  • Kementerian ESDM Republik Indonesia 1

    MINISTRY OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA

    DIRECTORATE GENERAL OF NEW, RENEWABLE ENERGY AND ENERGY CONSERVATION

    By:Yunus Saefulhak

    Director of Geothermal, DGNREEC, MEMR-RI

    Jakarta, 25 Oktober 2016

    International Workshop on Geothermal Business and Technology 2016

    University of Indonesia

  • Kementerian ESDM Republik Indonesia 2

    OUTLINE

    I. An Overview of Geothermal Development 3

    II. Challenges in Geothermal Business 9

  • Kementerian ESDM Republik Indonesia 3

    I. AN OVERVIEW OF GEOTHERMAL DEVELOPMENT

    OPPORTUNITY AND RECENT CONDITION

  • Kementerian ESDM Republik Indonesia 4

    2015 2020 2025 2030 2035 2040 2045 2050

    PLT Arus Laut

    PLT Bayu

    PLTS

    PLTD BBN

    PLT Bioenergi

    PLTA dan PLTMH

    PLTP

    KEN

    45 GW

    169 GW

    2015 2016 2017 2018 2019 2020 2025 2030 2040 2050

    Geothermal 1.438,5 1.653,5 1.908,5 2.133,5 2.493,5 3.109,5 7.241,5 9.300 13.423 17.546

    Hydro and Micro Hydro 5.024 5.119 5.236 5.491 7.008 7.889 20.960 25.844 35.611 45.379

    Bioenergy 1.740 1.886 2.093 2.359 2.674 3.024 5.532 9.651 17.887 26.123

    Solar 79 229 429 679 979 1.379 6.379 14.103 29.551 45.000

    Wind 7 57 107 207 307 507 1.807 7.167 17.887 28.607

    Other NRE 372 1.860 1.860 1.860 1.861 1.863 3.128 3.779 5.081 6.383

    Total 8.660 10.804 11.728 12.939 15.807 18.475 45.044 69.843 119.440 169.038

    Satuan: MW

    31%

    20%25%

    24%23%

    25%30%

    22%5%

    46%31%

    18%

    194

    MTOE

    412

    MTOE

    1.031

    MTOE

    NRE

    Oil

    Gas

    Coal

    2015 2025 2050

    Total of

    Power Plant

    51 GW 135 GW 444 GW

    NRE Power

    Plant

    9,6 GW

    (19%)

    45 GW

    (34%)

    169 GW

    (38%)

    Primary Energy Mix According to GR No. 79/2014 on National Energy Policy

  • Kementerian ESDM Republik Indonesia 5

    GPP SIBAYAK: 12 MW

    GPP GUNUNG SALAK: 377 MW

    GPP WAYANG WINDU: 227 MW

    GPP KAMOJANG: 235 MW

    GPP DARAJAT: 270 MW

    GPP DIENG: 60 MW

    GPP LAHENDONG: 100 MW

    Source: Geological Agency MEMR (2015)

    GPP ULUBELU: 165 MW

    GPP ULUMBU: 10 MW

    GPP MATALOKO: 2,5 MW

    GPP PATUHA: 55 MW

    No Island Num of Location

    Energy Potential (Mwe)

    TotalInstalledCapacity

    Resources Reserve

    Speculative Hypothetic Possible Probable Proven1 Sumatera 97 3,191 2,334 6,992 15 380 12,912 177

    2 Jawa 73 1,560 1,739 4,023 658 1,815 9,795 1,224

    3 Bali 6 70 22 262 - - 354 0

    4 Nusa Tenggara 27 225 409 917 - 15 1.566 12.5

    5 Kalimantan 14 152.5 30 - - - 182,5 0

    6 Sulawesi 77 1,221 318 1,441 108 120 3.208 100

    7 Maluku and South Maluku 33 560 91 800 - - 1.451 0

    8 Papua 3 75 - - - - 75 0

    Total 330 7,054.5 4,943 14,435 781 2,330 29,543,5 1,513.511.997,5 17.546

    29.543,5

    INDONESIA GEOTHERMAL POTENCY AND INSTALLED CAPACITY

  • Kementerian ESDM Republik Indonesia 6

    GEOTHERMAL WORKING AREA STATUS

    69 GWA(7.241,5 MW)

    OPERATION: 9 GWA (1.513,5 MW)

    Rencana Pengembangan (778 MW) 1. Sibayak (12 MW)2. Ulubelu (165 MW)3. Cibeureum-Parabakti (377 MW)4. Pangalengan (282 MW)5. Kamojang-Darajat (505 MW)6. Dieng (60 MW)7. Lahendong-Tompaso (80 MW)8. Ulumbu (10 MW)9. Mataloko (2,5 MW)

    PRODUCTION: 9 GWA (1.513,5 MW)Development Plans

    (778 MW)

    EXPLORATION: 15 GWA (1.810 MW)

