58
MIT ICAT MIT ICAT 16.72 Air Traffic Control Overview Prof. R. John Hansman MIT Department of Aeronautics and Astronautics

MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Embed Size (px)

Citation preview

Page 1: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICATMIT ICAT

16.72 Air Traffic Control Overview

Prof. R. John Hansman

MIT Department of Aeronautics and Astronautics

Page 2: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

US Capacity Issue

Prior to 9/11 the US Air Transportation system is approaching a criticalsaturation threshold where nominal interruptions (e.g. weather) resulted in anonlinear amplification of delay

US and Regional Economies highly dependant on Air Transportation Business travel (stimulated by info technology) Air Freight Personal travel

System is highly complex and interdependent Need better understanding of system dynamics and real constraints to guide

and justify efforts to upgrade NAS Current efforts will not provide capacity to meet demand which will re-emerge

when the economy cycles up

Impact of upcoming capacity crisis is not well understood Operational Impact Economic Impact

Similar Issues in Europe Different Issues in Emerging Regions (eg China, India)

MIT ICAT

MIT ICAT

Page 3: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICATMIT ICAT

Page 4: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Passenger Traffic by Region

Scheduled Revenue Passenger-Kilometers by Region

1400

1200

1000

800

600

400

200

0

1970 1975 1980 1985 1990 1995 2000 2005

RP

K (b

illio

n)

North America

Europe

Asia and Pacific

Latin America & Caribbean

Middle East

Africa

Source: ICAO, scheduled services of commercial air carriers

MIT ICAT

MIT ICAT

Page 5: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Trends in Aircraft Size A

vera

ge

seat

s p

er d

epar

ture

150

140

130

120

110

100

90

801990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003

Source: DOT Form 41 data (including Regional Jets and Turboprops)

MIT ICAT

MIT ICAT

Page 6: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

US FlightUS DelaysFlight Delaysfrom 1995 tofrom 20061995 to 2006

Data source: FAA Operational Network (OPSNET)

MIT ICAT

MIT ICAT

Page 7: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Flight CancellationsCancellations

Thousands 250

200

150

100

50

1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004

Source: BTS, Airline On Time Performance data

0

MIT ICAT

MIT ICAT

Page 8: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

US FlightUS DelaysFlight Delaysfrom 2000 tofrom 20062000 to 2006

Source: FAA OPSNET data

MIT ICAT

MIT ICAT

Page 9: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Delays at Chicago O’HarePressure for Demand Managment

ORD: Total Delays

0

2000

4000

6000

8000

10000

12000

14000

16000

To

tal D

elay

s 2004

2003

2002

2001

2000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Month

Source: FAA OPSNET data

MIT ICAT

MIT ICAT

Page 10: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

1980 198

2 198

4 198

6 198

8 199

0 199

2 199

4 199

6 199

8 200

0 20

0020

02

2004

Consumer complaints

0

5

10

15

20

25

Com

plai

nts

to t

he D

OT

(00

0) Southwest

USAirways United TWA Northwest America West Delta Continental Alaska American

Note: Year 2005 consumer complaints is an extrapolation using data from Jan-Mar 2005

Data source: DOT Aviation Consumer Protection Division, available at: http://airconsumer.ost.dot.gov/

MIT ICAT

MIT ICAT

Page 11: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Air Traffic Control Functions

Aircraft Separation Assurance

Traffic Congestion Management

Flight Information

Search and Rescue

Example of a Command, Control and Information System

MIT ICAT

MIT ICAT

Page 12: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

COMPONENTS OF AIR TRANSPORTATION INFRASTRUCTURE

Airports Runways Terminals Ground transport interface Servicing Maintenance

Air traffic management Communications Navigation Surveillance Control

Weather Observation Forecasting Dissemination

Skilled personnel

Cost recovery mechanism

MIT ICAT

MIT ICAT

Page 13: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Current Control Structure

Surface Control “Ground”

Local Control “Tower”

Terminal Area Control (TRACON) “Approach and “Departure”

Enroute Control (ARTCC) “Center”

Oceanic Control (FIR) “Oceanic”

Flow Control (ATCSCC) “Central Flow”

MIT ICAT

MIT ICAT

Page 14: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

US Air Route Traffic Control Center (ATRCC) Airspace - 20 Centers

ZSE ZMP

ZLC ZAU ZBW

ZOB ZDV ZNY

ZOA ZKC ZID ZDC

ZLA ZME ZAB ZFW

ZTL

ZJX

ZHU ZMA

MIT ICAT

MIT ICAT

Page 15: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

High Level Sectors257

MIT ICAT

MIT ICAT

Page 16: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Low Level Sectors 378

