Kementerian ESDM Republik Indonesia 1
MINISTRY OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA
DIRECTORATE GENERAL OF NEW, RENEWABLE ENERGY AND ENERGY CONSERVATION
By:Yunus Saefulhak
Director of Geothermal, DGNREEC, MEMR-RI
Jakarta, 25 Oktober 2016
International Workshop on Geothermal Business and Technology 2016
University of Indonesia
Kementerian ESDM Republik Indonesia 2
OUTLINE
I. An Overview of Geothermal Development 3
II. Challenges in Geothermal Business 9
Kementerian ESDM Republik Indonesia 3
I. AN OVERVIEW OF GEOTHERMAL DEVELOPMENT
OPPORTUNITY AND RECENT CONDITION
Kementerian ESDM Republik Indonesia 4
2015 2020 2025 2030 2035 2040 2045 2050
PLT Arus Laut
PLT Bayu
PLTS
PLTD BBN
PLT Bioenergi
PLTA dan PLTMH
PLTP
KEN
45 GW
169 GW
2015 2016 2017 2018 2019 2020 2025 2030 2040 2050
Geothermal 1.438,5 1.653,5 1.908,5 2.133,5 2.493,5 3.109,5 7.241,5 9.300 13.423 17.546
Hydro and Micro Hydro 5.024 5.119 5.236 5.491 7.008 7.889 20.960 25.844 35.611 45.379
Bioenergy 1.740 1.886 2.093 2.359 2.674 3.024 5.532 9.651 17.887 26.123
Solar 79 229 429 679 979 1.379 6.379 14.103 29.551 45.000
Wind 7 57 107 207 307 507 1.807 7.167 17.887 28.607
Other NRE 372 1.860 1.860 1.860 1.861 1.863 3.128 3.779 5.081 6.383
Total 8.660 10.804 11.728 12.939 15.807 18.475 45.044 69.843 119.440 169.038
Satuan: MW
31%
20%25%
24%23%
25%30%
22%5%
46%31%
18%
194
MTOE
412
MTOE
1.031
MTOE
NRE
Oil
Gas
Coal
2015 2025 2050
Total of
Power Plant
51 GW 135 GW 444 GW
NRE Power
Plant
9,6 GW
(19%)
45 GW
(34%)
169 GW
(38%)
Primary Energy Mix According to GR No. 79/2014 on National Energy Policy
Kementerian ESDM Republik Indonesia 5
GPP SIBAYAK: 12 MW
GPP GUNUNG SALAK: 377 MW
GPP WAYANG WINDU: 227 MW
GPP KAMOJANG: 235 MW
GPP DARAJAT: 270 MW
GPP DIENG: 60 MW
GPP LAHENDONG: 100 MW
Source: Geological Agency MEMR (2015)
GPP ULUBELU: 165 MW
GPP ULUMBU: 10 MW
GPP MATALOKO: 2,5 MW
GPP PATUHA: 55 MW
No Island Num of Location
Energy Potential (Mwe)
TotalInstalledCapacity
Resources Reserve
Speculative Hypothetic Possible Probable Proven1 Sumatera 97 3,191 2,334 6,992 15 380 12,912 177
2 Jawa 73 1,560 1,739 4,023 658 1,815 9,795 1,224
3 Bali 6 70 22 262 - - 354 0
4 Nusa Tenggara 27 225 409 917 - 15 1.566 12.5
5 Kalimantan 14 152.5 30 - - - 182,5 0
6 Sulawesi 77 1,221 318 1,441 108 120 3.208 100
7 Maluku and South Maluku 33 560 91 800 - - 1.451 0
8 Papua 3 75 - - - - 75 0
Total 330 7,054.5 4,943 14,435 781 2,330 29,543,5 1,513.511.997,5 17.546
29.543,5
INDONESIA GEOTHERMAL POTENCY AND INSTALLED CAPACITY
Kementerian ESDM Republik Indonesia 6
GEOTHERMAL WORKING AREA STATUS
69 GWA(7.241,5 MW)
OPERATION: 9 GWA (1.513,5 MW)
Rencana Pengembangan (778 MW) 1. Sibayak (12 MW)2. Ulubelu (165 MW)3. Cibeureum-Parabakti (377 MW)4. Pangalengan (282 MW)5. Kamojang-Darajat (505 MW)6. Dieng (60 MW)7. Lahendong-Tompaso (80 MW)8. Ulumbu (10 MW)9. Mataloko (2,5 MW)
PRODUCTION: 9 GWA (1.513,5 MW)Development Plans
(778 MW)
EXPLORATION: 15 GWA (1.810 MW)
EXPLOITATION: 8 GWA(1.190 MW)
1. Sibual-Buali (330 MW)2. Sungai Penuh (145 MW)3. Lumut Balai (285 MW)4. Hululais (340 MW)5. Karaha Cakrabuana (50 MW)6. Cibuni (10 MW)7. Tabanan (10 MW)
8. Tulehu (20 MW)
EXPLORATION & EXLOPITATION:
23 GWA ( 3.000 MW)
