

– Soils = 0.45

– Other materials = 0.35

Page 60: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Soils modulus determination

***Discussion based on handouts given.

• Determine the design level from modulus

measurements

– Charts account for seasonal changes

• Design level function of traffic

– Build in reliability safety factor

ESAL Design Value %

<10,000 60

10,000 – 1,000,000 75

>1,000,000 87.5

Page 61: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Quality requirements for untreated

Aggregate Base and Subbase

• Should meet requirements below

Test Subbase Base

CBR, min 20 80

R-Value, min 55 78

LL, max 25 25

PI, max 6 NP

Sand Eq., min 25 35

P200 12 7

Page 62: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Design charts

• Design charts were developed based

• Temperature

– 3 Regions

• New York: 45˚F

• North Carolina: 60˚F

• Arizona: 75˚F

• Pavement Type– Full depth HMA

– HMA over Emulsified Asphalt Bases- Three types

• I: dense graded aggregate, similar to HMA

• II: semiprocessed aggregate

• III: mixes with sands or silty sands

– HMA over untreated aggregate Base

– HMA and emulsified Asphalt over Untreated Aggregate Base

Page 63: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

AI – Design Procedure

• Select pavement type

• Select region

• Determine traffic

• Determine MR

• Use design charts to find thickness

Page 64: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

AI Minimum Thicknesses

ESALs Min HMA over Type I Min HMA over Type II

& Type III

104 1 2

105 1.5 2

106 2 3

107 2 4

>107 2 5

Page 65: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Combine thickness of HMA surface course and emulsified asphalt base

course.

I – mixes with processes dense graded agg which should be mixed in a plant and have

properties similar to HMA

II- mixes with semiprocessed, crusher run, pit run or bank run agg

III – mixes with sands or silty sand

Page 66: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Total HMA thickness, including both surface and base course

Page 67: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a
Page 68: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Design example

• MR = 10, 000 psi , ESAL = 106, Determine

thickness :

– Full depth HMA

– HMA surface over type II emulsified asphalt

base

– HMA over 6” untreated aggregate base

– HMA and emulsified asphalt mix over 6”

untreated aggregate base

Page 69: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

ATJ 5/85 Design Method

(2013 revision)

Page 70: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

• New flexible and semi flexible pavements

containing one or more bound layers

• New flexible for low volume roads,

consisting of unbound or new cement

stabilized granular materials

• New flexible and semi-flexible heavy duty

pavements for severe loading conditions

Page 71: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a
Page 72: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Data required:

• Type and volume of commercial vehicles

• Design life

• Sub-grade type and strength

• Type and properties of paving materials

• Environment which pavement will be

exposed to

Page 73: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Criteria

Page 74: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a
Page 75: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Traffic

• Data

– Number of commercial vehicles during Year 1

of Design Period, which is the expected year

of completion of construction.

– Vehicle class and axle load distribution.

– Directional and lane distribution factors.

– Traffic growth factors.

Page 76: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Design Procedure1. From traffic count , determine:

– ADT (3 days, 24 hours per day. If traffic count covers

time period of 0600 to 2200 hours, multiply the count

with 1.2)

– % PCV with un-laden weight > 1.5 tons (PCV) and

break down into vehicle categories.

– Traffic Growth factor (r) for CV

2. From geometric design – number of lanes and terrain

condition

Number of lanes (in ONE

direction)

Lane distribution factor, L

One 1.0

Two 0.9

Three or more 0.7

Page 77: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Type of Terrain Terrain factor, T

Flat 1.0

Rolling 1.1

Mountainous/steep 1.3

3. Design period

• 10 years for low volume and rural road.

• 20 years for high volume and urban road

4. Design traffic (1st year of design period)

ESALY1 = ADT x 365 x PCV x LEF (3.7) x L x T

ESALY1 = number of ESALs for base year (design lane)

ADT = Average Daily Traffic

PCV = Percentage of CV (un-laden weight > 1.5 tons)

VLF = Vehicle Load Equivalent Factor (including Tire Factor)

L = Lane Distribution Factor

T = Terrain Factor

Page 78: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

If traffic distribution by vehicle type is available:

ESALY1 = [ADTcv1 x LEFcv1 + ADTcv2 x LEFcv2 +…+

ADTcv3 x LEFcv3] x 365 x L x T

Page 79: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

5. Design Traffic (Number of ESALs) for the Design Period

ESALDES = ESALY1 x [(1 + r)n – 1)]/r

ESALDES = design traffic for the design lane in one direction

r = annual traffic growth rate factor for design period

n = number of years in design period

OR

Design Traffic ESALDES = ESALY1 x TGF

Page 80: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Total Growth Factor (TGF)

Page 81: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

6. Decide traffic category

Normal distribution with single tailed analysis, the following normal

deviate values shall apply:

• 60% Probablility: Mean – 0.253 x STD

•70% Probablility: Mean – 0.525 x STD

• 85% Probablility: Mean – 1.000 x STD

•statistical analysis shall be used to evaluate laboratory or field test

results for use as input for pavement design (sub-grade, sub-base,

road base and bituminous courses)

Page 82: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

7. SG categories

• Min 5% CBR for T1- T3

• If not, at least 0.3 meter of SG shall be

replaced or stabilized to ensure the minimum

value is met.

• Large volume traffic T4 and T5, min CBR 12%

Page 83: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

8. Get T and S, choose from catalogue

• Mechanistic Design using Elastic Layer Programs

• Asphalt Institute SW-1 (based on Manuals MS-1; MS-11;

MS-17; MS-23)

• Pavement Design: A Guide to the Structural Design of Road

Pavements, STANDARDS AUSTRALIA and AUSTROADS,

2004, in conjunction with CIRCLY Version 5.0

• SHELL SPDM Version 3.0

• Pavement Design and Analysis by Yang H. Huang, Second

Edition, 2003 in conjunction with KENLAYER

• Layer Elastic Theory using RUBICON TOOLBOX Version

2.9.8.

Page 84: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

• 3 types of pavement : – Conventional flexible pavement with granular base.

– Deep-strength flexible (composite) pavement with

bituminous surface course(s) and a base stabilized

with Portland cement, bituminous emulsion, or a

combination of both.

– Full-depth asphalt pavement with bituminous base

course

Page 85: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

T1 : < 1 million ESALs

Page 86: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

T2 : 1- 2 million ESALs

Page 87: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

T3: 2 -10 million ESALs

Page 88: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

T4 : 10 – 30 million ESALs

Page 89: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

T5 : > 30 million ESALs

Page 90: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

T5 : > 30 million ESALs

( Polymer Modified Asphalt)

Page 91: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Conceptual outline of Pavement Structure

Page 92: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a
Page 93: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a
Page 94: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a
Page 95: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Properties of Paving Materials• Bituminous Wearing and Binder Courses

Page 96: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

• Bituminous Road base

– similar to binder and wearing course except a lower

temperature used for this layer

• Crushed Aggregate and Wet Mix Road Base

– Performance -> shear strength, stiffness and by

material breakdown that may occur during

construction and heavy traffic

– similar composition but construction practices are

different

– Min CBR 80%, elastic modulus 350±100 Mpa

Page 97: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

• Stabilized Road base

– In situ or Plant

– 2 types:

• STB 1 . Aggregates stabilised primarily with

cement or lime . 3% to 5% Portland cement.

E = 1800 MPa; v = 0.40

• STB 2. Aggregates stabilised primarily with a

bituminous emulsion/foamed bitumen +

cementitious. Bituminous emulsion or foamed

bitumen and a maximum of 2% Portland cement.

E= 1200 MPa; v 0.35

Page 98: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Other options for Low Volume Roads

Page 99: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Example 1

• Traffic count data: ADT 2700 vehicles

both directions (24 hour period)

• PCV: 16% ( no detailed break down by

vehicle type)

• Terain : rolling

• Design life: 20 years

• Annual traffic growth: 4%

• CBR mean =18.5% , standard deviation=

4.4%, 85% probability

Page 100: MKAQ 1053 / SKAA 4813€¦ · Reliability • Definitions –Reliability = 1 –P[Failure] –“The reliability of a pavement design-performance process is the probability that a

Example 2

• Design a road pavement for a 4-lane freeway (concession toll-road)

with an average daily traffic of 7286 vehicles, of which 20% are

commercial vehicles with an un-laden weight > 1.5 tons

CV 1 = 624

CV 2 = 456

CV 3 = 316

CV 4 = 102