MIT ICAT

MIT ICAT

Page 17: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

TRACONSMIT ICAT

MIT ICAT

Page 18: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Overall StructureMIT ICAT

MIT ICAT

Page 19: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

ATM System CurrentFunctional Structure

Planning - Strategic Level

Sector Traffic

Planning

Aircraft StateAircraft Guidance and

Navigation

Sector Traffic Control

Traffic Sensor

Vectors

ClearancesPlanning

Approved Handoffs

Desired Sector Loads

Clearance Requests

Flight Planning

Weather

Filed

Negotiate < 5 min

Execution - Tactical Level

Pilot

Planned Flow Rates

Clearance Requests

AOC Schedule of Capacities

Approved Flight

National PlansFlow

Facility Flow

Planning

Flight Plans

FlightSchedule

Airline

hrs - day hrs 5-20 min 5 min Handoffs

CFMU TMU D-side R-side

Measurement

Real State Plan/Intent

Requests

AC State Sensor Other Aircraft

States

Efficiency Throughput Safety

Increasing Criticality Level

Source: A. Haraldsdottir Boeing

MIT ICAT

MIT ICAT

Page 20: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

ATC Control LooRadar Surveillance Limits

Vectors

Aircraft F light

M anagementC omp ute r

S tate

Flight PlanAmendments

Autop ilo tAuto thrust

MCP Controls

ATCF lightS trip s

Surveillance: Enroute: 12.0 s Terminal: 4.2 s

S tate C ommands

Tra jecto rC ommands

Initial Clearances

CDU

ADS : 1 sDisplays

AOC: Airline Operations Center

Pilot

DisplaysManual Control

Voice

ACARS (Datalink)

Decision Aids

N av igation

Emerging Approaches: ADS-B and Multi-Lateration

MIT ICAT

MIT ICAT

Page 21: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Radar Display Example

CO 123 350C B757 310

MIT ICAT

MIT ICAT

Page 22: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

ATM is a Human Centered Process

Contract process Negotiation Execution Monitoring Re-negotiation/amendment

Agents Controllers

Strategic Tactical

Pilots Airlines

Dispatchers ATC coordinators

Airports

Resources Airspace Runway Airport surfaces

MIT ICAT

MIT ICAT

Page 23: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Flight Progress StripMIT ICAT

MIT ICAT

Page 24: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Human Factors andAdaptation

ATM is a human centered contract process for the allocation ofairspace and airport surface resources.

Current NAS has evolved over 60 years

The system has significant local adaptations resulting innonhomogeneity Airspace design Local procedures Letters of agreement Noise restrictions Site specific training (FPL = 3-5 years)

Major operational changes were event driven, enabled btechnical capability Positive radar control - Grand Canyon 1956 TCAS - Los Cerritos 1982

MIT ICAT

MIT ICAT

Page 25: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

New York Arrival and Departure Tracks

MIT ICAT

MIT ICAT

Page 26: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

ATC Workload as a System Constraint

MIT ICAT

MIT ICAT

Page 27: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Blocking

Air traffic controller

Blocking action

Controlled resource

Block the flow to maintain number of aircraft within the acceptable level (ex. Set by AAR or OALT)

Finite capacity buffer

AAR is Airport Acceptance Rate OALT is sector Operationally Acceptable Level of Traffic

Saturated resource

Number of aircraft threshold corresponding For example,

to, for example, AAR or rate set by

OALT, (varies depending AAR or OALT

on current conditions)

MIT ICAT

MIT ICAT

Page 28: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICATMIT ICAT

Page 29: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Downstream Flow Constraints

Flow Management Capacity Constraint ex. Airport

Capacity Acceptance Constraint Rate (AAR)

Departure flow

Gates Ramp Taxiways Runways Terminal area and exit fixes

En route sector airspace

Destination airports

Gate Restrictions

ex. Sector Operationally Acceptable Level of Traffic (OALT)

Ramp Restrictions

Runway Restrictions

Taxi Restrictions Capacity

Constraint ex. Miles In Trail through exit fix

MIT ICAT

MIT ICAT

Page 30: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

12:19 p.m. 153 Aircraft In-bound

Dallas Fort-Worth

Aircraft are condensed into distinct flows feeding 4 arrival fixes.

June 20, 2001

MIT ICAT

MIT ICAT

Page 31: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

116 Aircraft In-bound

Atlanta

Condensation and merges have reduced 116 trajectories at airport to 4

ARTCCBoundaries

RouteFlown

11:15 a.m. June 14, 2001

MIT ICAT

MIT ICAT

Page 32: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

78 Aircraft In-bound

San Francisco

Special use airspace provides additional constraints

Special UseAirspace

RouteFlown

Flight Plan

June 11, 2001 4:13 p.m.