READY TO ASSIGNMENT / TENDER:
34 GWA (1.640 MW)
PPA/PJBL SIGNATURE PROCESS: Jailolo (40 MW)
LICENSEE PROCESS: 3 GWA (330 MW)
1. Seulawah Agam (165 MW)2. Gn. Lawu (110 MW)3. Way Ratai (55 MW)
PPA/PJBL SIGNATURE14 WKP (1.770 MW)
1. Muaralaboh (220 MW)2. Gn. Rajabasa (220 MW)3. Rantau Dedap (220 MW)4. Blawan-Ijen (110 MW)5. Gn.Ungaran (55 MW)6. Telaga Ngebel (165 MW)7. Baturaden (180 MW)8. Guci (55 MW)9. Kaldera Danau Banten (110 MW) 10. Cisolok Sukarame (45 MW)11. Tangkuban Perahu (110 MW) 12. Sorik Marapi (240 MW)13. Jaboi (10 MW)14. Sokoria (30 MW)
Kementerian ESDM Republik Indonesia 7
World Geothermal Energy Utilization by Country
NO COUNTRY POTENCY (Mwe) INSTALLED CAPACITY (MW) RATIO
1 USA 30,000 25.15% 3450 29.66% 11.50%
2 PHILLIPINES 4,000 3.35% 1870 16.07% 46.75%
3 INDONESIA 29,543.5 24.77% 1513.5 13.01% 5.12%
4 NEW ZEALAND 3,650 3.06% 1005 8.64% 27.53%
5 MEXICO 4,600 3.86% 1058 9.09% 23.00%
6 ITALY 3,270 2.74% 916 7.87% 28.01%
7 ICELAND 5,800 4.86% 665 5.72% 11.47%
8 KENYA 15,000 12.58% 636 5.47% 4.24%
9 JAPAN 23,400 19.62% 520 4.47% 2.22%
JUMLAH 119,263.5 100 % 11,633.5 100 % 9.75%
CATATAN:
WORLD ONLY UTILIZE ABOUT 9,75% (11,6 GW) FROM TOTAL GEOTHERMAL POTENCY (119,3 GW);
INDONESIA IN A SECOND POSITION ON GEOTHERMAL SOURCE POTENTIAL OR ABOUT 24,77 %;
INDONESIA IN A THIRD PLACE ON GEOTHERMAL UTILIZATION (12,95%);
PHILLIPINES BECOME WORLD OPTIMIZED GEOTHERMAL POTENTIAL (46,75 %) AND MANY OF GPP WITHIN THE NATURAL PRESERVE AREA;
JAPAN USING MORE GEOTHERMAL ENERGY FOR DIRECT USES.
Modified from: Bertani, WGC 2015
Kementerian ESDM Republik Indonesia 8
Geothermal Potential
Geothermal Working Area
Regulation
69 GWA Existing : 19 GWA
New : 50 GWA
29,5 GWeResources 11.997,5 MW
Reserves 17.546 MW
Geological Agency MEMR, Updated December 2015
Law No. 21/2014
GR No. 59/2007 jo. PP 75/2015
GR No. 28/2016
GR No. 9/2012
GR No. 79/2014
MEMR Regulation, Related Minstry of
Finace & Related Ministry of Environment
and Forestry Regulation
Installed Capacity
1.513,5 MWe 11 GPP on 9 GWA
8.63 % utilization from geothermal source
Main Obstacles
Land Overlapping
Pricing
Funding
Licensing
Social Matters Issues
Electric Production9,964 GWh Electrical realization of 2015
104% achievement from target of 9,594
GWh
September 2016 realization for 7,888
GWh (81%) from target 9,798 GWH
KONDISI SAAT INICurrent Condition
PNBPInvestation
USD 876,5 Millions Investment Realization on 2015
93,5 % achievement from USD 937,2 Million
Target
Realization per September 2016 USD 834
Million (86%) from USD 960 Million
IDR 886 Billion PNBP realization in 2015
153 % achievement from target IDR 580
Billion
per September 2016 Realization 504,58
Billion Rp (80 % from target of 630 Billion Rp )
Kementerian ESDM Republik Indonesia 9
II. CHALLENGES IN GEOTHERMAL BUSINESS
TARGET, RISK, OBSTACLES and BREAKTROUGHS
Kementerian ESDM Republik Indonesia 10
0 37110
7.560 35
215 255 225 360
616
450
858
650
1,175
999
0
500
1000
1500
2000
2500
3000
-
1,000.0
2,000.0
3,000.0
4,000.0
5,000.0
6,000.0
7,000.0
8,000.0
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Ad
dit
ion
al C
apac
ity
(MW
e)
Cap
acit
y (M
We)
Indonesia become World No.2 surpassingPhilippines
Indonesia become World No.1 Surpassing