    EXPLOITATION: 8 GWA(1.190 MW)

    1. Sibual-Buali (330 MW)2. Sungai Penuh (145 MW)3. Lumut Balai (285 MW)4. Hululais (340 MW)5. Karaha Cakrabuana (50 MW)6. Cibuni (10 MW)7. Tabanan (10 MW)

    8. Tulehu (20 MW)

    EXPLORATION & EXLOPITATION:

    23 GWA ( 3.000 MW)

    READY TO ASSIGNMENT / TENDER:

    34 GWA (1.640 MW)

    PPA/PJBL SIGNATURE PROCESS: Jailolo (40 MW)

    LICENSEE PROCESS: 3 GWA (330 MW)

    1. Seulawah Agam (165 MW)2. Gn. Lawu (110 MW)3. Way Ratai (55 MW)

    PPA/PJBL SIGNATURE14 WKP (1.770 MW)

    1. Muaralaboh (220 MW)2. Gn. Rajabasa (220 MW)3. Rantau Dedap (220 MW)4. Blawan-Ijen (110 MW)5. Gn.Ungaran (55 MW)6. Telaga Ngebel (165 MW)7. Baturaden (180 MW)8. Guci (55 MW)9. Kaldera Danau Banten (110 MW) 10. Cisolok Sukarame (45 MW)11. Tangkuban Perahu (110 MW) 12. Sorik Marapi (240 MW)13. Jaboi (10 MW)14. Sokoria (30 MW)

  • Kementerian ESDM Republik Indonesia 7

    World Geothermal Energy Utilization by Country

    NO COUNTRY POTENCY (Mwe) INSTALLED CAPACITY (MW) RATIO

    1 USA 30,000 25.15% 3450 29.66% 11.50%

    2 PHILLIPINES 4,000 3.35% 1870 16.07% 46.75%

    3 INDONESIA 29,543.5 24.77% 1513.5 13.01% 5.12%

    4 NEW ZEALAND 3,650 3.06% 1005 8.64% 27.53%

    5 MEXICO 4,600 3.86% 1058 9.09% 23.00%

    6 ITALY 3,270 2.74% 916 7.87% 28.01%

    7 ICELAND 5,800 4.86% 665 5.72% 11.47%

    8 KENYA 15,000 12.58% 636 5.47% 4.24%

    9 JAPAN 23,400 19.62% 520 4.47% 2.22%

    JUMLAH 119,263.5 100 % 11,633.5 100 % 9.75%

    CATATAN:

    WORLD ONLY UTILIZE ABOUT 9,75% (11,6 GW) FROM TOTAL GEOTHERMAL POTENCY (119,3 GW);

    INDONESIA IN A SECOND POSITION ON GEOTHERMAL SOURCE POTENTIAL OR ABOUT 24,77 %;

    INDONESIA IN A THIRD PLACE ON GEOTHERMAL UTILIZATION (12,95%);

    PHILLIPINES BECOME WORLD OPTIMIZED GEOTHERMAL POTENTIAL (46,75 %) AND MANY OF GPP WITHIN THE NATURAL PRESERVE AREA;

    JAPAN USING MORE GEOTHERMAL ENERGY FOR DIRECT USES.

    Modified from: Bertani, WGC 2015

  • Kementerian ESDM Republik Indonesia 8

    Geothermal Potential

    Geothermal Working Area

    Regulation

    69 GWA Existing : 19 GWA

    New : 50 GWA

    29,5 GWeResources 11.997,5 MW

    Reserves 17.546 MW

    Geological Agency MEMR, Updated December 2015

    Law No. 21/2014

    GR No. 59/2007 jo. PP 75/2015

    GR No. 28/2016

    GR No. 9/2012

    GR No. 79/2014

    MEMR Regulation, Related Minstry of

    Finace & Related Ministry of Environment

    and Forestry Regulation

    Installed Capacity

    1.513,5 MWe 11 GPP on 9 GWA

    8.63 % utilization from geothermal source

    Main Obstacles

    Land Overlapping

    Pricing

    Funding

    Licensing

    Social Matters Issues

    Electric Production9,964 GWh Electrical realization of 2015

    104% achievement from target of 9,594

    GWh

    September 2016 realization for 7,888

    GWh (81%) from target 9,798 GWH

    KONDISI SAAT INICurrent Condition

    PNBPInvestation

    USD 876,5 Millions Investment Realization on 2015

    93,5 % achievement from USD 937,2 Million

    Target

    Realization per September 2016 USD 834

    Million (86%) from USD 960 Million

    IDR 886 Billion PNBP realization in 2015

    153 % achievement from target IDR 580

    Billion

    per September 2016 Realization 504,58

    Billion Rp (80 % from target of 630 Billion Rp )