MIT ICAT

MIT ICAT

Page 33: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Projected % DevelopmentalControllers

From: ATCS Workforce Plan Briefing

MIT ICAT

MIT ICAT

Page 34: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Capacity Limit Factors

Demand Peak Demand Hub & Spoke Networks

Airspace Capacity Airspace Design Controller Workload Balkanization

Airport Capacity Runways Gates Landside Limits (including Security) Weather

Environmental Limits Noise (relates to Airport) Emissions (local, Ozone, NOX, CO2)

MIT ICAT

MIT ICAT

Page 35: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Airport SysteCapacity Limit Factors

Runways

Weather Capacity Variability Convective Weather

Landside Limits Gates Terminals & Security Road Access

Downstream Constraints

Controller Workload Environmental

Community Noise Emissions

Safety

MIT ICAT

MIT ICAT

Page 36: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Arr

ival

s p

er H

ou

rA

rriv

als

per

Ho

ur

MITMIT Airport Capacity EnvelopeICATICAT Boston (BOS)

100

80

90

68,50VFR ASPM - Apr 2000 - Visual Approaches

ASPM - Jul/Aug 2000 - Visual ApproachesCalculated VMC Capacity

70 Optimum Rate (BOS)

60

50

40

30

20

10

0

0 10 20 30 40 50 60 70 80 90 100

Departures per Hour

100

IFRASPM - Apr 2000 - Instrument Approaches

90 ASPM - Jul/Aug 2000 - Instrument Approaches

Calculated IMC Capacity 80 Reduced Rate (BOS)

70

60

50 44,44

40

30

20

10

0

0 10 20 30 40 50 60 70 80 90 100

Departures per Hour Source: FAA Benchmark Data

Page 37: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Separation Requirements forArrival (Same Runway)

MIT ICAT

MIT ICAT

Wake Turbulence Requirement Radar Separation requirements

Trailing Aircraft

Leading Aircraft

Heavy Large Small Heavy 4 5 5 B757 4 4 5 Large 3(2.5) 3(2.5) 4 Small 3(2.5) 3(2.5) 3(2.5)

Visual Separation requirements Pilots Discretion

Preceding arrival must be clear of runway at touchdown Runway Occupancy time

Page 38: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICAT

MIT ICAT

Variable Capacity Effects1995 Delays vs Operations

Data from FAA Capacity Office, CY95

0 200000 400000 600000 800000 1000000

Total Operations (CY95)

0

10

20

30

40

50

60

Dela

yed

Flig

hts

(per

100

0)

SFO

LGA EWR STL

LAX

ORD

DFW

ATL BOS

JFK

PHX

LAS

SJU

HNL PIT DEN

CLT

IAH

MEM

From John Andrews, MIT Lincoln Lab

Page 39: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICAT

MIT ICAT

Page 40: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Safety vs CapacityMIT ICAT

MIT ICAT

The current airborne system is extremely safe but conservative

Increased capacity with current infrastructure implies Reduced OperationalSeparation Airborne Separation Standards Runway Occupancy Times Wake Vortex Controller Personal Buffers ...

How do you dependably predict the safety impact of changes in a complexinterdependent system? Statistics of small numbers Differential analysis limited to small or isolated changes Models??

Safety Veto Effect

Runway Incursions are an area of concern

Page 41: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICAT

MIT ICAT

EN ROUTE MINIMA HAVE NOTCHANGED DESPITE 5 x IMRPOVEMENT

IN RADAR PERFORMANCE

ARSR-1 ARSR-4 ASR-6 ASR-9 Mode A Mode S 0

20

40

60

80

100

120

Azim

uth

reso

lutio

n at

max

imum

rang

e as

% o

f en

rout

e m

inim

a 5 nm en route separation minima

1950

2000 1960

2000 1960

2000

1950 2000

Long range Medium range Medium rangeprimary radars primary radars secondary radars

Page 42: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICAT

MIT ICAT

SEPARATION ASSURANCE CONSIDERATIONS

PERSONAL SURVEILLANCE SAFETY BUFFER UNCERTAINTY

MINIMUMSEPARATIONSTANDARD

PROCEDURAL HAZARD ZONESAFETY

BUFFER

Page 43: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICAT

MIT ICAT

IMPROVED SURVEILLANCE HAS NOT LED TO REDUCED EN ROUTE MINIMA

WHEN STANDARDS IMPROVED SURVEILLANCE WERE DEVELOPED ENVIRONMENT

(e.g. 1950s for en route radar) (e.g. today for en route radar) Minimum

SeparationStandard

Surveillance has improved, but separation minima have not changed:procedural safety buffer has implicitly increased