United States
Installed Capacity Upadated
Sept. 2016: 1,513.5 MW (Additional Capacity from GPP Ulubelu Unit 3 on July 26th , 2016 for 55 MW and GPP Lahendong Unit 5 on Sept 16th, 2016 for 20 MW)Additional COD Plans for 2016: GPP Sarulla Unit 1 for 110 MW GPP Karaha Unit 1 for 30 MW
*Assumption: Philippines (1.870 MW) and US (3.450 MW) not performing any capacity increasment
TARGET AND MILESTONE OF GEOTHERMAL DEVELOPMENT
Installed Capacity Target Capacity Additional Capacity
Kementerian ESDM Republik Indonesia 11
Exploration Cost = 8-9% Total Project Cost
Development Cost Structure for 50 110 MW
Investment Estimation US$ 3.0 4.0 M/MW
Exploration Survey 1 - 2%
Exploration Wells
7%
Development Wells
27 - 28%
Production Facilities and SAGS12 - 13%
GPP53 - 55%
Exploration Cost Estimation (3 Wells)
NO ActivityEstimated Cost
(US$) Million
1. Geology, Geochemical and
Geophysics Survey
(Well Pad Determination)
7
2. AMDAL, SIPPA, IPPKH 0,1
3. Land Acquisition 1
4. Well Pad + Road Entrance
(Assumption : 6 km)
5
5. Well Drilling 21
TOTAL 34,1
Source: Modified from PGE, 2013
INVESTMENT COST ESTIMATION
Kementerian ESDM Republik Indonesia 12
40-50
70-80
80-90100
Drilling Success Ratio
GEOTHERMAL INVESTMENT RISK
Development Risk
Recognisance Survey
of Manifestation AreaDetailed Survey
(Detailed Spacing)
Gradient Thermal
Drilling Exploration Drilling
Wells
Well Status
Source: S.Sudarman
Kementerian ESDM Republik Indonesia 13
Geothermal Location
Within the Forest Area
Pricing
Geothermal Development Main Obstacles and Sollution
Funding
Licensing
Social Matters Issues
Kementerian ESDM Republik Indonesia 14
Licensing & Non-Licensing on Geothermal Sector of DGNREEC
PROPOSAL OF DE-REGULATION1. Recommendation for Approval of Amendment of
Investment2. Recommendation for Approval of Amendment
Shareholders3. Recommendation for Approval of Amendment of
Investment and Financing4. Recommendation for Approval of Amendment Articles
of Association5. Recommendations Approval of Amandement of
Directors and Commissioners6. Recommendation of RPTKA (Foreign Workers)7. Recommendation of Competency of Foreign Worker8. Recommendation Purchase and Use of Explosives9. Recommendation of Destruction of Explosives10. Approval of Purchasing Permission of Iron or Steel
DELEGATED TO BKPM
1. PSA2. IPB (Geothermal License)3. Permission to Use
Explosives4. Certification of Registration
of Geothermal
PERMANENT
1. Certificate of Eligibility of Equipment (SKPP)
2. Certificate of Installation (SKPI)
3. Approval of WPS/PQR and Welding Qualification
4. Recommendation of Imported Material
From 21 License & Non Licence 18 Licence & Non
Licence
Kementerian ESDM Republik Indonesia 15
Assignment on SOE
PSA+ Exploration
Fixed Tariff
Geothermal Development Breaktrough
Simplification of Licensing &
Non-Licensing
Incentive (Fiscal & Non Fiscal)
Geothermal Fund
Optimizing of Potential Development
in the Large Field
Kementerian ESDM Republik Indonesia 16www.ebtke.esdm.go.id
Jalan Pegangsaan Timur No. 1A Menteng, Jakarta Pusat 10320; Telp/Faks : 021-31924540
MINISTRY OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA
DIRECTORATE GENERAL OF NEW, RENEWABLE ENERGY AND ENERGY CONSERVATION