  • Kementerian ESDM Republik Indonesia 9

    II. CHALLENGES IN GEOTHERMAL BUSINESS

    TARGET, RISK, OBSTACLES and BREAKTROUGHS

  • Kementerian ESDM Republik Indonesia 10

    0 37110

    7.560 35

    215 255 225 360

    616

    450

    858

    650

    1,175

    999

    0

    500

    1000

    1500

    2000

    2500

    3000

    -

    1,000.0

    2,000.0

    3,000.0

    4,000.0

    5,000.0

    6,000.0

    7,000.0

    8,000.0

    2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

    Ad

    dit

    ion

    al C

    apac

    ity

    (MW

    e)

    Cap

    acit

    y (M

    We)

    Indonesia become World No.2 surpassingPhilippines

    Indonesia become World No.1 Surpassing

    United States

    Installed Capacity Upadated

    Sept. 2016: 1,513.5 MW (Additional Capacity from GPP Ulubelu Unit 3 on July 26th , 2016 for 55 MW and GPP Lahendong Unit 5 on Sept 16th, 2016 for 20 MW)Additional COD Plans for 2016: GPP Sarulla Unit 1 for 110 MW GPP Karaha Unit 1 for 30 MW

    *Assumption: Philippines (1.870 MW) and US (3.450 MW) not performing any capacity increasment

    TARGET AND MILESTONE OF GEOTHERMAL DEVELOPMENT

    Installed Capacity Target Capacity Additional Capacity

  • Kementerian ESDM Republik Indonesia 11

    Exploration Cost = 8-9% Total Project Cost

    Development Cost Structure for 50 110 MW

    Investment Estimation US$ 3.0 4.0 M/MW

    Exploration Survey 1 - 2%

    Exploration Wells

    7%

    Development Wells

    27 - 28%

    Production Facilities and SAGS12 - 13%

    GPP53 - 55%

    Exploration Cost Estimation (3 Wells)

    NO ActivityEstimated Cost

    (US$) Million

    1. Geology, Geochemical and

    Geophysics Survey

    (Well Pad Determination)

    7

    2. AMDAL, SIPPA, IPPKH 0,1

    3. Land Acquisition 1

    4. Well Pad + Road Entrance

    (Assumption : 6 km)

    5

    5. Well Drilling 21

    TOTAL 34,1

    Source: Modified from PGE, 2013

    INVESTMENT COST ESTIMATION

  • Kementerian ESDM Republik Indonesia 12

    40-50

    70-80

    80-90100

    Drilling Success Ratio

    GEOTHERMAL INVESTMENT RISK

    Development Risk

    Recognisance Survey

    of Manifestation AreaDetailed Survey

    (Detailed Spacing)

    Gradient Thermal

    Drilling Exploration Drilling

    Wells

    Well Status

    Source: S.Sudarman

  • Kementerian ESDM Republik Indonesia 13

    Geothermal Location

    Within the Forest Area

    Pricing

    Geothermal Development Main Obstacles and Sollution

    Funding

    Licensing

    Social Matters Issues

  • Kementerian ESDM Republik Indonesia 14

    Licensing & Non-Licensing on Geothermal Sector of DGNREEC

    PROPOSAL OF DE-REGULATION1. Recommendation for Approval of Amendment of

    Investment2. Recommendation for Approval of Amendment

    Shareholders3. Recommendation for Approval of Amendment of

    Investment and Financing4. Recommendation for Approval of Amendment Articles

    of Association5. Recommendations Approval of Amandement of

    Directors and Commissioners6. Recommendation of RPTKA (Foreign Workers)7. Recommendation of Competency of Foreign Worker8. Recommendation Purchase and Use of Explosives9. Recommendation of Destruction of Explosives10. Approval of Purchasing Permission of Iron or Steel

    DELEGATED TO BKPM

    1. PSA2. IPB (Geothermal License)3. Permission to Use

    Explosives4. Certification of Registration

    of Geothermal

    PERMANENT

    1. Certificate of Eligibility of Equipment (SKPP)

    2. Certificate of Installation (SKPI)

    3. Approval of WPS/PQR and Welding Qualification

    4. Recommendation of Imported Material

    From 21 License & Non Licence 18 Licence & Non

    Licence

  • Kementerian ESDM Republik Indonesia 15

    Assignment on SOE

    PSA+ Exploration

    Fixed Tariff

    Geothermal Development Breaktrough

    Simplification of Licensing &

    Non-Licensing

    Incentive (Fiscal & Non Fiscal)

    Geothermal Fund

    Optimizing of Potential Development

    in the Large Field

  • Kementerian ESDM Republik Indonesia 16www.ebtke.esdm.go.id

    Jalan Pegangsaan Timur No. 1A Menteng, Jakarta Pusat 10320; Telp/Faks : 021-31924540

    MINISTRY OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA

    DIRECTORATE GENERAL OF NEW, RENEWABLE ENERGY AND ENERGY CONSERVATION