Page 44: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Schedule FactorsMIT ICAT

MIT ICAT

Peak Demand/Capacity issue driven (in part) by airline Hub and Spokescheduling behavior Peak demand often exceeds airport IFR capacity (VFR/IFR Limits) Depend on bank spreading and lulls to recover Hub and Spoke amplifies delay

Hub and spoke is an efficient network Supports weak demand markets

Schedules driven by competitive/market factors Operations respond to marketing Trend to more frequent services, smaller aircraft Ratchet behavior Impact of regional jets

Ultimately, airlines will schedule rationally To delay tolerance of the market (delay homeostasis)

Limited federal or local mechanisms to regulate schedule

Page 45: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICAT

MIT ICAT Hub and Spoke Network

Completely Connected Network = 2(N-1) Flights(eg., 50 Airports, 98 Flights)

Page 46: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICAT

MIT ICAT Fully Connected Network

Completely Connected Network = N(N-1)(eg., 50 Airports, 2450 Flights)

Page 47: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICAT

MIT ICAT

Capacity Exampl(50 Flights/hr)

70

60

50

40

30

20

10

0

Time

0

50

100

150

200

250

T ime

Page 48: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICAT

MIT ICAT

Capacity Exampl(40 Flights/hr)

0

10

20

30

40

50

60

70

Time

250

200

150

100

50

0

T ime

Page 49: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICAT

MIT ICAT

Capacity Exampl(30 Flights/hr)

0

50

100

150

200

250

T ime

0

10

20

30

40

50

60

70

Time

Page 50: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Classic Delay vs DemandCurve

MIT ICAT

MIT ICAT

DELAY

CapacityLimit

Linear Region

Non-Linear Region

DEMAND

Page 51: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICAT

MIT ICAT LGA Air 21 Impact

LaGuardia Airport

0

20 40

60

80

100 120

140

160 180

200

06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Time of Day

Historic Movements AIR-21 Induced Svc.

Maximum Hourly Operations Based on Current Airspace & ATC Design

Source: William DeCota, Port Authority of New York

Page 52: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

DELA

Y

MIT ICAT

MIT ICAT LGA

DEMAND

Capa

city

Lim

it

Source: William DeCota, Port Authority of New York

Page 53: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICAT

MIT ICAT

Flight Delays at LGAFlight Delays at LGAfrom 2000 to 2006from 2000 to 2006

Source: FAA OPSNET data

Page 54: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Suggested PoliticalSolutions to Capacity Shortfall

MIT ICAT

MIT ICAT

Full or Partial Privatization (eg AIR-21) May improve modernization,costs and strategic management Limited impact on capacity

Re-regulation Increased Costs to Consumer

Demand Management (eg Peak Demand Pricing) Reduced service to weak markets Need to insure that revenues go to improved capacity

Run System Tighter Requires improved CNS Safety vs Capacity Trade

Build more capacity Local community resistance

Multi-modal transportation networks

Page 55: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

ConclusionMIT ICAT

MIT ICAT

Technology in Pipeline will have limited impact on peak Capacity atCurrently Stressed Airports 20% to 40% Optimistically

System will become (is) Capacity Restricted Airlines will Schedule in Response to Market Demand

Delay Homeostasis (at Hubs) Increased Traffic at Secondary Airports High Frequency Service Changing Value for Reliability

Overall system response is not clear

Need Protection of Airport and Spectrum Resources More runways in critical locations New ATM paradigms

Need for leadership

Page 56: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICAT

MIT ICAT

Multi-Stakeholder Considerations & Role of System Transition Plans

Demand Performance

Stakeholder Decisions

Transformative Actions

Change Process

Implementation

SystemCapability

Selected Actions

AggregateInefficiencyMetrics

Corrective Actions

Monitoring & Forecasting

Stakeholder Awareness or Perception Ai

Research and Development

Capabilities

Research Needs System Concepts

Road Map

Stakeholder Values Vi

Stakeholder Objectives Oi Stakeholder

Decisions Stakeholder Decisions

Stakeholder i Optimization

FAA>OEP JPDO > NGATS EU > CESARE

Page 57: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

Focus is the OEP 35 airportsMIT ICAT

MIT ICAT

More? Oakland Burbank Long Beach John Wayne-Orange County Tucson Albuquerque San Antonio Houston Hobby Palm Beach

Page 58: MIT ICAT 16.72 Air Traffic Control Overview Air Traffic Control Overview ... Clearance Requests Flight Planning Weather ... To delay tolerance of the market

MIT ICAT

MIT ICAT